Borough of Hanover
The Case Study of a Phased, Complete System Upgrade
Michael J. Mehaffey, P.E.Trisha L.K. Graves, P.E.
May 12, 2016
![Page 2: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/2.jpg)
System Description
• Area Served by Hanover Water: – York and Adams County, PA - Conewago Twp.,
Hanover Borough, McSherrystown Borough, Penn Twp.
• Approximately 40,000 individuals served• Over 50% of water is used for commercial
and industrial• Source Water:
– Primary – South Branch Conewago Creek (Sheppard Myers Dam, Lawrence Baker Sheppard Dam)
– Secondary – Slagles Run
![Page 3: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/3.jpg)
System Description (con’t)
• Pre-Sedimentation:– Clear Lake Reservoir – 66 MG man-made lake
• Water Treatment Plant– Two parallel conventional treatment process trains,
“Old Plant” and “New Plant”
• Distribution System and Storage– 202 miles of piping from 4” to 20”– Two elevated storage tanks (750,000 gallons total)– Parr’s Hill reservoirs (13 MG storage)– Parr’s Hill Pump Station (Max 1,230 gpm to high
service zone)
![Page 4: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/4.jpg)
Initial Evaluations/Permitting
• Water Allocation Permit– Renewal of 1990 permit submitted in 2013
• Dam Inspections– Completed for all 3 dams annually beginning in 2012– Numerous “red flags” noted during inspections
• Water Treatment Plant Evaluation– Completed in mid-2013
• Parr’s Hill Evaluation – Completed in early 2013
![Page 5: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/5.jpg)
Initial Condition Assessment
Base Map Morning Glory Intake Tower
Auxiliary Spillway Ogee Crest
Auxiliary Spillway Chute
Sheppard-Myers Reservoir
Principal Spillway Wasteway Channel
Unnamed Tributary
South Branch Conewago Creek
![Page 6: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/6.jpg)
Sheppard Myers Dam Evaluation
• Evaluation Completed June 2013– Demolish existing spillway and
construct a new labyrinth spillway and stilling basin
– Embankment modifications– Construct new headwall structure– Install new drainage along
embankment– Install toe drain weir box to measure
seepage
![Page 7: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/7.jpg)
Sheppard Myers Dam Evaluation
• Design anticipated to begin in 2016• Construction Cost Estimate - $6 million
![Page 8: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/8.jpg)
Parr’s Hill Reservoir & Pump Station
• 13 million gallons finished water storage• New cover and liner installed • New pump station for vertical can pumps• Existing pump station reused to house stand-
by generator
![Page 9: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/9.jpg)
2014 Parr’s Hill Reservoir & Pump Station Improvements
Existing Pump Station New Pump Station
Liner Cover
![Page 10: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/10.jpg)
Raw Water Conveyance/Pre-Sedimentation
• Kitzmiller Raw Water Project
• Description of Clear Lake
![Page 11: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/11.jpg)
Existing WTP Facility Existing WTP
![Page 12: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/12.jpg)
Total permitted capacity is adequate to supply current and projected future demands (2040)
• WTP Permitted Capacity (11.6 mgd) is Adequate for Projected Demands
• Historical Production (2003 – 2012)– Average Daily 5.2 mgd– Maximum Day 7.3 mgd– Maximum Day 6.4 mgd (since 2008)
• Projected 2040 Demand (Planning Study)– Average Daily 6.4 mgd– Maximum Day 9.1 mgd
Old Plant,
3.6New
Plant, 8
![Page 13: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/13.jpg)
Phased Improvement Plan
• Phase 1– Old Plant Improvements, BW Recycle
Modifications, Chemical Systems, Safety, Security, Portions of Electrical and SCADA/I&C Improvements
• Phase 2– New Plant Improvements, High Service
Pumping, Portions of Electrical and SCADA/I&C Improvements
![Page 14: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/14.jpg)
Clearlake – Phase 2
• Improvements to outlet structure • Influent and effluent control valves added• Level monitoring
![Page 15: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/15.jpg)
Rapid Mix Improvements
Install Mixerand Baffles in
Existing Chamber
Old Plant(Phase 1)
New Plant (Phase 2)
![Page 16: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/16.jpg)
Low Duty Pumping Improvements
Old Plant (Phase 1) New Plant (Phase 2)New Pumps and VFDs
New Motors and VFDs
![Page 17: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/17.jpg)
Old Plant Filter Improvements - Phase 1
• Filtration Process Rebuild– Replaced Underdrain– Install Dual Media– Install Air Scour Equipment– Coat Interior of Filter Boxes– Construct Curbs– Install PLC Controls, MOVs, Instrumentation,
Replace Filter Gallery Piping– Pressure Inject Cracks, Coat Exterior of Boxes
![Page 18: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/18.jpg)
Old Plant Filter Improvements - Phase 1
![Page 19: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/19.jpg)
New Plant Filter Improvement - Phase 2
![Page 20: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/20.jpg)
Backwash Recycle Improvements - Phase 1
![Page 21: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/21.jpg)
New Roof on Clearwell - Phase 1
![Page 22: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/22.jpg)
New Chemical Building – Phase 1
• Storage and feed equipment for:– Chlorine (sodium hypochlorite)– Fluoride– Caustic Soda– Sodium Permanganate
• PLC controls and instrumentation• Chemical delivery area• Safety equipment (eyewash and safety
showers)
![Page 23: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/23.jpg)
Chemical Storage and Feed Systems – Phase 1
Existing New Chemical Building
![Page 24: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/24.jpg)
pH Adjustment Soda Ash to Caustic Soda
![Page 25: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/25.jpg)
Gas Chlorine to Sodium Hypochlorite
![Page 26: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/26.jpg)
Fluoride Drum Storage to Bulk Storage
![Page 27: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/27.jpg)
High Service Pump Station Improvements (Phase 2)
![Page 28: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/28.jpg)
Instrumentation, Controls, and Data Acquisition Systems will Improve WTP Performance
• Existing I&C is minimal
• Data acquisition, analyses, control primarily manual
![Page 29: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/29.jpg)
Instrumentation & Controls – Phase 1
• Primary Control Station & SCADA Programming• Old Plant filter PLC, MOV, instrumentation• Communications network• Backwash water tank controls and
instrumentation• Chemical facilities controls and instrumentation
![Page 30: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/30.jpg)
Total System Integration - Phase 2
Future Remote System Connections
![Page 31: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/31.jpg)
Impacts of Phased Approach on WTP
• Old Plant will be in service during construction of New Plant
• Relocation of existing generator• Instrumentation Capabilities
– Local Automated Control – Phase 1– Remote Automated Control – Phase 2
• Construction Sequence of High Service PS• Permitting Impacts
![Page 32: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/32.jpg)
Outlet Works Intake Tower
Spillway Ogee Crest
Spillway Chute
Long Arm Reservoir
Outlet Works Conduit Outlet
Long Arm Creek
Access Bridge
Flow Gauging Station
Access Road
Benches
Dam Crest
Access Road
Access Gate
Stilling Basin
Caretaker’s House & Maintenance Shed
![Page 33: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/33.jpg)
Lawrence Baker Sheppard Dam Evaluation
• Evaluation completed January 2016
• Minor Improvements scheduled for summer of 2016
![Page 34: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/34.jpg)
Kitzmiller Dam
• Evaluation Completed February 2014
• Minor Improvements to be scheduled
![Page 35: Borough of Hanover The Case Study of a Phased, Complete](https://reader035.vdocuments.us/reader035/viewer/2022081402/6291542301779c422978e992/html5/thumbnails/35.jpg)
Final Thoughts
• Keeping up with the improvements required for aging infrastructure is a challenge.
• Holistic review of system improvements is important.
• Engaging all stakeholders is critical.• Phasing designs should be used after careful
consideration.