borg warner presentation
TRANSCRIPT
End Show
805 E Maple Rd # 300
Birmingham, MI 48009
(248)433-1030
Studio B Architects Inc
3800 Automation Drive - Auburn Hills, Michigan 48326
End Show
- 3800 automation drive - auburn hills, mi. 48326
Scope of Work Analysis
Determine project parameters.
Define scope of work to be performed.
Establish project documentation procedures.
• 410 Herman Miller Ethospace Workstations
• Target Project Completion August 2002
• Union Installation
• Consolidation Project
Scope of Work
Project Process
End Show
- 3800 automation drive - auburn hills, mi. 48326
Manufacture Evaluation
Develop detailed product
specifications from approved final
furniture plans.
Establish a CAD/CAP database
for use in order entry.
End Show
- 3800 automation drive - auburn hills, mi. 48326
Drawing & Specification Development
Develop detailed product specifications from approved final
furniture plans.
Establish a CAD/CAP database for use in order entry.
End Show
- 3800 automation drive - auburn hills, mi. 48326
Design and Product Application Consulting
Furniture Specifications
Application Guide Lines.
End Show
Borg Warner Powertrain Technical Center
CHANGE ORDER
Owners Name: Borg Warner Date: June 5, 2002
Address: 3800 Automation Drive, Auburn Hills, MI 48326
Attention: Greg Wruck
Project Address: 3800 Automation Ave, Auburn Hills, MI. 48326
CONSTRUCTION CHANGE ORDER NUMBER: 2
Change order #2 due to the unloading and staging of non-combustible furnishings
on jobsite, all combustible furnishings will be reloaded and sent to Furniture
Management Service’s warehouse in Pontiac, Michigan. Combustible furnishing will
stay at FMS’s warehouse until the city of Auburn Hills issues a Temporary
Certificate of Occupancy. When TCO has been issued the combustible furniture will
be redelivered to the jobsite.
GENERAL SCOPE OF WORK DESCRIPTION:
Pursuant to the Construction Agreement between Contractor and Owner dated April 2002, The
Contractor performed the following changes:
GENERAL CONDITIONS: 1) PAYMENT
Payment for this Change Order is due upon completion of the work described above,
and submittal of invoice by the Contractor.
2) INCORPORATION
This Change Order, by agreement of Owner and Contractor, is incorporated by
reference into the Construction Agreement between Owner and Contractor. All terms
and conditions in the General Conditions section of the Construction Agreement
between Owner and Contractor apply to this Change Order.
Bruce Tharp _________________________________
Project Director
Client Signature
Facility Matrix Group
__________
_______
Date
Change Order Management
Process all change orders due to:
Field changes / Layout revisions / Order modifications.
- 3800 automation drive - auburn hills, mi. 48326
End Show
- 3800 automation drive - auburn hills, mi. 48326
Delivery Scheduling/Status Reports
Create a master schedule and critical path plan.
Develop phasing plans to match occupancy dates.
End Show
Project Manager: Bruce Tharp Issue Date: 19-Jul-02
* The items identif ied herein shall be corrected by the General Contractor or by their sub-contractor(s) prior to f inal acceptance of the w ork by the tenant and/or tenant's landlord/ow ner. Any omission of items
from this punchlist does not w aiver the General Contractor's responsibilities for f inish quality w orkmanship, materials, quarantees, etc.
* If any of the items or parts listed are to be considered additional w ork (i.e., not part of the contract) by the General Contractor or sub-contractor(s) , the landlord/ow ner and tenant must be notif ied in w riting no
later than 10 days after issue date, identifying costs for such, prior to proceeding w ith the w ork.
* All repair w ork shall be done in an expeditious manner w ith due respect to tenant's w ork schedule and personnel. If required by the landlord/tenant, a schedule for repairs shall be submitted for use in
coordinating the same w ith the landlord/tenant.
* The General Contractor shall notify the Architect and Landlord/Ow ner of his completion of repairs in order that f inal approval inspection may be provided
Location / Punchlist Punchlist Date Approval
Date Room # Dwg Code Item Y or N Description Resource Completed Signature Comments
7/19 G-33 A Y Scratched mobile pedestal FMS 7/25/2002
G-35 B Y Loose end panel base FMS 7/25/2002
G-39 B Y Loose end panel base FMS 7/25/2002
G-21 B Y Loose end panel base FMS 7/25/2002
G-24 B Y Loose end panel base FMS 7/25/2002
G-7 B Y Loose end panel base FMS 7/25/2002
Borg Warner3800 Automation Dr
Auburn Hills, MI 48326
Project Punchlist - Ground Floor West Side
- 3800 automation drive - auburn hills, mi. 48326
Punchlist Development
Identified all products that were damaged,
shipped or installed incorrectly.
Assigned resources and completion dates.