8Th November 2008

U Kyaw Linn

Managing Director

Public Works

Ministry of Construction

Page 2: Bored pile prsentation   part 2

Desanding

• တြင္းူးြ ူးး ပ ူးလ ိုအပ္ေးသာအနက္ေးရာက္လ ွ်င္ တြင္းူးြ ူးး ငင္းူးလိုပငနန္းူးက ို

1:30ငန္႕ ရပာ္ူးး ပ ူး bentonite း ဖင္း ထ ိုင္ေးေနသာအနယ ွ်ာူးး ကိုး

ေးး ဖူးညင္းူးစ ာငပယူရမည္။ ထ ိုေ႕နာက္ကြ င္ငြင္းူးထရဲ း bentonite

အနယ ွ်ာူး်ားႏး င္း သြဲ ို႕က ို desanding း ပဳ လိုပ္း ငင္းူးး ဖင္း

ငစဲးထိုြ္ေးပူးရမည္။

• Desanding း ပဳလိုပး္ ငင္းူးဆ ိုသည လာ desander

က္း ဖင္း တြင္းူးအတြင္းူးမ bentonite

း်ားႏး င း္ေးရာေးး်ားႏး းာေးေနသာသ်ဲားႏး င း္ အနညအ်ားႏး ွ်ာူးက ို ငစဲးထိုြက သန္႕ င္

တသာူးေးသာ bentonite က ိုတြင္းူးအတြင္းူးသ ို႕ ပန္ထည္း ေးပူးး ပ ူး

သ်ဲားႏး င း္အနညအ်ားႏး ္ မွ်ာူးက ို အ ပင္ ို႕စ န္႕ထိုြ္ေးပူးး ငင္းူးး ဖ ္ည္။

သ ို႕မ သာ တကန္ကရ ္ေးလာင္းူး ေးသာအငါ ေးအာက္ေးး ငတြင္

သ်ဲားႏး င း္အနညအ်ားႏး ွ်ာူးကင္းူးေးးူးေး ပါမည္။

Page 3: Bored pile prsentation   part 2

Desanding

Copressed Air

Disposal material, sand

and other impurities

Desander

Air compressor

Purified bentonite

Page 4: Bored pile prsentation   part 2

To minimum damage to cages

during reinforcement fitting it is

necessary to follow the procedure

indicated in Fig.

1. used of a purpose-made lifting

beam

2. welding of 25 mm steel lifting

lugs to the top of the cage cages

and

3.welding of at least of 3 binders

within the cage to each main bar

Page 5: Bored pile prsentation   part 2

The reinforcement cages should be

prepared as shown in Fig.

-Check the spacing bar are sufficient to ensure

minimum concrete to steel and that the cage is

correctly dimensioned (100 mm cover)

-Lower the c age un t i l i t s top s tee l i s

approximately 1 m above the top of the casing.

-Put two short 3 m length steel beams such as

rail through reinforcement beneath a binder hoop

of the cage to rest across the top of the casing.

-Lower the cage onto the beams and ensure that

the support is strong and secure.

-Remove the lifting beam and cut off lifting lug

f r o m t h e i n s t a l l e d c a g e .

-Lower the next cage onto the installed cage.

-Ensure overlap is 45 times the main bar

diameter.

-Weld together a min imum of 10 main

(longitudinal) bars, each 200 mm length.

-Lift joined caged sections to take out of the

supporting beams.

-Lower to correct level or to 1 meter below the

top of the next cage for next installing sequence.

Page 6: Bored pile prsentation   part 2

oHjcif;csjcif;

• o H j c i f ; w p f c k o n f 1 2 m

&SdNyD;vdktyfonfUteufa&mufatmifwpfjcif;E S i f Y w p f j c i f ;Weldingaqmfíqufay;&rnf/wpfjcif;ESifYwpfjcif;t q u f o n f 1 m & S d & r n f / o H j c i f ;atmufajconfwGif;atmufajcESifYtenf;0.5 m

G m & r n f / o H j c i f ; w p f c k E S i f Y w p f c kWeldingaqmfEdkif&efyxroHjcif;\tay:Stiffenerr i n g E S i f Y S t a n d p i p e M u m ;2.5 m &Snf&xm;oHvrf; ESpfacsmif;xnfUíxrf;xm;ay;&rnf/a&vnfvkyfief;aqmif&Gufygutay:qHk;oHjcif;udk S t a n d p i p e w a l l E S i f Y x d o n f Ut a e t x m ; a & m u f a t m i f T h i n s h e e tjzifYywfay;xm;&rnf/4if;Thin sheetonf

Page 7: Bored pile prsentation   part 2

2 Nos. Of Rail 2.5 m long

Stiffener ring

Page 8: Bored pile prsentation   part 2
Page 9: Bored pile prsentation   part 2
Page 10: Bored pile prsentation   part 2
Page 11: Bored pile prsentation   part 2
Page 12: Bored pile prsentation   part 2

With thin sheet rounded

Page 13: Bored pile prsentation   part 2
Page 14: Bored pile prsentation   part 2

Hook

Page 15: Bored pile prsentation   part 2
Page 16: Bored pile prsentation   part 2

oHjcif;csaeyHk

Page 17: Bored pile prsentation   part 2
Page 18: Bored pile prsentation   part 2

oHjcif;csjcif;

oHjcif;tqufqufjcif;

oHjcif;tm;vdktyfonfUae&modkYa&mu

fatmifoHcsdwfjzifYcsdwfíwyfqifaeyHk

Page 19: Bored pile prsentation   part 2

Tremie Pipe

• oHjcif;tm;xrf;xm;aomoHvrf;y:wGifPlat form

q i f N y D ; T r e m i e p i p e r s m ; u d k

t&pfjzifYqufíaomf4if; Flange ESifY Rubber

w a s h e r o H k ; í e y f j z i f Y u s y f í a o m f

4if;wGif;atmufajcESifYtenf;qHk; 0.5 m

t u G m a & m u f o n f t x d a & v H k a t m i f q u f

ay;&rnf/NyD;vsifHopperwyfay;&rnf/Tremiep i p e r s m ; o n f 1 m , 2 m , 3 m , 4 m

ponfjzifY&SdMuonf/vdktyfonfUt&Snf&atmifwGuf c s u f í q u f a y ; & r n f / y d k a e v s i fP l a t f o r m

ESifYoHvrf;Mum;wGif;opfom;wHkrsm;jzifYwGif; a t m u f a j c E S i f Y v d k t y f o n f U t

uGma&mufatmifcHay;&rnf/

Page 20: Bored pile prsentation   part 2

Platform

Tremie Pipe

Page 21: Bored pile prsentation   part 2
Page 22: Bored pile prsentation   part 2
Page 23: Bored pile prsentation   part 2
Page 24: Bored pile prsentation   part 2

Hopper

Page 25: Bored pile prsentation   part 2

Platform

Tremie Pipe

Page 26: Bored pile prsentation   part 2
Page 27: Bored pile prsentation   part 2

CEMENT TEST RESULT

PROJECT - BRIDGE

TYPE OF CEMENT - ORDINARY PORTLAND CEMENT

CEMENT BRAND - HORSE - HEAD BRAND

Sr No Test Information Test ResultsStandard Specification

BS: 12:1958 BS : 12: 1978

1 Setting Time

(a) Initial Setting Time 1 hr : 25 min < 45 min < 45 min

(b) Final Setting Time 3 hrs > 10 hrs > 10 hrs

2 Compressive Strength

(motar Cube)

at 3 days (average) 2480 p.s.i min : 2200 p.s.i min : 2200 p.s.i

at 7 days (average) 3685 p.s.i min : 3400 p.s.i

3 Fineness

Retained on B.S Sieve 6% max : 10% max : 10%

No. 170 (average)

Page 28: Bored pile prsentation   part 2

Sieve

(mm)

9.52

4.76

2.40

1.20

0.60

0.30

0.15

Grading Requirements for F/A (A.S.T.M Standard C 33.92 a)

Percentage by weight passing sieve

Test Grading

Grading Requirements

100.00 99.7

95-100 97.7

80-100 80.0

50-58 47.8

2-10 -

25-60 13.2

10-30 3.2

Page 29: Bored pile prsentation   part 2

Sr Specification

No BS. 3148/1980

1 pH 6-8

2 Turbidity (NTU)

3 Chloride (as NaCL) > 500 ppm

(ppm)

4 Alkali Carbonate > 1000 ppm

(as CaCo3) (ppm)

5 Alkali Bicarbonate > 1000 ppm

(as HCO3) (ppm)

6 Sulphate > 1000 ppm

(as SO4) (ppm)

7 Dissolved Solid > 1000 ppm

(ppm)

8 Ca Content (ppm) -

9 Mg Content (ppm) -

Apperance

Water Specification

Page 30: Bored pile prsentation   part 2

Cube Test

Page 31: Bored pile prsentation   part 2

Ready to start

Sonic Integrity Test

Page 32: Bored pile prsentation   part 2

Concreting

• y x r O D ; p G m C o n c r e t e t m ; T r e m i e p i p e

\ a t m i f a j c u d k 0 . 5 m c e f Y i H k r d a p & e f

C o n c r e t e u d k w G u f c s u f í T r e m i e p i p e

twGif;odkYwpfcgwnf;avmif;xnfY&rnf/r

a v m i f ; r D T r e m i e p i p e

xdyft0wGifazmYwHk;wpfwHk;xnfUxm;&rnf/avmif; N y D ; í a z m Y w H k ;

onfa&ay:odkUay:vmvsif?Tremie pipe

twGif;wGifa&r&Sdvsifatmifjrifygonf/

C o n c r e t e a v m i f ; v m í T r e m i e

pipewpfqifYtm;jzKwf&efvdktyfvmyguTremie

Pipe atmufajconf ConcretetxJütenf;qHk;1.5 m

& S d a e a t m i f q G J x k w f N y D ; r S w p f

qifYtm;jzKwf&rnf/

Page 33: Bored pile prsentation   part 2

Not less than 0.5 meter

Plastic Ball

Page 34: Bored pile prsentation   part 2
Page 35: Bored pile prsentation   part 2
Page 36: Bored pile prsentation   part 2

Insert of tremie pipe is atleast 1.5m

Page 37: Bored pile prsentation   part 2
Page 38: Bored pile prsentation   part 2
Page 39: Bored pile prsentation   part 2

Concrete bucket

Tremie pipe hopper

Plat Form

Page 40: Bored pile prsentation   part 2
Page 41: Bored pile prsentation   part 2

Pulled Out Of Stand Pipe

ESKwfaomtcg Boom ESifY Vibrohammer rxdap&yg

Vibrohammer jzifY Stand pipe tm; concrete

E S i f Y v G w f a t m i f q G J E S K w f N y D ; v G w f

oGm;vsif Stand pipe

tm;vJroGm;atmiftenf;i,fjyefpdkufay;&rnf/( Vibro r&kduf&? Own weight jzifYomzdcs&ef)

NyD;rS Vibro csNyD; CraneBuDK;jzifYríqGJxkwf&rnf/

Page 42: Bored pile prsentation   part 2

When stand pipe rest on the bed

Cut off here

Pull Out Of Stand Pipe

Page 43: Bored pile prsentation   part 2
Page 44: Bored pile prsentation   part 2
Page 45: Bored pile prsentation   part 2

Vibrohammer

Page 46: Bored pile prsentation   part 2

Advantages Of R.C.D

• Perform speedily

• Low noise and low vibration

• Pile diameter is large and a deep pile is performable

• Suitable to under water performance too

• The rotary table and main body are separately opera

tables

Page 47: Bored pile prsentation   part 2

Disadvantages Of R.C.D

• May be unsuitable for a case where is cobble stone are biggest than

drill pipe

• Poor management of performance causes collapse of hole wall

• Loosened foundation at pile tip

• Loosened ground around pile

• Lowered quality of concrete due to poor management

• Lowered bearing power due to imperfect removal of saline (Salary)

• Difficult disposition to mud–water and waste soil

But,

These disadvantage are controlled by the quality of

performance management

Page 48: Bored pile prsentation   part 2

Drill Bit

Drilling pipe

Jet pipe(Jet nozzle)

Air pipe

Stand pipeExcavated material

Kelly bar Delivery hose

Air hose

Rotary table

Injected Air

Excavated Material

Page 49: Bored pile prsentation   part 2

Air Lift Type

S 320

Air Compressor

Air HoseWorking Bench

Crane

This method is applicable when the drilling rig is used as air lift drill. Air is

injected from a compressor through a swivel joint. (An air drill pipe and jet nozzle are

used). The S 320 main body uses a hydraulic pump for driving the rotary table without

employing a suction pump, vacuum pump, etc.

Water is drained directly from the swivel joint to the water tank.

Water tank

Page 50: Bored pile prsentation   part 2

Pump Suction

Submersible pump

Water tankS 320

Hose

Rotary table

Working bench

Crane

This method is general used. There is no wall surface breakage due to

vibration of rotary table. The water tank is connected with the stand pipe through

a hose. Water is supplied with a submersible pump. The water level in the stand

pipe can be adjust easily by submersible pump in water tank.

Page 51: Bored pile prsentation   part 2

Air Swivel

Kelly Bar

Rotary TableStagging

Bentonite In Put Pipe

Delivery hose

Page 52: Bored pile prsentation   part 2

Air Hose

Tremie Pipes

Deposited material and

bentonite are delivered to

sentimental tank

Working bench

Page 53: Bored pile prsentation   part 2
Page 54: Bored pile prsentation   part 2

Thank You!