BOP Stack
ABRAXAS PETROLEUM CORP RAVEN RIG NO. 1
11/03/2011
0' Total length/GL-top trip nipple
RKB= Floor= Rotary Beam to G/L=
0' to Top of Rotating Head
0" Height
TO MUD TANKS
13-5/8" 5M
BX-160 13-5/8" 5M Hydril
0' G/L to Top Hydril
0" Height
0" Height
BX-160 BX-159
13-5/8" 5M x 13-5/8" 10M DSA
13-5/8" 10M - Pipe Rams 0" Height Blind Rams
2-1/16" 10m BX-152 0" Height
13-5/8" 10M Mud cross 13-5/8" 10M
BX-159 4-1/16" 10M H.C.R. BX-159 BX-15
13-5/8" 10M - Pipe Rams 0" Height
Ground Level / Matting Board Spool set @ 3" below G/L Spool = 24"
13-5/8" 10M
Ground Level / Matting Board BX-159 13-5/8" 10M Spool BX-159 13-5/8" 10M x 11" 5M DSA RX-54 / R-54 11" 5M x 9-5/8" SOW
13-5/8" 10M
DSA = 5" Wellhead @ 32" below G/L
DSA11" 5M
C-22 Profile