booth design approval request form deadline: april …

1
BOOTH DESIGN APPROVAL REQUEST FORM DEADLINE: APRIL 19, 2021 NOTE: No display variances will be granted. Please design your display in accordance with the published NPE2021 Show Rules & Regulations. Your booth elevation plan must be submitted with this form. Requirements: Show management approval is required for the following booth designs/productions: Hanging displays, signs and banners (Show Rule #31 and #49) Truss installation overhead and floor supported (Show Rule #55) Use of copyrighted materials (i.e. music, video, photo, etc.) (Show #41) Show Management approval is required for all hanging signs which are only permitted in island booths 400 square feet and greater. Mandatory All exhibitors are required to submit booth plans for approval to ensure your exhibit is not in violation. Submit your booth plans early so necessary adjustments can be made to avoid additional expense to bring your booth into compliance. Instructions: Complete and submit this form with your booth plan drawing and elevation plan by April 19, 2021. Structural drawings for truss, multi-story, covered exhibits and towers MUST include a signature or stamp of a reviewing structural engineer indicating the structure design is properly engineered for its proposed use, AND a signature of an authorized official of the exhibit building company indicating the structure is built in compliance with the details and specifications set forth on the drawings. Your booth elevation plan must be submitted with this form. Exhibitor: ___________________________________ Booth #: __________________________________________ Display Builder: ________________________________ Contact: _____________________________________ Title: __________________________________________ Email: _____________________________________ Phone: __________________________________________ Request Approval for (please check all that apply): Unit of Measurement Meter Imperial Booth Display Plan Multi-Story Exhibit Covered Exhibit Booth Truss Tower Hanging Sign/s *(Dimensions): __________; Height from floor: To Top: __________; To Bottom: __________ * Number of Overhead Signs: ___________ Hanging Truss (Dimensions): ___________; Height from floor: To Top: __________; To Bottom: ___________ Will booth display have a raised floor? Yes No Height from floor to top: _________ Copyrighted Material (Specify Type): __________________________________________________________________ Submit via email to [email protected] Notification of approval or violation will be sent to you within ten (10) business days of receipt. Show Management Approval Notification of Violation* By: ____________________________________ *Reason: Signature: ____________________________________ Date: ____________________________________

Upload: others

Post on 11-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

BOOTH DESIGN APPROVAL REQUEST FORM DEADLINE: APRIL 19, 2021

NOTE: No display variances will be granted. Please design your display in accordance with the published NPE2021 Show Rules & Regulations. Your booth elevation plan must be submitted with this form.

Requirements: Show management approval is required for the following booth designs/productions: Hanging displays, signs and banners (Show Rule #31 and #49) Truss installation overhead and floor supported (Show Rule #55) Use of copyrighted materials (i.e. music, video, photo, etc.) (Show #41) Show Management approval is required for all hanging signs which are only permitted in island booths 400 square feet

and greater.

Mandatory All exhibitors are required to submit booth plans for approval to ensure your exhibit is not in violation. Submit your booth plans early so necessary adjustments can be made to avoid additional expense to bring your booth into compliance.

Instructions: Complete and submit this form with your booth plan drawing and elevation plan by April 19, 2021. Structural drawings for truss, multi-story, covered exhibits and towers MUST include a signature or stamp of a reviewing

structural engineer indicating the structure design is properly engineered for its proposed use, AND a signature of anauthorized official of the exhibit building company indicating the structure is built in compliance with the details andspecifications set forth on the drawings. Your booth elevation plan must be submitted with this form.

Exhibitor: ___________________________________ Booth #: __________________________________________

Display Builder: ________________________________

Contact: _____________________________________ Title: __________________________________________

Email: _____________________________________ Phone: __________________________________________

Request Approval for (please check all that apply):

Unit of Measurement Meter Imperial

Booth Display Plan Multi-Story Exhibit Covered Exhibit Booth Truss Tower

Hanging Sign/s *(Dimensions): __________; Height from floor: To Top: __________; To Bottom: __________* Number of Overhead Signs: ___________

Hanging Truss (Dimensions): ___________; Height from floor: To Top: __________; To Bottom: ___________

Will booth display have a raised floor? Yes No Height from floor to top: _________

Copyrighted Material (Specify Type): __________________________________________________________________

Submit via email to [email protected]

Notification of approval or violation will be sent to you within ten (10) business days of receipt.

Show Management Approval Notification of Violation*By: ____________________________________ *Reason:

Signature: ____________________________________

Date: ____________________________________