Page 1: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Bond Construction Bond Construction UpdateUpdateCitizen’s Oversight Citizen’s Oversight CommitteeCommittee

Bond Construction Bond Construction UpdateUpdateCitizen’s Oversight Citizen’s Oversight CommitteeCommittee

Long Beach Community College District October 2008

EDUCATE ENGAGE EMPOWER 1

Page 2: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Agenda Completed Construction Projects

PCC Learning Resource Center Current & Upcoming Construction Projects

LAC Central Plant LAC South Quad Complex LAC Learning Resource Center LAC Building A, Student Services Retrofit LAC Math Technology Building LAC Parking Structure LAC Infrastructure Improvements – Phase 3 PCC Central Plant PCC Industrial Tech Phase 1 PCC MDAB (Multi-Disciplinary Academic Building) PCC Building C Retrofit District Wide Building Needs Assessment Projects

Toilet Improvement Projects Quick-Start Projects ADA Projects Lighting Projects Classroom Improvement Projects

Q & A

2

Page 3: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Completed Construction Projects

Construction Complete Modern Facility with Computer Lab

and Multimedia Stand alone Data Center. Provides

District IT redundancy Bridge to building E Design elements move towards

energy efficiencies Ribbon cutting held 9/17/08

PCC Learning Resource Center – Measure E 2002PCC Learning Resource Center – Measure E 2002

3

Page 4: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Central Plant equipment, Public Safety, & Field House for Athletics

Final FF&E installation underway Plant ready for operation and awaiting

completion of LRC & SQC Construction 99% Complete Anticipated startup 11/08

LAC Central Plant – Measure E 2002LAC Central Plant – Measure E 2002

4

Page 5: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Construction approx. 86% Complete

Space includes Approx. 68,000 ASF 32 modern classrooms and labs 38 faculty offices Executive office suites Multipurpose room State of the art Board Room

Substantial completion anticipated December 2008

South Quad Complex – Measure E 2002South Quad Complex – Measure E 2002

5

Page 6: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Construction 89% Complete Adds 10,000 ASF to existing

building Substantial Completion

Anticipated December 2008

LAC/Learning Resource Center – Measure E 2002LAC/Learning Resource Center – Measure E 2002

6

Page 7: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Design Development to be submitted this month Adds 4,000 ASF to existing building Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc.

LAC Building A – Student Services RetrofitLAC Building A – Student Services Retrofit

Measure E 2008Measure E 2008

7

Page 8: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Completed Schematic Design (June 2008) Currently in Design Development phase Will house Math and Culinary Arts instructional

program as well as Reprographics Estimated start of construction 2011

LAC Math Technology Building – Measure E 2008LAC Math Technology Building – Measure E 2008

8

Page 9: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Planning initiated for approximately 900 Vehicles To be procured under “Design Build Delivery”

method To be located Southeast corner of Lot J adjacent

to the Verizon building Photovoltaic Electrical Generation Array on top

level of structure

Anticipated start of construction 2009

LAC Parking Structure – Measure E 2008LAC Parking Structure – Measure E 2008

9

Page 10: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

LAC Infrastructure Improvements – Phase 3LAC Infrastructure Improvements – Phase 3

Measure E 2008Measure E 2008

Planning underway with P2S Engineering

Completes chilled water lines to North side of campus

Includes other major utility upgrades; RW,DW, Data, etc.

Existing building HVAC systems to be upgraded in synch with infrastructure improvements

Coordinated with modernization and quick start projects

10

Page 11: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Houses Central Plant equipment and Maintenance and Operations facility

Construction Approximately 99% Complete

Currently provides chilled water to the PCC LRC

PCC Central Plant – Measure E 2002PCC Central Plant – Measure E 2002

11

Page 12: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Modern facility houses Machine Tool and Welding Departments

Construction is 42% complete

Replaces existing antiquated structures

New Northern face of the campus

Completion anticipated summer 2009

PCC Industrial Technology Center Phase 1PCC Industrial Technology Center Phase 1

Measure E 2002Measure E 2002

12

Page 13: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

50% construction documents submitted Swing space planning completed 9/2008, construction Spring 2009 Anticipated start of MDAB construction Summer 2009 To be completed in two phases

PCC MDAB PCC MDAB (Multi-Disciplinary Academic Building) Measure E 2002(Multi-Disciplinary Academic Building) Measure E 2002

13

Page 14: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

To be designed by Hill Partnership Architects Houses the Fitness Center, Gymnasium, Weight

Room, and Faculty and Staff Offices Swing space to be located in PCC building V Anticipated start of construction Summer 2009 To be completed concurrently with MDAB project

PCC Building C Retrofit - Measure E 2008PCC Building C Retrofit - Measure E 2008

14

Page 15: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Toilet Improvement Projects

Quick-Start Projects ADA Projects

District Wide Building Needs Assessment ProjectDistrict Wide Building Needs Assessment ProjectMeasure E 2008Measure E 2008

15

Page 16: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

Current and UpcomingConstruction Projects

Lighting Projects Classroom Improvement Projects

District Wide Building Needs Assessment ProjectsDistrict Wide Building Needs Assessment ProjectsMeasure E 2008Measure E 2008

16

Page 17: Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1

QUESTIONS & ANSWERS

EDUCATE ENGAGE EMPOWER 17