boeing and ait - boein… · boeing and ait uid program manager workshop may 5-6, ... master...

16
Boeing and AIT Boeing and AIT UID Program Manager Workshop UID Program Manager Workshop May 5 May 5 - - 6, 2005 6, 2005 Jeffrey Geear Program Manager, AIT Integrated Defense Systems The Boeing Company 314-777-8280

Upload: trinhphuc

Post on 16-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Boeing and AITBoeing and AITUID Program Manager WorkshopUID Program Manager WorkshopMay 5May 5--6, 20056, 2005

Jeffrey GeearProgram Manager, AIT

Integrated Defense SystemsThe Boeing Company

314-777-8280

Page 2: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

AIT Strategic Focus

• Moore's Law: Computing power doubles every 18 months

• Gilder's Law: Network bandwidth capacity triples every 12 months

• Metcalfe's Law: Value of network increases exponentially as number of nodes increases

Integration across the supply chain, Interoperability of the technologies and Scalability of information are key to AIT success

Data Information Knowledge Decision

Page 3: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Integrated Defense SystemsAIT Status

The Team• AIT Teams established at every major IDS site• IDS AIT Steering Team - Leaders from each AIT site team (represent all functions)• IDS AIT Program Office

Our Approach• Functional collaboration across IDS, working together with Boeing Commercial,

Phantom Works, and Shared Services Group• Proactive involvement with business and program planning teams• Support policy development and Boeing compliance• Participate in OSD (JALC), Industry (AIA), and Standards (ISO) working groups• The single “face” to Customers and Suppliers regarding AIT

Our Status• Leadership established and enterprise organization in work• Engaged with key Customer stakeholders in all aspects of AIT� e.g. Single Process Initiative w/DCMA for UID implementation

• Working with Boeing Commercial to coordinate and leverage strategies• Boeing AIT Summits in Nov ’04 and Apr ‘05

Page 4: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Some UID Examples within Boeing• Oklahoma City � E-3 IDS repair – proposed in the form of MIL-STD-129P� B-2, Spares – proposed in the form of adding MIL-STD-129P

• Long Beach� C17 Production Contract� B1B Multiple Contracts

• Philadelphia� CH47F Engineering Service Task Order� V22 New Build, Mid/Late 2005

• Mesa� AH64 New Build, in discussion

• Huntsville� Spares - 3 active proposals with MIL-STD-130L

• St. Louis� T-45, FY05 Production Contract, Mod signed 13 Dec 04, Marking A/C only� F-18, Production Contract in discussion� AV8, Harrier Integrated Supply Support, On Contract Planned for June 05

• Wichita� KC-135 CCAB, in discussion� B-52 CONECT, in discussion

Page 5: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

UID - Addressing Compliance• We are responding to RFPs & working with our Customers to begin

incorporating UID, but most contracts are in their formative state.

• Our experience in part marking and UID is based on commercial aircraft practices and early DoD development work.

• We have a standard IDS flow-down clause for UID that all sites can use with our suppliers (single “face” to our suppliers).

• We are creating the capability to utilize both Construct 1 & 2 UIDs at most sites - our suppliers or GFE providers may use a different construct than we have elected to use ourselves.

• Data constructs will vary by Boeing site. Each program will be working directly with their Customers to determine the ‘best fit’.

• We are currently in dialogue with our Customers to ensure our deployment plans will support their planned use of this data.

Page 6: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Supplier Flowdown ClauseMaster Customer Contract Requirements (CCR):252.211-7003 Item Identification and Valuation (JAN 2004).

Seller shall comply with the unique item identification requirements of this clause for those subassemblies, components, and parts specified elsewhere in this contract. Such identification and marking shall be a high-capacity 2D machine readable code to comply with MIL-STD-130L. The code may include, as space is available, linear bar code and human readable characters. Unless otherwise specified in Boeing product drawings or specifications, the seller may use either Construct #1 or Construct #2. The Seller shall not be required to furnish item valuations as set forth in this clause.

Page 7: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Framework for UID SPI

DCMA/IDSEnterprise

UID SPI MOA

DCMA/IDSEnterprise

UID SPI MOA

Contract Contract

Contract Contract

Contract Contract

DCMA/IDSSite

UID SPI

DCMA/IDSSite

UID SPI

• Common principles; framework for site-level SPIs• Referenced in site-level Block Change mods

• Block Change mod incorporating DFARS clause, MIL-STD-130L/M, Special Provision tying activation of UID requirements to equitable adjustments

• Site-level implementation plan

• Service/Component customers authorize/fund UID implementation –activates above Special Provision

• CLIN/SLIN changes to itemize UID parts• New contracts also reference SPI(s)

Page 8: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Single Process Initiative

• Two Tier Process for SPI � Top Level IDS Enterprise SPI (Proposal in Review)� Site SPI with local DCMA

• StL AIT Program has drafted a common template

• Product of SPI will be a MOA with the Government

Jan Feb Mar Apr May

IDS Proposal

IDS Site Boilerplate &Start work on site MOA

IDS MOA Approved

Site MOA Proposal

Notional Schedule

Page 9: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

WAWF Readiness• Working with the sites and DCMA HQ defining WAWF

business rules for issues such as:

� Direct transmission to the UID registry when required

� RFID requirements, using the MIRR as the Advance Ship Notice (ASN)

� DoD deliveries using delivery documents other than MIRR

�WAWF handling of multiple part numbers per CLIN

� Transmitting fully concatenated UID to WAWF

Rules must be defined to ensure flawless transmission to WAWF

Page 10: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Item History

UID RegistryInitial

Acceptance

Replace/ Repair UID’d

Component Storage

Restore for Use

Maint. & Repair

Replace, Repair, UID’d

ComponentDispose

Restore & Use

Item History

Maint. & Repair

(Non-UID)

Tran

spor

t

UseUse

Idle

Transp ort

Use

Use

FMS

SURPLUS

DRMS

Reentry

Acquisition

Item Lifecycle

Page 11: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Item History

�� �

�� � �� �

Initial Acceptance

Replace/ Repair UID’d

Component Storage

Restore for Use

Maint. &

Repair

Replace, Repair, UID’d

ComponentDispose

Restore & Use

Item History

Maint. & Repair (Non-UID)

Tran

spor

t

UseUse

Idle

Tr ans po rt

Use

Use

FMS

SURPLUS

DRMS

Reentry

Acquisition

Item History

�� �

�� � �� �

Initial Acceptance

Replace/ Repair UID’d

Component Storage

Restore for Use

Maint. &

Repair

Replace, Repair, UID’d

ComponentDispose

Restore & Use

Item History

Maint. & Repair (Non-UID)

Tran

spor

t

UseUse

Idle

Tr ans po rt

Use

Use

FMS

SURPLUS

DRMS

Reentry

Acquisition

UID in Operational UseUID Data Elements in Systems

Industry

LMCO Boeing NGC Raytheon

Other Gov’ts

Wide AreaWorkflowWide AreaWorkflowCM

Systems

2410

CM Systems

2410

PLCS/UID Vision

DoD

Part

Component

Subassembly

Assembly

ItemParentParent

ParentParent

ParentParent

ParentParent

ChildChild

ChildChild

ChildChild

ChildChild

Page 12: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

������������� ���� �����

• This evolution in Automatic Identification Technology (AIT)� Satisfies DoD requirement for

marking unique identifiers on parts� 2-D symbology dramatically

improves the ability to identify, track and manage parts

• Strong IP Position � System, method & computer

program patent 6,799,187� S/W & Know How

• Growth Potential� Potential to integrate with OEM

systems

Page 13: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Process & Systems Status

n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a

No information/update

n/a Does not apply

Waiting IDS decision

Waiting Site decision

Under development

In production trials

Being implemented

Implemented

Develop/update standards for part markingSupport required qualification testing

7E7,

dat

a TB

D

Function/Tasks

Finance/Business Operations

Engineering

St.

Lou

is

Finance processes/systems updatedBusiness systems mapping for WAWF

UID Process and System Status Matrix

Define serialization requirements and processes

SPI Contracts training

Develop program part marking strategy

SS

G U

S C

usto

ms,

Con

trac

ts

BC

A, C

AS

SS

G S

ecur

ity

Support system/software modificationDevelop systems architecture for UID/RFID

Develop/support equipment interfaces

Operations

SSG/IT

Install/deploy shipping equipment/processes

PRO-6404 releasedSupport site process/system implementations

Define Operations requirementsInstall/deploy production equipment/processes

Points of Contact

Jeff

Nei

ll

Jack

San

ders

Product Support

Mac

on

Pug

et S

ound

, Pro

pert

yP

uget

Sou

ndA

nahe

im

IDS

Phi

lade

lphi

aW

ichi

ta (

Mili

tary

)

Long

Bea

ch

Hun

tsvi

lle

Jim

San

born

Tom

Han

dler

Alic

e M

acy

John

Fun

ke

Ste

phen

Joh

nson

Jim

kru

pitz

er

Site UID Implementation ManagementSite UID Implementation Leader identifiedSite UID Implementation team identified

Mes

a

Hun

tingt

on B

each

Sea

l Bea

ch

OK

CS

an A

nton

ioC

anog

a P

ark

Dec

atur

Site UID Implementation plan deployed

John

She

arer

John

Fun

ke

Jay

Livi

ngst

one

Ric

hard

Kle

insm

ith

Jeff

Gee

ar

Mik

e B

arne

s

Page 14: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Backup

Page 15: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

SPI Top-Level MOA• Common principles for UID implementation across IDS:� Site leadership and DCMA resident offices will develop site-

specific implementation plans

� Contractor (by site) selects MIL-STD-compliant UID Construct; respects supplier/subcontractor/IWA choices

� DCMA and site/program leadership work together with program customers re any equitable adjustments for nonrecurring costs, potential patent issues, and with DCMA-HQ re WAWF enhancements for UID

� Acquisition of general purpose marking/reading equipment and IT system enhancements for UID will typically be treated per existing ABU accounting disclosure statement(s)

� Estimating techniques (options) for development of Government Unit Acquisition Cost (GUAC) values under cost-type contracts

Page 16: Boeing and AIT - Boein… · Boeing and AIT UID Program Manager Workshop May 5-6, ... Master Customer Contract Requirements ... Notional Schedule

Site-level SPI Mod• Contract mod covering site’s DoD contracts:� Invokes IDS-level UID SPI MOA principles� Invokes site-level UID implementation plan� Incorporates DFARS (interim or final) UID clause, MIL-STD-130L

(M?) and related requirements, and a Special Provision regardingactivation of UID requirements that:

• Ties activation to execution of site level UID implementation plan

• Ties to funding (if required) of nonrecurring implementation cost• Invokes DCMA authority to extend (partially waive) applicability

of UID requirements consistent with the implementation plan• Provides authorization and consent to use of possibly patented

2-D matrix barcode format mandated by DoD UID policy� Coordinated with affected program customers for concurrent

modification of individual contracts to specify items (includingthose <$5K or embedded) that require UID