Board Updates for Facility and Maintenance Department March 13, 2017 1. Socorro High School: a. Old Business: 1. Work is still underway on the installation of the new head-end equipment, intercom / clock / bell system at the High School. Additional equipment is being ordered. b. New Business: 1. Great Western had found that our speaker and clock wiring is in bad shape and will need to pull new wiring throughout the building, I am waiting on pricing from them to perform this work. 2. Mr. David Hicks had donated some Terra Pro for the High School baseball field. This product will aid in the growth of the out-field grass. He will deliver two tons of this material and the Maintenance staff will apply this product during the re-seeding process this month. 2. Socorro Sarracino Middle School: a. Old Business: 1. The SMS school roof is currently undergoing an insurance claim inspection; It was determined that high winds has caused roof damage to portions of the roof. Along with these roof concerns also posed moisture infiltration issues into several classrooms. Air Quality sampling and moisture test have been taken in several classrooms, results are still pending. 2. Odors are presenting themselves with these leaks into the building, the cause appears to be the old carpet in the building is smelling, therefore we will be replacing carpet with VCT in some of the classrooms over the spring break and plan to do more during the summer break.

Upload: vuongkhue

Post on 02-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

BoardUpdates

for

FacilityandMaintenanceDepartment

March13,2017

1. SocorroHighSchool:a. OldBusiness:

1. Workisstillunderwayontheinstallationofthenewhead-endequipment,intercom/clock/bellsystemattheHighSchool.Additionalequipmentisbeingordered.

b. NewBusiness:1. GreatWesternhadfoundthatourspeakerandclockwiringisin

badshapeandwillneedtopullnewwiringthroughoutthebuilding,Iamwaitingonpricingfromthemtoperformthiswork.

2. Mr.DavidHickshaddonatedsomeTerraProfortheHighSchoolbaseballfield.Thisproductwillaidinthegrowthoftheout-fieldgrass.HewilldelivertwotonsofthismaterialandtheMaintenancestaffwillapplythisproductduringthere-seedingprocessthismonth.

2. SocorroSarracinoMiddleSchool:

a. OldBusiness:1. TheSMSschoolroofiscurrentlyundergoinganinsuranceclaim

inspection;Itwasdeterminedthathighwindshascausedroofdamagetoportionsoftheroof.Alongwiththeseroofconcernsalsoposedmoistureinfiltrationissuesintoseveralclassrooms.AirQualitysamplingandmoisturetesthavebeentakeninseveralclassrooms,resultsarestillpending.

2. Odorsarepresentingthemselveswiththeseleaksintothebuilding,thecauseappearstobetheoldcarpetinthebuildingissmelling,thereforewewillbereplacingcarpetwithVCTinsomeoftheclassroomsoverthespringbreakandplantodomoreduringthesummerbreak.

b. NewBusiness:

1. Theinsuranceadjusterhadconcludedhisfindingsandwillberecommendingapproximately2/3oftheschoolsrooftobereplaced.Alongwithsomepatchareasandroofdrainstoalsoberepaired.

2. ThefollowingwasastatementprovidedbyHavanaEnvironmentalaftertheyhadconductedtheirindoorairqualityinspection:

Room9andRoom7

Thesouthwallinroom9andthenorthwallinroom7werewetatthetimeofthesitevisit.Thecarpetinroom9wasalsowet.Havonadidnotidentifyanvisiblemoldgrowthineitherroom.Inroom9,theambientairsamplereportedaslightlyhighertotalfungalsporecountcomparedtotheoutsidereferencesamplewithanelevatedlevelofAspergillus/Penicilliumcomparedtotheoutsidereferencesample.AlowlevelofStachybotryswasalsoidentifiedinthisairsample.Irecommendthatthewetdrywallberemovedinbothrooms.Thecarpetshouldbesteamcleanedataminimum.

BandRoom

Theambientairsamplewaswithinacceptablelimitscomparedtotheoutsidereferencesample.Havonadidnotidentifyanyvisiblemoldgrowthanddidnotdetectanymoistureusingamoisturemeter.

Library

Theambientairsamplewaswithinacceptablelimitscomparedtotheoutsidereferencesample.Aceilingtilewasmissingduetowaterdamageandatrashcanwasundertheceilingtiletocatchwater.Thecarpethadawaterstainonitinthisarea.Thecarpetshouldbesteamcleaned.

Havonainspectedafewmoreclassroomswithminimaldamage,whichwillbedocumentedinthewrittenreport.

3. TheinsuranceadjusterrequestedthatMooringRestoration

removeportionsofthewallbetweenrooms7&9todryouttheareaandperformtheirremediationprocess.Oncethewallwasremoved,anindoorairscrubberprocesstookplaceandafinalinspectionoftheindoorairqualitywasperformedtoensure

thattheairqualitywassatisfactory.Thefollowingarethefinalresults: PURPOSE:OnMarch6,2017,CissyPuma,aCertifiedEnvironmentalInspector,conductedthefinalclearancetesting.Thepurposeofthetestingwastoensurethattheremediatedareasinclassrooms7and9werewithintheacceptableparametersinregardstothepresenceofmicrobialspores,aswellas,todetermineiftheengineeringcontrolscouldberemoved.SAMPLINGPROCEDURESDuringthesitevisit,atotalofthreeambientairsampleswerecollected.Thesampleswereadministeredinthecontainedareainclassrooms7and9,thehallwayoutsideofrooms7and9,andtheoutside.Theoutsideairsamplewastakeninfrontofthebuildingandwasusedforcomparativepurposes.AZefondigitalairpumpwasusedtoexecutetheairsamplinganddisposableaircassetteswerethesamplemediausedtocollectthesamples.Thepumpwascalibratedtodraw15litersofairperminuteforaspecificdurationoftime.Afterthesampleswerecollected,theywereloggedontoachainofcustodyandtakentoImmunoLyticsofAlbuquerque,NewMexico.Thesampleswereanalyzedfortotalfungalsporeanalysis.SAMPLERESULTS•Theambientairsampletakeninthecontainedareaintheclassrooms7and9reportedalowertotalfungalsporecountcomparedtotheoutsideandinsidereferenceairsamples.Thetypesofmicrobialsporesidentifiedintheairsampletakeninthecontainedareawereconsistentwiththetypesofmicrobialsporesidentifiedintheinsideandoutsidereferencesamples.•Theresultsfromthefinalclearancetestingshowthattheremediatedareaintheclassrooms7and9werewithintheacceptableparametersinregardstothepresenceofmicrobialspores.Atthetimeofthesampling,theremediatedareasweresafeforre-occupancyandbuiltbacktooccur.•Currentlytherearenogovernmentalregulatorylawsfor"safe"oracceptablemoldsporeconcentrationlevelsintheindoorenvironment.Typically,theindustrystandardistomakeacomparisonbetweenthetypesofmoldsporesandtheirconcentrationlevelsinaninsideairsampleandanambientbackgroundsampletodetermineifthereispossiblecontamination.

3. ZimmerlyElementarySchool:

a. OldBusiness:1. N/A

b. NewBusiness:1. N/A

4. ParkviewElementarySchool: a. OldBusiness:

1. NAb. NewBusiness:

1. NA

5. MidwayElementarySchool:a. OldBusiness:

1. NAb. NewBusiness:

1. N/A

6. SanAntonioElementarySchool:a. NewBusiness:

1. HBConstructioniscurrentlyworkingonStructuralsteelerecting,interiorwallframing,electricalrough-in,plumbingrough-in,HMFrames,HVACunithangers.Firesuppressionpipingisnowbeinginstalled,alongwiththeepicoremetaldeckingintheclassroomareas.Interioracousticalwallinsulationisunderwayalongwithstartingtheinteriorwallgrywallinstallation,exteriorblockveneerisalsoinprogress