bo normark what can hvdc marketing and sales, grid light ... · pdf filetransmission systems...

28
© ABB-Toll Inauguration - 1 - 10/7/2005 Power from shore – inauguration event What can HVDC Light ® do for you – it’s time to connect Applications Key Components Bo Normark Marketing and Sales, Grid Systems

Upload: lyphuc

Post on 06-Feb-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

-10

/7/2

005

Power from shore –inauguration event

What can HVDC Light® do for you –it’s time to connectApplicationsKey Components

Bo NormarkMarketing and Sales, Grid Systems

Page 2: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

-10

/7/2

005

HVDC Light®: Unique system with unique featuresTransmission System with converters and cables

Converts give less stress on cable system and allows:

Lightweight extruded cable Prefabricated joint technology

Superior voltage and reactive power controlEnvironmentally adapted

Short permitting timeSmall footprint and low profile of convertersOil free cableNo magnetic fields

New applications opens new possibilities

Page 3: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-3

-10

/7/2

005

ABB Semiconductor capabilitiesSemiconductor Devices

...Industry... Transmission Systems ...Transportation

Reliable Products for...

Device Encapsulation

Page 4: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-4

-10

/7/2

005

IGBT Silicon Chip - a reliable Power Switch

Silicon Wafer with Chips

Single IGBT Chip

StakPakTM Modul Submodule

Page 5: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-5

-10

/7/2

005

StakPakTM product platform for HVDC and FACTS

Main featuresVersatile modular design for HVDC and FACTS applications

ABB-proprietary encapsulation design withFailsafe short-circuit modeTotally immune to mechanical mounting tolerances

Design based on ABB’s recognized high voltage IGBT chip technology

Proven Quality and Reliabilitymore than 100’000 units in operationmore than 500’000 module-years of successful operationfailure rates allow maintenance intervals > 3 years

Page 6: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-6

-10

/7/2

005

Chip Factory and Module AssemblyRecognized leading high voltage IGBT technology

Dedicated high voltage Semiconductor development and manufacturing

Our module assembly line is dedicated to high voltage products

Page 7: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-7

-10

/7/2

005

Quality and Reliability is key

We use dedicated high voltage test equipment for product qualification and test

Data from our extensive field experience is used to improve our production processes on an ongoing basis

15000 units in operation, failure rates allow maintenance intervals > 3 years

Page 8: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-8

-10

/7/2

005

ABB Cable capabilities

FinlandFinland

KarlskronaKarlskrona

NorwayNorwaySwedenSweden

GreatBritainGreatBritain

High Voltage CablesCapability for extruded and paper insulated cables, AC and DC

Standard cables and advanced customized products

Efficient production for long and heavy cables

Proven track record of running cable projects on a global basis.

Modern factory in Modern factory in KarlskronaKarlskrona since since 19921992

Page 9: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-9

-10

/7/2

005

References tell about our capability

Land and sea cables with paper and oil.1952 First 400 KV LPOF Cable

1954 First DC MIND Cable to Gotland

XLPE introduced 1965 for AC1973 First XLPE Submarine cable 60 KV

to Åland

1978 XLPE 245 KV cables

XLPE introduced 1997 for DC (HVDC Light®)1997 Gotland land cable

2002 Cross Sound Cable

2004 Troll Cables

Page 10: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

0 -

10/7

/200

5

Major supplier of XLPE cable for d.c. and a.c.

Cables from ABB1350 km installed HVDC Light®cables since 1998

745 km installed XLPE cables above 220 kV since 1978out of totally about 4000 kminstalled world-wide

Page 11: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

1 -

10/7

/200

5

Cost effective installations

Page 12: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

2 -

10/7

/200

5

HVDC Light® Convertor Development

2006up to 1100 MWup to+/- 300 kV

2004up to 550 MWup to +/- 150 kV

1997Hellsjön+/- 10 kV

19997 MW - 50 MW +/- 80 kV

2001up to 330 MWup to +/- 150 kV

3 3 350 60

220

330 350

550 550

700

1100

0

200

400

600

800

1000

1200

1997 1999 2000 2002 2004 2006

Power MWVoltage kV

Page 13: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

3 -

10/7

/200

5

HVDC Light®, six key applications

Page 14: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

4 -

10/7

/200

5

Improved grid reliability by HVDC Light®, values

Increased grid reliability byFast and accurate voltage control

Can not be overloaded

Black start capability

Short time to market by simplified permitting procedure

DC lines will never be subject to an unforeseen increase of power flow due to the outage of system components. Therefore it is not necessary to reserve capacity margins on DC lines in order to fulfil the (n-1) principle. DC links can rather be operated at their rated power, unless there are limitations inside the adjacent AC networks.

Source: IAEW/Consentec report 2001

Page 15: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

5 -

10/7

/200

5

Cross Sound Cable US, HVDC Light®

Customer needsProvide power exchange channel Long Island - Connecticut

ABB’s responseTurnkey 330 MW HVDC Light®transmission system

Customer benefitsEasy siting of convertor stations by compact designNo need for network reinforcementsIncreased security of supply by continues voltage and VAR controlShort permitting, delivery and commissioning time

Grid reliability

Page 16: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

6 -

10/7

/200

5

HVDC Light , proven technology

Page 17: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

7 -

10/7

/200

5

Improved grid reliability by HVDC Light®

Case 350 MW, short distance transmission 100 kmDC alternative, HVDC Light® transmission +/- 150 kV

AC alternative, 220 kV overhead line

Grid reliability, 350 MWW

0

50

100

150

200

250

300

350

400

HVDC Light- low

HVDC Light- high

AC OHL -low

AC OHL -high

MU

SD

Other cost AC

Other cost DC

EPC cost DC

EPC cost AC

Page 18: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

8 -

10/7

/200

5

Connecting wind farms, offshore is growing

Source: DENA Study Feb 2005

Page 19: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-1

9 -

10/7

/200

5

Connecting wind farms by HVDC Light®, values

Facilitates grid connection byVoltage and reactive power support

No limitation in distance

Ride-through capability at faults

Easy permitting

Short construction time

Page 20: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

0 -

10/7

/200

5

Checklist, connecting wind farms

Need for power transmission 200 - 1000 MWNeed for accurate and fast control Distance more than 50 kmDifficult to obtain permits for OH-linesDifficult to find/reach interconnection point in the gridDifficult to build a substation near the coastline (for reactive power compensation) Weak AC network Risk for dynamic instability Power quality issues Need for grid black start capability Need for high availability during thunderstorms, windstorms/hurricanes or icingNeed for compact offshore moduleRisk of low harmonic resonancesNeed for fast voltage and reactive power control to enhance network security

Page 21: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

1 -

10/7

/200

5

Connecting wind farms by HVDC Light®

Case 350 MW, 70 km sea cable and 30 km land cableDC alternative, HVDC Light® transmission +/- 150 kV

AC alternative, 220 kV AC cable

Connecting wind farms, 350 MW

0

50

100

150

200

250

300

350

HVDC Light -low

HVDC Light -high

AC Cables -low

AC Cables -high

MU

SD

Other cost AC

Other cost DC

EPC cost DC

EPC cost AC

Page 22: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

2 -

10/7

/200

5

Cost is historically the key problem ?

State of the art historicallyUndergrounding cost is 5 – 15 times OHL

Page 23: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

3 -

10/7

/200

5

Underground power links by HVDC Light®, valuesEasier permit procedure by

Underground invisible cable systemEnvironmental friendly oil-free cablesShort installation and implementation timeEnvironmentally adapted converter stationsNo EMFNo audible noise

Time savingNo loss of property valueIncreased grid reliability by voltage and reactive power supportIncreased utilization of existing AC networkReduced losses in connected AC network by voltage control

Page 24: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

4 -

10/7

/200

5

Underground power links by HVDC Light®, values

Flexible Cable systemRobust, lightweight and oil-free cablesPre-fabricated jointsCable faults can be quickly located and repaired Enables installations in existing right of ways e.g. existing cable ducts, roads, subways, railways, channels

Page 25: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

5 -

10/7

/200

5

Underground power links by HVDC Light®

Case 700 MW, long distance transmission 400 kmDC alternative, HVDC Light® transmission +/- 300 kV

AC alternative, 400 kV overhead line

Underground power links, 700 MW

0

100

200

300

400

500

600

700

800

900

HVDC Light -low

HVDC Light -high

AC OHL -low

AC OHL -high

MU

SD

Other cost AC

Other cost DC

EPC cost DC

EPC cost AC

Page 26: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

6 -

10/7

/200

5

Southern Link, SwedenCustomer’s need

Improved security of the electricity supply in South and Central SwedenDistance 400 km

Alternatives400 kV overhead transmission lineTurnkey 500 – 700 MW ±300 kV underground HVDC Light® transmission system

Customer’s benefits with HVDCShorter project time due to easier permitting ( 2 – 3 years )Increased power transfer existing a.c. linesImproved reactive balance in both ends

Project statusFinal evaluation ongoing. Decision 2005

Cost of HVDC option comparable to OHL

Page 27: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC

©AB

B-To

ll In

augu

ratio

n-2

7 -

10/7

/200

5

What can HVDC Light® do for you ?We can offer proven system with unique features

Environmentally adaptedSuperior grid reliability properties

Cost competitive particularly when all factors are considered, example

Undergrounding used to be 5 – 15 times more costly, with HVDC Light® relation could typically be 1 – 3 times

Suitable to meet new demands such as grid reliability and connection of wind farms. Offshore power supply has shown the example.

Challenge us with your application and ask us what HVDC Light® could do for you

Page 28: Bo Normark What can HVDC Marketing and Sales, Grid Light ... · PDF fileTransmission Systems ... above 220 kV since 1978 out of totally about 4000 km ... 800 900 HVDC Light - low HVDC