BMIS 351 SYSTEMS D ESIGN P ROJECT I NSTRUCTIONS For your final assignment in this course, you will create a project using the require elow! "ou may use your own place of usiness #preferred$ or an e%isting usiness tha to perform these e%ercises! &nswers such as '"es( or ')o( are notsufficient to respond to these questions! Final Project Requirements *reate an entire S+ * process that will ring added -alue to a usiness! .se of the f mandatory/ 1! 0lanning 0hase a! Identify the project what is it supposed to do2 !+etermine the methodology to e used descrie, in detail, why you chose t methodology c! +efine4determine usiness requirements and descrie the techniques you wil gather this information ! &nalysis 0hase a! +escrie how this project will ring added -alue to the usiness! 6his sho form of an actual presentation outline, such as one would read while doing 0oint presentation to the Board i! +etermine who the 7ey players are ii!+escrie any 7nown or possile issues that might arise as to why the not e appro-ed !&long with the outline, prepare a .se *ase diagram for the new system ensu consider staffing, udgets, training, maintenance, etc! 3! +esign 0hase a! +etermine the hardware and software requirements i! 8ill the e%isting infrastructure support the project2 1! If not, descrie in detail what will e needed! ii!Is new hardware required2 iii!Is new software required2 1! If new software is required, how will it e otained2 ! Is the e%isting dataase adequate2 !*reate the 0roject wor7 plan, complete with #projected$ timelines using a :! Implementation 0hase a! +escrie how the system is to e implemented 0hased2 6urn 7ey2 Mirrored2 !+escrie why the implementation you chose is the est for this project! Sumit this assignment y 11/5; p!m! #<6$ on Monday of Module48ee7 =!

Upload: connor

Post on 08-Oct-2015

17 views

Category:

Documents


0 download

DESCRIPTION

Instructions

TRANSCRIPT

BMIS 351Systems Design Project InstructionsFor your final assignment in this course, you will create a project using the requirements outlined below. You may use your own place of business (preferred) or an existing business that will allow you to perform these exercises. Answers such as Yes or No are not sufficient to respond to these questions.

Final Project RequirementsCreate an entire SDLC process that will bring added value to a business. Use of the following is mandatory:

1. Planning Phasea. Identify the projectwhat is it supposed to do?b. Determine the methodology to be used; describe, in detail, why you chose this methodologyc. Define/determine business requirements and describe the techniques you will use to gather this information2. Analysis Phasea. Describe how this project will bring added value to the business. This should be in the form of an actual presentation outline, such as one would read while doing a Power Point presentation to the Boardi. Determine who the key players areii. Describe any known or possible issues that might arise as to why the project will not be approvedb. Along with the outline, prepare a Use Case diagram for the new systemensure you consider staffing, budgets, training, maintenance, etc.3. Design Phasea. Determine the hardware and software requirementsi. Will the existing infrastructure support the project?1. If not, describe in detail what will be needed.ii. Is new hardware required?iii. Is new software required?1. If new software is required, how will it be obtained?2. Is the existing database adequate?b. Create the Project work plan, complete with (projected) timelines using a Gantt chart.4. Implementation Phasea. Describe how the system is to be implemented; Phased? Turn key? Mirrored? Parallel?b. Describe why the implementation you chose is the best for this project.

Submit this assignment by 11:59 p.m. (ET) on Monday of Module/Week 7.