BMCL: TUNNEL OF DEBTS Group 2 Mr. Teerasak Soongloy st107910 Mr. Gaurav Kundalia st107916 Mr. Hariom Ghimire st107876 Ms. Qurat Ul-Ain st107862 Ms. Prakriti Paudel st107883 Ms. Kirana Praimanee st107859 Ms. U-thumporn H.A. st107892 SM80.9007 Project Finance Instructor: Dr.Sundar Venkatesh 30th November 2009

Upload: abhiait08

Post on 16-Dec-2014

261 views

Category:

Business


3 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Bmcl

BMCL:TUNNEL OF DEBTS

Group 2Mr. Teerasak Soongloy st107910Mr. Gaurav Kundalia st107916Mr. Hariom Ghimire st107876Ms. Qurat Ul-Ain st107862Ms. Prakriti Paudel st107883Ms. Kirana Praimanee st107859Ms. U-thumporn H.A. st107892

SM80.9007 Project FinanceInstructor: Dr.Sundar Venkatesh

30th November 2009

Page 2: Bmcl

AGENDA

♫ Project Overview and Structure

♫ Valuation – Sensitivity Analysis

♫ Refinancing

♫ Risk Management ♫ Conclusion and Lesson Learnt

Page 3: Bmcl

PROJECT OVERVIEW&

STRUCTURE

Page 4: Bmcl

BANGKOK METRO PUBLIC CO., LTD

Transportation Industry

Page 5: Bmcl
Page 6: Bmcl

MRT - OPERATION

MRT

BMCL: design,

manufacture, supply, install and test commission

M&E contract to Lincas & Siemens

(turnkey approach)

BMCL: Operation and maintenance

of MRT

Page 7: Bmcl

5,417 m ฿ (27.5%)Equity

14,314 m ฿(72.5%)Debt

FINANCIAL STRUCTURE

64 %

6

19,731 m ฿

Metro Mall Development

Ltd.

Triads NetworksCo., Ltd.

100 % 56 %

PRE-IPO DEC 2005

1.Long Term Loans – tranche A 11,000(76.85%) (For procurement of the M&E Equipment)2. Long Term Loans – Tranche D 500 (3.49%)(For payment of additional project costs)3. Long Term Loans – Tranche D 650 (4.54%)(For payment of additional expenses from KTB,TMB,BAY and SCIB) 4. Other Liabilities 2,164(15.12%)(Construction and other payable)

Major shareholders

1. CH.Karnchang Plc ,Ltd. 40.26%2. Bangkok Expressway 18.89%3. Natural Park Plc ,Ltd. 18.75%4. Krung Thai Bank 9.56%5. TMB Bank 4.81% 6. Employees 3.88%7. Siam City Bank 2.30%8. Tokyu Construction co, Ltd 1.31%9. Others 0.25%

BMCL NetworkLtd.

Page 8: Bmcl

FINANCIAL STRUCTUREMajor shareholders

1. MRTA25%

2. Public 23.07%

3. CH Karnchang Plc, Ltd 19.56%4. Natural Park Plc, Ltd

12.00%5. BECL

9.99%6. Krung Thai 3.94%7. TMB Bank Pcl, Ltd

2.00%8. siam City Bank Pcl, Ltd 0.96%9. Tokyu Construction

0.84%10. Others

0.16%11. Directors, Exe & Staff 2.49%

POST-IPO SEPT 2006

1.Long Term Loans – tranche A 10,560 (82.5%) (For procurement of the M&E Equipment)2 . Long Term Loans – shareholder 1,065 (8.3%)(CH.Karnchang Plc. ,Ltd)3. Other Liabilities 1,177 (9.2%)(Construction and other payable)

8,439 m ฿ (39.73%)Equity

12,802 m฿ (60.27%)Debt

64 %

21,241m ฿

Metro Mall Development

Ltd.

BMCL NetworkLtd.

Triads NetworksCo., Ltd.

70% 56 %

2006, balance of Tranche D Facility & Tranche E Facility paid in full (1,114.4 m฿).

Page 9: Bmcl

• Investors become a part of company also risk sharing• Hence, repayment is not the obligation and cheaper debentures• Benefit from Share price• Transfer of skill and knowledge

+

PUBLIC LISTING

Page 10: Bmcl

BMCL AND IPO

Expansion of Capacity 5 trains

To compensate for crash accident High cost, low revenue Debt Service Investment

Subsidiaries Metro Mall Development Limited BMCL Network Limited Traids Networks company Limited

Page 11: Bmcl

PROJECT VALUATION

Page 12: Bmcl

ASSUMPTIONS FOR VALUATION:

•The project is BOT, and concession period is 25 years begin from year 2004

•Fare rate is adjusted according to CPI -6% increase in very 2 year starting from 2010

•Passenger growth rate for existing line: 15% for year 2010-2013

•Passenger growth rate for expansion line: Data Source-BMCL

•Other Income is assumed to be 15% for this project which will compose from advertising service, Telecommunication services & retail space leases

•Selling and Administration expenses is 15% for existing line and 5% for expansion line with correspondent revenue

•The Maximum capacity is 1080000 Passenger per day

•The Interest rate for Tranche A loan is MLR +.25%, Tranche E loan and CH.K Loan is MLR + 0.5% respectively

Page 13: Bmcl

ASSUMPTIONS FOR VALUATION:

•Salary and Wage is 15% of revenue fare box revenue

•Repair and Maintenance cost will increased by 1% each year after 2009

•Utility and Insurance cost are fixed-Historical income statement

•Cost of Commercial Development is 65% of it's revenue for whole project life

•Project Cost Amortization is apportion according to number of passenger

•The company will pay the rest of its interest(which was capitalize) when it has enough cash flow (repay in the year 2013 at once)

•Corporate Income tax-30%, Company has tax holiday for 8 years

•The company has 8 years tax holiday and loss carry forward to 5 Years, according to tax law of Thailand

•Revenue is apportion to MRTA according to contract

Page 14: Bmcl

INCOME SOURCE

Fare box revenue-87%(The revenue come from the operation of train service in the form of Cash & Prepaid Card)

Commercial development revenue-13%(The revenue compose from advertising service, Telecommunication services & retail space leases)

Page 15: Bmcl

EXPENSES

Cost of fare box

Salary, Wage & other employees benefitRepair and maintenance costUtilities costInsurance expensesSelling and administration expenses

Cost of Commercial Development

Page 16: Bmcl

VALUATION: FCFE

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

(904.13)

(630.15)

(419.88)

(20.20)

(52.77)

4,160.41

(1,051.41)

1,130.01

2,085.70

2,434.64

2019 2020 2021 2022 2023 2024 2025

1,755.83

1,835.16

896.00

(104.53)

1,471.54

2,654.90

2,415.16

Amount in Bn BahtFree Cash Flow to Equity

2026 2027 2028 2029 2,657.35

2,535.16

3,038.63

2,908.98

BMCL will have positive FCFE only after year 2013

BMCL has to share revenue with MRTA from the year 2015, so that FCFE is negative

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

-2,000.00

-1,000.00

-

1,000.00

2,000.00

3,000.00

4,000.00

5,000.00

FCFE

FCFE

Year

Bil

lio

n B

t

Page 17: Bmcl

DSCR TO LENDERS

Minimum required DSCR is (according to Concession) 1.2, which is not satisfied

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

-8.00

-4.00

-

4.00

8.00

12.00

16.00

20.00

24.00

28.00

32.00

36.00

DSCR

DSCR to Commercial Lender

DSCR to Share Holder

Minimum Requirement

Year

DS

CR

Page 18: Bmcl

STOCK VALUATION-EXISTING CAPACITY

NPV $8,028,138.66

Outstanding Share 11,950,000.00

Share Value 0.67 Current Market Price

(As on 28/11/2009)0.73

In the current situation, we can’t recommend investors to buy the stock since it is over valued

Page 19: Bmcl

STOCK VALUATION-IF BMCL INCREASE IT’S CAPACITY

Year No of Train

Value of Stock

Market Price Recommendation

2018 1 0.86 0.73

2018 2 1.02 0.73

2018 3 1.17 0.73

2019 4 1.32 0.73

2019 5 1.48 0.73

If BMCL announce future plan to buy more Trains, we recommend investors to buy the stock

Page 20: Bmcl

STOCK VALUATION:-IF THE CONSTRUCTION IS EXPANDED

line delayed

The value of stock is very sensitive to the expansion plan, if it delayed the valuation will significantly change

1 2 3 -

0.10

0.20

0.30

0.40

0.50

0.60

Share Value

Price of Stock

Delayed Year

Bah

t

Page 21: Bmcl

SCENARIO ANALYSIS

If fare changes

The share price of BMCL is highly sensitive to fare rate. If the fare increases the investment in BMCL will be attractive

-5% 0% 5% 10% 15% -

0.20

0.40

0.60

0.80

1.00

1.20

1.40

Value of Share

Share Price

Market Price

% Change in Fare

Bah

t

Page 22: Bmcl

SCENARIO ANALYSIS

If BMCL do not share revenue with MRTA

BMCL stock price is attractive if it has not to share revenue to MRTA

Revenue Share with MRTA Revenue do not Share with MRTA0

0.5

1

1.5

2

2.5

3

Value of Share

Bah

t

Page 23: Bmcl

REFINANCING

Page 24: Bmcl

RESTRUCTURING IN 2008

2008 2012 20182013

Tranch ABaht 11000 mn

3.17% MLR + 0.25%

D:E = 1.7:1D:E = 2.7:1

Page 25: Bmcl

REFINANCING OPTIONS (DSCR SENSITIVE)

Availability Cost Covenants

Debentures

Debt Restructuring

Debt Refinancing(New Banks)

Debt Refinancing(Old Banks)

Subordinate Debt

Bankruptcy

Weight Symbol

Not Imp.

Little Imp.

Imp.

Very Imp.

Most Imp.

Page 26: Bmcl

Availability Cost Covenants

Equity Dilution

New Sponsor

Govt. Aid-MRT payment-Guarantee-Increase Price-Arrange Loan

REFINANCING OPTIONS (REPUTATION SENSITIVE)

Weight Symbol

Not Imp.

Little Imp.

Imp.

Very Imp.

Most Imp.

Page 27: Bmcl

PROJECT RISK &

MITIGATION

Page 28: Bmcl

PROJECT RISK DISCUSSION

• All the Projects are risky• In beginning we decide to accept /reject Project on the basis of Risk

Assessment• During the Operation phase many of the Risks are realized. At this stage

the Role of risk Mitigation strategies become obvious. • In one way it can be said that If the Risk Mitigation strategies are well

perceived & executed, can make the project less risky at the later stages especially after the Heavy Investments are made & Operations started.

• Thus the failure/success of a project can be attributed to the extent to which the appropriate Risk Mitigation strategies are identified & applied when such are needed timely.

• In this context we tried to develop Risk Mitigation Matrix, as follows:

1- Identification & Rating of Project Risks

2- Identification of appropriate Risk Mitigation strategies (RMS)

3- After careful observations/readings assign the ratings to RMS according to predetermined scale & multiply it with Respective Project Risks.

4- To get an idea how each risk Mitigation strategy is successful in coping the relative Risks

Page 29: Bmcl

PROJECT RISK

Risk Factors Risk Mitigation

1. Economic risk

1. Risks relating to fare revenue2. Risks relating to fluctuation of

cost of fare3. Risks relating to revenue from

commercial development4. Inflation

1. Revenue sharing should be reviewed

2. Relaxation in fare price terms of concession agreement

2. Financial risk

1. Unavailability of funds2. Company reliance on the

financial support from its major shareholders

1. Government can help in renegotiation in restructuring

2. Government guarantee

3. Contractual and legal risk

1. Delay in solving contractual issues

2. Delay in solving disputes3. Change order negotiation

1. Involvement of Higher Government

Page 30: Bmcl

PROJECT RISK

Risk Factors Risk Mitigation

4. Operational & Technical Risk

1. Company reliance on Siemens and Lincas for manufacture and maintenance of its M&E Equipment

2. High maintenance cost3. Subcontractors-related risks4. Equipment productivity5. Labor productivity

1. Qualified staff2. Fix as many operating risks as

possible to provide 3. Ensure strong penalty clauses

or cost sharing arrangements are included within contracts for technical services & time delays 

5. Design & Physical risk

1. Inadequate specification2. Conflict of documents3. Difference in execution4. Design change5. Geological risk6. Construction material risk

1. Fully investigate the opportunities for staging the development to meet demand.

6. Foreign Exchange Risk

Risks from the interest rate and foreign exchange rate fluctuations

1. Applying appropriate Hedging strategy

Page 31: Bmcl

Risk Factors Risk Mitigation

7. Construction risk 1. Delay Risk2. Lack of coordination risk

1. Research the strength of the construction co. manage a contract of this capacity and absorb cost overruns.

2. Subcontracts8. Political Risk 1. Risks relating to the

Concession Agreement and the govt supervision

2. Risks relating to the govt policy in the construction and operation of the mass transit railway system

1. Contractual arrangements

9. Safety and social risk

1. Accidents 2. Ecological constraints3. Damage to persons or property 4. Pollution and safety rules 5. Public consultancy

1- Obtain insurance where possible to protect against large-scale environmental damage

10. Force majeure risk

War , Act of God, Fire and Theft

1 - Obtain insurance where possible to protect against large-scale environmental damage

PROJECT RISK

Page 32: Bmcl

The decision to go for IPO before debt restructuring seems to be rational since BMCL can raise money after IPO and because good reputation amongst investors

BMCL’s revenue is very sensitive to both fare and expansion line.

BMCL cannot serve the debt if there is no expansion.

The expansion part that will have significant effect on the existing line is Blue Line, Green Line and Red Line.

OVERALL ANALYSIS

Page 33: Bmcl

CONCLUSION

In light of several possibilities, if BMCL want to service the debt they have to go for equity dilution, by issuing new stock, however according to the current situation, it is unlikely that it will get positive response from the investors.

The investors should invest in the company if the plans of future expansions are certain and the company commit to buy additional trains in future.

This company will need Government Aid in order to enhance the operations feasibility in future.

Page 34: Bmcl

SOURCES

Primary Source:

Interview with MRTA, BMCL officers and Kim Eng Analysts.

Secondary Source:

http://www.bangkokmetro.co.th

http://www.mrta.co.th

http://www.bangkoktransport.net

http://marketdata.set.or.th

http://www.2bangkok.com/2bangkok/Subway/newsold.shtml

www.kimeng.co.th

www.bangkokpost.com

www.ryt9.com

Page 35: Bmcl
Page 36: Bmcl

SCENARIO ANALYSIS

If the Train Crash in the Year 2018

0% 50% 70% 80%0

0.10.20.30.40.50.60.70.8

If Train Crash in Year 2018Share Price

Valuation

Market Price

Revenue Decreased

Bah

t

Back up

Page 37: Bmcl

Before

Page 38: Bmcl

PRE & POST IPO STRUCTURE