vestas.com Blowing in the wind: Some answers to effective wind turbine procurement Peter Mills: 22 February 2010

Upload: others

Post on 28-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

vestas.com

Blowing in the wind: Some answers to effective wind turbine procurement

Peter Mills: 22 February 2010

Page 2: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Agenda

Key ContractsKey Contracts

Key risks

Procurement

Key risks

Procurement

Key risks

Service

Key risksService

Page 3: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Page 4: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key contracts: Procurement

EPC

= + ++

Supply

Supply

SupplySupply only

Supply and

Services

+

EPC

= +++

EPC

Supply &

Services

SupplySupplySupply

only

Supply and

Services

EPC

= ++

Supply

Page 5: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key contracts: Service

Page 6: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key contracts: Service

• Regular servicing

• Breakages

• Keeping the turbines available

• Long term

Service

Page 7: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key risks: Procurement

• Wind farms are unique power plants

• location of wind farm sites

• climatic conditions impacting installation

• wind conditions

• grid connection requirements

• regulatory requirements

• Tailored contractual approach required

Page 8: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key risks: Procurement

• Transportation by sea

• In country transport

• Route construction

• Regulatory requirements

Page 9: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Page 10: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key risks: Procurement

• Installation in high wind

• Crane requirements

• Roads, hardstands, foundations

• Requirements for commissioning

Page 11: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key risks: Procurement

• Wind an unpredictable resource

• Collection of site data

• Analysis of site data

• Actual conditions differing from site data

• Force Majeure

Page 12: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key risks: Procurement

• Approvals, permits and consents

• Off-take arrangements

• Connection agreement

• Regulatory requirements

Page 13: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

Peter Mills | Blowing in the wind

Key Risks: Service

• Wind conditions

• Wear, breakages

• Availability and production

Page 14: Blowing in the wind: Some answers to effective wind ... › wp-content › uploads › Peter_Mills_0.pdf · Peter Mills | Blowing in the wind Key risks: Procurement • Wind farms

vestas.com

Thank you

Copyright NoticeThe documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any means—such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.