bloody bloody andrew jackson scenic drafting package · bloody bloody andrew jackson scenic...
TRANSCRIPT
P I A
N O
B A N DL E A D E R
B A S SG U I T A R
G U I T A R 2
S H E L V E S
C
D
E
A
B
G
F
H
I
K
N
M
LJ
T R U S S P I C K P O I N T
F.C.1
3
5E L E C T R I C # 1
78910
E L E C T R I C # 1 A
11121314T R U S S P I C K P O I N T
15E L E C T R I C # 2
1617181920212223B L A C K B O R D E R24
25E L E C T R I C # 3
262728293031323334
35E L E C T R I C # 4
3637
38
394041B L A C K D R A P E42434445
46
E L E C T R I C # 2 A
47
50
535455
4
6
2
S R T A B C U R T A I N4948
51S L T A B C U R T A I N 52
E L E C T R I C # 3A
3 B A N N E R S
S H E L V E S
S C A F F O L D I N G
D E T R I T R U S /S O U N D A B S O R P T I O N F
R I D
G E
DRUMS
Steel truss wall with agedcorrugated metal backing
Overhead stock truss
Pit elevatorat house level
Edge ofshow deck
-14"
+0"
-24"
+24"
+8"
DS platform(stack of drywall)
-43"
-42"-7"
Inset vents in fascia Pit F
ill
Black visqueen
Black visqueen
Black visqueen
Overhead extension of back wallseen over side walls
Overhead extension of back wallseen over side walls
Open web joistabove wall
Open web joistabove wall
Column AB
Column BC
Column CDColumn DE
Column EF
Column FG
Drumset platform Stock risers
Metal grateplatform
Stack of 3wooden pallets Box or crate.
Approx 1'-9" x 4' x 2'-4"
Overhead border
Overhead black drape.
Tab curtain Tab curtain
"We the People"banner
11'-1
0"
38'-4"
20'-5
"
5'-9"
Pipe on columnsfor speaker mounting
-7"
Metal stairs from stock
DetritusHazer located US.TBD by Lighting Designer.
Joist above wall Joist above wall
Stack of barrelsor crates
G r o u n d p l a nScale: 1/4" = 1'-0"1
24'-3
"
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
1
Groundplan
AEB1/4" = 1'-0"
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
13'-0
"
PL
68
1012
1416
1820
2224
26 F
T
S e c t i o n @ C LScale: 1/2" = 1'-0"1
Open web joist
Stock truss
18'-0
"
16'-0
"
Pipe for speaker mount
T R
U S
S P
I C K
P O
I N T
F.C. 1 3 5
E L E
C T
R I
C #
1
7 8 9 10
E L E
C T
R I
C #
1 A
11 12 13 14T
R U
S S
P I C
K P
O I N
T
15E
L E C
T R
I C
# 2
16 17 18 19 20 21 22 23B
L A C
K
B O
R D
E R
24 25E
L E C
T R
I C
# 3
26 27 28 29 30 31 32 33 34 35E
L E C
T R
I C
# 4
36 37 38
E L E
C T
R I
C #
2 A
4 62
E L E
C T
R I
C #
3A
3 B
A N
N E
R S
Stock metal shelves
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
2
Section at CL
AEB1/2" = 1'-0"
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
*See plate 11 for softgood hanging positions*
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
3
Front Elevation
AEB1/2" = 1'-0"
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
F r o n t E l e v a t i o nScale: 1/2" = 1'-0"1
CL
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
4
Wall D (Back Wall)
AEBAs Noted
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
A n g l e I r o n D e t a i lScale: Actual Size6
1 1/
2"
DS
1 1/2" packing
1 1/2" squaretube steel
1/8" masonite
1/8" masonite attachedafter installation of wall
3/4" MDF(top & bottom rail facing)
D e t a i l – S e c t i o nScale: Actual Size5
Corrugated metalattached to back of frames
(metal gets aged paint treatmentbefore attaching to frame)
6"
37'-11"
O P E N
W a l l D – F r o n tScale: 1/2" = 1'-0"1
Engages to Column DEEngages to Column CD
18'-
0"
7'-7"
~8'-8 1/2" typ.
7'-5 1/4"
7'-4"
2'-0
"
7'-2
"
12'-
5"
1 1/2" square tube steel(outer frame)
1 1/2" angle iron
6
5 1/2"
5
1/2"
Space diagonals to fit
3/4" MDF facingattached to all frames
1/4" masonite on front(on 2" packing)
and back of frames.See detail below.
Corrugated metalattached to back of all frames
(metal gets aged paint treatmentbefore attaching to frame)
7'-0
1/2
"
5 1/
2"
3"
5
(use offcut fro
m horizontals)
1 1/2" squaretube steel
Reverse & Repeat FacingsS e c t i o n @ C LScale: 1/2" = 1'-0"3
6
3 1/4"
DS
R e s e a r c h E x a m p l eNote: Corrugated metal will be painted4
6"
5 1/2"
See section detail below.
W a l l D – P l a nScale: 1/2" = 1'-0"2
3'-10 1/4" B • R • E • A • K B • R • E • A • K
B • R • E • A • KB • R • E • A • K
B • R • E • A • K
B • R • E • A • K
Front masonite facing attachedafter wall is assembled in space.
Column DE.See plate 8.
Column CD.See plate 8. Wall L (See plate 5)
Wall J (See plate 5)
2'-3"
7'-7"
2'-4 3/4"
See plate 9 for columns
W a l l L – F r o n tScale: 1/2" = 1'-0"11
See plate 4 forconstruction techniques.
15'-9
"
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
5
Walls A, B, F, G, J, K, L
AEBAs Noted
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
W a l l s A & B L a y o u tScale: 1/4" = 1'-0"1
Column AB Column BC
*See plate 8 for columns*
Horizontals align
Wall B Joist (Plate 7)
3'-6"
7'-7"
doo
rway
13'-0
"
5'-0" doorway
9'-0"
(open)
(open)
(open) (open)
(open)
(open)
(open)(open)
(open)
W a l l s A & G – F r o n tScale: 1/2" = 1'-0"3
B U I L D 2
4'-0 7
/8"
9'-4 1
/4"
16'-0
"
1'-10 1/2"
3'-9"
Drywall onUS side
W a l l B – F r o n tScale: 1/2" = 1'-0"5
W a l l s A & G – P l a nScale: 1/2" = 1'-0"4
Typical metal studwall construction
DS
W a l l B – P l a nScale: 1/2" = 1'-0"6
Drywall onUS side
DS
Drywall onUS side
W a l l F – F r o n tScale: 1/2" = 1'-0"7
Potential hole cut for lighting instrument.TBD in space.
W a l l F – P l a nScale: 1/2" = 1'-0"8
Drywall onUS side
DS
W a l l s F & G L a y o u tScale: 1/4" = 1'-0"2
Column EF Column FG
Wall F Joist (Plate 7)
10'-0
"
10'-0"
10' strip of black visqueenhung or loosely attachedto stock flats.
See Groundplan for positioning.
W a l l K – F r o n tScale: 1/2" = 1'-0"9
Column CD
W a l l J – P l a nScale: 1/2" = 1'-0"12 W a l l L – P l a n
Scale: 1/2" = 1'-0"13
Column DE
2'-3"
7'-7"
2'-4 3/4"
See plate 9 for columns
15'-9
"
See plate 4 forconstruction techniques.
W a l l J – F r o n tScale: 1/2" = 1'-0"10
Wall D (plate 4)
DS
Typical metal studwall construction
E
NM
Engages tocolumn DE 6"
W a l l E – P l a nScale: 1/2" = 1'-0"9W a l l C – P l a n
Scale: 1/2" = 1'-0"7
DS
Typical metal studwall construction
C
HI
Engages tocolumn CD6"
1
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
6
Walls C, E, H, I, M, N
AEBAs Noted
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!W a l l C – F r o n tScale: 1/2" = 1'-0"6
4'-0"
4'-0"
4'-0"
4'-0"
16'-0
"
2'-0"2'-0" typ.
19'-6"
3'-6" 4'-0" 12'-0"
P O
S S
I B
L E
B R
E A
K
Paper-covered lauan on US side. Painted/distressed.
( o p e n )
2'-0" 2'-0" typ.
19'-6"
16'-0
"
14'-0" 5'-6"4'-
0"4'-
0"4'-
0"4'-
0"
W a l l E – F r o n tScale: 1/2" = 1'-0"8
P O
S S
I B
L E
B R
E A
K
Paper-covered lauan on US side. Painted/distressed.
( o p e n )
Engages to Wall Nfor support (see below)
10'-0"
Wall E
10' strip of black visqueenhung or loosely attachedto stock flats.6" US of Wall E opening(see plan below).
W a l l M – F r o n tScale: 1/2" = 1'-0"3
12'-0
"
10' strip of black visqueenhung or loosely attachedto stock flats.6" US of Wall C opening(see plan below).
10'-0"
Wall C
W a l l I – F r o n tScale: 1/2" = 1'-0"2
12'-0
"
B U I L D 2
W a l l s H & N – F r o n tScale: 1/2" = 1'-0"4
2'-0"
16'-0
"
Paper-covered lauan on US side. Painted/distressed.
W a l l s H & N – P l a nScale: 1/2" = 1'-0"5
C o r n e r D e t a i lScale: 6" = 1'-0"1
2'-0"
W a l l C / E J o i s t s – S e c t i o nScale: 1" = 1'-0"8
6
1'-9" 16'-0" 1'-9"
19'-6"
5 1/2"
W a l l C / E J o i s t s – S e c t i o nScale: 1" = 1'-0"9
DS
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
7
Joists
AEBAs Noted
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
10
8
3'-0" typ.
S m
o k e
P o
c k e
t
2'-6" 4'-10" 4'-10" 4'-10" 2'-6"Joists engage tocolumn CD or DE
W a l l C / E J o i s t s – F r o n tScale: 1" = 1'-0"7
B U I L D 2
Wall C or E
9
Install with verticalson SL side
2"
3/4"
2"
D i a g o n a l s D e t a i l – S e c t i o nScale: Actual Size10
1x pine
10
2
W a l l B J o i s t – F r o n tScale: 1" = 1'-0"1
4'-0" typ.
Approx. 4'-1"
Engages to column BCat an angle
DS
W a l l B J o i s t – T o pScale: 1" = 1'-0"4
Column AB Angle to fitWall B below Column BC
W a l l B J o i s t – S e c t i o nScale: 1" = 1'-0"2
6
2'-0"
5 1/2"
W a l l F J o i s t – F r o n tScale: 1" = 1'-0"3
Engages to column EFat an angle
10
Reverse & Repeat Wall B Joist
DSW a l l B J o i s t – T o pScale: 1" = 1'-0"5
Column FGWall F belowAngle to fitColumn EF
5 1/2"
3 1/2"
1x pine
T e e s D e t a i l – S e c t i o nScale: Actual Size6
3/4"
C o l u m n CD
C
D
CL
J
9"
9"
Joist above wall
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
8
Columns
AEBAs Noted
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
1'-4"
Angled toward house wall (approx 35°)
7 5/8"1'-9 3/4"
Edge of platform ill
-43"
C
A
B
H
C o l u m n B C
C o l u m n A B
CL
CL
Discuss this junctionwith designer
Pipe @ 9' off deck forspeaker mounting
Angled jack
Handrail
Joist above wall
+0"
PL
S M O K EP O C K E T
C o l u m n s A B & B C – P l a nScale: 1" = 1'-0"1
R e v e r s e a n d R e p e a t f o rS L c o l u m n s ( D E , E F , F G )
House Level-43"
C o l u m n s A B & F G – F r o n tScale: 1/2" = 1'-0"2
21'-7
"
Stage Level+0"
B U I L D 2
6"
C o l u m n s B C , C D , D E , & E F – P l a nScale: 1/2" = 1'-0"5
Plywood construction.Fill visible seams with joint compound.
C o l u m n s A B & F G – P l a nScale: 1/2" = 1'-0"4
Fill visible seams with joint compound
Plywood
Lauan
C o l u m n s B C , C D , D E , & E F – F r o n tScale: 1/2" = 1'-0"3
18'-0
"
B U I L D 4
9"
9'-0"
Pipe for speaker mounting(onstage side of BC and EF only)
1'-0"
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
9
Pit Fill & Stairs
AEBAs Noted
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
Concrete paint treatment
(mea
sure
in sp
ace)
2'-0"
House Level-43"
P i t F i l l – F r o n tScale: 1/2" = 1'-0"2
CL
~ 43'-9"
Stage Level+0"
3
4'-9 1/4"2'-4"9'-6 3/4"2'-4" 16'-8" 2'-4"
DS platforms
Available at Home Depot.Six total vents needed.Build forestage to fit.
~ 3
'-7"
2'-0"
P i t F i l l – S e c t i o nScale: 1/2" = 1'-0"3
10
Possible lighting sourcebehind each vent. Coordinatewith lighting designer.
2'-11
"
S R S t a i r s – F r o n tScale: 1/2" = 1'-0"6
S R S t a i r s – P l a nScale: 1/2" = 1'-0"4
4'-7"
4'-0"
11"
typ.
7"
Metal construction.From stock.
S R S t a i r s – S i d eScale: 1/2" = 1'-0"5
typ.
2'-9"
3'-0"
S L S t a i r s – F r o n tScale: 1/2" = 1'-0"7
1'-9"
S L S t a i r s – F r o n tScale: 1/2" = 1'-0"8 S L S t a i r s – S i d e
Scale: 1/2" = 1'-0"9
11"typ
.
Metal construction.
typ.
7"
N o s i n g D e t a i lScale: Actual Size10
3/4"
5"
MDF edging withimperfect edges
3'-1
"
Concrete paint treatment
Inset louvredvents in facing
2"
P i t F i l l – P l a nScale: 1/2" = 1'-0"1
Pit elevator at house level.No pit wall.
Follow actual curve of stage edge.
MDF nosing
Date of Drawing:
THIS DRAWING REPRESENTS VISUAL CONCEPTSAND CONSTRUCTION SUGGESTIONS ONLY
P L A T E
OF 11
The designer is unqualified to determine the structural orelectrical appropriateness of this design, and will not assume responsibilityfor improper engineering, construction, handling, or use. All materials andconstruction must comply with the most stringent applicable Federal and
local Fire, Safety, Energy, and Environmental Codes.
11
Hanging Goods
AEB1/4" = 1'-0"
Director: Myrona DeLaney
Scenic Designer: Andy Broomell
Production Manager: Keith Bangs
Technical Director: Keith Bangs
Lighting Designer: Kristin Neu
Sound Designer: Matt Glenn
Costume Designer: Kaitlyn Kaufman
Stage Manager: Anne Hitt
Venue: Claire Trevor Theatre, UCI
Scale: Drawn By:
Drawing Schedule:
UPDATED 10.27.13
1. Groundplan2. Section at CL3. Front Elevation4. Wall D (Back Wall)5. Walls A, B, F, G, J, K, L6. Walls C, E, H, I, M, N7. Joists8. Columns9. Pit Fill & Stairs
10. Platforms11. Hanging Goods
ATTENTION!
This drawing is approved.
BUILD from this
drawing!
PL
T R
U S
S P
I C K
P O
I N
T
F.C. 1 3 5
E L E
C T
R I C
# 1
7 8 9 10
E L E
C T
R I C
# 1
A
11 12 13 14T
R U
S S
P I C
K P
O I
N T
15E
L E C
T R
I C #
2
16 17 18 19 20 21 22 23B
L A C
K B
O R
D E
R24 25
E L E
C T
R I C
# 3
26 27 28 29 30 31 32 33 34 35E
L E C
T R
I C #
4
36 37 38 39 40 41B
L A C
K D
R A
P E
42 43 44 45 46
E L E
C T
R I C
# 2
A
47 50 53 54 554 62
S R
T A
B C
U R
T A
I N
4948 51S
L T
A B
C U
R T
A I N
52
E L E
C T
R I C
# 3
A
3 B
A N
N E
R S
18'-0
"
31'-0
"
Lineset 23.Overhead 10'x60' black border.Trim 31' to bottom of drape.
Lineset 41.Overhead 30'x60' black drape.Trim 18' to bottom of drape.
H a n g i n g G o o d s – S e c t i o nScale: 1/4" = 1'-0"2
12'-0
"
NOTE: Side withdiagonal crossbraces
should face audience.
LNES
ET 2
2
LNES
ET 1
4
T R U S S P I C K P O I N T
F.C.1
3
5E L E C T R I C # 1
78910
E L E C T R I C # 1 A
11121314T R U S S P I C K P O I N T
15E L E C T R I C # 2
1617181920212223B L A C K B O R D E R24
25E L E C T R I C # 3
262728293031323334
35E L E C T R I C # 4
3637
38
394041B L A C K D R A P E42434445
46
E L E C T R I C # 2 A
47
50
535455
4
6
2
S R T A B C U R T A I N4948
51S L T A B C U R T A I N 52
E L E C T R I C # 3A
3 B A N N E R S
Stock tab curtain SL & SR.Trim 18' to bottom of drape.
Lineset 23.Overhead 10'x60' black border.Trim 31' to bottom of drape.
Lineset 41.Overhead 30'x60' black drape.Trim 18' to bottom of drape.
H a n g i n g G o o d s – P l a nScale: 1/4" = 1'-0"1
CL
(Lineset 14) 14'-8" to CL
(Lineset 22) 6'-8" to CL
Stock 10' truss above bandHanging position for Lighting & Sound
NOTE: Side with diagonalcrossbraces should face audience