Cable Length Summary
Block-2 COMM
Total Est1. = Total calculated lengths of cables in the cable tab.
2. Actual Pulled = Actual cable lengths pulled.
3. Est Unpulled = Estimated length to be pulled.
4. On Order = Cable quantity ordered.
5. Over/Short = Estimate of cables excess (+) or shortage (-) quantity.
6. Field Dev = Overpull (+%) when field pulled lengths are above design estimates;
Underpull (-%) when field pulled lengths are below design estimates.
Total Est
Actual Pulled
Est Unpulled
On Order
Over/Short
Field Dev
X
Y
-
7/29/2019 Blk-2 Fiber Msd
3/26
Total
# Cables
Total
Pulled
Total Est
Description Actual
Pulled
Over/
Short
Field
Dev
Type Code Est
Unpulled
On
Order
L e n g t h i n M e t e r s
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:44 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
Cable Length Summary
Furnish Spec Weight
of CU
FIBER04 QC-1023 4C FIBER OPTIC 62.5/125UM 073 15505 15505 0%(15505)0 0
RG-58 CO-AXIAL CABLE RG-58 C/U 03 1062 1062 0%(1062)0 0
Report Filter = ( CABLE_NUMBER Like 'C2%') AND (CABLE_SEG_CODE = 'CO' OR CABLE_SEG_CODE = 'T') AND CABLE_STATUS = 'Released'
Overall Totals: 76 0 16,567 0 16,567 0
Page 2 of 2
-
7/29/2019 Blk-2 Fiber Msd
4/26
Unique identifying number assigned the cable(s).
Identifies number of physical cables associated with cable number. (e.g. A cable number for a power feed may include three(3) 1/C cables).
Description of the type of cable (e.g. 7/C #14).
Voltage rating of cables insulation system (e.g. 600V)
Optional - when included is used to indicate that cable has and overall shield
Type of cable insulation material (e.g. XLPE).Type of cable jacket material (e.g. PVC)
Design revision status of the cable.
Plant system to which the cable is assigned (e.g. CD - which would be the Condensate System).
Description of service for which cable is used (e.g. Condensate Booster Pump A).
Optional - when included specifies special grounding requirement (e.g. #2 Bare CU - may be specified when using non-metallic conduit).
Segregation Code assigned to cable (e.g. MV - which would be Medium Voltage Power)
Unique code assigned to each different cable type.
Automatically calculated length which includes the length of the raceway path through which a cable is routed and also includes any end lengths which may be
manually input to account for the cable segment between the last raceway point and the connected equipment (see end length).
Automatically calculated contingency allowance based on the total routed length.
Optional - when included identifies actual installed cable lengths.
Optional - when included identifies budget reference numbers associated with cables.
Optional - when included identifies optional cable information.
Optional - when included identifies Start/Construction code
Contract responsible for providing the cable
Contract responsible for installing the cable
Identifying numbers of equipment between which cable is routed.
Description of equipment between which cable is routed.
Optional - when included identifies equipment compartment to which cable is to be terminated (e.g. switchgear cubicle).
Optional - when included identifies additional lengths which may be input to account for the cable segment between the last raceway point and the connected
equipment (see Rtd Length).
Optional - when included may be used to identify Master Schematic or other wiring drawing on which cable terminations are defined.
Optional - when included may be used to identify document(s) providing unique equipment installation details.
Optional - not required if zone is identified. Identifies the East - North grid location and Elevation of Equipment
Optional - not required when North / East / Elevation coordinates are identified. Identifies name or pre-defined zone in which equipment is located.
Optional - when included identifies optional notes, references, etc.
Optional - Identifies the cables installation route through the raceway system.
Optional - shown only on the last page of cable tabulation and identifies the additional constraints used in the generation of the report.
Cable No.
No. of Cables
Description
Voltage Rating
Shield
InsulationJacket
Rev.
System
Service
Ground
Seg Code
Type Code
Routed Length
Allowance
Pull Length
Budget Ref No
Option 1 / 2 / 3
Startup Code
Furnished SpecInstallation Spec
From/To Equipment Number
From/To Description
Compartment
End Length
Wiring Drawing
Location Drawing
North / East / Elevation
Zone
Remarks
Route Points
Filter Criteria
ITEM DESCRIPTION
Block-2 COMM Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Schematic Dwg:
Description:
Route Points:
Cable No. : Rev:
Type Code:
Service:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment::
Description:
Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
Furnish Spec:
North: North:
Total Length (m):
Remarks:
Schematic Dwg:
End Length(m):
Cable Tabulation
-
7/29/2019 Blk-2 Fiber Msd
5/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CMA 1
N
PVC
CO
4
33 DATA RETRIEVAL PNL
BEMCO
C20BBE 5
4.16KV UNIT SWBD BUS A
ED-693631
C20CMA01 5
4.16KV UNIT SWGR DATA RETRIEVAL PANEL (BLK-2)
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
37Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-693631
00C20CMA4004 DATA RETRIEVAL PANEL FOR BLOCK-24C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-067 C20-TK-069 C20-TK-071 C20-TK-074 C20-TK-073 C20-TK-062 CABLE
FIBER04
CPB 1
N
PVC
CO
23
540
BEMCO
C20SW63 10
NETWORK SW63 IN ST2 ELEC ROOM
ED-694669
P00SW171 35
NETWORK SW171 IN CCB
EA-681112
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
563Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694669
00C20CPB6001 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C24-TK-054 C24-TK-053 C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 CABLE C24-TK-215B C24-TK-218 C20-EMH-009
C20-D066-44 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63
C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032
C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
23
540
BEMCO
C20SW64 10
NETWORK SW64 IN ST2 ELEC ROOM
ED-694669
P00SW172 35
NETWORK SW172 IN CCB
EA-681112
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
563Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694669
00C20CPB6002 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C24-TK-054 C24-TK-053 C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 CABLE C24-TK-215B C24-TK-218 C20-EMH-009
C20-D066-44 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63
C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032
C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
Page 1 of 22
-
7/29/2019 Blk-2 Fiber Msd
6/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
29
719
BEMCO
C20SW196 10
NETWORK SW196 IN BLK-2 MVLV BLDG
ED-694669
P00SW171 35
NETWORK SW171 IN CCB
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
748Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694669
00C20CPB6003 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211
C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009
C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-64
C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032
C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
29
719
BEMCO
C20SW197 10
NETWORK SW197 IN BLK-2 MVLV BLDG
ED-694669
P00SW172 35
NETWORK SW172 IN CCB
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
748Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694669
00C20CPB6004 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211
C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009
C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-64
C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032
C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
29
719
BEMCO
C20SW198 10
NETWORK SW198 IN BLK-2 MVLV BLDG
ED-694669
P00SW171 35
NETWORK SW171 IN CCB
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
748Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694669
00C20CPB6005 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211
C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009
C20-D066-44 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63
C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032
C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
Page 2 of 22
-
7/29/2019 Blk-2 Fiber Msd
7/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
29
719
BEMCO
C20SW199 10
NETWORK SW199 IN BLK-2 MVLV BLDG
ED-694669
P00SW172 35
NETWORK SW172 IN CCB
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
748Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694669
00C20CPB6006 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211
C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009
C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-64
C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032
C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
29
719
BEMCO
C20SW200 10
NETWORK SW200 IN BLK-2 MVLV BLDG
ED-694669
P00SW171 35
NETWORK SW171 IN CCB
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
748Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694669
00C20CPB6007 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211
C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009
C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-64
C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032
C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
29
719
BEMCO
C20SW201 10
NETWORK SW201 IN BLK-2 MVLV BLDG
ED-694669
P00SW172 35
NETWORK SW172 IN CCB
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
748Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694669
00C20CPB6008 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211
C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009
C20-D066-44 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63
C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032
C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
Page 3 of 22
-
7/29/2019 Blk-2 Fiber Msd
8/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
2
11
BEMCO
C21-CPB-66-GH-013 11
B2H1T I/O CABINET-1_TMR
ED-694669
C21-CPB-66-GH-011 0
B2H1T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6009 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
2
11
BEMCO
C21-CPB-66-GH-013 11
B2H1T I/O CABINET-1_TMR
ED-694669
C21-CPB-66-GH-011 0
B2H1T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6010 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
2
11
BEMCO
C21-CPB-66-GH-013 11
B2H1T I/O CABINET-1_TMR
ED-694669
C21-CPB-66-GH-011 0
B2H1T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6011 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
2
12
BEMCO
C21-CPB-66-GH-012 6
B2H1T I/O CABINET-2_TMR
ED-694669
C21-CPB-66-GH-011 6
B2H1T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6012 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-151 CABLE
Page 4 of 22
-
7/29/2019 Blk-2 Fiber Msd
9/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
2
12
BEMCO
C21-CPB-66-GH-012 6
B2H1T I/O CABINET-2_TMR
ED-694669
C21-CPB-66-GH-011 6
B2H1T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6013 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-151 CABLE
FIBER04
CPB 1
N
PVC
CO
2
12
BEMCO
C21-CPB-66-GH-012 6
B2H1T I/O CABINET-2_TMR
ED-694669
C21-CPB-66-GH-011 6
B2H1T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6014 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-151 CABLE
FIBER04
CPB 1
N
PVC
CO
3
14
BEMCO
C21-CPB-66-GH-003 5
B2H1 I/O CABINET-2_SIMP
ED-694669
C21-CPB-66-GH-001 9
B2H1 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6015 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-148 CABLE
FIBER04
CPB 1
N
PVC
CO
3
14
BEMCO
C21-CPB-66-GH-003 5
B2H1 I/O CABINET-2_SIMP
ED-694669
C21-CPB-66-GH-001 9
B2H1 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6016 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-148 CABLE
Page 5 of 22
-
7/29/2019 Blk-2 Fiber Msd
10/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
3
15
BEMCO
C21-CPB-66-GH-004 6
B2H1 I/O CABINET-3_SIMP
ED-694669
C21-CPB-66-GH-001 9
B2H1 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6017 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-148 CABLE
FIBER04
CPB 1
N
PVC
CO
3
15
BEMCO
C21-CPB-66-GH-004 6
B2H1 I/O CABINET-3_SIMP
ED-694669
C21-CPB-66-GH-001 9
B2H1 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6018 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-148 CABLE
FIBER04
CPB 1
N
PVC
CO
2
11
BEMCO
C22-CPB-66-GH-013 11
B2H2T I/O CABINET-1_TMR
ED-694669
C22-CPB-66-GH-011 0
B2H2T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6019 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
2
11
BEMCO
C22-CPB-66-GH-013 11
B2H2T I/O CABINET-1_TMR
ED-694669
C22-CPB-66-GH-011 0
B2H2T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6020 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
Page 6 of 22
-
7/29/2019 Blk-2 Fiber Msd
11/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
2
11
BEMCO
C22-CPB-66-GH-013 11
B2H2T I/O CABINET-1_TMR
ED-694669
C22-CPB-66-GH-011 0
B2H2T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6021 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
3
14
BEMCO
C22-CPB-66-GH-012 5
B2H2T I/O CABINET-2_TMR
ED-694669
C22-CPB-66-GH-011 9
B2H2T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6022 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-141 CABLE
FIBER04
CPB 1
N
PVC
CO
3
14
BEMCO
C22-CPB-66-GH-012 5
B2H2T I/O CABINET-2_TMR
ED-694669
C22-CPB-66-GH-011 9
B2H2T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6023 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-141 CABLE
FIBER04
CPB 1
N
PVC
CO
3
14
BEMCO
C22-CPB-66-GH-012 5
B2H2T I/O CABINET-2_TMR
ED-694669
C22-CPB-66-GH-011 9
B2H2T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6024 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-141 CABLE
Page 7 of 22
-
7/29/2019 Blk-2 Fiber Msd
12/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
3
15
BEMCO
C22-CPB-66-GH-003 6
B2H2 I/O CABINET-2_SIMP
ED-694669
C22-CPB-66-GH-001 5
B2H2 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6025 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-139 C20-TK-137 CABLE
FIBER04
CPB 1
N
PVC
CO
3
15
BEMCO
C22-CPB-66-GH-003 6
B2H2 I/O CABINET-2_SIMP
ED-694669
C22-CPB-66-GH-001 5
B2H2 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6026 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-139 C20-TK-137 CABLE
FIBER04
CPB 1
N
PVC
CO
3
16
BEMCO
C22-CPB-66-GH-004 7
B2H2 I/O CABINET-3_SIMP
ED-694669
C22-CPB-66-GH-001 5
B2H2 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
19Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6027 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-139 C20-TK-137 CABLE
FIBER04
CPB 1
N
PVC
CO
3
16
BEMCO
C22-CPB-66-GH-004 7
B2H2 I/O CABINET-3_SIMP
ED-694669
C22-CPB-66-GH-001 5
B2H2 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
19Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6028 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-139 C20-TK-137 CABLE
Page 8 of 22
-
7/29/2019 Blk-2 Fiber Msd
13/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
2
12
BEMCO
C23-CPB-66-GH-013 7
B2H3T I/O CABINET-1_TMR
ED-694669
C23-CPB-66-GH-011 5
B2H3T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6029 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO
2
12
BEMCO
C23-CPB-66-GH-013 7
B2H3T I/O CABINET-1_TMR
ED-694669
C23-CPB-66-GH-011 5
B2H3T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6030 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO
2
12
BEMCO
C23-CPB-66-GH-013 7
B2H3T I/O CABINET-1_TMR
ED-694669
C23-CPB-66-GH-011 5
B2H3T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6031 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO
3
13
BEMCO
C23-CPB-66-GH-012 5
B2H3T I/O CABINET-2_TMR
ED-694669
C23-CPB-66-GH-011 5
B2H3T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6032 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-140 C20-TK-143 CABLE
Page 9 of 22
-
7/29/2019 Blk-2 Fiber Msd
14/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
3
13
BEMCO
C23-CPB-66-GH-012 5
B2H3T I/O CABINET-2_TMR
ED-694669
C23-CPB-66-GH-011 5
B2H3T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6033 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-140 C20-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO
3
13
BEMCO
C23-CPB-66-GH-012 5
B2H3T I/O CABINET-2_TMR
ED-694669
C23-CPB-66-GH-011 5
B2H3T CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6034 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-140 C20-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO
3
13
BEMCO
C23-CPB-66-GH-003 8
B2H3 I/O CABINET-2_SIMP
ED-694669
C23-CPB-66-GH-001 5
B2H3 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6035 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-165 CABLE
FIBER04
CPB 1
N
PVC
CO
3
13
BEMCO
C23-CPB-66-GH-003 8
B2H3 I/O CABINET-2_SIMP
ED-694669
C23-CPB-66-GH-001 5
B2H3 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6036 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-165 CABLE
Page 10 of 22
-
7/29/2019 Blk-2 Fiber Msd
15/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
3
15
BEMCO
C23-CPB-66-GH-004 10
B2H3 I/O CABINET-3_SIMP
ED-694669
C23-CPB-66-GH-001 5
B2H3 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6037 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-165 CABLE
FIBER04
CPB 1
N
PVC
CO
3
15
BEMCO
C23-CPB-66-GH-004 10
B2H3 I/O CABINET-3_SIMP
ED-694669
C23-CPB-66-GH-001 5
B2H3 CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6038 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-165 CABLE
FIBER04
CPB 1
N
PVC
CO
3
18
BEMCO
C20-CPB-66-GH-023 18
B2BT I/O CABINET-2_TMR
ED-694669
C20-CPB-66-GH-021 0
B2BT CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6039 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
3
18
BEMCO
C20-CPB-66-GH-023 18
B2BT I/O CABINET-2_TMR
ED-694669
C20-CPB-66-GH-021 0
B2BT CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6040 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
Page 11 of 22
-
7/29/2019 Blk-2 Fiber Msd
16/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
3
18
BEMCO
C20-CPB-66-GH-023 18
B2BT I/O CABINET-2_TMR
ED-694669
C20-CPB-66-GH-021 0
B2BT CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6041 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
3
19
BEMCO
C20-CPB-66-GH-024 7
B2BT I/O CABINET-3_SIMP
ED-694669
C20-CPB-66-GH-021 12
B2BT CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
22Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6042 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-133 CABLE
FIBER04
CPB 1
N
PVC
CO
3
19
BEMCO
C20-CPB-66-GH-024 7
B2BT I/O CABINET-3_SIMP
ED-694669
C20-CPB-66-GH-021 12
B2BT CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
22Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6043 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-133 CABLE
FIBER04
CPB 1
N
PVC
CO
3
16
BEMCO
C20-CPB-66-GH-004 5
B2C I/O CABINET-3_SIMP
ED-694669
C20-CPB-66-GH-001 7
B2C CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
19Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6044 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-149 C20-TK-150 CABLE
Page 12 of 22
-
7/29/2019 Blk-2 Fiber Msd
17/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
3
16
BEMCO
C20-CPB-66-GH-004 5
B2C I/O CABINET-3_SIMP
ED-694669
C20-CPB-66-GH-001 7
B2C CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
19Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6045 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-149 C20-TK-150 CABLE
FIBER04
CPB 1
N
PVC
CO
3
18
BEMCO
C20-CPB-66-GH-005 7
B2C I/O CABINET-4_SIMP
ED-694669
C20-CPB-66-GH-001 7
B2C CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6046 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-149 C20-TK-150 CABLE
FIBER04
CPB 1
N
PVC
CO
3
18
BEMCO
C20-CPB-66-GH-005 7
B2C I/O CABINET-4_SIMP
ED-694669
C20-CPB-66-GH-001 7
B2C CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6047 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-149 C20-TK-150 CABLE
FIBER04
CPB 1
N
PVC
CO
2
11
BEMCO
C20-CPB-66-GH-012 5
B2E I/O CABINET-1_SIMP
ED-694669
C20-CPB-66-GH-011 6
B2E CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6048 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-145 CABLE
Page 13 of 22
-
7/29/2019 Blk-2 Fiber Msd
18/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
2
11
BEMCO
C20-CPB-66-GH-012 5
B2E I/O CABINET-1_SIMP
ED-694669
C20-CPB-66-GH-011 6
B2E CONTROLLER CABINET
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6049 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-145 CABLE
FIBER04
CPB 1
N
PVC
CO
3
13
BEMCO
C20-CPB-66-GH-011 6
B2E CONTROLLER CABINET
ED-694669
C20-CPB-66-GH-013 7
B2E I/O CABINET-2_SIMP
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6050 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-145 CABLE
FIBER04
CPB 1
N
PVC
CO
3
13
BEMCO
C20-CPB-66-GH-011 6
B2E CONTROLLER CABINET
ED-694669
C20-CPB-66-GH-013 7
B2E I/O CABINET-2_SIMP
EA-681122
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694669
00C20CPB6051 BLOCK-2 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C20-TK-145 CABLE
Page 14 of 22
-
7/29/2019 Blk-2 Fiber Msd
19/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
14
318
BEMCO
C20-PAB-55-GH-010 10
BLK-2 DBRS FLTR CNTL PNL
ED-694679
C20-CPB-66-GN-001 5
B2C NETWORK CABINET
EA-681112
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
332Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694679
00C20CPB6079 BLOCK-2 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C24-TK-038 C24-TK-044 C24-TK-045 C24-TK-046 C24-TK-222 C24-TK-221 C24-TK-219 C24-TK-216 C24-TK-214 C24-TK-212
C24-TK-210 C24-TK-208 C24-TK-206 C24-TK-204 C24-TK-202 C20-TK-208 C20-TK-212B C20-TK-217B C20-TK-218B C20-TK-223B C20-TK-158
C20-TK-154 C20-TK-150 C20-TK-149 C20-TK-145 C20-TK-143 C20-TK-140 C20-TK-165 CABLE
FIBER04
CPB 1
N
PVC
CO
14
318
BEMCO
C20-PAB-55-GH-010 10
BLK-2 DBRS FLTR CNTL PNL
ED-694679
C20-CPB-66-GN-001 5
B2C NETWORK CABINET
EA-681112
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
332Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694679
00C20CPB6080 BLOCK-2 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C24-TK-038 C24-TK-044 C24-TK-045 C24-TK-046 C24-TK-222 C24-TK-221 C24-TK-219 C24-TK-216 C24-TK-214 C24-TK-212
C24-TK-210 C24-TK-208 C24-TK-206 C24-TK-204 C24-TK-202 C20-TK-208 C20-TK-212B C20-TK-217B C20-TK-218B C20-TK-223B C20-TK-158
C20-TK-154 C20-TK-150 C20-TK-149 C20-TK-145 C20-TK-143 C20-TK-140 C20-TK-165 CABLE
FIBER04
CPB 1
N
PVC
CO
13
284
BEMCO
C21-MBR-10-GH-001 15
DIVERTER DAMPER LCP
ED-694680
C20-CPB-66-GN-001 5
B2C NETWORK CABINET
EA-685856
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
297Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694680
00C20CPB6084 BLOCK-2 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C21-TK-041 C21-TK-042 C21-TK-044 C21-TK-045 C21-TK-046 C21-TK-051 CABLE C21-TK-323 C21-TK-322 C21-TK-311 C21-TK-302
C21-TK-301 C21-TK-101 C21-TK-203 C21-TK-102 C21-TK-201 C21-TK-517 C21-TK-518A C21-TK-519A C21-TK-520A C21-TK-521A C21-TK-523A
C20-TK-206A C20-TK-210A C20-TK-219A C20-TK-218A C20-TK-223A C20-TK-158 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE
Page 15 of 22
-
7/29/2019 Blk-2 Fiber Msd
20/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
13
284
BEMCO
C21-MBR-10-GH-001 15
DIVERTER DAMPER LCP
ED-694680
C20-CPB-66-GN-001 5
B2C NETWORK CABINET
EA-685856
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
297Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694680
00C20CPB6085 BLOCK-2 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C21-TK-041 C21-TK-042 C21-TK-044 C21-TK-045 C21-TK-046 C21-TK-051 CABLE C21-TK-323 C21-TK-322 C21-TK-311 C21-TK-302
C21-TK-301 C21-TK-101 C21-TK-203 C21-TK-102 C21-TK-201 C21-TK-517 C21-TK-518A C21-TK-519A C21-TK-520A C21-TK-521A C21-TK-523A
C20-TK-206A C20-TK-210A C20-TK-219A C20-TK-218A C20-TK-223A C20-TK-158 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE
FIBER04
CPB 1
N
PVC
CO
9
183
BEMCO
C22-MBR-10-GH-001 15
DIVERTER DAMPER LCP
ED-694680
C20-CPB-66-GN-001 5
B2C NETWORK CABINET
EA-685856
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
192Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694680
00C20CPB6088 BLOCK-2 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C22-TK-041 C22-TK-042 C22-TK-044 C22-TK-045 C22-TK-046 C22-TK-051 CABLE C22-TK-323 C22-TK-322 C22-TK-311 C22-TK-302
C22-TK-301 C22-TK-101 C22-TK-203 C22-TK-102 C22-TK-201 C22-TK-517 C22-TK-518A C22-TK-520A C20-TK-247A C20-TK-162A C20-TK-161A
C20-TK-140 C20-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO
9
183
BEMCO
C22-MBR-10-GH-001 15
DIVERTER DAMPER LCP
ED-694680
C20-CPB-66-GN-001 5
B2C NETWORK CABINET
EA-685856
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
192Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694680
00C20CPB6089 BLOCK-2 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C22-TK-041 C22-TK-042 C22-TK-044 C22-TK-045 C22-TK-046 C22-TK-051 CABLE C22-TK-323 C22-TK-322 C22-TK-311 C22-TK-302
C22-TK-301 C22-TK-101 C22-TK-203 C22-TK-102 C22-TK-201 C22-TK-517 C22-TK-518A C22-TK-520A C20-TK-247A C20-TK-162A C20-TK-161A
C20-TK-140 C20-TK-143 CABLE
Page 16 of 22
-
7/29/2019 Blk-2 Fiber Msd
21/26
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
3:57 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 4.0)
Run Date: 2/12/2013
Sargent & Lundy LLC, Chicago, IL
Block-2 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
13
280
BEMCO
C200102 7
GENERATOR CONT & PROT PNL BLK-2
ED-694681
C20-CPB-66-GN-001 7
B2C NETWORK CABINET
EA-681112
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
293Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694681
00C20CPB6102 BLOCK-2 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 C24-TK-214 C24-TK-212 C24-TK-210 C24-TK-208 C24-TK-206 C24-TK-204
C24-TK-202 C20-TK-208 C20-TK-212B C20-TK-217B C20-TK-218B C20-TK-223B C20-TK-158 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE
FIBER04
CPB 1
N
PVC
CO
27
651
BEMCO
C20BPA01 9
VFD PANEL FOR CW PUMP#1A BLOCK-2
ED-694681
C20-CPB-66-GN-001 8
B2C NETWORK CABINET
EA-681133
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
678Total Length (m):
escription:
Remarks:
Schematic: EA-681122
End Length(m):
ED-694681
00C20CPB6103 BLOCK-2 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C00-TK-141 C00-TK-142 C00-TK-146 C00-TK-152 C00-TK-157 C00-TK-163 C00-TK-162 C00-TK-172 CABLE C00-EMH-179 C00-D363-04
C00-EMH-176 C00-D359-27 C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-61 C30-EMH-011 C30-D070-64 C30-EMH-010 C30-D066-59 C30-EMH-009
C30-D065-60 C30-EMH-008 C30-D063-40 C30-EMH-007 C20-D066-42 C20-EMH-009 C24-TK-218 C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B
C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-233 C20-TK-231 C20-TK-159
C20-TK-153 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE
FIBER04
CPB 1
N
PVC
CO
27
651
BEMCO
C20BPA01 9
VFD PANEL FOR CW PUMP#1A BLOCK-2
ED-694681
C20-CPB-66-GN-001 8
B2C NETWORK CABINET
EA-681133
Cable: Rev:
Type Code: