  • 7/25/2019 Blaine Apparatus Calibration sheet

    1/1

    Date of calibration : -

    Next due Date:-

    Room condition Temp. C R.H. (%)

    13.51 gm/cc Before Calibraton 27.8 65

    127.3488 grams After Calibration 26.9 68

    Weigtht of the mercury filling the entire cell (Wa)

    Wa1 = 83.9117 grams Wa1 = 84.1395 grams Wa1 = 84.1921 grams

    Wa2 = 83.8946 grams Wa2 = 84.2085 grams Wa2 = 84.1639 grams

    Wa3 = 83.9025 grams Wa3 = 84.2985 grams Wa3 = 84.1725 grams

    Wa = 83.9029 grams Wa = 84.2155 grams Wa = 84.1762 grams

    Weight of the mercury filling the portion of ) Weight of the mercury filling the portion of ) Weight of the mercury filling the portion of )

    the cell above the OPC cement bed (Wb)

    Wb1 = 58.5960 grams Wb1 = 58.7901 grams Wb1 = 58.7130 grams

    Wb2 = 58.5435 grams Wb2 = 58.8299 grams Wb2 = 58.7522 grams

    Wb3 = 58.5367 grams Wb3 = 58.8888 grams Wb3 = 58.7526 grams

    Wb = 58.5587 grams Wb = 58.8363 grams Wb = 58.7393 grams

    Wa - Wb Volume of the cell V= Wa - Wb Wa - Wb

    D D D

    = 1.8760 cm3

    1.8786 cm3

    1.8828 cm3

    Factor Calculation for PPC 356 m2/kg

    2.83 2.83

    1.8760 cm3

    0.50

    0.50 48.80 Sec.P V (1-e)

    = 2.6545 grams

    P x (1-e) x SQRT( e3s) x SQRT ( Ts)

    50.96295 m

    2/kg

    3.15 3.15

    1.8786 cm3

    0.50

    0.50

    P V (1-e)

    = 2.9587 grams 45.00 Sec.

    P x (1-e) x SQRT( es3) x SQRT ( Ts)

    43.98

    Factor Calculation for Fly Ash 485 m2/kg

    2.22 2.22

    1.8828cm

    3

    0.500.50 50.00 Sec.

    P V (1-e)

    = 2.0899 grams

    FACTOR = 68.59

    Weight of( FLYASH) to be taken (M) =

    FACTOR =Ss

    SQRT ( Ts)

    STD SRM Sample (1001FC2) BLAINE (Ss)

    pecific Gravity of Standard FLYASH ( P ) = Specific Gravity of Standard Flyash ( P ) =

    Volume of the Cell ( V ) = Porosity of the Standard Flyash (es ) =Porosity of the Flyash ( e ) = Time interval of Standard Flyash(Ts ) =

    Porosity of the OPC Cement ( e ) =

    Weight of Cement(OPC) to be taken (M) =

    Time interval of Standard Cement (Ts) =

    FACTOR = Ssx Psx ( 1-es) x SQRT(e3)

    FACTOR =

    FACTOR =Factor Calculation for OPC STD SRM Sample(1001A16) BLAINE =

    pecific Gravity of OPC Cement ( P ) = Specific Gravity of Standard Cement(Ps) =

    Volume of the Cell ( V ) = Porosity of the Standard Cement (es) =

    Volume of the Cell ( V ) = Porosity of the Standard Cement (es ) =

    Porosity of the PPC Cement ( e ) = Time interval of Standard Cement(Ts ) =

    Weight of Cement(PPC) to be taken (M) =

    FACTOR = Ss x Ps x ( 1-es) x SQRT(e3)

    he cell above the cement bed (Wb) the cell above the cement bed (Wb)

    Volume of the cell V = Volume of the cell V =

    STD SRM Sample1002A9 BLAINE =

    pecific Gravity of PPC Cement ( P ) = Specific Gravity of Standard Cement(Ps) =

    Cell Sl. No : Sunday, February 01, 2015

    Density of Mercury at 26.5 C =Weight of Empty cell

    PPC OPC FLYASH

    CALIBRATION

    BLAINE APPARATUS-

    BLAINE APPRATUS NO : Thursday, January 01, 2015