bkz contracting company profile
DESCRIPTION
BKZ Constriction Company is working in Azad Jammu & Kashmir.BKZ Const. is Government Contractor.TRANSCRIPT
BB KK ZZConstructions Pvt. Ltd.
B K Z Construction Pvt. Ltd.
Professional Builders
Office Number 16, Ground Floor, Ahmed Centre, I-8 Markaz, Islamabad.Ph: 051-4864508, Fax: 051-4101739, Cell: 0345-5004101Email: [email protected], Web: www.bkzconst.com
BKZ Pro f i l eBKZ Pro f i l e
INTRODUCTION
BB KK ZZConstruction Pvt. Ltd.
BKZ Construction (Pvt.) Ltd. stands for Bashir Khurshid and Zaman.
BKZ Construction Pvt. Ltd. is a successful, privately owned construction company established in 2008. It is involved in multi-disciplined building and civil engineering projects. The Company has a wide and varied client base from blue chip private sector clients to central government agencies and local authorities.
We have extensive experience across a variety of projects including commercial, industrial, distribution, leisure, retail, education, residential, prison and armed forces.
BKZ Construction Pvt. Ltd. has a history of commitment, co-operation and non adversarial contracting. By working together and maintaining client relationships we have developed a reputation for delivering successful projects, which has generated a large amount of repeat business.
BKZ Construction Pvt. Ltd. recognizes all forms of procurement, traditional tender, partnering, design and build. These have and will all contribute to the service that BKZ Construction Pvt. Ltd. offers their clients.
Our aim is to continue to provide an outstanding level of customer service. To measure the success of a project and to gauge our performance we operate an ongoing client satisfaction program. The data collected from this enables us to strive for continuous improvement. The objective is to build on the Company's strengths and the development of areas of expertise to the benefit of clients, employees and all associated with BKZ Construction Pvt. Ltd.
Safety, Health and Environment are incorporated into all the Company's activities. All employees take an active role and are totally committed to SHE.
INTRODUCTIONINTRODUCTION
Our mission is to perform for our customers the highest level of quality construction services at fair and market competitive prices. To ensure the longevity of our company, through repeat and referral business achieved by customer satisfaction in all areas; including timeliness, attention to detail and service-minded attitudes. Our mission is to maintain the highest levels of professionalism, integrity, honesty and fairness in our relationships with our suppliers, subcontractors, professional associates and customers.
To deliver high-quality, cost-effective projects on schedule by employing and supporting motivated, flexible, and focused teams. We value the importance of our relationships and will continue to remain fair and true in our dealings with all employees, clients, vendors, and partners. Our clients count on our dependability, our drive, and our integrity. We take great pride in our accomplishments and build on them every day.
We offer consistent, reliable and timely service in a proactive manner. We also provide our customers with the industries highest standards of proactive management and quality of workmanship. We earn the trust of our customers by treating them as we treat ourselves, with respect, honesty and fairness.
Our personnel are the foundation of our success. We all share a cohesive vision as well as the core philosophy of BKZ Construction Pvt. Ltd. and execute both with purpose and pride. We trust and support each other. We value creativity, productivity and loyalty. The value we appreciate in each other reflects in the quality of work we produce together.
We strive to live balanced lives in work, family and play. By exercising our ethics and value's on each and every project, we cultivate the future of the company. We are as confident of our future as we are of yours. We care about our clients, their families and their future because we care about our own families, communities and future.
MISSION AND VISIONMISSION AND VISION
MISSION:
VISION:
To further strengthen and expand our new establish position and continue being the first choice for clients.
ORGANIZATION CHARTORGANIZATION CHART
B K Z Construction Pvt. Ltd.
Professional Builders
HR
Assis
tan
t
Dire
cto
r
Acc
ou
nta
nt
Ch
ief
Ex
ec
uti
ve
Dire
cto
r
Str
uct
ure
En
gin
ee
rM
ech
an
ica
lE
ng
ine
er
Su
b E
ng
ine
er
Sto
re K
ee
pe
r
Pla
nt / M
ach
ine
ryO
pe
rato
r
Su
rve
yor
Su
b E
ng
ine
er
Sto
re K
ee
pe
r
Fo
rem
an
Me
cha
nic
s
Sto
re K
ee
pe
r
La
bo
ur
Pla
nt / M
ach
ine
ryO
pe
rato
r
HR
Offic
eA
ssis
tan
t
Acc
ou
nts
Co
mp
ute
rO
pe
rato
r
Hig
hw
ay
En
gin
ee
r
Su
rve
yor
Fo
rem
an
La
bo
ur
Nearly 6.5 million people work at approximately 252,000 construction sites across the nation on any given day. The fatal injury rate for the construction industry is higher than the national average in this category for all industries.
Potential hazards for workers in construction include:
· Falls (from heights);
· Trench collapse;
· Scaffold collapse;
· Electric shock and arc flash/arc blast;
· Failure to use proper personal protective equipment; and
· Repetitive motion injuries.
For construction, the 10 OSHA standards most frequently included in the agency's citations in FY 2004 were:
1. Scaffolding
2. Fall protection (scope, application, definitions)
3. Excavations (general requirements)
4. Ladders
5. Head protection
6. Excavations (requirements for protective systems)
7. Hazard communication
8. Fall protection (training requirements)
9. Construction (general safety and health provisions)
10.Electrical (wiring methods, design and protection)
Hazard: When scaffolds are not erected or used properly, fall hazards can occur. About 2.3 million construction workers frequently work on scaffolds. Protecting these workers from scaffold-related accidents would prevent an estimated 4,500 injuries and 50 fatalities each year.
!Scaffold must be sound, rigid and sufficient to carry its own weight plus four times the
maximum intended load without settling or displacement. It must be erected on solid footing.
EMPHASIS OF WORKER SAFETYEMPHASIS OF WORKER SAFETY
Hazards & Solutions
Solutions:
Hazard: Each year, falls consistently account for the greatest number of fatalities in the construction industry. A number of factors are often involved in falls, including unstable working surfaces, misuse or failure to use fall protection equipment and human error. Studies have shown that using guardrails, fall arrest systems, safety nets, covers and restraint systems can prevent many deaths and injuries from falls.
!Consider using aerial lifts or elevated platforms to provide safer elevated working surfaces;
!Erect guardrail systems with toe-boards and warning lines or install control line systems to
protect workers near the edges of floors and roofs;
Solutions:
Fall Protection
Hazard: Ladders and stairways are another source of injuries and fatalities among construction workers. OSHA estimates that there are 24,882 injuries and as many as 36 fatalities per year due to falls on stairways and ladders used in construction. Nearly half of these injuries were serious enough to require time off the job.
!Use the correct ladder for the task.
!Have a competent person visually inspect a ladder before use for any defects such as:
! Structural damage, split/bent side rails, broken or missing rungs/steps/cleats and
missing or damaged safety devices;
! Grease, dirt or other contaminants that could cause slips or falls;
! Paint or stickers (except warning labels) that could hide possible defects.
! Make sure that ladders are long enough to safely reach the work area.
!Mark or tag ("Do Not Use") damaged or defective ladders for repair or replacement, or
destroy them immediately.
!Never load ladders beyond the maximum intended load or beyond the manufacturer's rated
Solutions:
Ladders
B K Z Construction Pvt. Ltd.
Professional Builders
DIRECTORSDIRECTORS
Muhammad Zaman
Muhammad Khurshid
Muhammad Bashir
Qualification:Experience:
Matric25 years construction experience.
Qualification:Professional Qualification:Experience:
Graduation (Economics)3 years diploma in Construction5 years experience in Construction
Qualification:Experience:
Matric10 years construction experience.
PROJECTS OF B K Z PROJECTS OF B K Z
B K Z Construction Pvt. Ltd.
Professional Builders
Contract Identification ClientStartingMonthly /Year
CompletionMonth /Year
TotalContractAmount (Rs.Million)
PWD Project serraDRU Package SidpurMuzaffarabad, AJK
PWD Project DRUPackage TehsilAthmukam, DistrictMuzaffarabad, AJK
Private ProjectAl-Haram CityRawalpindi
PWD
PWD
Private
March 2009
July 2009
January 2010
March 2010
March 2010
January 2011
48.153million
30 million
100 million
PROJECTSPROJECTS
PWD Project serraDRU Package TalgranGHS Rajpaian,Muzaffarabad, AJK
PWD In Process 26.2million
PWD Project serraDRU Package GundigranDIU, Muzaffarabad, AJK
PWD In Process 35million
TECHNICAL
&
NON-TECHNICAL
STAFF
TECHNICAL
&
NON-TECHNICAL
STAFF
NamePresentPosition
QualificationTotal
ExperienceYears with
Firm
Muhammad ZamanSheikh
Chief Executive Matric 22 years 2 years
Muhammad Khurshid DirectorB.A
3 years Diplomain Construction
05 years 2 years
Muhammad HassanAccountant / HR Advisor
MS.cManagement
(HRM) UKMBA (Finance) PK
20 years 2 years
Aamer Mubarak Civil Engineer F.Sc. 01 year 01 year
Rana Abdul Hameed Civil Engineer F.Sc. 05 year 01 year
Irshad Gul
Muhammad Bashir
Abdul Qadeer
Rana Mohsin
Ch. Muhammad Usman
Raja Muhammad Bilal
Muhammad Naseer
Raja Muhammad Ashaq
Abdul Qadeer Khan
Muhammad Fareed
Rana Muhammad Bashir
Site Engineer Civil Engineering 01 year 6 months
Site Supervisor Matric 10 years 02 years
Supervisor B.A 01 year 01 year
Engineer DAE 01 year 01 year
Surveyor Diploma inSurveyor
03 years 08 months
Surveyor 05 years 01 year
Surveyor 03 years 02 years
Surveyor 05 years 03 months
Accountant B.Com 03 years 01 year
ComputerOperator I.Com 01 year 06 months
Accountant B.A 01 year 05 months
Diploma inSurveyor
Diploma inSurveyor
Diploma inSurveyor
LIST OF STAFFLIST OF STAFF
MACHINERY
&
EQUIPMENTS
MACHINERY
&
EQUIPMENTS
LIST OF MACHINERYLIST OF MACHINERY
S.NO NAME OF MACHINERY QTY.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Dozer CAT D-9H
Excavator Wheel Type Back - Hoe Hydraulic Caterpillar
Excavator Track Chain Type Back Hoe Hydraulic CAT 225
Loader CAT950-B
Loader CAT 950-E
Loader CAT950-A
Tractor Hydraulic
Water Bozer
Dump Truck Rear Hydraulic
Dump Truck Bottom Hydraulic
Concrete Mixer Machine
Diesel Generator
Level Machine of Different Brand
Guarder Shuttering 30m Length 2100mm Height
Gauder Shuttering 25m Length & 1700mm Height
Concrete Vibrators of Different Types and Different Brands
Generator of Capacity 5 to 15 KVA
Generator of Capacity of 500 KVA
Generator of Capacity of 100 KVA
03
04
02
05
02
02
02
05
07
01
15
05
05
01
01
10
05
03
04
Rented
Rented
CLIENTAGE LISTCLIENTAGE LIST
Gwadar Development Authority, Govt. Of Balochistan.
Building and Road Department, Govt. Of Balochistan.
Education Department, Govt. Of Pakistan.
World Bank
Coast Guard, Govt. Of Pakistan
ERA, Govt. Of Pakistan.
SERA (State Earthquake Rehabilitation Authority), Govt. Of AJ&K
NESPAK, Pakistan
DRU Muzaffarabad, Govt. AJ&K
Public World Department, Govt. Of AJ&K
Education Department. Govt. Of AJ&K
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
REGISTRATION
&
AFFILIATION
REGISTRATION
&
AFFILIATION
FBRPAKISTAN
FBRPAKISTAN
BANK SBANK S
B K Z Construction Pvt. Ltd.
Professional Builders
3 0 , 6 5 0 0 0 . 0 0***********
( u h t L o n n )R p e e s T i r y a c s S i x t y F i v e T h u s a d s o l y
FINANCIAL STATEMENTFINANCIAL STATEMENT
B K Z Construction Pvt. Ltd.
Professional Builders
AUDITOR’S REPORTAUDITOR’S REPORT
B K Z Construction Pvt. Ltd.
Professional Builders