björn zapfel unfccc secretariat [email protected] options for appraising...

4
Björn Zapfel UNFCCC secretariat http://ji.unfccc.int [email protected] Options for appraising determinations/verification s Fourth meeting of the Joint Implementation Supervisory Committee (JISC 04) Bonn, Germany September 2006

Upload: verity-baker

Post on 18-Dec-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Björn Zapfel UNFCCC secretariat  ji-info@unfccc.int Options for appraising determinations/verifications Fourth meeting of the Joint

Björn ZapfelUNFCCC

secretariat

http://[email protected]

Options for appraising determinations/verifications

Fourth meeting of theJoint Implementation Supervisory Committee(JISC 04)

Bonn, GermanySeptember 2006

Page 2: Björn Zapfel UNFCCC secretariat  ji-info@unfccc.int Options for appraising determinations/verifications Fourth meeting of the Joint

Options for appraisals Background

Background

• JISC 02: Draft procedures on public availability of documents

• JISC 03: Procedures for reviews

Discussion of procedures for appraisals of determinations/verifications

Page 3: Björn Zapfel UNFCCC secretariat  ji-info@unfccc.int Options for appraising determinations/verifications Fourth meeting of the Joint

Options for appraisals Basic options

Basic options

JISC members may request a review within 45 days after the publication of a determination 15 days after the publication of a verification

Individual decision

Period for requesting review (45/15 days)

Option 1: No specific appraisal procedures

Option 2: Internal appraisal procedures (15/6 days)

Option 2: External appraisal procedures (15/6 days)

Page 4: Björn Zapfel UNFCCC secretariat  ji-info@unfccc.int Options for appraising determinations/verifications Fourth meeting of the Joint

Options for appraisals Pros and Cons

Pros and Cons

Additional costs Additional, time-consuming task for

selected JISC (alternate) members No project-specific

external expertise

No assistance to JISC members

No additional tasks for selected JISC (alternate) members

Project-specific assistance to

JISC members by two independent expert appraisals

No additional costs Assistance to other

JISC members

No additional costs

Option 3:External appraisal

procedures

Option 2: Internal appraisal

procedures

Option 1: No appraisal procedures