biological opinion update dry creek projects

15
Biological Opinion Update Dry Creek Projects David Manning Principal Environmental Specialist Sonoma County Water Agency 707-547-1988, [email protected]

Upload: khoi

Post on 01-Feb-2016

21 views

Category:

Documents


0 download

DESCRIPTION

Biological Opinion Update Dry Creek Projects. David Manning Principal Environmental Specialist Sonoma County Water Agency 707-547-1988, [email protected]. 12 Year Dry Creek Habitat Enhancement Requirements. Multiple Phases Multiple Goals 5 Tributary Projects - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Biological Opinion Update  Dry Creek Projects

Biological Opinion Update Dry Creek Projects

David ManningPrincipal Environmental SpecialistSonoma County Water Agency707-547-1988, [email protected]

Page 2: Biological Opinion Update  Dry Creek Projects

12 Year Dry Creek Habitat Enhancement Requirements

• Multiple Phases

• Multiple Goals

• 5 Tributary Projects

• 6 Total Miles of Restoration

• 8 Sites (Upper, Middle, Lower)

• Summer and Winter Habitat

• Bank Stabilization

• Flow Preservation

Page 3: Biological Opinion Update  Dry Creek Projects

Dry Creek Tributary Enhancement Grape Creek

Page 4: Biological Opinion Update  Dry Creek Projects

Dry Creek Fish Habitat Enhancement Feasibility Study

Two Study Phases

1) Inventory of Current ConditionsWatershed Characteristics▪ Stream Geomorphology▪ Fish Habitat

2) Feasibility Analysis and Conceptual Design

Page 5: Biological Opinion Update  Dry Creek Projects

Fish Habitat Inventory Inventory of 13.9 miles Pools, Riffles, and Glides, Stream Width, Stream Depth, and “Complexity”

Page 6: Biological Opinion Update  Dry Creek Projects

Opportunities for Fish Habitat Enhancement

▪ Abundant opportunities for enhancement of pools, riffles, stream banks and creation of off-channel habitats

▪ All areas of interest within historic channel

Page 7: Biological Opinion Update  Dry Creek Projects

Fish Habitat Enhancement

Before After

Dry Creek

Page 8: Biological Opinion Update  Dry Creek Projects

Detailed Feasibility Analysis and Concept Designs

▪ System-scale feasibility▪ Project-scale feasibility

Upcoming Schedule▪ Spring – summer 2010: Detailed feasibility analysis▪ Fall 2010: Concept designs and ranking of

opportunities▪ Summer 2011: Pilot project implementation

Feasibility Study Next Steps

Page 9: Biological Opinion Update  Dry Creek Projects

Coho Salmon Age: 1+

Chinook Salmon Age: 0+ Steelhead Age: 2+

Dry Creek Anadromous Salmonids

Page 10: Biological Opinion Update  Dry Creek Projects

Dry Creek Downstream Migrant Trap

Flow

FishCollection

BoxSpin

Page 11: Biological Opinion Update  Dry Creek Projects

0

200

400

600

800

1,000

1,200

4/1

4/8

4/1

5

4/2

2

4/2

9

5/6

5/1

3

5/2

0

5/2

7

6/3

6/1

0

6/1

7

6/2

4

7/1

7/8

7/1

5

7/2

2

7/2

9

8/5

8/1

2

8/1

9

8/2

6

Nu

mb

er o

f F

ish

0

10

20

30

40

50

60

70

4/1

4/8

4/1

5

4/2

2

4/2

9

5/6

5/1

3

5/2

0

5/2

7

6/3

6/1

0

6/1

7

6/2

4

7/1

7/8

7/1

5

7/2

2

7/2

9

8/5

8/1

2

8/1

9

8/2

6

Nu

mb

er o

f F

ish

Steelhead parr

Steelhead smolts

*Captured: 5,231*Estimate: no estimate

*Captured: 228*Estimate: no estimate

Page 12: Biological Opinion Update  Dry Creek Projects

0

10

20

30

40

50

60

70

4/1

4/8

4/1

5

4/2

2

4/2

9

5/6

5/1

3

5/2

0

5/2

7

6/3

6/1

0

6/1

7

6/2

4

7/1

7/8

7/1

5

7/2

2

7/2

9

8/5

8/1

2

8/1

9

8/2

6

Nu

mb

er o

f F

ish

0

1,000

2,000

3,000

4,000

5,000

4/1

4/8

4/1

5

4/2

2

4/2

9

5/6

5/1

3

5/2

0

5/2

7

6/3

6/1

0

6/1

7

6/2

4

7/1

7/8

7/1

5

7/2

2

7/2

9

8/5

8/1

2

8/1

9

8/2

6

Nu

mb

er o

f F

ish

Steelhead smolts

Chinook smolts

*Captured: 21,200*Estimate: 160,000+

*Captured: 228*Estimate: no estimate

Page 13: Biological Opinion Update  Dry Creek Projects

Juvenile Sampling, Fall (2008 & 2009)

Snorkeling observations

Backpack electrofishing

PIT Tagging

Page 14: Biological Opinion Update  Dry Creek Projects

• Fewer juvenile steelhead in 2009 as compared to 2008

• General trend of larger steelhead downstream as compared to upstream

• Differences in emigration between reaches (based on PIT tagging) MAY suggest differences in habitat quality

• No coho (except for a very few in the smolt trap)

Juvenile Sampling, Fall (2008 & 2009)

Page 15: Biological Opinion Update  Dry Creek Projects

Questions