Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Power Purchase and Grid Connection Procedures
Aidan FossANF Energy Solutions Inc.
Building Your Biogas System Building Your Biogas System WorkshopWorkshop1010thth March 2009 March 2009
![Page 2: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/2.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
ANF Energy Solutions
• DG grid connection specialists• No project ownership• Current projects
Biogas 21
Landfill Gas 2
Wind 25
PV 5
Small Hydro 3
River Turbine 1
• Increasing involved in research due to new connection issues
![Page 3: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/3.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
The Grid Connection
HV FUSE
INTER-TIE CIRCUIT-BREAKER
GENERATOR CIRCUIT-BREAKER
TO DIGESTER & POWERHOUSE LOADS
INTER-TIETRANSFORMER
M REVENUE METER
BIOGAS GENERATOR
UTILITY FEEDER
HV DISCONNECT
LV DISCONNECT
LV FUSE
M REVENUE METER
HV FUSE
GENERATOR CIRCUIT-BREAKER
TO OTHERLOADS
INTER-TIETRANSFORMER
M REVENUE METER
BIOGAS GENERATOR
LV DISCONNECT
POWER EXPORTER NET METERING
LV FUSE
HV EQUIPMENTOWNED BY
FARMER
![Page 4: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/4.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Getting Connected
• Power Purchase Options
• Grid Access
• Grid Connection Costs
• Grid Connection Process
![Page 5: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/5.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Power Purchase
Options:• Embedded Retail Generator – market price• Net Metering – to 500kW• RESOP – Renewable Energy incentive• CESOP – Clean Energy incentive - ??• Green Energy Act – will replace RESOP
![Page 6: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/6.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Renewable Energy Standard Offer Program (RESOP)
• Launched in Nov 2006• 11c/kWh + 3.52c/kWh for peak• 20 year contract with OPA• Up to 10MW, 50kV• Requires a CIA• Green, Yellow & Orange zones• Driver for flood of projects• Suspended in May 2008• Biogas OK to 5MW• Will be superseded by Green Energy Act
![Page 7: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/7.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Grid Access Rights
• No guaranteed access rights
• Distribution Code has limited capacity
• Until 12 February 2009, Distribution Code was ‘First-come First-served’ for all generation in 10kW-10MW range
![Page 8: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/8.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Hydro One Queue
Substation Capacity = 20MW
Queue Position Project
1 111 (10 MW)
2 222 (10 MW)
CIA Pending 333 (10 MW)
CIA Pending 444 (500 kW)
• Capacity limits due to feeder, switchgear and transformers• Speculative projects ahead in the queue could delay your
application by 2-3 years per project
![Page 9: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/9.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Hydro One Queue Analysis
Project Size Applications
<500kW 39
501kW - 8.99MW 184
9 - 10MW 971
Full Substations 117 of 151
• From Hydro One queue 31-Oct-08• Over 80% in 9-10 MW range• Blockages started in windy areas – Great Lakes• Blanket applications in Eastern Ontario Aug/Sept 07• Small biogas being shut out from many agricultural areas
![Page 10: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/10.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Wind & Farm Biogas
Wind & PV Farm Biogas
Typically 9-10MW Generally <500kW
Multiple applications financed by large corporations
Individual applications financed by farmers
Flexible on location Tied to farms
30-35% capacity factor 70-100% capacity factor
Competition between generators Co-operation between farmers
Grid access is first step - companies forced to speculate
No speculation, but forced to rapidly submit Form Bs
Removes opportunity for small biogas
No significant impact on wind farm development
![Page 11: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/11.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Distribution Code Modification
12th February 2009 Amendment• Up to 250kW: Queue exempt on feeders
below 15kV• Up to 500kW: Queue exempt on feeders
above 15kV
![Page 12: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/12.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Grid Connection Costs
• All costs up-front – unlike load customer• Distribution Network designed for load
customers• Deep Entry – Watch out for $$$:
– Protection upgrades– Anti-islanding protection– Recloser replacement– Voltage regulators
![Page 13: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/13.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
The Single-phase Hydraulic Recloser
• Extensively deployed across Ontario
• Restores load customers in 1-2 seconds
• Simple, reliable• Can be a big problem
for generation
![Page 14: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/14.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Grid Connection Process
1. Initial Feasibility Assessment2. Connection Impact Assessment
– Gives queue position– 12 months to CCRA
3. Connection Cost Estimate4. Connection Cost Recovery Agreement5. Connection Agreement
![Page 15: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/15.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Grid Connection Process
• Distribution Code timescales not met – Hydro One swamped
• Generator responsibility for connection design, equipment procurement and protection design
• No simplified process for small generation
![Page 16: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/16.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Terryland Farm 180kW Biogas
• Form A submitted Sept 2006
• CIA issued May 2007
• Commissioned August 2007
• Major delay due to Anti-islanding Protection
![Page 17: Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy](https://reader036.vdocuments.us/reader036/viewer/2022081603/56649dbf5503460f94ab2c71/html5/thumbnails/17.jpg)
Biogas Workshop10th March 2009
ANF Energy Solutions IncPower Purchase& Connection
Fepro Farms 499kW Biogas
• July 2007 – 1st Form B and CIA
• Highlighted several areas of unclear connection policy
• Pilot for new Anti-islanding protection strategy
• Scheduled for March 2009