BioDRI. Gasified Biomass for greener steel
Carl-Erik Grip, Luleå University of Technology
Project partners
Financing: Swedish Energy Agency + Partners
![Page 2: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/2.jpg)
Reheating Rolling/cooling Heat treatment
Fuel
Coke plant Ironmaking Steelmaking Casting/Cooling
Energy gases
Melting/steelmaking Casting/cooling
Steelmaking routes
![Page 3: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/3.jpg)
Reheating Rolling/cooling Heat treatment
Fuel
Coke plant Ironmaking Steelmaking Casting/Cooling
Energy gases
Melting/steelmaking Casting/cooling
Steelmaking routes
Direct reduction Natural gas
ORE
Gasified Biomass
![Page 4: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/4.jpg)
BIODRI: Production chain.
![Page 5: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/5.jpg)
BIODRI: Production chain.
WP1
WP2
WP3
WP4
![Page 6: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/6.jpg)
WP 1 Biomass Supply
Structure of Availability Statistics
Harvesting cost
![Page 7: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/7.jpg)
Biomass for 925000 tonne BioDRI
![Page 8: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/8.jpg)
WP2 Pilot trials of Entrained flow gasification
Problem: Heat loss influenced result
Estimated composition at full scale
Lambda CO CO2 H2 CH4 H2O N2
0,3 46,5 8,9 32,1 2 8,5 2,00,35 46,7 8,4 26,6 1,5 14,4 2,30,4 46,0 8,9 22,1 1 19,3 2,6
![Page 9: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/9.jpg)
9
Wp3: Metallurgical studies (Laboratory and pilot scale)
B) BioDRI for powder production: 1) Annealing road • Production of test material was made LKAB. High demand on pellets • Pilot annealing and study of properties was made at HÖGANÄS.
Chemical composition of product can be made OK. Some factors influencing physical properties should be studied further
2) Remelting road • Replacing HBI with BioDRI in EAF seems OK. Potential to save energy
with up to 20% and CO2 with up to 60%
A) BioDRI for BF (Pot furnace Reduction tests and ITH at LKAB) • The Reduction gas will be OK if the Syngas is dried before mixing • If it is wet it will be detrimental to production (low reduction rate) • BioDRI strength is OK • It would improve cost if lower metallisation and %C could be used
![Page 10: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/10.jpg)
WP4 Systemanalysis (reMIND)
![Page 11: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/11.jpg)
Norhern case. Effect on fossil CO2
![Page 12: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/12.jpg)
CO2 yield of biomass
![Page 13: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/13.jpg)
Cost per ton CO2 and its sensitivity to price
![Page 14: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/14.jpg)
Northern case: Cost effects
![Page 15: BioDRI. Gasified Biomass for greener steel · 2016. 11. 7. · • BioDRI is technically possible. Up to 1 Mton/year Fossil CO 2 is eliminated for the northern case . • However,](https://reader036.vdocuments.us/reader036/viewer/2022071218/60506f527b98d1592c7d6342/html5/thumbnails/15.jpg)
• BioDRI is technically possible. Up to 1 Mton/year Fossil CO2 is eliminated for the northern case .
• However, it is more expensive than fossil routes. The cost increases with high specific addition. Perhaps it is better to divide the BioDRI addition between several blast furnaces?
• The efficiency (CO2 decrease/unit of biomass) was compared to that for use for car fuel. It is the same at at high addition, better at low rate.
• Research to decrease process costs is important, (e.g.: cheap CCS, lower DRI metallization and C content + cost rationalisation for harvest and transport of large biomass amounts)
• Governmental incentives are needed to make renewable practice competitive. They must be independent of political winds and formed so they do not kill the industry!!!!
• Different renewable ideas compete for the same biomass but are now studied separately. A project for unified evaluation has been granted.