bio-data

6
Prayer for the post of Land Surveyor 1. Name : MD. Abdul Mannan. 2. Father’s Name : Late Abdul Hakim 3. Permanent & Present Address : Vill-Badekalmeshar, Post- National University, House No.8, Lane No.6, Ward No. 5, Block-A, Signboard-Kamarjury Road, P.S. Joydebpur, District-Gazipur-1704. 4. Date of Birth : 12 th January 1967 5. Nationality : Bangladeshi by birth 6. Religion : Islam (Sunni) 7. Marital Status : Married 8. Passport No : AC 1777899 9. Height : 166 Cm 10. Weight : 75 kg 11. Educational Qualification : S. S. C. Ex. (Science Group) from Dhaka Board in 1982. H. S. C. Ex. (Science Group) from Dhaka Board in 1985. 12. Technical Qualification i. Successfully completed on Machinist Trade from Bangladesh Machine tools factory (BMTF) Ltd. Under Belgium Government Technical Assistant Program 1 Years Training Program in 1988. ii. Departmental Diploma on Surveyor & Draftsman in civil from Bangladesh Survey Organization (BSO) Ltd.1 years Mobile : +88-01675417609 (Self) : +88-01726830033 (Res.) [email protected]

Upload: abdul-mannan

Post on 14-Apr-2017

167 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Bio-Data

Prayer for the post of Land Surveyor

1. Name : MD. Abdul Mannan. 2. Father’s Name : Late Abdul Hakim 3. Permanent & Present Address : Vill-Badekalmeshar, Post- National University, House No.8,

Lane No.6, Ward No. 5, Block-A, Signboard-Kamarjury Road, P.S. Joydebpur, District-Gazipur-1704.

4. Date of Birth : 12th January 19675. Nationality : Bangladeshi by birth

6. Religion : Islam (Sunni)7. Marital Status : Married

8. Passport No : AC 17778999. Height : 166 Cm

10. Weight : 75 kg11. Educational Qualification : S. S. C. Ex. (Science Group) from Dhaka Board in 1982.

H. S. C. Ex. (Science Group) from Dhaka Board in 1985.12. Technical Qualification i. Successfully completed on Machinist Trade from

Bangladesh Machine tools factory (BMTF) Ltd. Under Belgium Government Technical Assistant Program

1 Years Training Program in 1988. ii. Departmental Diploma on Surveyor & Draftsman in civil

from Bangladesh Survey Organization (BSO) Ltd.1 years training program in 1989.

iii. Successfully completed on Architectural Drafting on Civil from Dhaka Polytechnic Institute in 1994, 6 Months

Training program iv. Departmental Training on Survey (Topographical) from

Bangladesh Consultant Limited 1 years Training Program.13. Working Experience * Worked as a Surveyor & Draftsman with Bangladesh

Consultant Ltd. (BCL) Since 1st June 1999 to 1st January 2014 it is 13 years and 6 months are noted bellow.

** Worked as a Surveyor for Maidansher-Bamyen Road project In Afghanistan under Ministry of public works (Mopw) from

20th April 2013 to 8th December 2013 it is 8 months Constructions supervision.

* Worked as a Surveyor for Joydebpur-Mymensingh Road Project from 11th December 2012 to 19th April 2013 it is

5 Months, Contract No. 3 & 4 Constructions supervision.

Mobile : +88-01675417609 (Self) : +88-01726830033 (Res.)

Email: [email protected]

Page 2: Bio-Data

** Worked as a Surveyor for Maidansher-Bamyen Road project

In Afghanistan under Ministry of public works (Mopw) from 6th July 2012 to 10th December 2012 it is 5 Months,

Constructions supervision. * Worked as a Surveyor for Joydebpur-Mymensingh Road

Project from 14th November 2011 to 5th July 2012 it is 8th

Months, Contract No.1,2,3&4 Constructions supervision.

** Worked as a Surveyor for Maidansher-Bamyen Road project In Afghanistan under Ministry of public works (Mopw) from

9th July 2011 to 15th November 2011 it is 5 Months. Constructions supervision.

* Worked as a Surveyor for Joydebpur-Mymensingh Road From 9th March 2011 to 8th July 2011 it is 5 Month,

Constructions supervision. ** Worked as a Surveyor for Gazni–Ghardaz Road Project In

Afghanistan under Islamic Republic Development From 28th November 2010 to 8th March 2011 it is 4 Months

Constructions supervision. * Worked as a Surveyor for joydebpur-Mymensingh Road

Project from 11th January 2010 to 27th November 2010 it is 10 Months, Utility survey and Trees counting.

** Worked as a Surveyor for Ujar – Yevlakh Road Project in Azerbaijan Republic, Ministry of

Transport, Road Tran service Department from 17th July 2007 to 10th January 2010 it is 2 years and 6 Months,

Constructions supervision. * Worked as a surveyor for Padma Bridge Project, RRMP- ii,

RNIMP- iii Design Phase, Prepared for Land Acquisition Plan, Setting out for Road Center Line and River Bank

from 1st June 2005 to 16th July 2006 it is 1 years and 2 months.

* Worked as a Surveyor for (Dhaka-Mawa-Bhanga- -Gopalganj-Mollahat-Noapara Road 160km) South West

Road Network Development Project SRNDP undertaken by Japan Overseas Consultant in association with BCL

from 1st June 1999 to 31st May 2005 it is 5 Years and 6 Months, Design Phase and Constructions supervision.

ii) Worked as a Surveyor with BKI-DI-HAM-VOA-JV (Netherlands) Gorai River Re-Excavation (GRC) Project

in Kustia Since 30th October 1998 to 31st March 1999 it is 5 Month.

iii) Worked as a Surveyor with Hebai Electric Power Design Institute (EPDI) China for the 60MG Gas Turbine

Page 3: Bio-Data

Power Station and 132kv Transmission Line in

Mymensingh since 11th January 1998 to 11th November 1998 it is 1 Years.

iv) Worked as a Surveyor with Surface Water Modeling Center (SWMC) for the Maghna-Dhonagoda Irrigation

Project in Chandpur and Tarail-Phachuria Project in Gopalganj Since 1st December 1998 to 1st

March 1999 it is 3 Months. v) Worked as a Surveyor with HAM-VOA-JV (Natherland)

for the Jamuna Multipurpose Bridge Project Contract-2 River Training works since 12th December 1994 to 12th

June 1997 it is 2 Years and 7 Months. vi) Part Time worked as a Surveyor & Draftsman with

Samsung & Taihan Electric Wire Co. South Korea Under Bangladesh Power Development Board in Dhaka.

Vii) Worked as a Surveyor & Draftsman with Beijing Electric Power Transmission & Transformation(BETT)Co. under

Bangladesh Power Development Board Grater Dhaka Phase-iii Contract No. 57292/5 since 12th December

1992 to 12th December 1994 it is 2 Years. viii) Worked as a Surveyor & Draftsman with Hebai Electric

Power Design Institute (EPDI) China under BPDB Grater Dhaka for the 33kv,132kv,230kv Transmission

Line Deputation by BSO Ltd. ix) Worked as a Surveyor & Draftsman with Bangladesh

Survey Organization (BSO) Ltd. Since 12th December 1989 to 12th December 1992 it is 4 Years.

14. Good idea about Instrument i) Total Station Sokkia Power Set 2010 ii) Total Station Sokkia Set II & III

iii) Pantex Theodolite iv) Hillzer Watts Theodolite

v) Sokkia Automatic Level B1, B2 vi) Sokkia Level Lasers

vii) U-Level, Kern Level, Digital Level, Topcon, Leica viii) Plan Table Works

15. Good idea about Computer i) Auto CAD 2D ii) Excel

iii) MS Word

Signature: ___________________________ (MD. Abdul Mannan)

Page 4: Bio-Data