bim and asset management workflows to close the circle

56
Join the conversation #AU2015 BIM and Asset Management Workflows to Close the Circle Jorge Quiroz Director DCV Consultores [email protected] George Broadbent Director of Asset Management Microdesk Inc. [email protected]

Upload: others

Post on 25-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BIM and Asset Management Workflows to Close the Circle

Join the conversation #AU2015

BIM and Asset Management

Workflows to Close the Circle

Jorge QuirozDirector

DCV Consultores

[email protected]

George BroadbentDirector of Asset Management

Microdesk Inc.

[email protected]

Page 2: BIM and Asset Management Workflows to Close the Circle

It is critical to define a standardized list of Assets at the

Design Stage to be able to integrate a BIM Model all the

way down to Construction and into Operations without

the burden of re-creating the Model all over again in

every single Stage of the process.

CLASS SUMMARY

Page 3: BIM and Asset Management Workflows to Close the Circle

At the end of this class, you will be able to:

Better understand the workflow of incorporating Asset Management

information within a BIM Model.

Define the list of Parameters that need to be consider throughout the project

development and how they are mapped to the different building

objects/elements.

Establish a criteria of who is responsible of getting the right information into the

Model so when is handed over for Maintenance, the Model can be easily

integrated with an Asset Management System.

Understanding the implications of a new way (electronic version)

of handling and integrating the Close Out Package documentation with the BIM

Model.

Get to know some Asset Management Systems that interact with Revit.

KEY LEARNING OBJECTIVES

Page 4: BIM and Asset Management Workflows to Close the Circle

Via the Survey Stations, email or mobile device.

AU 2016 passes awarded daily!

Give your feedback after

each session.

Give instructors feedback

in real-time.

Provide AU Session feedback

#AU2015

Page 5: BIM and Asset Management Workflows to Close the Circle

#AU2015

Page 6: BIM and Asset Management Workflows to Close the Circle

AGENDA

#AU2015

Page 7: BIM and Asset Management Workflows to Close the Circle

Who We Are

The Background

The Solution

The Challenges

What Needs To Be Done

Demo

Next Steps

Conclusions

Q&A

AGENDA

Page 8: BIM and Asset Management Workflows to Close the Circle

WHO WE ARE

Page 9: BIM and Asset Management Workflows to Close the Circle

DCV Consultores

DCV is a South America based consulting company who offers solutions for

Architects, Engineers and Contractors along with Developers and Owners in

the areas of Virtual Design and Construction.

We have over 10 year of experience which has allowed us to built an

expertise on BIM workflows, processes, procedures and best practices

applied specifically for the AEC market.

Over the last 3 years we have been working directly with the Autodesk LATAM

Team helping the biggest Construction and Real Estate companies in the

region adopt BIM Technology.

WHO WE ARE

Page 10: BIM and Asset Management Workflows to Close the Circle

DCV Consultores

Among the services we offered are the following:

BIM Adoption / Implementation

BIM Standards Development

BIM Management

Training and Support

Modeling

Project Coordination

Virtual Reality

WHO WE ARE

Page 11: BIM and Asset Management Workflows to Close the Circle

Microdesk

AECO Industry Consulting Firm

Founded in 1994

11 locations nationwide

140 AECO Consulting Specialists and Software Developers

WHO WE ARE

Page 12: BIM and Asset Management Workflows to Close the Circle

Microdesk

We provide process consulting, technology, integration and software

development services to streamline:

Planning

Design

Construction

Operations and Maintenance

Facilities and Asset Management

WHO WE ARE

Page 13: BIM and Asset Management Workflows to Close the Circle

THE BACKGROUND

Page 14: BIM and Asset Management Workflows to Close the Circle

Typical Building Lifecycle Costs

BACKGROUND

CONCEPTUALIZATION &

ANALYSIS

DESIGN DOCUMENTATION MAINTENANCE &

OPERATIONS

CONSTRUCTIONCONCEPTUALIZATION &

ANALYSIS

DESIGN DOCUMENTATION MAINTENANCE &

OPERATIONS

CONSTRUCTION

80%15%5%

Page 15: BIM and Asset Management Workflows to Close the Circle

Throughout the project development, lots of information is input to a BIM

Model by all participants but the data components (properties,

parameters, values, fields, etc.) of an Asset Management System are

often left to last or never take into consideration.

This information is needed for Maintenance and Operations and without

effective, reliable and timely data, an Asset Management Program will

not be sustainable.

THE BACKGROUND

Page 16: BIM and Asset Management Workflows to Close the Circle

THE BACKGROUND

When construction is completed, owners receive drawings,

specifications, catalogs, operation manuals, warranties, etc. as part of

the close-out package.

The project information is not

centralized and the data comes from

different sources.

This information is not always

accessible to parts of the Organization

that need it.

Page 17: BIM and Asset Management Workflows to Close the Circle

Design

THE BACKGROUND

Construction Maintenance

Page 18: BIM and Asset Management Workflows to Close the Circle

THE SOLUTION

Page 19: BIM and Asset Management Workflows to Close the Circle

If we can centralize all the project related data into a single system, the

information can be leverage by multiple users.

BIM is one of the several tools that will help us standardize and

automate the way we can feed asset data and information into an Asset

Management System.

THE SOLUTION

Page 20: BIM and Asset Management Workflows to Close the Circle

To that extend, we need to “start from the end” and ask our

maintenance people what needs to be included in the information they

receive, so when they get it, they can get the most out of it.

THE SOLUTION

CONSTRUCTION MAINTENANCEDESIGN

COMMISSIONING

Page 21: BIM and Asset Management Workflows to Close the Circle

THE SOLUTION

An Asset Management System can serve as a single repository of all

project related information, allowing to schedule maintenance jobs,

keeping track of changes as well as all historical data performed on an

asset and providing access to all team members.

Page 22: BIM and Asset Management Workflows to Close the Circle

THE CHALLENGES

Page 23: BIM and Asset Management Workflows to Close the Circle

Collect and organize assets, along with the associated information.

Centralize the asset data within or linked to a BIM Model throughout the

asset lifecycle allowing different people to access the data they need as

they need it.

Understand what the field staff need to operate and maintain those

assets and provide them with the tools to help them do their job more

efficiently.

THE CHALLENGES

Page 24: BIM and Asset Management Workflows to Close the Circle

Successful implementation of any

technology within an Organization

is built on these three elements.

THE CHALLENGES

SUCESS

PEOPLE

PROCESSPRODUCT

Page 25: BIM and Asset Management Workflows to Close the Circle

People Staff turnover

Educate every single Department and/or Division within the Organization on the

benefits of BIM for Asset Management

Change mindset from 2D drawings to 3D asset databases

Process Standardize how to incorporate intelligent data into the projects

Establish a workflow to advance BIM development from Design through

Construction and Maintenance

THE CHALLENGES

Page 26: BIM and Asset Management Workflows to Close the Circle

Product Access to cloud-based applications

Modeling

Visualization

Yearly Upgrades

Asset Management

THE CHALLENGES

Page 27: BIM and Asset Management Workflows to Close the Circle

WHAT NEEDS TO BE DONE

Page 28: BIM and Asset Management Workflows to Close the Circle

Organize your efforts around the

four components of the Project’s

Lifecycle.

WHAT NEEDS TO BE DONE

PROJECT LIFECYCLE

Conceptualization & Analysis

Design & Documentation

Management & Construction

Maintenance & Operations

Page 29: BIM and Asset Management Workflows to Close the Circle

Develop a framework that includes:

A Criteria for the selection of Projects that will be developed in BIM

and used for Asset Management

BIM Standards and Support Files that supports the four components

of the Project’s Lifecycle

BIM Contract Language for Design and Construction

Identification and Organization of all Assets

Organization of BIM content

Require an As-Built Models as a deliverable

Develop Pilot Projects for building-based and field-based assets

WHAT NEEDS TO BE DONE

Page 30: BIM and Asset Management Workflows to Close the Circle

An Asset Management Program should be flexible enough to allow the

use of BIM at any Stage of the Project regardless of when it starts.

WHAT NEEDS TO BE DONE

Conceptualization & Analysis

Management & Construction

Design & Documentation

Maintenance & Operations

Asset Management Program

Page 31: BIM and Asset Management Workflows to Close the Circle

Understand the differences between the Level of

Development and the Level of Detail.

WHAT NEEDS TO BE DONE

An Object developed

in LOD200 can be

integrated to an Asset

Management System.

Page 32: BIM and Asset Management Workflows to Close the Circle

Document and organize all of the assets into two major categories,

building-based and field-based assets, along with all the associated

information.

For building-based assets we have identified about 350 objects under

75 major categories, which will become the basis of our asset hierarchy.

These objects have been grouped together under five major disciplines,

Architectural, Electrical, Mechanical, Plumbing and Structural.

The next step is the identification of the field-based assets.

WHAT NEEDS TO BE DONE

Page 33: BIM and Asset Management Workflows to Close the Circle

Group all these objects into discipline sub-groups, such as HVAC,

Plumbing, Fire Protection, Electrical, Electronics, etc.

WHAT NEEDS TO BE DONE

Page 34: BIM and Asset Management Workflows to Close the Circle

Mechanical Equipment have different properties depending on it’s

particular function (air-based, water-based, etc.) and should be treated

differently as the project moves from Stage to Stage.

WHAT NEEDS TO BE DONE

Air Handling Unit Chiller

Page 35: BIM and Asset Management Workflows to Close the Circle

Organize the Mechanical Equipment in specific Sub-Categories based

on their function.

Category

Sub-Category / Level 1

Sub-Category / Level 2

Family

Type

Instance

WHAT NEEDS TO BE DONE

Doors DuctsMechanical

EquipmentPipes Stairs

Structural

ColumnsWalls Windows

Air-Side

Components

Water-Side

ComponentsCondensers

Heat

Exchangers

Boilers ChillersCooling

TowersPumps Tanks

Water

Filters

Water

Softeners

Centrifugal End Suction Inline SewageSplit

Case

60 GPM 95 GPM 200 GPM 320 GPM 400 GPM 500 GPM

Instance

A

Instance

B

Page 36: BIM and Asset Management Workflows to Close the Circle

Create Systems and Services and identify which Objects that are part of

them.

Category

System(Objects)

Name

WHAT NEEDS TO BE DONE

Air

Terminals

Air System

Diffusers

Duct

FittingsDucts

Mechanical

Equipment

Pipe

FittingsPipes Sprinklers

Duct

Accessories

Pipe

Accessories

Dampers Filters

Rectangular

Ducts

Rectangular

Fittings

Fire Protection

System

Sprinklers Panels Valves

Metal PipesMetal Pipe

Fittings

Air Handling

UnitPumps

Etc.

Supply Return Exhaust Wet Foam FM200

Etc.

Etc.

Etc. Etc.

Page 37: BIM and Asset Management Workflows to Close the Circle

The identification of these categories and sub-categories of MEP

objects (equipment, components, systems, sub-systems, etc.) is helping

us creating “buckets” of data with similar characteristics (properties,

parameters, values, fields, etc.) that will help us push the right data to

the right object and/or groups of objects at any Stage of the Project.

These “buckets” of data will allow us to keep the information organized

along with keeping the Model updated regardless of where the data is

defined.

WHAT NEEDS TO BE DONE

Page 38: BIM and Asset Management Workflows to Close the Circle

WHAT NEEDS TO BE DONE

It is critical to build a library of

specific BIM Content that will be

organized based on these “buckets”

of information.

Page 39: BIM and Asset Management Workflows to Close the Circle

WHAT NEEDS TO BE DONE

Create custom “data fields” for Asset

Management that fit your needs and

define at which stage of the Project

(Design, Construction and/or

Maintenance) they need to be filled.

Page 40: BIM and Asset Management Workflows to Close the Circle

WHAT NEEDS TO BE DONE

BIM Model Laser Scan Updated BIM Model

We are forcing Contractors to provide an as-built / as-constructed BIM

Model at the end of construction.

Page 41: BIM and Asset Management Workflows to Close the Circle

DEMO

Page 42: BIM and Asset Management Workflows to Close the Circle

Challenge

Population of a CMMS system

Project Close Out Packages – 12 to 18 months

Traditional Data Capture with Data Scrubbing – 6 to 12 months

Manual Data Entry by sitting through Close Out Packages

Result

- Disconnected Export / Import processes that are difficult to manage and repeat as building

change

CMMS and Revit

Both contain asset data

Both contain asset location information

DEMO

Page 43: BIM and Asset Management Workflows to Close the Circle

BIM Savings

Up to 40% unbudgeted change orders eliminated

Up to 80% reduction in time to generate a cost estimate

Cost estimation accuracy within 3%

Savings up to 10% of the contract value through clash detections

Up to 7% reduction in project time

Stanford University Center for Integrated Facilities Engineering (CIFE) figures based on 32 major projects using BIM

DEMO

Page 44: BIM and Asset Management Workflows to Close the Circle

Benefits

ModelStream v1.0

CMMS asset automatically created / updated

Asset attributes populated from Revit

Location information creation

Bi-directional synchronization of assets and location data between BIM and CMMS

DEMO

Revit Maximo

ModelStream

Page 45: BIM and Asset Management Workflows to Close the Circle

DEMO

DesignConstruction

Coordination

As-Built

Models

O&M System

Synchronization

EAM /

Performance

Monitoring

Field Verification

BIM360 Field Tools

ModelStreamMaximo

Revit4D,5D & 6D Models

Page 46: BIM and Asset Management Workflows to Close the Circle

ModelStream

As-Built Model

Now becomes the Record Model

Is now relevant for the life of the facility

Facility Maintenance & Operations Staff

Visualization toll embedded with Maximo

Work area verification (valve location, access panels, etc.)

In the end it is a Record Model that is dynamically connected to the

Enterprise Asset Management Systems which allows for the

visualization and capture of operational data

DEMO

Page 47: BIM and Asset Management Workflows to Close the Circle

NEXT STEPS

Page 48: BIM and Asset Management Workflows to Close the Circle

To develop a database were the Level

of Detail (amount of data) and the

Level of Development (amount of

geometry) coexist.

To develop a custom version of the

template family files which will include

all the necessary “data fields” needed

for Asset Management.

NEXT STEPS

Page 49: BIM and Asset Management Workflows to Close the Circle

To develop add-ins that will help us automate the process of validating

the integrity of content (family), which will include:

• Categories and Sub-Categories

• Systems and Services

• Parameters

• Etc.

NEXT STEPS

Page 50: BIM and Asset Management Workflows to Close the Circle

CONCLUSIONS

Page 51: BIM and Asset Management Workflows to Close the Circle

The integration of BIM with Asset Management Applications is a long-

term plan but to see results you should set and defined short, mid and

long term goals.

Talk to your Maintenance and Operations people, find out what they

need.

As with any other technology, when implementing an Asset

Management Program you need to do it through Pilot Projects and fine-

tune it as you move forward.

CONCLUSIONS

Page 52: BIM and Asset Management Workflows to Close the Circle

Adjust the tools to the end user’s needs as much as you can to get buy-

in.

When starting a Asset Management effort, start small and build the

effort up.

Time spent planning is time well spent.

CONCLUSIONS

Page 53: BIM and Asset Management Workflows to Close the Circle

THERE IS LIGHT AT THE END OF THE TUNNEL

JUST KEEP MOVING

Page 54: BIM and Asset Management Workflows to Close the Circle

Q&A

Page 55: BIM and Asset Management Workflows to Close the Circle

Thank You So Much

Page 56: BIM and Asset Management Workflows to Close the Circle

Autodesk is a registered trademark of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not

responsible for typographical or graphical errors that may appear in this document. © 2015 Autodesk, Inc. All rights reserved.