bill resume 1-30-2015

7
To be instrumental in the growth and development of a corporation in the Petroleum field while continuing my career path in Petroleum Engineering, utilizing hands-on drilling and production practices combined with my engineering education and experience. Bachelors of Science degree in Petroleum & Natural Gas Engineering from New Mexico Institute of Mining & Technology. Class of 1997 35-plus years experience working in the Petroleum industry. Excellent safety record., Wyoming Drilling consultant Peak Energy 11/16/2013 – Present, DTC Energy Group 303- 242-3504 Drilling Engineer, Drilling Turner, Shannon and Mowry Formations, 50 Miles South Of Gillette WY, All under-balanced drilling 800-1400psi on Annulus, Muti Well Pads, Harald Jordan Vice President & Drilling Engineer for Peak Energy. 970-749-3495. William K Lee 5064 Chuckwagon Trl Casper WY 82604 Cell 307-277-3415 Email: [email protected] Career Objective Summary of Qualifications Professional Experience March 2008 - Present

Upload: bill-lee

Post on 08-Aug-2015

64 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Bill Resume 1-30-2015

To be instrumental in the growth and development of a corporation in the Petroleum field while continuing my career path in Petroleum Engineering, utilizing hands-on drilling and production practices combined with my engineering education and experience.

Bachelors of Science degree in Petroleum & Natural Gas Engineering from

New Mexico Institute of Mining & Technology. Class of 1997

35-plus years experience working in the Petroleum industry.

Excellent safety record.,

Wyoming

Drilling consultant

Peak Energy 11/16/2013 – Present, DTC Energy Group 303-242-3504 Drilling Engineer, Drilling Turner, Shannon and Mowry Formations, 50 Miles South Of Gillette WY, All under-balanced drilling 800-1400psi on Annulus, Muti Well Pads, Harald Jordan Vice President & Drilling Engineer for Peak Energy. 970-749-3495.

Dakota Territory Williston Basin

Drilling consultant

Liberty Resources 1/1/2012 – 5/1/2013 Upstream International, / Michael Power, Drilling Engineer 303-881-5677

Drilling Bakken Shale oil wells Multi well Pads, 10,000’ laterals

William K Lee5064 Chuckwagon Trl

Casper WY 82604Cell 307-277-3415

Email: [email protected]

Career ObjectiveSummary of QualificationsProfessional Experience

March 2008 - Present

Page 2: Bill Resume 1-30-2015

Drilling consultant

Continental Resources DTC Energy

Drilling Bakken Shale oil wells 3/10/2012 – 11/15/2012, over 10,000’ laterals

South Texas Eagleford Shale

Drilling Consultant.

Drilling consultant, SM – Energy, Laredo Texas Eagleford shale, 2/2011- 4/26/2011, 10,000’ laterals

Pennsylvania

Drilling consultant

Cabot Oil & Gas 4/1/2010 – 11/15/2010 Drilling Marcellus Shale Horizontal Wells in Pennsylvania. Rig was stacked out. Michael Bail, Drilling Engineer.

Consultant for Forrest Oil Company

Coordinate and supervise operation of drilling horizontal pad wells and vertical gas wells in the Texas Panhandle. While employed with Cabot Oil & Gas, coordinated and supervised the Paradox Field in Wyoming according to company procedure.

Warren Resources, Inc. Casper, WY

Vice President / Senior Engineer

Promoted to Vice President and Senior Engineer March, 2004. Responsible for engineering and execution of the operations of all drilling projects in Texas, Wyoming, and California. Responsibilities included the supervision of drilling consultants in the field on different drilling locations. Tracked, signed off, and coded all drilling invoices. I have operated and drilled several multi- lateral horizontal wells in Nacogdoches and Panola County Texas. Duties included acquiring leases, building locations, hiring drilling contractors, writing well procedures and AFEs, supervision and drilling of multiple wells simultaneously, bidding out casing, cementing services and all related drilling equipment. Have handled fishing operations and stuck pipe in the past. Maintained an excellent safety record and kept up to date on the latest drilling procedures.

NEW MEXICO TECH

1997 - March 2008

Page 3: Bill Resume 1-30-2015

Attended New Mexico Institute of Mining and Technology during traditional semesters while working throughout the summers for various oil and gas companies to maintain current industry policies and procedures.

Toolpusher/Driller/Derrickman Laredo, TX

Worked for several drilling contactors in Texas prior to returning to school to obtain my degree in Petroleum Engineering. Drilling experience includes rigs up to 24,000’ capacity and high-pressure gas wells in South Texas Lobo sands and the Austin Chalk oil and gas wells around Bryan and College Station, Texas. Summer Job 1996 Red Cedar Natural Gas Gathering Company, Durango COField Hand

Working in the field maintaining dehydration units and Production.

3/89 - 09/90 Dawn Trucking Corporation, Farmington NM 87499 Diesel Mechanic

Heavy truck mechanic on the tailings pile removal site in Durango CO

11/88 - 3/89 Big A Drilling Farmington NM 87499 Derrick Hand

Working derricks on a drilling rig--5000-8000ft holes.

10/88 - 11/88 Parker Drilling Company Tulsa OKDriller

Performed all drilling duties on rig for a 13000ft hole in Del Norte CO

7/88 - 9/88 Grace Drilling Company Tulsa OKDerrick Hand

Work as derrick hand on a 14000ft hole in South Fork CO

5/88 - 7/88 Aztec Drilling Aztec NMDerrick Hand

Work as derrick hand in the Four Corners area. Utah

Prior to 1991

1992 - 1997

Page 4: Bill Resume 1-30-2015

4/88 - 5/88 Big Horns Drilling Steamboat Springs CODriller

Perform all duties as driller.

5/87 - 5/88 Bob’s Truck and Bus Repair Durango CODiesel Mechanic

Heavy truck repair, Rig up and Water trucks

10/86 - 4/87 Trans American Natural Gas Corp. Laredo TXDriller

Perform all duties as driller, drilling high pressure gas wells in South Texas.

9/83 - 10/86 Moran Bros. Drilling Corp. Houston TXRelief Toolpusher

Perform all duties as relief toolpusher on a 16000ft diesel electric drilling rig drilling high pressure, High Temp gas wells in South Texas. Set a new drilling record for the seven sister’s lease, drilled well in ninety one days beat old record by two days of drilling time.

7/82 - 9/83 Bearden Drilling Corp. Wichita Falls TXDriller

Perform all duties as driller, drilling wells in South Texas.

4/82 - 7/82 Chapman Drilling Corp. Houston TXDerrick Hand

Worked derrick on high pressure gas wells in South Texas.

12/80 - 4/82 Champion Drilling Corp. Odessa TXToolpusher

Perform all duties as drilling rig manager in Bryan and Giddings, Texas, drilling wells for U.S. Operators. Bryan, TX Austin Chalk.

8/80 - 12/80 Robinson Bros. Drilling Corp. Woodward OKDriller Daylight tour

Perform all duties as daylight driller, drilling high pressure gas wells in South Texas.

4/80 - 8/80 Blocker Drilling Corp. Houston TXDriller

Perform all duties as driller. Wildcat 24,000’ well north of Laredo TX

1/79 - 7/79 Robinson Bros. Drilling Corp. Woodward OKDriller

Page 5: Bill Resume 1-30-2015

Perform all duties as driller. Oil base mud, High pressure gas wells , Laredo TX

1975 - 1979 Bearden Drilling Corp. Wichita Falls TXDriller

Perform all duties as driller. Webb County, TX

Horizontal drilling experience drilling multilateral wells, 10,000’ plus laterals

Ran drilling operations for Anadarko Petroleum, Samson Investment Company, and Range Resources

Drilled C B M wells in Gillette, Wyoming

Worked as Vice President & Senior Engineer for Warren Resources.

Took Company public in 2004 Stock Symbol WRES

Managed drilling contractors & consultants for all Warren E&P, Inc. wells

Drilled horizontal slim hole re-entries in the Austin Chalk, Texas

New Mexico Institute of Mining & Technology Socorro, NM

Bachelor of Science degree in Petroleum & Natural Gas Engineering, May, 1997 GPA 3.78 Graduated with honors and ranked in the top 5% of my class.

Wild Well Control BOP Certification 7/30/2016

Technical Highlight Education