Page 1: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

BILL REQUEST - CODE REVISER'S OFFICE

BILL REQ. #: H-2429.2/15 2nd draftATTY/TYPIST: AL:aklBRIEF DESCRIPTION: Concerning the capital budget.

Page 2: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

AN ACT Relating to the capital budget; making appropriations and1authorizing expenditures for capital improvements; amending RCW243.160.080, 27.34.330, 28A.525.166, 28A.525.172, 28B.20.725,328B.15.310, 28B.15.210, 28B.30.750, 28B.35.370, 28B.50.360,443.34.080, 43.155.050, 43.155.070, 43.160.080, 43.131.413, and543.131.414; amending 2013 2nd sp.s. c 19 ss 1073, 1074, 1077, 1078,61090, 1091, 1093, 1099, 1108, 1104, 1105, 2024, 2028, 3067, 3058,73101, 3190, 3212, 5007, 5020, 5015, 5025, 5055, 5108, 5110, and 70438(uncodified); amending 2013 3rd sp.s. c 1 s 3 (uncodified);9reenacting and amending RCW 70.105D.070; adding new sections to 2013102nd sp.s. c 19 (uncodified); creating new sections; repealing 2013112nd sp.s. c 19 s 7013 (uncodified); and declaring an emergency.12

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:13

NEW SECTION. Sec. 1. (1) A capital budget is hereby adopted14and, subject to the provisions set forth in this act, the several15dollar amounts hereinafter specified, or so much thereof as shall be16sufficient to accomplish the purposes designated, are hereby17appropriated and authorized to be incurred for capital projects18during the period beginning with the effective date of this act and19ending June 30, 2017, out of the several funds specified in this act.20

Code Rev/AL:akl 1 H-2429.2/15 2nd draft

Page 3: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(2) The definitions in this subsection apply throughout this act1unless the context clearly requires otherwise.2

(a) "Fiscal year 2016" or "FY 2016" means the period beginning3July 1, 2015, and ending June 30, 2016.4

(b) "Fiscal year 2017" or "FY 2017" means the period beginning5July 1, 2016, and ending June 30, 2017.6

(c) "Lapse" or "revert" means the amount shall return to an7unappropriated status.8

(d) "Provided solely" means the specified amount may be spent9only for the specified purpose.10

(3) Unless otherwise specifically authorized in this act, any11portion of an amount provided solely for a specified purpose that is12not expended subject to the specified conditions and limitations to13fulfill the specified purpose shall lapse.14

(4) The amounts shown under the headings "Prior Biennia," "Future15Biennia," and "Total" in this act are for informational purposes only16and do not constitute legislative approval of these amounts. "Prior17biennia" typically refers to the immediate prior biennium for18reappropriations, but may refer to multiple biennia in the case of19specific projects. A "future biennia" amount is an estimate of what20may be appropriated for the project or program in the 2017-201921biennium and the following three biennia; an amount of zero does not22necessarily constitute legislative intent to not provide funding for23the project or program in the future.24

(5) "Reappropriations" in this act are appropriations and, unless25the context clearly provides otherwise, are subject to the relevant26conditions and limitations applicable to appropriations.27Reappropriations shall be limited to the unexpended balances28remaining on June 30, 2015, from the 2013-2015 biennial29appropriations for each project.30

PART 131GENERAL GOVERNMENT32

NEW SECTION. Sec. 1001. FOR THE SECRETARY OF STATE33Library - Archives Building (30000033)34The appropriation in this section is subject to the following35

conditions and limitations:36

Code Rev/AL:akl 2 H-2429.2/15 2nd draft

Page 4: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(1) The appropriation is provided solely for a predesign to1determine: (a) Necessary program space for the state library2currently located in Tumwater, and additional archive space; and (b)3capital budget requirements, including the use of fees collected by4the secretary of state that will support a certificate of5participation for the financing of the construction of the facility,6and future operating costs.7

(2) The study must consider the use of the general administration8building site as a possible location; and any benefits or9consequences may be identified at this site or other sites10considered.11

(3) The office of financial management shall determine the12maximum use of the site and consider the consolidation of other state13agencies, including separately elected officials.14

(4) The building must be a high performance building as described15in section 7008 of this act and the construction must be procured16using a performance based method including design-build or design-17build-operate-maintain.18Appropriation:19

State Building Construction Account—State. . . . . . . . $250,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . $55,428,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $55,678,00023

NEW SECTION. Sec. 1002. FOR THE SECRETARY OF STATE24Minor Works (91000007)25

Appropriation:26State Building Construction Account—State. . . . . . . $1,007,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,007,00030

NEW SECTION. Sec. 1003. FOR THE DEPARTMENT OF COMMERCE31Local and Community Projects (20064008)32The reappropriation in this section is subject to the following33

conditions and limitations: The reappropriation is subject to the34provisions in section 131, chapter 488, Laws of 2005.35Reappropriation:36Code Rev/AL:akl 3 H-2429.2/15 2nd draft

Page 5: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . . $434,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $45,458,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,892,0004

NEW SECTION. Sec. 1004. FOR THE DEPARTMENT OF COMMERCE5Rural Washington Loan Fund (20064010)6

Reappropriation:7Rural Washington Loan Account—State. . . . . . . . . . $2,383,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $1,744,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,127,00011

NEW SECTION. Sec. 1005. FOR THE DEPARTMENT OF COMMERCE12Rural Washington Loan Fund (20074008)13

Reappropriation:14Rural Washington Loan Account—State. . . . . . . . . . $1,822,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . $205,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,027,00018

NEW SECTION. Sec. 1006. FOR THE DEPARTMENT OF COMMERCE19Housing Assistance, Weatherization, and Affordable Housing20

(20074009)21Reappropriation:22

State Taxable Building Construction Account—23State. . . . . . . . . . . . . . . . . . . . . . . $1,405,00024

Washington Housing Trust Account—State. . . . . . . . . . $86,00025Subtotal Reappropriation. . . . . . . . . . . . . $1,491,00026

Prior Biennia (Expenditures). . . . . . . . . . . . $198,509,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,000,00029

NEW SECTION. Sec. 1007. FOR THE DEPARTMENT OF COMMERCE30Job Development Fund Grants (20074010)31The reappropriation in this section is subject to the following32

conditions and limitations: The reappropriation is subject to the33Code Rev/AL:akl 4 H-2429.2/15 2nd draft

Page 6: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

provisions of section 1032, chapter 520, Laws of 2007 and section11005, chapter 36, Laws of 2010 1st sp. sess.2Reappropriation:3

State Building Construction Account—State. . . . . . . $3,987,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $44,943,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,930,0007

NEW SECTION. Sec. 1008. FOR THE DEPARTMENT OF COMMERCE8Local and Community Projects (20084001)9The reappropriation in this section is subject to the following10

conditions and limitations: Except as directed otherwise prior to the11effective date of this section, the department shall not expend the12reappropriation in this section unless and until the nonstate share13of project costs have been either expended, or firmly committed, or14both, in an amount sufficient to complete the project or a distinct15phase of the project that is useable to the public for the purpose16intended by the legislature. This requirement does not apply to17projects where a share of the reappropriation is released for design18costs only.19Reappropriation:20

State Building Construction Account—State. . . . . . . . $113,00021Prior Biennia (Expenditures). . . . . . . . . . . . $127,577,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $127,690,00024

NEW SECTION. Sec. 1009. FOR THE DEPARTMENT OF COMMERCE25Community Development Fund (20084850)26

Reappropriation:27State Building Construction Account—State. . . . . . . $1,213,00028Prior Biennia (Expenditures). . . . . . . . . . . . . $19,703,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,916,00031

NEW SECTION. Sec. 1010. FOR THE DEPARTMENT OF COMMERCE32Building for the Arts (30000006)33

Reappropriation:34Code Rev/AL:akl 5 H-2429.2/15 2nd draft

Page 7: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . $1,594,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $8,481,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,075,0004

NEW SECTION. Sec. 1011. FOR THE DEPARTMENT OF COMMERCE5Housing Assistance, Weatherization, and Affordable Housing6

(30000013)7Reappropriation:8

Washington Housing Trust Account—State. . . . . . . . . $276,0009Prior Biennia (Expenditures). . . . . . . . . . . . $129,724,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $130,000,00012

NEW SECTION. Sec. 1012. FOR THE DEPARTMENT OF COMMERCE132010 Local and Community Projects (30000082)14The reappropriation in this section is subject to the following15

conditions and limitations: The projects must comply with RCW1643.63A.125 and other requirements for community projects administered17by the department.18Reappropriation:19

State Building Construction Account—State. . . . . . . $1,991,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $11,431,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,422,00023

NEW SECTION. Sec. 1013. FOR THE DEPARTMENT OF COMMERCE24Drinking Water State Revolving Fund Loan Program (30000095)25

Reappropriation:26Drinking Water Assistance Account—State. . . . . . . . $6,451,00027Drinking Water Assistance Repayment Account—State. . $90,368,00028

Subtotal Reappropriation. . . . . . . . . . . . . $96,819,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $10,863,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $107,682,00032

NEW SECTION. Sec. 1014. FOR THE DEPARTMENT OF COMMERCE33Code Rev/AL:akl 6 H-2429.2/15 2nd draft

Page 8: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Community Economic Revitalization Board (30000097)1Reappropriation:2

Public Facility Construction Loan Revolving Account—3State. . . . . . . . . . . . . . . . . . . . . . . $2,104,0004

Prior Biennia (Expenditures). . . . . . . . . . . . . $2,896,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0007

NEW SECTION. Sec. 1015. FOR THE DEPARTMENT OF COMMERCE8Housing Assistance, Weatherization, Affordable Housing Trust Fund9

(30000098)10The reappropriation in this section is subject to the following11

conditions and limitations: The reappropriation is subject to the12provisions of section 1026, chapter 49, Laws of 2011 1st sp. sess.13Reappropriation:14

State Taxable Building Construction Account—State. . . $5,506,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $44,494,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00018

NEW SECTION. Sec. 1016. FOR THE DEPARTMENT OF COMMERCE19Public Works Assistance Account Program (30000103)20The reappropriation in this section is subject to the following21

conditions and limitations: The reappropriation is subject to the22provisions of section 1021, chapter 48, Laws of 2011 1st sp. sess.23Reappropriation:24

Public Works Assistance Account—State. . . . . . . . $90,734,00025Prior Biennia (Expenditures). . . . . . . . . . . . $233,851,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $324,585,00028

NEW SECTION. Sec. 1017. FOR THE DEPARTMENT OF COMMERCE29Building Communities Fund Grants (30000102)30The reappropriation in this section is subject to the following31

conditions and limitations:32

Code Rev/AL:akl 7 H-2429.2/15 2nd draft

Page 9: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(1) The reappropriation is subject to the provisions of section11027, chapter 49, Laws of 2011, 1st sp. sess.2

(2) The reappropriation is provided solely for the University3District food bank project.4Reappropriation:5

State Building Construction Account—State. . . . . . . . $573,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $12,830,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,403,0009

NEW SECTION. Sec. 1018. FOR THE DEPARTMENT OF COMMERCE10Local and Community Projects (30000166)11The reappropriation in this section is subject to the following12

conditions and limitations: The reappropriation is subject to the13provisions of section 1002, chapter 2, Laws of 2012 2nd sp. sess.14Reappropriation:15

State Building Construction Account—State. . . . . . . $1,887,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $14,930,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,817,00019

NEW SECTION. Sec. 1019. FOR THE DEPARTMENT OF COMMERCE20Weatherization (91000247)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 1015, chapter 2, Laws of 2012 2nd sp. sess.24Reappropriation:25

State Taxable Building Construction Account—State. . . $5,313,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $19,687,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00029

NEW SECTION. Sec. 1020. FOR THE DEPARTMENT OF COMMERCE30Clean Energy Partnership (30000175)31The reappropriation in this section is subject to the following32

conditions and limitations:33

Code Rev/AL:akl 8 H-2429.2/15 2nd draft

Page 10: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(1) The reappropriation is provided solely for implementation of1the recommendations of the clean energy leadership council by2providing state matching funds for projects that:3

(a) Integrate energy efficiency and renewable energy in4buildings;5

(b) Integrate renewable energy into the regional electrical grid;6(c) Advance bioenergy in the state.7(2) State funding must not exceed fifty percent of the total8

program or project funds.9(3) Eligible projects must:10(a) Involve a majority of companies that are located in11

Washington state;12(b) Represent a substantially new solution that is not widely13

available today; and14(c) Be designed to generate solutions that are applicable both15

inside and outside of the state.16Reappropriation:17

Public Facility Construction Loan Revolving Account—18State. . . . . . . . . . . . . . . . . . . . . . . $4,828,00019

Prior Biennia (Expenditures). . . . . . . . . . . . . . $672,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,500,00022

NEW SECTION. Sec. 1021. FOR THE DEPARTMENT OF COMMERCE23Financing Energy/Water Efficiency (30000180)24

Reappropriation:25Public Works Assistance Account—State. . . . . . . . . $4,886,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . $114,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00029

NEW SECTION. Sec. 1022. FOR THE DEPARTMENT OF COMMERCE30Public Works Assistance Account Program 2013 Loan List (30000184)31The reappropriation in this section is subject to the following32

conditions and limitations: The reappropriation is subject to the33provisions of section 1016, chapter 2, Laws of 2012 2nd sp. sess.34Reappropriation:35

Code Rev/AL:akl 9 H-2429.2/15 2nd draft

Page 11: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Public Works Assistance Account—State. . . . . . . . $82,786,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $82,786,0004

NEW SECTION. Sec. 1023. FOR THE DEPARTMENT OF COMMERCE5Youth Recreational Facilities Grants (30000185)6The reappropriation in this section is subject to the following7

conditions and limitations: The reappropriation is subject to the8provisions of section 1062, chapter 19, Laws of 2013 2nd sp. sess.9Reappropriation:10

State Building Construction Account—State. . . . . . . $2,568,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $1,563,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,131,00014

NEW SECTION. Sec. 1024. FOR THE DEPARTMENT OF COMMERCE15Building for the Arts Grants (30000186)16The reappropriation in this section is subject to the following17

conditions and limitations: The reappropriation is subject to the18provisions of section 1063, chapter 19, Laws of 2013 2nd sp. sess.19Reappropriation:20

State Building Construction Account—State. . . . . . . $3,301,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $6,903,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,204,00024

NEW SECTION. Sec. 1025. FOR THE DEPARTMENT OF COMMERCE25Building Communities Fund Grants (30000188)26The reappropriation in this section is subject to the following27

conditions and limitations: The reappropriation is subject to the28provisions of section 1072, chapter 19, Laws of 2013 2nd sp. sess.29Reappropriation:30

State Building Construction Account—State. . . . . . . $2,692,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $2,587,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 10 H-2429.2/15 2nd draft

Page 12: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,279,0001

NEW SECTION. Sec. 1026. FOR THE DEPARTMENT OF COMMERCE2Drinking Water State Revolving Fund Loan Program (30000189)3The reappropriations in this section are subject to the following4

conditions and limitations: For projects involving repair,5replacement, or improvement of a clean water infrastructure facility6or other public works facility for which an investment grade7efficiency audit is obtainable, the public works board must require8as a contract condition that the project sponsor undertake an9investment grade efficiency audit. The project sponsor may finance10the costs of the audit as part of its drinking water state revolving11fund program loan.12Reappropriation:13

Drinking Water Assistance Account—State. . . . . . . . $4,400,00014Drinking Water Assistance Repayment Account—15

State. . . . . . . . . . . . . . . . . . . . . . $200,000,00016Subtotal Reappropriation. . . . . . . . . . . . $204,400,00017

Prior Biennia (Expenditures). . . . . . . . . . . . . $8,800,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $213,200,00020

NEW SECTION. Sec. 1027. FOR THE DEPARTMENT OF COMMERCE21Community Economic Revitalization Board (30000190)22The reappropriation in this section is subject to the following23

conditions and limitations: The reappropriation is subject to the24provisions of section 1070, chapter 19, Laws of 2013 2nd sp. sess.25Reappropriation:26

Public Facility Construction Loan Revolving Account—27State. . . . . . . . . . . . . . . . . . . . . . . $5,052,00028

Prior Biennia (Expenditures). . . . . . . . . . . . . $3,948,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,00031

NEW SECTION. Sec. 1028. FOR THE DEPARTMENT OF COMMERCE32Weatherization (30000192)33

Code Rev/AL:akl 11 H-2429.2/15 2nd draft

Page 13: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is subject to the2provisions of section 1076, chapter 19, Laws of 2013 2nd sp. sess.3Reappropriation:4

State Building Construction Account—State. . . . . . . $4,291,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $15,709,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,0008

NEW SECTION. Sec. 1029. FOR THE DEPARTMENT OF COMMERCE92013-2015 Energy Efficiency Grants (30000193)10The reappropriation in this section is subject to the following11

conditions and limitations: The reappropriation is subject to the12provisions of section 1075, chapter 19, Laws of 2013 2nd sp. sess.13Reappropriation:14

State Building Construction Account—State. . . . . . $21,714,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $3,286,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00018

NEW SECTION. Sec. 1030. FOR THE DEPARTMENT OF COMMERCE19Renton Aerospace Training Center Construction (30000724)20The reappropriation in this section is subject to the following21

conditions and limitations: The reappropriation is subject to the22provisions of section 3, chapter 1, Laws of 2013 3rd sp. sess.23Reappropriation:24

State Building Construction Account—State. . . . . . $10,000,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00028

NEW SECTION. Sec. 1031. FOR THE DEPARTMENT OF COMMERCE29ARRA SEP Revolving Loans (30000725)30

Appropriation:31Energy Recovery Act Account—State. . . . . . . . . . . $2,500,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033

Code Rev/AL:akl 12 H-2429.2/15 2nd draft

Page 14: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . $10,000,0001TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,500,0002

NEW SECTION. Sec. 1032. FOR THE DEPARTMENT OF COMMERCE3Behavioral Health: Evaluation and Treatment Centers Grant Program4

(91000644)5The appropriation in this section is subject to the following6

conditions and limitations:7(1) The appropriation in this section is provided solely for the8

department of commerce, in collaboration with the department of9social and health services, to issue at least three grants, one of10which will be to the Woodmont recovery center, to hospitals or other11entities to establish new community hospital inpatient psychiatric12beds, free-standing evaluation and treatment facilities, enhanced13services facilities, triage facilities, or crisis stabilization14facilities with sixteen or fewer beds for the purpose of providing15short-term detention services through the publicly funded mental16health system. Funds may be used for construction and equipment costs17associated with establishment of the community hospital inpatient18psychiatric beds, free-standing evaluation and treatment facilities,19enhanced services facilities, triage facilities, or crisis20stabilization facilities. These funds may not be used for operating21costs associated with the treatment of patients using these services.22The department shall establish criteria for the issuance of grants23and priority must be given to those proposals to establish new24community hospital inpatient psychiatric beds or free-standing25evaluation and treatment facilities. The criteria must include:26

(a) Evidence that the application was developed in collaboration27with one or more regional support networks, as defined in RCW2871.24.025;29

(b) Evidence that the applicant has assessed and would meet gaps30in geographical access to short-term detention services under chapter3171.05 RCW in their region;32

(c) A commitment by applicants to serve persons who are publicly33funded and persons detained under the involuntary treatment act at34chapter 71.05 RCW;35

(d) Evidence of capacity of the applicant to serve individuals36with medical and psychiatric comorbidities;37

Code Rev/AL:akl 13 H-2429.2/15 2nd draft

Page 15: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(e) A commitment by the applicant to maintain the beds or1facility for at least a ten-year period;2

(f) The date upon which structural modifications or construction3would begin and the anticipated date of completion of the project;4

(g) A detailed estimate of the costs associated with opening the5beds; and6

(h) The applicant's commitment to work with local courts and7prosecutors to ensure that prosecutors and courts in the area served8by the hospital or facility will be available to conduct involuntary9commitment hearings and proceedings under chapter 71.05 RCW.10

(2) To accommodate the emergent need for inpatient psychiatric11services, the department of health and the department of commerce, in12collaboration with the department of social and health services shall13establish a concurrent and expedited process for the purpose of grant14applicants meeting any applicable regulatory requirements necessary15to operate inpatient psychiatric beds, free-standing evaluation and16treatment facilities, enhanced services facilities, triage17facilities, or crisis stabilization facilities.18

(3) $3,000,000 is provided for the Swedish Ballard psychiatric19unit.20Appropriation:21

State Building Construction Account—State. . . . . . . $9,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,00025

NEW SECTION. Sec. 1033. FOR THE DEPARTMENT OF COMMERCE26Clean Energy and Energy Freedom Program (30000726)27The appropriations in this section are subject to the following28

conditions and limitations:29(1) The appropriations are provided solely for projects that30

provide a benefit to the public through development, demonstration,31and deployment of clean energy technologies that save energy and32reduce energy costs, reduce harmful air emissions or otherwise33increase energy independence for the state. All expenditures must be34used for projects that develop and acquire assets that have a useful35life of at least thirteen years. These requirements must be specified36in funding agreements issued by the department.37

Code Rev/AL:akl 14 H-2429.2/15 2nd draft

Page 16: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(2)(a) $10,000,000 of the state taxable building construction1account is provided solely to create a revolving loan fund to support2the widespread use of proven energy efficiency and renewable energy3technologies now inhibited by lack of access to capital.4

(b) The department shall provide grant funds to one or more5competitively selected nonprofit lenders that will provide matching6private capital and will administer the loan fund. The department7must select the loan fund administrator or administrators through a8competitive process, with scoring conducted by a group of qualified9experts, applying criteria specified by the department.10

(c) The department must establish guidelines that specify11applicant eligibility, the screening process, and evaluation and12selection criteria. The guidelines must be used by the nonprofit13lenders.14

(d) Loan applications must disclose all sources of public funds15invested in the project. The nonprofit lender must make loans16available to the following types of projects that include, but are17not limited to: Residential, commercial, industrial, and agricultural18energy retrofits, residential and community-scale solar19installations, anaerobic digesters to treat dairy and organic waste,20and combined heat and power projects using woody biomass as a fuel21source.22

(e) State funds may not exceed fifty percent of the estimated23cost of a project, and funding preference must be provided to24projects that offer a higher percentage of nonstate match funds.25

(f) The department must conduct due diligence activities26associated with the use of public funds, including oversight of the27project selection process and project monitoring.28

(3) $6,600,000 of the state taxable building construction account29is provided solely for credit enhancements of advanced solar and30renewable energy manufacturing within Washington state. The31department shall develop an application process to competitively32select projects.33

(4)(a) $13,000,000 of the state building construction account is34provided solely for grants to advance clean and renewable energy35technologies and advance transmission and distribution control system36improvements for increased reliability, resiliency, and enabling37integration of distributed and renewable resources and technology by38public and private electrical utilities that serve retail customers39in the state. Eligible utilities may partner with other public and40Code Rev/AL:akl 15 H-2429.2/15 2nd draft

Page 17: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

private sector research organizations and businesses in applying for1funding.2

(b) The department shall develop a grant application process to3competitively select projects for grant awards, to include scoring4conducted by a group of qualified experts with application of5criteria specified by the department. In development of the6application criteria, the department shall, to the extent possible,7allow smaller utilities or consortia of small utilities to apply for8funding.9

(c) The department shall convene an advisory panel of electric10utility representatives to identify program objectives, near term11priorities and long term goals.12

(d) Applications for grants must disclose all sources of public13funds invested in a project.14

(e) Grant funds must be used for research, development, or15demonstration projects that integrate intermittent renewables through16energy storage, information technology or other smart grid17technologies, dispatch energy storage resources from utility control18rooms, use demand response, transactive control, or the thermal19properties and electric load of commercial buildings and district20energy systems to store energy, reduce transmission congestion or21otherwise improve system reliability and resiliency and enable22integration of distributed and renewable energy sources.23

(5)(a) $10,000,000 of the state building construction account is24provided solely for grants to match federal funds or other nonstate25funding sources used to research, develop, and demonstrate clean26energy technologies.27

(b) The department shall consult with the University of28Washington, Washington State University, the Pacific Northwest29national laboratory and other clean energy organizations to design30the program. The program shall offer matching funds for clean energy31projects including, but not limited to: Advancing energy storage and32solar technologies, advancing bioenergy, developing new lightweight33materials, and advancing renewable energy and energy efficiency34technologies.35

(6) $400,000 of the state building construction account—state is36provided solely for capital funding of wood energy conversion37projects at public facilities.38

(7) The department must report on number and results of projects39that receive grants or loans through the clean energy fund, including40Code Rev/AL:akl 16 H-2429.2/15 2nd draft

Page 18: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

the number of job hours created and the number of jobs maintained and1created, to the governor and the legislature, by November 1, 2016.2Appropriation:3

State Taxable Building Construction Account—State. . $17,000,0004State Building Construction Account—State. . . . . . $23,400,0005

Subtotal Appropriation. . . . . . . . . . . . . . $40,400,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . $240,000,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . $280,400,0009

NEW SECTION. Sec. 1034. FOR THE DEPARTMENT OF COMMERCE10Substance Abuse and Mental Health Facilities (91000646)11

Appropriation:12State Building Construction Account—State. . . . . . . $2,000,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00016

NEW SECTION. Sec. 1035. FOR THE DEPARTMENT OF COMMERCE17Public Works Assistance Account Program 2016 Loan List (30000727)18The appropriation in this section is subject to the following19

conditions and limitations: $69,733,000 is provided solely for the20ranked list of projects in LEAP capital document number 2015-1,21developed March 27, 2015.22Appropriation:23

Public Works Assistance Account—State. . . . . . . . $69,733,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . $280,000,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $349,733,00027

NEW SECTION. Sec. 1036. FOR THE DEPARTMENT OF COMMERCE28Building for the Arts Program (30000731)29The appropriation in this section is subject to the following30

conditions and limitations:31(1) The appropriation is subject to the provisions of RCW32

43.63A.750.33

Code Rev/AL:akl 17 H-2429.2/15 2nd draft

Page 19: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(2) Except as directed otherwise prior to the effective date of1this section, the department may not expend the appropriation in this2section unless and until the nonstate share of project costs have3been either expended, or firmly committed, or both, in an amount4sufficient to complete the project or a distinct phase of the project5that is useable to the public for the purpose intended by the6legislature. This requirement does not apply to projects where a7share of the appropriation is released for design costs only.8

(3) The appropriation is provided solely for the following list9of projects:10Spokane children's theatre. . . . . . . . . . . . . . . . . . $18,00011KEXP's new home at Seattle center. . . . . . . . . . . . . $1,866,00012Admiral theatre renovation 2.0. . . . . . . . . . . . . . . $100,00013Kirkland arts center - capital improvements project. . . . . $48,00014Uniontown creativity center addition and site15

improvements. . . . . . . . . . . . . . . . . . . . . . $123,00016San Juan islands museum of art. . . . . . . . . . . . . . . $650,00017KidsQuest children's museum - good to grow capital18

campaign. . . . . . . . . . . . . . . . . . . . . . . $2,000,00019Cornish playhouse. . . . . . . . . . . . . . . . . . . . . . $232,00020ACT theatre eagles auditorium restoration and renovation. . $303,00021Music works northwest park 118 building renovation. . . . . . $64,00022New hands on children's museum. . . . . . . . . . . . . . . $393,00023TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . $5,797,00024Appropriation:25

State Building Construction Account—State. . . . . . . $5,797,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . $21,600,00028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,397,00029

NEW SECTION. Sec. 1037. FOR THE DEPARTMENT OF COMMERCE30Youth Recreational Facilities Program (30000792)31The appropriation in this section is subject to the following32

conditions and limitations:33(1) The appropriation is subject to the provisions of RCW34

43.63A.135.35(2) Except as directed otherwise prior to the effective date of36

this section, the department may not expend the appropriation in this37

Code Rev/AL:akl 18 H-2429.2/15 2nd draft

Page 20: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

section unless and until the nonstate share of project costs have1been either expended, or firmly committed, or both, in an amount2sufficient to complete the project or a distinct phase of the project3that is useable to the public for the purpose intended by the4legislature. This requirement does not apply to projects where a5share of the appropriation is released for design costs only.6

(3) The appropriation is provided solely for the following list7of projects:8Youth activity wing at the Tom Taylor family YMCA. . . . . . $515,0009BGCB main club project. . . . . . . . . . . . . . . . . . $1,200,00010BGCB hidden valley fieldhouse project. . . . . . . . . . . $1,200,00011Sultan boys & girls club. . . . . . . . . . . . . . . . . . $340,00012Stanwood-Camano family YMCA. . . . . . . . . . . . . . . . $1,200,00013YMCA camp Terry environmental recreation center. . . . . . . $500,00014Mukilteo boys & girls club. . . . . . . . . . . . . . . . $1,200,00015Lummi youth wellness center renovation project. . . . . . $1,200,00016TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . $7,355,00017Appropriation:18

State Building Construction Account—State. . . . . . . $7,355,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . $32,000,00021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $39,355,00022

NEW SECTION. Sec. 1038. FOR THE DEPARTMENT OF COMMERCE23Building Communities Fund Program (30000803)24The appropriation in this section is subject to the following25

conditions and limitations:26(1) The appropriation is subject to the provisions of RCW27

43.63A.125.28(2) Except as directed otherwise prior to the effective date of29

this section, the department may not expend the appropriation in this30section unless and until the nonstate share of project costs have31been either expended, or firmly committed, or both, in an amount32sufficient to complete the project or a distinct phase of the project33that is useable to the public for the purpose intended by the34legislature. This requirement does not apply to projects where a35share of the appropriation is released for design costs only.36

Code Rev/AL:akl 19 H-2429.2/15 2nd draft

Page 21: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(3) The appropriation is provided solely for the following list1of projects:2Rainier Beach urban farm and wetlands. . . . . . . . . . . . $307,0003Whatcom county emergency food hub. . . . . . . . . . . . . . $575,0004Hopelink Redmond integrated services center. . . . . . . . $2,400,0005Riverside drive building purchase. . . . . . . . . . . . . . $138,0006Centerforce. . . . . . . . . . . . . . . . . . . . . . . . . $98,0007Eritrean association community kitchen. . . . . . . . . . . . $58,0008Tonasket food bank building acquisition. . . . . . . . . . . $22,0009Building for the future. . . . . . . . . . . . . . . . . . . $300,00010Entiat Valley community services resource center. . . . . . $100,00011Pike market neighborhood center. . . . . . . . . . . . . . . $500,00012Opportunity council renovation project. . . . . . . . . . . $170,00013FareStart facility expansion to the Pacific tower. . . . . . $438,00014Walla Walla community teen center. . . . . . . . . . . . . . $475,00015El Centro de la Raza community access & parking16

improvements. . . . . . . . . . . . . . . . . . . . . . $600,00017Good ground capital campaign. . . . . . . . . . . . . . . . $300,00018Renewed hope capital campaign. . . . . . . . . . . . . . . . $66,00019International community health services (ICHS). . . . . . $3,500,00020Casa latina: A home for opportunity. . . . . . . . . . . . . $150,00021Centerstone building renovation. . . . . . . . . . . . . . $1,500,00022PSRS office building conversion. . . . . . . . . . . . . . . $212,00023Prairie oaks. . . . . . . . . . . . . . . . . . . . . . . . $200,00024Leschi center renovation. . . . . . . . . . . . . . . . . $1,000,00025Everett family YMCA. . . . . . . . . . . . . . . . . . . . $2,000,00026Behavioral healthcare center for children, youth and27

families. . . . . . . . . . . . . . . . . . . . . . . $2,000,00028Phoenix rising. . . . . . . . . . . . . . . . . . . . . . . $250,00029Gordon family YMCA (Sumner, WA). . . . . . . . . . . . . . $2,000,00030Community grief support and recovery center. . . . . . . . $1,000,00031Auburn youth resources campus expansion. . . . . . . . . . . $500,00032TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . $20,859,00033Appropriation:34

State Building Construction Account—State. . . . . . $20,859,00035Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $036Future Biennia (Projected Costs). . . . . . . . . . $120,000,00037

TOTAL. . . . . . . . . . . . . . . . . . . . . . $140,859,00038

Code Rev/AL:akl 20 H-2429.2/15 2nd draft

Page 22: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 1039. FOR THE DEPARTMENT OF COMMERCE1Housing Trust Fund Appropriation (30000833)2The appropriation in this section is subject to the following3

conditions and limitations:4(1) The appropriation in this section is provided solely for the5

department to award loans and grants on a competitive basis to6affordable housing projects statewide that will produce, at a7minimum, a total of 1,900 homes and 500 seasonal beds, in the8following categories and amounts:9

(a) For people with chronic mental illness, 281 homes;10(b) For homeless families with children, 529 homes;11(c) For people with disabilities, developmental disabilities,12

veterans, and others, 500 homes; of that number, a minimum of 10013must be for veterans;14

(d) For homeless youth, 200 homes;15(e) For farmworkers, 190 homes and 500 seasonal beds;16(f) For seniors, 200 homes.17(2) If upon review of completed applications, the department18

determines there are not adequate suitable projects in a category,19the department may allocate funds to projects serving other low-20income and special needs populations, provided those projects are21located in an area with an identified need for the type of housing22proposed.23Appropriation:24

State Taxable Building Construction Account—State. . $80,000,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . $220,000,00027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $300,000,00028

NEW SECTION. Sec. 1040. FOR THE DEPARTMENT OF COMMERCE292015-2017 Community Economic Revitalization Board Program30

(30000834)31The appropriation in this section is subject to the following32

conditions and limitations: If House Bill No. 1856 or other33legislation that provides an exception for counties with the state's34highest unemployment rates to the community economic revitalization35board program's median hourly wage requirement is not enacted by June36

Code Rev/AL:akl 21 H-2429.2/15 2nd draft

Page 23: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

30, 2015, the appropriation from the state taxable building1construction account—state in this section shall lapse.2Appropriation:3

State Taxable Building Construction Account—State. . . $2,000,0004Public Facility Construction Loan Revolving Account—5

State. . . . . . . . . . . . . . . . . . . . . . . $8,100,0006Subtotal Appropriation. . . . . . . . . . . . . . $10,100,0007

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . $28,000,0009

TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,100,00010

NEW SECTION. Sec. 1041. FOR THE DEPARTMENT OF COMMERCE11Energy Efficiency and Solar Grants (30000835)12The appropriation in this section is subject to the following13

conditions and limitations:14(1)(a) $5,630,000 for fiscal year 2016 and $5,630,000 for fiscal15

year 2017 is provided solely for grants to be awarded in competitive16rounds to local agencies, public higher education institutions, and17state agencies for operational cost savings improvements to18facilities and related projects that result in energy and operational19cost savings.20

(b) At least ten percent of each competitive grant round must be21awarded to small cities or towns with a population of five thousand22or fewer residents.23

(c) In each competitive round, the higher the leverage ratio of24nonstate funding sources to state grant and the higher the energy25savings, the higher the project ranking.26

(2) $3,750,000 is provided solely for grants to be awarded in27competitive rounds to local agencies, public higher education28institutions, and state agencies for projects that involve the29purchase and installation of solar energy systems, including solar30modules and inverters, with a preference for Washington-manufactured31products.32

(3) $1,650,000 is provided solely for energy efficiency33improvements to minor works and stand-alone projects at state-owned34facilities that repair or replace existing building systems including35but not limited to HVAC, lighting, insulation, windows, and other36mechanical systems. Eligibility for this funding is dependent on an37

Code Rev/AL:akl 22 H-2429.2/15 2nd draft

Page 24: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

analysis using the office of financial management's life cycle cost1tool that compares project design alternatives for initial and long-2term cost-effectiveness. Assuming a reasonable return on investment,3the cost to improve the project's energy efficiency compared to the4original project request will be added to the project appropriation5after construction bids are received. The department of commerce6shall coordinate with the office of financial management to develop a7process for project submittal, review, approval criteria, tracking8project budget adjustments, and performance measures.9

(4) $225,000 is provided solely for resource conservation10managers in the department of enterprise services to coordinate with11state agencies to assess and adjust existing building systems and12operations to optimize the efficiency in use of energy and other13resources in state-owned facilities. The department of commerce will14oversee an interagency agreement with the department of enterprise15services to fund the resource conservation managers.16Appropriation:17

State Building Construction Account—State. . . . . . $30,000,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . $120,000,00020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $150,000,00021

NEW SECTION. Sec. 1042. FOR THE DEPARTMENT OF COMMERCE22Ultra-Efficient Affordable Housing Demonstration (30000836)23The appropriation in this section is subject to the following24

conditions and limitations:25(1) The appropriation in this section is provided solely for26

loans or grants to low-income housing developers to design and27construct ultra-high energy efficient housing projects including28single and multifamily units;29

(2) By December 1, 2015, in consultation with professional30building, energy efficiency and housing finance organizations, the31office of financial management and appropriate legislative staff, the32department shall develop a process that is designed to solicit,33evaluate and fund ultra-high energy efficient housing projects as34part of the housing trust fund competitive program.35

(3) To receive funding, a project must demonstrate energy-saving36and renewable energy systems designed to reach net-zero energy use37

Code Rev/AL:akl 23 H-2429.2/15 2nd draft

Page 25: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

after housing is fully occupied and must provide a life-cycle cost1analysis report to the department; and2

(4) The department must consider, at a minimum and in any order,3the following factors in assigning a numerical ranking to a project:4

(a) Whether the proposed design has demonstrated that the project5will achieve net-zero energy use when fully occupied;6

(b) The life cycle cost of the project;7(c) That the project demonstrates a design, use of materials, and8

construction process that can be replicated by the Washington9building industry;10

(d) The extent to which the project leverages nonstate funds;11(e) The extent to which the project is ready to proceed to12

construction;13(f) Whether the project promotes sustainable use of resources and14

environmental quality;15(g) Whether the project is being well-managed to fund maintenance16

and capital depreciation;17(h) Reduction of housing and utilities carbon footprint; and18(i) Other criteria that the department considers necessary to19

achieve the purpose of this program.20Appropriation:21

State Taxable Building Construction Account—State. . . $5,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00025

NEW SECTION. Sec. 1043. FOR THE DEPARTMENT OF COMMERCE26Housing Trust Fund Portfolio Preservation Program (30000837)27

Appropriation:28Washington Housing Trust Account—State. . . . . . . . $5,000,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00032

NEW SECTION. Sec. 1044. FOR THE DEPARTMENT OF COMMERCE33Weatherization Matchmaker Program (30000838)34

Appropriation:35State Building Construction Account—State. . . . . . $20,000,00036

Code Rev/AL:akl 24 H-2429.2/15 2nd draft

Page 26: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . $60,000,0002

TOTAL. . . . . . . . . . . . . . . . . . . . . . $80,000,0003

NEW SECTION. Sec. 1045. FOR THE DEPARTMENT OF COMMERCE42015-2017 Drinking Water State Revolving Fund Loan Program5

(30000840)6The appropriations in this section are subject to the following7

conditions and limitations:8(1) $4,400,000 of the drinking water assistance account for9

fiscal year 2016 and $4,400,000 of the drinking water assistance10account for fiscal year 2017 is provided as state match for federal11safe drinking water funds.12

(2) For projects involving repair, replacement, or improvement of13a clean water infrastructure facility or other public works facility14for which an investment grade efficiency audit is obtainable, the15public works board must require as a contract condition that the16project sponsor undertake an investment grade efficiency audit. The17project sponsor may finance the costs of the audit as part of its18drinking water state revolving fund program loan.19

(3) The agency must encourage local government use of federally-20funded drinking water infrastructure programs operated by the United21States department of agriculture - rural development.22Appropriation:23

Drinking Water Assistance Account—State. . . . . . . $120,000,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . $480,000,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $600,000,00027

NEW SECTION. Sec. 1046. FOR THE DEPARTMENT OF COMMERCE28Community Energy Efficiency Program (30000845)29

Appropriation:30State Building Construction Account—State. . . . . . $10,000,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . $40,000,00033

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00034

Code Rev/AL:akl 25 H-2429.2/15 2nd draft

Page 27: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 1047. FOR THE DEPARTMENT OF COMMERCE12016 Local and Community Projects (30000846)2The appropriation in this section is subject to the following3

conditions and limitations:4(1) Except as directed otherwise prior to the effective date of5

this section, the department may not expend the appropriation in this6section unless and until the nonstate share of project costs have7been either expended, or firmly committed, or both, in an amount8sufficient to complete the project or a distinct phase of the project9that is useable to the public for the purpose intended by the10legislature. This requirement does not apply to projects where a11share of the appropriation is released for design costs only.12

(2) Prior to receiving funds, project recipients must demonstrate13that the project site is under control for a minimum of ten years,14either through ownership or a long-term lease. This requirement does15not apply to appropriations for preconstruction activities or16appropriations whose sole purpose is to purchase real property that17does not include a construction or renovation component.18

(3) Projects funded in this section may be required to comply19with Washington's high performance building standards as required by20chapter 39.35D RCW.21

(4) Project funds are available on a reimbursement basis only,22and shall not be advanced under any circumstances.23

(5) Projects funded in this section must be held by the recipient24for a minimum of ten years and used for the same purpose or purposes25intended by the legislature as required in RCW 43.63A.125(6).26

(6) Projects funded in this section, including those that are27owned and operated by nonprofit organizations, are generally required28to pay state prevailing wages.29

(7) $1,500,000 of the appropriation in this section is provided30solely for the Fairchild air force base protection and community31empowerment project. Of that amount, $200,000 is provided for the32purchase of twenty acres of land for development of affordable33housing. The remaining $1,300,000 is provided for the county's34purchase of mobile home parks in order to reduce the use of the35accident potential zone for residential purposes. If the county36subsequently rezones, develops, and leases the mobile home park37property for commercial or industrial uses, the county must repay to38

Code Rev/AL:akl 26 H-2429.2/15 2nd draft

Page 28: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

the state the $1,300,000 appropriation in its entirety within ten1years.2

(8) The appropriation is provided solely for the following list3of projects:4AHCC reclaimed water project. . . . . . . . . . . . . . . . $709,0005Appleway trail. . . . . . . . . . . . . . . . . . . . . . $1,000,0006Basin 3 sewer rehabilitation center. . . . . . . . . . . . $1,000,0007Bellevue downtown park inspiration playground and sensory8

garden. . . . . . . . . . . . . . . . . . . . . . . . . $500,0009Bender fields parking lot and restrooms. . . . . . . . . . $1,000,00010Blackhills community soccer complex safety projects. . . . . $750,00011Bremerton children's dental clinic. . . . . . . . . . . . . $396,00012Brewster reservoir replacement project. . . . . . . . . . $1,000,00013Brookville gardens community park improvements. . . . . . $1,200,00014Camas-Washougal Babe Ruth youth baseball improve Louis15

Bloch park. . . . . . . . . . . . . . . . . . . . . . . . $10,00016Cancer immunotherapy facility-Seattle children's research17

institute. . . . . . . . . . . . . . . . . . . . . . . $5,000,00018Caribou trail apartments. . . . . . . . . . . . . . . . . . $100,00019Carnegie improvements for the rapid recidivism reduction20

program. . . . . . . . . . . . . . . . . . . . . . . . $1,000,00021Cascade mental health care evaluation and treatment22

unit. . . . . . . . . . . . . . . . . . . . . . . . . $2,992,00023Cavalero park - Region park facility/skateboard park. . . . $500,00024CDM caregiving services: Clark county aging care resource25

center. . . . . . . . . . . . . . . . . . . . . . . . . $900,00026Centerville school heating upgrades. . . . . . . . . . . . . $46,00027Chambers creek regional park pier extension and moorage. . $2,500,00028City of Lynden-riverview road construction. . . . . . . . . $850,00029City of Lynden-safe routes to school and Kaemingk30

trail gap elimination. . . . . . . . . . . . . . . . . . $300,00031City of Mt. Vernon downtown flood protect project &32

riverfront trail. . . . . . . . . . . . . . . . . . . $1,500,00033City of Pateros water system. . . . . . . . . . . . . . . $1,500,00034City of Stanwood police station/city hall relocation. . . . $300,00035Confluence area parks upgrade and restoration. . . . . . . $1,000,00036Covington community park. . . . . . . . . . . . . . . . . $2,000,00037Critical roof repair - Edmonds center for the arts38

(ECA) gym. . . . . . . . . . . . . . . . . . . . . . . . $250,00039

Code Rev/AL:akl 27 H-2429.2/15 2nd draft

Page 29: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Cross park, Pierce county. . . . . . . . . . . . . . . . . . $500,0001Dawson place child advocacy center building completion2

project. . . . . . . . . . . . . . . . . . . . . . . . . $161,0003DeKalb street pier. . . . . . . . . . . . . . . . . . . . . $500,0004DNR/City of Castle Rock exchange. . . . . . . . . . . . . . . $80,0005Drug abuse prevention center. . . . . . . . . . . . . . . . . $96,0006DuPont historical museum renovation. . . . . . . . . . . . . $46,0007East Tacoma Community Center. . . . . . . . . . . . . . . $1,000,0008Emergency generator for kidney resource center. . . . . . . $226,0009Enumclaw expo center. . . . . . . . . . . . . . . . . . . . $350,00010Fairchild air force base protection & community11

empowerment project. . . . . . . . . . . . . . . . . . $1,500,00012Federal Way performing arts and conference center. . . . . $2,000,00013Franklin Pierce early learning center. . . . . . . . . . . $2,000,00014Gateway center project. . . . . . . . . . . . . . . . . . . $900,00015Gratzer park ball fields. . . . . . . . . . . . . . . . . . $200,00016Grays Harbor navigation improvement project. . . . . . . . $2,000,00017Green river gorge open space buffer, Kummer connection. . . $750,00018Guy Cole center revitalization. . . . . . . . . . . . . . . $450,00019Haggis museum & colonary institute. . . . . . . . . . . . $1,000,00020Historic renovation of stucco and roofs. . . . . . . . . . . $300,00021Hopelink at ronald commons. . . . . . . . . . . . . . . . . $750,00022Institute of blue tarp research. . . . . . . . . . . . . . $1,968,00023Irvine slough stormwater separation. . . . . . . . . . . . . $500,00024Kahlotus highway sewer force main. . . . . . . . . . . . . $2,750,00025Key Pen civics center. . . . . . . . . . . . . . . . . . . . $50,00026KiBe high school parking. . . . . . . . . . . . . . . . . . $125,00027Kitsap humane society - shelter renovation. . . . . . . . . . $90,00028Lacey boys & girls club. . . . . . . . . . . . . . . . . . . $29,00029Life support. . . . . . . . . . . . . . . . . . . . . . . $1,250,00030Main street revitalization project. . . . . . . . . . . . $1,000,00031Martin Luther King Jr. family outreach center expansion32

project. . . . . . . . . . . . . . . . . . . . . . . . . $85,00033Mercer arena energy savings & sustainability funding. . . . $450,00034Meridian center for health. . . . . . . . . . . . . . . . $2,250,00035Minor road water reservoir replacement. . . . . . . . . . $1,500,00036Mt. Spokane guest services building &37

preservation/maintenance of existing facilities. . . . . $520,00038Nonshellfish natural resource investments. . . . . . . . . $1,000,00039North Kitsap fishline food bank. . . . . . . . . . . . . . . $750,00040Code Rev/AL:akl 28 H-2429.2/15 2nd draft

Page 30: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Onalaska community tennis and sports courts. . . . . . . . . $80,0001Opera house ADA access. . . . . . . . . . . . . . . . . . . $356,0002PCAF's building for the future. . . . . . . . . . . . . . . $350,0003Pe Ell second street. . . . . . . . . . . . . . . . . . . . $197,0004Phinney neighborhood association accessibility project. . . $750,0005Pike place market front project. . . . . . . . . . . . . . . $800,0006Police station security/hardening. . . . . . . . . . . . . . $38,0007Port of Centralia-Centralia station. . . . . . . . . . . . . $500,0008PROVAIL TBI residential facility. . . . . . . . . . . . . . $450,0009Renovate senior center. . . . . . . . . . . . . . . . . . . $400,00010Rochester boys & girls club. . . . . . . . . . . . . . . . . $38,00011Rockford treatment facility improvements project. . . . . . $600,00012Roslyn renaissance-NW improve company building renovation13

project. . . . . . . . . . . . . . . . . . . . . . . . . $500,00014S 228th street interurban trail connector. . . . . . . . . . $500,00015Sammamish rowing association boathouse. . . . . . . . . . . $500,00016SE 240th St. watermain system improvement project. . . . . . $700,00017Seattle theatre group. . . . . . . . . . . . . . . . . . . . $131,00018Sentinel way restoration. . . . . . . . . . . . . . . . . . $450,00019Snohomish veterans memorial rebuild. . . . . . . . . . . . . $10,00020South sound shoreline and heritage protection. . . . . . . . $900,00021Splash pad/foundation: Centralia outdoor pool restoration22

project. . . . . . . . . . . . . . . . . . . . . . . . . $200,00023Springbrook park neighborhood connection project. . . . . . $300,00024SR 532 flood berm and bike/pedestrian path. . . . . . . . . . $85,00025St. Vincent food bank & community services construction26

project. . . . . . . . . . . . . . . . . . . . . . . . . $400,00027Sunset neighborhood park. . . . . . . . . . . . . . . . . $2,000,00028The gathering house job training café. . . . . . . . . . . . $14,00029The salvation army Clark county: Corps community center. . $1,200,00030Tulalip water pipeline. . . . . . . . . . . . . . . . . . $3,000,00031Twin bridges historical museum facility rehabilitation. . . . $62,00032Twisp civic building. . . . . . . . . . . . . . . . . . . . $500,00033Veterans center. . . . . . . . . . . . . . . . . . . . . . . $600,00034Washington green schools. . . . . . . . . . . . . . . . . . $105,00035Washougal senior/community center roof/HVAC replace &36

kitchen improvements. . . . . . . . . . . . . . . . . . $300,00037Water meter and system improvement program. . . . . . . . . $500,00038White river restoration project. . . . . . . . . . . . . . . $850,00039Willapa behavioral health safety improvement project. . . . . $75,00040Code Rev/AL:akl 29 H-2429.2/15 2nd draft

Page 31: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Yakima children's museum center. . . . . . . . . . . . . . . $50,0001Yelm community center. . . . . . . . . . . . . . . . . . . . $500,0002Yelm senior center. . . . . . . . . . . . . . . . . . . . . . $80,0003TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . $76,500,0004Appropriation:5

State Building Construction Account—State. . . . . . $76,500,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $76,500,0009

NEW SECTION. Sec. 1048. FOR THE DEPARTMENT OF COMMERCE10Energy Efficiency Grants for Local Governments (91000241)11The reappropriation in this section is subject to the following12

conditions and limitations: The reappropriation is subject to the13provisions of section 301, chapter 1, Laws of 2012 2nd sp. sess.14Reappropriation:15

State Building Construction Account—State. . . . . . . $1,732,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $16,268,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,000,00019

NEW SECTION. Sec. 1049. FOR THE DEPARTMENT OF COMMERCE20Energy Efficiency Grants for Higher Education (91000242)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 307, chapter 1, Laws of 2012 2nd sp. sess.24Reappropriation:25

State Building Construction Account—State. . . . . . . $5,077,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $14,923,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,00029

NEW SECTION. Sec. 1050. FOR THE DEPARTMENT OF COMMERCE30Public Works Pre-Construction Loan Program (91000319)31

Reappropriation:32Public Works Assistance Account—State. . . . . . . . . . $767,00033

Code Rev/AL:akl 30 H-2429.2/15 2nd draft

Page 32: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . $2,233,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,0003

NEW SECTION. Sec. 1051. FOR THE DEPARTMENT OF COMMERCE4Housing for Families with Children (91000409)5The reappropriation in this section is subject to the following6

conditions and limitations: The reappropriation is subject to the7provisions of section 310, chapter 1, Laws of 2012 2nd sp. sess.8Reappropriation:9

State Taxable Building Construction Account—State. . . $2,472,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $5,778,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,250,00013

NEW SECTION. Sec. 1052. FOR THE DEPARTMENT OF COMMERCE14Housing for Seniors and People with Physical Disabilities15

(91000411)16The reappropriation in this section is subject to the following17

conditions and limitations: The reappropriation is subject to the18provisions of section 311, chapter 1, Laws of 2012 2nd sp. sess.19Reappropriation:20

State Taxable Building Construction Account—State. . . $4,350,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $5,316,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,666,00024

NEW SECTION. Sec. 1053. FOR THE DEPARTMENT OF COMMERCE25Housing for People with Chronic Mental Illness (91000412)26The reappropriation in this section is subject to the following27

conditions and limitations: The reappropriation is subject to the28provisions of section 1010, chapter 2, Laws of 2012 2nd sp. sess.29Reappropriation:30

State Taxable Building Construction Account—State. . . . $190,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . $935,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 31 H-2429.2/15 2nd draft

Page 33: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,125,0001

NEW SECTION. Sec. 1054. FOR THE DEPARTMENT OF COMMERCE2Housing for the Homeless (91000413)3The reappropriation in this section is subject to the following4

conditions and limitations: The reappropriation is subject to the5provisions of section 1011, chapter 2, Laws of 2012 2nd sp. sess.6Reappropriation:7

State Taxable Building Construction Account—State. . . $5,996,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $22,948,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,944,00011

NEW SECTION. Sec. 1055. FOR THE DEPARTMENT OF COMMERCE12Housing for Farmworkers (91000414)13The reappropriation in this section is subject to the following14

conditions and limitations: The reappropriation is subject to the15provisions of section 1012, chapter 2, Laws of 2012 2nd sp. sess.16Reappropriation:17

State Taxable Building Construction Account—State. . . $5,160,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $1,055,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,215,00021

NEW SECTION. Sec. 1056. FOR THE DEPARTMENT OF COMMERCE22Housing for People At Risk of Homelessness (91000415)23The reappropriation in this section is subject to the following24

conditions and limitations: The reappropriation is subject to the25provisions of section 312, chapter 1, Laws of 2012 2nd sp. sess.26Reappropriation:27

State Taxable Building Construction Account—State. . . . $959,00028Prior Biennia (Expenditures). . . . . . . . . . . . . $1,541,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,00031

NEW SECTION. Sec. 1057. FOR THE DEPARTMENT OF COMMERCE32

Code Rev/AL:akl 32 H-2429.2/15 2nd draft

Page 34: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Housing for Low-Income Households (91000416)1The reappropriation in this section is subject to the following2

conditions and limitations: The reappropriation is subject to the3provisions of section 1013, chapter 2, Laws of 2012 2nd sp. sess.4Reappropriation:5

State Taxable Building Construction Account—State. . . $2,689,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . $293,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,982,0009

NEW SECTION. Sec. 1058. FOR THE DEPARTMENT OF COMMERCE102012 Local and Community Projects (91000417)11The reappropriation in this section is subject to the following12

conditions and limitations: The reappropriation is subject to the13provisions of section 302, chapter 1, Laws of 2012 2nd sp. sess.14Reappropriation:15

State Building Construction Account—State. . . . . . . $1,889,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $7,734,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,623,00019

NEW SECTION. Sec. 1059. FOR THE DEPARTMENT OF COMMERCE20Local and Community Projects 2012 (91000437)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 1003, chapter 2, Laws of 2012 2nd sp. sess.24Reappropriation:25

State Taxable Building Construction Account—State. . . $1,800,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $1,035,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,835,00029

NEW SECTION. Sec. 1060. FOR THE DEPARTMENT OF COMMERCE30Pacific Medical Center (91000445)31The appropriation in this section is subject to the following32

conditions and limitations: The appropriation in this section is33

Code Rev/AL:akl 33 H-2429.2/15 2nd draft

Page 35: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

provided solely for window repair, replacement, and weatherization,1or for tenant improvements at Pacific tower made or provided on2behalf of Seattle College district.3Reappropriation:4

State Taxable Building Construction Account—State. . . $2,405,0005State Building Construction Account—State. . . . . . . $9,818,0006

Subtotal Reappropriation. . . . . . . . . . . . . $12,223,0007Appropriation:8

State Building Construction Account—State. . . . . . . $6,000,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $7,777,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,000,00012

NEW SECTION. Sec. 1061. FOR THE DEPARTMENT OF COMMERCE13Sand Point Building 9 (91000446)14The reappropriation in this section is subject to the following15

conditions and limitations: The reappropriation is subject to the16provisions of section 1068, chapter 19, Laws of 2013 2nd sp. sess.17Reappropriation:18

State Taxable Building Construction Account—State. . . $9,802,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $4,198,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,00022

NEW SECTION. Sec. 1062. FOR THE DEPARTMENT OF COMMERCE23Mental Health Beds (91000447)24The reappropriation in this section is subject to the following25

conditions and limitations: The reappropriation is subject to the26provisions of section 1071, chapter 19, Laws of 2013 2nd sp. sess.27Reappropriation:28

State Building Construction Account—State. . . . . . . $3,644,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $1,356,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00032

NEW SECTION. Sec. 1063. FOR THE DEPARTMENT OF COMMERCE33

Code Rev/AL:akl 34 H-2429.2/15 2nd draft

Page 36: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Housing for Homeless Veterans (91000455)1The reappropriation in this section is subject to the following2

conditions and limitations: The reappropriation is subject to the3provisions of section 1065, chapter 19, Laws of 2013 2nd sp. sess.4Reappropriation:5

State Taxable Building Construction Account—State. . . $9,001,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . $366,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,367,0009

NEW SECTION. Sec. 1064. FOR THE DEPARTMENT OF COMMERCE10Housing for Farmworkers (91000457)11The reappropriation in this section is subject to the following12

conditions and limitations: The reappropriation is subject to the13provisions of section 1066, chapter 19, Laws of 2013 2nd sp. sess.14Reappropriation:15

State Taxable Building Construction Account—State. . $19,723,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $7,327,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,050,00019

NEW SECTION. Sec. 1065. FOR THE DEPARTMENT OF COMMERCE20Housing for People with Developmental Disabilities (91000458)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 1067, chapter 19, Laws of 2013 2nd sp. sess.24Reappropriation:25

State Taxable Building Construction Account—State. . . $6,392,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $2,627,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,019,00029

NEW SECTION. Sec. 1066. FOR THE DEPARTMENT OF COMMERCE30Housing for People with Chronic Mental Illness (91000459)31

Reappropriation:32State Taxable Building Construction Account—State. . . $5,735,00033

Code Rev/AL:akl 35 H-2429.2/15 2nd draft

Page 37: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . $329,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,064,0003

NEW SECTION. Sec. 1067. FOR THE DEPARTMENT OF COMMERCE4Public Works Assistance Account Project Backfill (91000581)5

Reappropriation:6State Building Construction Account—State. . . . . . . $3,263,0007Prior Biennia (Expenditures). . . . . . . . . . . . $154,737,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $158,000,00010

NEW SECTION. Sec. 1068. FOR THE DEPARTMENT OF COMMERCE11Clean Energy and Energy Freedom Program (91000582)12The reappropriations in this section are subject to the following13

conditions and limitations: The reappropriations are subject to the14provisions of section 1074, chapter 19, Laws of 2013 2nd sp. sess.15Reappropriation:16

Energy Recovery Act Account—State. . . . . . . . . . . $4,000,00017State Taxable Building Construction Account—State. . . $8,924,00018State Building Construction Account—State. . . . . . $19,069,00019

Subtotal Reappropriation. . . . . . . . . . . . . $31,993,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $8,007,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00023

NEW SECTION. Sec. 1069. FOR THE DEPARTMENT OF COMMERCE24Innovation Partnership Zones - Facilities and Infrastructure25

(92000089)26The reappropriation in this section is subject to the following27

conditions and limitations: The reappropriation is subject to the28provisions of section 309, chapter 1, Laws of 2012 2nd sp. sess.29Reappropriation:30

State Building Construction Account—State. . . . . . . $3,725,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $9,795,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 36 H-2429.2/15 2nd draft

Page 38: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,520,0001

NEW SECTION. Sec. 1070. FOR THE DEPARTMENT OF COMMERCE2Community Economic Revitalization Board Administered Economic3

Development, Innovation, and Export Grants (92000096)4The reappropriations in this section are subject to the following5

conditions and limitations: The reappropriations are subject to the6provisions of section 304, chapter 1, Laws of 2012 2nd sp. sess.7Reappropriation:8

State Building Construction Account—State. . . . . . . $4,267,0009Public Works Assistance Account—State. . . . . . . . $14,595,00010

Subtotal Reappropriation. . . . . . . . . . . . . $18,862,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $13,736,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,598,00014

NEW SECTION. Sec. 1071. FOR THE DEPARTMENT OF COMMERCE15Main Street Improvement Grants (92000098)16The reappropriations in this section are subject to the following17

conditions and limitations: The reappropriations are subject to the18provisions of section 305, chapter 1, Laws of 2012 2nd sp. sess.19Reappropriation:20

Public Works Assistance Account—State. . . . . . . . . . $355,00021State Building Construction Account—State. . . . . . . $3,115,00022

Subtotal Reappropriation. . . . . . . . . . . . . $3,470,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $11,380,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,850,00026

NEW SECTION. Sec. 1072. FOR THE DEPARTMENT OF COMMERCE27Brownfield Redevelopment Grants (92000100)28The reappropriation in this section is subject to the following29

conditions and limitations: The reappropriation in this section is30provided solely for redevelopment of the Bellingham waterfront.31Reappropriation:32

Local Toxics Control Account—State. . . . . . . . . . $1,194,00033

Code Rev/AL:akl 37 H-2429.2/15 2nd draft

Page 39: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . $306,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,0003

NEW SECTION. Sec. 1073. FOR THE DEPARTMENT OF COMMERCE4Port and Export Related Infrastructure (92000102)5The reappropriation in this section is subject to the following6

conditions and limitations: The reappropriation is subject to the7provisions of section 306, chapter 1, Laws of 2012 2nd sp. sess.8Reappropriation:9

State Building Construction Account—State. . . . . . $13,603,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $19,547,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,150,00013

NEW SECTION. Sec. 1074. FOR THE DEPARTMENT OF COMMERCE14Projects for Jobs and Economic Development (92000151)15The reappropriations in this section are subject to the following16

conditions and limitations: The reappropriations are subject to the17provisions of section 1077, chapter 19, Laws of 2013 2nd sp. sess.18Reappropriation:19

Public Facility Construction Loan Revolving20Account—State. . . . . . . . . . . . . . . . . . . $7,100,00021

State Building Construction Account—State. . . . . . $22,256,00022Subtotal Reappropriation. . . . . . . . . . . . . $29,356,00023

Prior Biennia (Expenditures). . . . . . . . . . . . . $7,753,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,109,00026

NEW SECTION. Sec. 1075. FOR THE DEPARTMENT OF COMMERCE27Projects that Strengthen Youth and Families (92000227)28The reappropriation in this section is subject to the following29

conditions and limitations: The reappropriation is subject to the30provisions of section 1079, chapter 19, Laws of 2013 2nd sp. sess.31Reappropriation:32

State Building Construction Account—State. . . . . . $12,695,00033

Code Rev/AL:akl 38 H-2429.2/15 2nd draft

Page 40: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . $6,982,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,677,0003

NEW SECTION. Sec. 1076. FOR THE DEPARTMENT OF COMMERCE4Projects that Strengthen Communities and Quality of Life5

(92000230)6The reappropriations in this section are subject to the following7

conditions and limitations: The reappropriations are subject to the8provisions of section 1078, chapter 19, Laws of 2013 2nd sp.s. and9section 6006 of this act.10Reappropriation:11

Environmental Legacy Stewardship Account—State. . . . . $395,00012State Building Construction Account—State. . . . . . $22,372,00013

Subtotal Reappropriation. . . . . . . . . . . . . $22,767,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $9,361,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,128,00017

NEW SECTION. Sec. 1077. FOR THE OFFICE OF FINANCIAL MANAGEMENT18Cowlitz River Dredging (20082856)19

Reappropriation:20State Building Construction Account—State. . . . . . . . $246,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $1,254,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00024

NEW SECTION. Sec. 1078. FOR THE OFFICE OF FINANCIAL MANAGEMENT25Catastrophic Flood Relief (20084850)26The appropriation in this section is subject to the following27

conditions and limitations:28(1) Up to $26,800,000 of the appropriation is for advancing the29

long-term strategy for the Chehalis Basin projects to reduce flood30damage and restore aquatic species including a programmatic31environmental impact statement, data collection, engineering design32of future construction projects, feasibility analysis, and engagement33of state agencies, tribes, and other parties.34

Code Rev/AL:akl 39 H-2429.2/15 2nd draft

Page 41: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(2) Up to $23,200,000 of the appropriation is for construction of1local priority flood protection and habitat restoration projects.2

(3) Up to one percent of the appropriation provided in this3section may be used by the recreation and conservation office to4administer contracts associated with the subprojects funded through5this section. Contract administration includes, but is not limited6to: Drafting and amending contracts, reviewing and approving7invoices, tracking expenditures, and performing field inspections to8assess project status when conducting similar assessments related to9other agency contracts in the same geographic area.10Reappropriation:11

State Building Construction Account—State. . . . . . $12,484,00012Appropriation:13

State Building Construction Account—State. . . . . . $50,000,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $25,203,00015Future Biennia (Projected Costs). . . . . . . . . . $120,000,00016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $207,687,00017

NEW SECTION. Sec. 1079. FOR THE OFFICE OF FINANCIAL MANAGEMENT18Office of Financial Management Capital Budget Staff (30000045)19

Appropriation:20State Building Construction Account—State. . . . . . . $1,000,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . $4,000,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00024

NEW SECTION. Sec. 1080. FOR THE OFFICE OF FINANCIAL MANAGEMENT25Oversight of State Facilities (30000046)26The appropriations in this section are subject to the following27

conditions and limitations:28(1) The office of financial management, with assistance from the29

department of enterprise services and other state agencies as needed,30shall conduct space studies and make recommendations to the31legislature on the state's space standards including alternative32workplace strategies. State agencies shall provide space use data in33a format prescribed by the office of financial management to support34this effort. The office of financial management shall report the35

Code Rev/AL:akl 40 H-2429.2/15 2nd draft

Page 42: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

results and recommendations to the legislative fiscal committees by1July 1, 2016.2

(2) The office of financial management, with assistance from the3department of enterprise services and other state agencies as needed,4shall update the lease space requirements to reflect high performance5building standards and any other components that may improve the6conditions of leased space.7Appropriation:8

State Building Construction Account—State. . . . . . . $1,040,0009Thurston County Capital Facilities Account—State. . . $1,120,00010

Subtotal Appropriation. . . . . . . . . . . . . . $2,160,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,160,00014

NEW SECTION. Sec. 1081. FOR THE OFFICE OF FINANCIAL MANAGEMENT15Construction Contingency Pool (90000300)16The appropriation in this section is subject to the following17

conditions and limitations: The appropriation in this section is18provided solely for construction projects that confront emergent and19unavoidable costs in excess of the construction contingency included20in the project appropriation. For requests occurring during a21legislative session, an agency must notify the legislative fiscal22committees before requesting contingency funds from the office of23financial management. Eligible agencies that may apply to the pool24include higher education institutions, the department of corrections,25the department of social and health services, the department of26enterprise services, the criminal justice training commission, the27department of veterans affairs, and the department of fish and28wildlife. Eligible construction projects are only projects that had29cost reductions as kept on file with the office of financial30management. The office of financial management must notify the31legislative evaluation and accountability program committee, the32house capital budget committee, and senate ways and means committee33as projects are approved for funding.34Appropriation:35

State Building Construction Account—State. . . . . . . $5,000,00036Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $037

Code Rev/AL:akl 41 H-2429.2/15 2nd draft

Page 43: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0002

NEW SECTION. Sec. 1082. FOR THE OFFICE OF FINANCIAL MANAGEMENT3Emergency Repairs (90000301)4The appropriation in this section is subject to the following5

conditions and limitations: Emergency repair funding is provided6solely to address unexpected building or grounds failures that will7impact public health and safety and the day-to-day operations of the8facility. To be eligible for funds from the emergency repair pool, an9emergency declaration signed by the affected agency director must be10submitted to the office of financial management and the appropriate11legislative fiscal committees. The emergency declaration must include12a description of the health and safety hazard, the possible cause,13the proposed scope of emergency repair work and related cost14estimate, and identification of other funding that may be applied to15the project. For emergencies occurring during a legislative session,16an agency must notify the legislative fiscal committees before17requesting emergency funds from the office of financial management.18The office of financial management must notify the legislative19evaluation and accountability program committee, the house capital20budget committee, and senate ways and means committee as emergency21projects are approved for funding.22Appropriation:23

State Building Construction Account—State. . . . . . . $5,000,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00027

NEW SECTION. Sec. 1083. FOR THE OFFICE OF FINANCIAL MANAGEMENT28Emergency Repair Pool for K-12 Public Schools (90000302)29The appropriation in this section is subject to the following30

conditions and limitations: Emergency repair funding is provided31solely to address unexpected and imminent health and safety hazards32at K-12 public schools, including skill centers, that will impact the33day-to-day operations of the school facility. To be eligible for34funds from the emergency repair pool, an emergency declaration must35be signed by the school district board of directors and the36

Code Rev/AL:akl 42 H-2429.2/15 2nd draft

Page 44: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

superintendent of public instruction, and submitted to the office of1financial management for consideration. The emergency declaration2must include a description of the imminent health and safety hazard,3the possible cause, the proposed scope of emergency repair work and4related cost estimate, and identification of local funding to be5applied to the project. Grants of emergency repair moneys must be6conditioned upon the written commitment and plan of the school7district board of directors to repay the grant with any insurance8payments or other judgments that may be awarded, if applicable. The9office of financial management must notify the legislative evaluation10and accountability program committee, the house capital budget11committee, and the senate ways and means committee as emergency12projects are approved for funding.13Appropriation:14

Common School Construction Account—State. . . . . . . $5,000,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00018

NEW SECTION. Sec. 1084. FOR THE OFFICE OF FINANCIAL MANAGEMENT19Chehalis River Basin Flood Relief Projects (91000398)20

Reappropriation:21State Building Construction Account—State. . . . . . . . $206,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $4,794,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00025

NEW SECTION. Sec. 1085. FOR THE OFFICE OF FINANCIAL MANAGEMENT26Higher Education Preservation Information (91000427)27The reappropriations in this section are subject to the following28

conditions and limitations: The reappropriations are subject to the29provisions of section 6007 of this act.30Reappropriation:31

University of Washington Building Account—State. . . . . $116,00032Washington State University Building33

Account—State. . . . . . . . . . . . . . . . . . . . $85,00034Eastern Washington University Capital Projects35

Code Rev/AL:akl 43 H-2429.2/15 2nd draft

Page 45: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Account—State. . . . . . . . . . . . . . . . . . . . $21,0001Central Washington University Capital Projects2

Account—State. . . . . . . . . . . . . . . . . . . . $17,0003The Evergreen State College Capital Projects4

Account—State. . . . . . . . . . . . . . . . . . . . $12,0005Western Washington University Capital Projects6

Account—State. . . . . . . . . . . . . . . . . . . . $19,0007Subtotal Reappropriation. . . . . . . . . . . . . . $270,0008

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $270,00011

NEW SECTION. Sec. 1086. FOR THE OFFICE OF FINANCIAL MANAGEMENT12Construction Contingency Pool (91000428)13The reappropriation in this section is subject to the following14

conditions and limitations: The reappropriation is subject to the15provisions of section 1091, chapter 19, Laws of 2013 2nd sp. sess.16Reappropriation:17

State Building Construction Account—State. . . . . . . $1,875,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,875,00021

NEW SECTION. Sec. 1087. FOR THE OFFICE OF FINANCIAL MANAGEMENT22Culverts in Three State Agencies (92000004)23

Reappropriation:24State Building Construction Account—State. . . . . . . $4,516,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $2,484,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,00028

NEW SECTION. Sec. 1088. FOR THE DEPARTMENT OF ENTERPRISE29SERVICES30

East Plaza - Water Infiltration and Elevator Repairs (30000548)31Reappropriation:32

State Building Construction Account—State. . . . . . . . $500,00033Prior Biennia (Expenditures). . . . . . . . . . . . . $2,603,00034

Code Rev/AL:akl 44 H-2429.2/15 2nd draft

Page 46: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,103,0002

NEW SECTION. Sec. 1089. FOR THE DEPARTMENT OF ENTERPRISE3SERVICES4

NRB Garage Fire Suppression System Repairs (30000578)5Reappropriation:6

State Building Construction Account—State. . . . . . . . $500,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $1,738,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,238,00010

NEW SECTION. Sec. 1090. FOR THE DEPARTMENT OF ENTERPRISE11SERVICES12

Minor Works Preservation (30000635)13Reappropriation:14

State Building Construction Account—State. . . . . . . $1,477,00015Thurston County Capital Facilities Account—State. . . . $501,00016

Subtotal Reappropriation. . . . . . . . . . . . . $1,978,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $2,050,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,028,00020

NEW SECTION. Sec. 1091. FOR THE DEPARTMENT OF ENTERPRISE21SERVICES22

Minor Works Preservation (30000722)23The appropriations in this section are subject to the following24

conditions and limitations: No minor works funds may be allotted25until a parking strategy is completed. Up to $300,000 of the26appropriation in this section is provided for the department to27develop a capitol campus parking strategy. The strategy must include:28(1) During the legislative sessions a reduction of agency reserve29stalls from twenty-six percent to fifteen percent as recommended by30the 2014 state of Washington parking and transportation study; (2)31incorporating parking attendants or parking arms to accept payment32for campus parking during the legislative sessions; (3) install at33least two electronic boards that show the available parking capacity34

Code Rev/AL:akl 45 H-2429.2/15 2nd draft

Page 47: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

in the east plaza garage. The department shall report to all fiscal1committees on its progress by November 1, 2015.2Appropriation:3

Thurston County Capital Facilities Account—State. . . . $850,0004State Building Construction Account—State. . . . . . . $9,002,0005State Vehicle Parking Account—State. . . . . . . . . . . $300,0006

Subtotal Appropriation. . . . . . . . . . . . . . $10,152,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . $19,000,0009

TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,152,00010

NEW SECTION. Sec. 1092. FOR THE DEPARTMENT OF ENTERPRISE11SERVICES12

Old Capitol - Exterior and Interior Repairs (30000724)13Appropriation:14

Thurston County Capital Facilities Account—State. . . $1,500,00015State Building Construction Account—State. . . . . . . $1,500,00016

Subtotal Appropriation. . . . . . . . . . . . . . $3,000,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00020

NEW SECTION. Sec. 1093. FOR THE DEPARTMENT OF ENTERPRISE21SERVICES22

West Campus Historic Buildings Exterior Preservation (30000727)23Appropriation:24

State Building Construction Account—State. . . . . . . $2,000,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00028

NEW SECTION. Sec. 1094. FOR THE DEPARTMENT OF ENTERPRISE29SERVICES30

East Plaza - Structure and Elevator Repairs (30000717)31Appropriation:32

State Building Construction Account—State. . . . . . . $8,239,00033Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034

Code Rev/AL:akl 46 H-2429.2/15 2nd draft

Page 48: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . $27,442,0001TOTAL. . . . . . . . . . . . . . . . . . . . . . $35,681,0002

NEW SECTION. Sec. 1095. FOR THE DEPARTMENT OF ENTERPRISE3SERVICES4

Campus Utility Repairs - Sunken Garden to General Administration5(30000731)6Appropriation:7

State Building Construction Account—State. . . . . . . $5,569,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . $18,661,00010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,230,00011

NEW SECTION. Sec. 1096. FOR THE DEPARTMENT OF ENTERPRISE12SERVICES13

Capitol Campus Heating Systems Repairs - Phase 1 (30000730)14The appropriation in this section is subject to the following15

conditions and limitations: The appropriation in this section is16provided solely for the department to competitively contract an17energy audit on the capitol campus steam system. The audit must18consider converting to centralized hot water boilers and using a heat19recovery power system.20Appropriation:21

Thurston County Capital Facilities Account—State. . . . $500,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00025

NEW SECTION. Sec. 1097. FOR THE DEPARTMENT OF ENTERPRISE26SERVICES27

Capitol Campus Critical Network Standardization and Connectivity28(30000732)29

The appropriation in this section is subject to the following30conditions and limitations: The appropriation in this section is31provided solely for installing any remaining building meters as32needed on the capitol campus, and providing building performance data33electronically. Dashboard displays must be installed in the three34legislative buildings.35Code Rev/AL:akl 47 H-2429.2/15 2nd draft

Page 49: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1Thurston County Capital Facilities Account—State. . . . $250,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,0005

NEW SECTION. Sec. 1098. FOR THE DEPARTMENT OF ENTERPRISE6SERVICES7

Campus Physical Security & Safety Improvements (30000728)8Appropriation:9

State Building Construction Account—State. . . . . . . $4,000,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00013

NEW SECTION. Sec. 1099. FOR THE DEPARTMENT OF ENTERPRISE14SERVICES15

Capitol Court Major Exterior and Building Systems Renewal16(30000738)17

The appropriation in this section is provided solely for18development of a plan that identifies the existing building19deficiencies and recommended project specific improvements with cost20estimates to be completed as funding becomes available. Urgent21repairs to this building will be prioritized against the other22projects in the department of enterprise services' minor works23project list.24Appropriation:25

Enterprise Services Account—State. . . . . . . . . . . . $150,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . $1,220,00028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,370,00029

NEW SECTION. Sec. 1100. FOR THE DEPARTMENT OF ENTERPRISE30SERVICES31

Capitol Lake Long-term Management Planning (30000740)32Appropriation:33

Enterprise Services Account—State. . . . . . . . . . . . $100,00034Code Rev/AL:akl 48 H-2429.2/15 2nd draft

Page 50: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $100,0003

NEW SECTION. Sec. 1101. FOR THE DEPARTMENT OF ENTERPRISE4SERVICES5

Engineering and Architectural Services: Staffing (30000762)6(1) The appropriation in this section is provided solely for7

architectural and engineering services to manage public works8contracting for all state facilities pursuant to RCW 43.19.450. The9service charge is increased from 2.15 percent to 2.27 percent of10total project costs to reduce the number of projects assigned to each11manager. The intended results of the increased fee are improved12accountability, reduced project delays, and reduced the number and13cost of change orders. At the end of each fiscal year, the department14must report to the office of financial management and the fiscal15committees of the legislature on performance improvements resulting16from the increased management fee, including the following:17

(a) The number of projects managed by each manager compared to18previous biennia;19

(b) Projects that were not completed on schedule and the reasons20for delays; and21

(c) The number and cost of the change orders and the reason for22each change order.23

(2) The department shall convene a group of private sector24architects and contractors with state agency facilities personnel, at25a minimum of twice per year, to share at a minimum, information on26high performance methods, ideas, operating and maintenance issues,27and cost. The facility personnel must be from the community and28technical colleges, the four-year institutions of higher education,29and any other state agencies that have recently completed a new30building or are currently in the construction phase.31

(3) The department, with assistance from the capital projects32authority review board, shall provide recommendations to the33governor, house capital budget committee, and senate ways and means34committee, on ways to improve the project delivery methods. It must35include, at a minimum, methods to incorporate more architectural and36engineering firms and contractors to be eligible for design build37projects, and methods for including high performance criteria with38

Code Rev/AL:akl 49 H-2429.2/15 2nd draft

Page 51: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

incentives for the architectural and engineering firm and contractor1to meet the performance measures in design-bid-build project delivery2methods.3Appropriation:4

State Building Construction Account—State. . . . . . . $9,800,0005Thurston County Capital Facilities Account—State. . . $3,000,0006Charitable, Educational, Penal, and Reformatory7

Institutions Account—State. . . . . . . . . . . . $2,000,0008Subtotal Appropriation. . . . . . . . . . . . . . $14,800,0009

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,800,00012

NEW SECTION. Sec. 1102. FOR THE DEPARTMENT OF ENTERPRISE13SERVICES14

NRB Garage Fire Suppression System & Critical Repairs (30000719)15Appropriation:16

State Building Construction Account—State. . . . . . . $8,077,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . $1,516,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,593,00020

NEW SECTION. Sec. 1103. FOR THE DEPARTMENT OF ENTERPRISE21SERVICES22

Campus Building and Grounds Facilities Replacements (30000759)23Appropriation:24

State Building Construction Account—State. . . . . . . $2,477,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,477,00028

NEW SECTION. Sec. 1104. FOR THE DEPARTMENT OF ENTERPRISE29SERVICES30

Campus Steam System and Chiller Upgrades (91000014)31The reappropriations in this section are subject to the following32

conditions and limitations: The reappropriations are subject to the33provisions of section 1106, chapter 19, Laws of 2013 2nd sp. sess.34

Code Rev/AL:akl 50 H-2429.2/15 2nd draft

Page 52: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1Thurston County Capital Facilities Account—State. . . $1,074,0002State Building Construction Account—State. . . . . . . $1,802,0003

Subtotal Reappropriation. . . . . . . . . . . . . $2,876,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $1,121,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,997,0007

NEW SECTION. Sec. 1105. FOR THE DEPARTMENT OF ENTERPRISE8SERVICES9

Capitol Campus Exterior Lighting Upgrades (30000736)10The appropriation in this section is subject to the following11

conditions and limitations: The department shall pursue energy12services contracts as much as is feasible to provide funding.13Appropriation:14

Thurston County Capital Facilities Account—State. . . $1,000,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00018

NEW SECTION. Sec. 1106. FOR THE DEPARTMENT OF ENTERPRISE19SERVICES20

Archives Building and Capitol Court HVAC Upgrades (91000015)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 1107, chapter 19, Laws of 2013 2nd sp. sess.24Reappropriation:25

State Building Construction Account—State. . . . . . . . $70,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . $930,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00029

NEW SECTION. Sec. 1107. FOR THE DEPARTMENT OF ENTERPRISE30SERVICES31

State Capitol Master Plan (30000760)32

Code Rev/AL:akl 51 H-2429.2/15 2nd draft

Page 53: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The appropriation in this section is subject to the following1conditions and limitations:2

(1) The appropriation in this section is provided solely for the3department to identify potential development sites, and any4infrastructure that may be needed for further development.5

(2) The department shall provide a list to all fiscal committees6of designated parking areas with: (a) Permanent capitol campus FTEs;7(b) temporary capitol campus FTEs; (c) state agency reserve spaces;8(d) state agency vehicles; (e) state agency motor pool vehicles; and9(f) nonstate agency vehicles. The department shall also provide a10prioritized list of parking spaces that ranks campus FTEs as the11highest priority. Other parking locations in Thurston county may also12be considered.13Appropriation:14

Thurston County Capital Facilities Account—State. . . . $250,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00018

NEW SECTION. Sec. 1108. FOR THE DEPARTMENT OF ENTERPRISE19SERVICES20

Utilities & Transportation Commission Building (91000432)21The appropriations in this section are subject to the following22

conditions and limitations: The appropriations in this section are23provided solely for predesign, which may also serve as bridging24documents, design, competition honoraria, project management, and25other planning activities including permits. The building must be26delivered using design build, as defined by chapter 39.10 RCW with a27guarantee for energy, operations, and maintenance performance. The28term for performance guarantee must not be less than one year. The29state may use state employees for services not related to building30performance. Criteria for selecting the design build contractor must31include life-cycle costs, energy costs, or energy use index.32Contractors, and architectural and engineering firms may be eligible33for additional points during the scoring process if they have34experience with the state agency, or if they are considered a small35business. The building must be built using sustainable building36

Code Rev/AL:akl 52 H-2429.2/15 2nd draft

Page 54: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

standards as defined in section 7008 of this act. The project will be1alternatively financed as authorized in section 7002 of this act.2Appropriation:3

Public Service Revolving Account—State. . . . . . . . $2,000,0004Enterprise Services Account—State. . . . . . . . . . . $3,000,0005

Subtotal Appropriation. . . . . . . . . . . . . . $5,000,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0009

NEW SECTION. Sec. 1109. FOR THE DEPARTMENT OF ENTERPRISE10SERVICES11

1063 Block Replacement (91000016)12The reappropriation in this section is subject to the following13

conditions and limitations: The reappropriation is subject to the14provisions of section 1109, chapter 19, Laws of 2013 2nd sp. sess.,15except that the building will be alternatively financed as authorized16by and subject to the conditions of section 7002 of this act.17Reappropriation:18

State Building Construction Account—State. . . . . . . $9,138,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $3,862,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,000,00022

NEW SECTION. Sec. 1110. FOR THE MILITARY DEPARTMENT23Pierce County Readiness Center (30000593)24

Reappropriation:25Military Department Capital Account—State. . . . . . . $2,758,00026State Building Construction Account—State. . . . . . . $3,269,00027General Fund—Federal. . . . . . . . . . . . . . . . . $24,876,00028

Subtotal Reappropriation. . . . . . . . . . . . . $30,903,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $2,698,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,601,00032

NEW SECTION. Sec. 1111. FOR THE MILITARY DEPARTMENT33Thurston County Readiness Center (30000594)34

Code Rev/AL:akl 53 H-2429.2/15 2nd draft

Page 55: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The reappropriation and appropriations in this section are1subject to the following conditions and limitations: The military2department shall transfer title of the Olympia armory to the Thurston3county boys and girls club when the Thurston county readiness center4is completed.5Reappropriation:6

State Building Construction Account—State. . . . . . . $2,750,0007Appropriation:8

State Building Construction Account—State. . . . . . . $7,883,0009General Fund—Federal. . . . . . . . . . . . . . . . . $34,207,00010

Subtotal Appropriation. . . . . . . . . . . . . . $42,090,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . $50,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,890,00014

NEW SECTION. Sec. 1112. FOR THE MILITARY DEPARTMENT15Minor Works Preservation - 2013-2015 Biennium (30000602)16

Reappropriation:17State Building Construction Account—State. . . . . . . . $307,00018General Fund—Federal. . . . . . . . . . . . . . . . . $1,082,00019

Subtotal Reappropriation. . . . . . . . . . . . . $1,389,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $3,837,00021Future Biennia (Projected Costs). . . . . . . . . . . $2,500,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,726,00023

NEW SECTION. Sec. 1113. FOR THE MILITARY DEPARTMENT24Minor Works Program - 2013-2015 Biennium (30000605)25

Reappropriation:26General Fund—Federal. . . . . . . . . . . . . . . . . $8,893,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $4,032,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,925,00030

NEW SECTION. Sec. 1114. FOR THE MILITARY DEPARTMENT31Yakima Training Center Barracks (30000696)32

Reappropriation:33

Code Rev/AL:akl 54 H-2429.2/15 2nd draft

Page 56: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

General Fund—Federal. . . . . . . . . . . . . . . . . $18,000,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,000,0004

NEW SECTION. Sec. 1115. FOR THE MILITARY DEPARTMENT5Minor Works Preservation - 2015-2017 Biennium (30000702)6

Appropriation:7State Building Construction Account—State. . . . . . . $7,267,0008General Fund—Federal. . . . . . . . . . . . . . . . . $10,195,0009

Subtotal Appropriation. . . . . . . . . . . . . . $17,462,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,462,00013

NEW SECTION. Sec. 1116. FOR THE MILITARY DEPARTMENT14Minor Works Program - 2015-2017 Biennium (30000744)15

Appropriation:16State Building Construction Account—State. . . . . . . $5,163,00017General Fund—Federal. . . . . . . . . . . . . . . . . $15,953,00018

Subtotal Appropriation. . . . . . . . . . . . . . $21,116,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $21,116,00022

NEW SECTION. Sec. 1117. FOR THE MILITARY DEPARTMENT23Montesano Readiness Center Roof Replacement and Tenant24

Improvements (30000805)25Appropriation:26

General Fund—Federal. . . . . . . . . . . . . . . . . $1,500,00027State Building Construction Account—State. . . . . . . $3,750,00028

Subtotal Appropriation. . . . . . . . . . . . . . $5,250,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,250,00032

Code Rev/AL:akl 55 H-2429.2/15 2nd draft

Page 57: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 1118. FOR THE DEPARTMENT OF ARCHAEOLOGY AND1HISTORIC PRESERVATION2

Historic County Courthouse Grants Program (30000010)3Appropriation:4

State Building Construction Account—State. . . . . . . $1,500,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $10,400,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,900,0008

NEW SECTION. Sec. 1119. FOR THE DEPARTMENT OF ARCHAEOLOGY AND9HISTORIC PRESERVATION10

Historic Courthouse Preservation Grants (92000001)11Reappropriation:12

State Building Construction Account—State. . . . . . . $1,696,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . $304,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00016

NEW SECTION. Sec. 1120. FOR THE DEPARTMENT OF ARCHAEOLOGY AND17HISTORIC PRESERVATION18

Heritage Barn Preservation Program (92000002)19Reappropriation:20

State Building Construction Account—State. . . . . . . . $256,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . $244,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00024

(End of part)

Code Rev/AL:akl 56 H-2429.2/15 2nd draft

Page 58: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

PART 21HUMAN SERVICES2

NEW SECTION. Sec. 2001. FOR THE DEPARTMENT OF SOCIAL AND HEALTH3SERVICES4

Naselle Youth Camp - Three Cottages: Renovation (20081222)5Reappropriation:6

State Building Construction Account—State. . . . . . . $1,703,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . $197,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,900,00010

NEW SECTION. Sec. 2002. FOR THE DEPARTMENT OF SOCIAL AND HEALTH11SERVICES12

Western State Hospital New Kitchen and Commissary Building13(20081319)14Appropriation:15

State Building Construction Account—State. . . . . . $27,600,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . $828,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,428,00019

NEW SECTION. Sec. 2003. FOR THE DEPARTMENT OF SOCIAL AND HEALTH20SERVICES21

Medical Lake Campus - Laundry Building: New Construction22(20082371)23Appropriation:24

State Building Construction Account—State. . . . . . . . $150,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . $10,100,00027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,250,00028

NEW SECTION. Sec. 2004. FOR THE DEPARTMENT OF SOCIAL AND HEALTH29SERVICES30

Minor Works Preservation Projects: Statewide (91000037)31Appropriation:32

State Building Construction Account—State. . . . . . $14,100,00033

Code Rev/AL:akl 57 H-2429.2/15 2nd draft

Page 59: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,100,0003

NEW SECTION. Sec. 2005. FOR THE DEPARTMENT OF SOCIAL AND HEALTH4SERVICES5

Fircrest School Electrical Service Rehabilitation (30000415)6The appropriation in this section is provided solely for7

electrical service rehabilitation and improvements on campus. The8department of social and health services will also coordinate with9the department of health to install a new and separate electrical10service for the public health laboratory.11Appropriation:12

State Building Construction Account—State. . . . . . . $5,200,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,200,00016

NEW SECTION. Sec. 2006. FOR THE DEPARTMENT OF SOCIAL AND HEALTH17SERVICES18

Minor Works Program Projects: Statewide (30001859)19Appropriation:20

State Building Construction Account—State. . . . . . . . $755,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,755,00024

NEW SECTION. Sec. 2007. FOR THE DEPARTMENT OF SOCIAL AND HEALTH25SERVICES26

Minor Works Preservation Projects: Statewide (30002235)27Reappropriation:28

State Building Construction Account—State. . . . . . . $4,000,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $10,155,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,155,00032

Code Rev/AL:akl 58 H-2429.2/15 2nd draft

Page 60: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 2008. FOR THE DEPARTMENT OF SOCIAL AND HEALTH1SERVICES2

Child Study and Treatment Center - Orcas: Acute Treatment3Addition (30002733)4Appropriation:5

State Building Construction Account—State. . . . . . . $1,100,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,100,0009

NEW SECTION. Sec. 2009. FOR THE DEPARTMENT OF SOCIAL AND HEALTH10SERVICES11

Western State Hospital - South Hall: Building Systems Replacement12(30002735)13Appropriation:14

Charitable, Educational, Penal, and Reformatory15Institutions Account—State. . . . . . . . . . . . $4,450,00016

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,450,00019

NEW SECTION. Sec. 2010. FOR THE DEPARTMENT OF SOCIAL AND HEALTH20SERVICES21

Echo Glen - Housing Unit: Acute Mental Health Unit (30002736)22Appropriation:23

State Building Construction Account—State. . . . . . . $4,950,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,950,00027

NEW SECTION. Sec. 2011. FOR THE DEPARTMENT OF SOCIAL AND HEALTH28SERVICES29

Eastern State Hospital - Westlake: Nurse Call System (30002739)30Appropriation:31

State Building Construction Account—State. . . . . . . $1,200,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

Code Rev/AL:akl 59 H-2429.2/15 2nd draft

Page 61: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,200,0001

NEW SECTION. Sec. 2012. FOR THE DEPARTMENT OF SOCIAL AND HEALTH2SERVICES3

Yakima Valley School - Main Building: Roofing Replacement4(30002742)5Appropriation:6

State Building Construction Account—State. . . . . . . $1,500,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00010

NEW SECTION. Sec. 2013. FOR THE DEPARTMENT OF SOCIAL AND HEALTH11SERVICES12

Green Hill School: New Acute Mental Health Unit (30002745)13Appropriation:14

State Building Construction Account—State. . . . . . . $4,950,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,950,00018

NEW SECTION. Sec. 2014. FOR THE DEPARTMENT OF SOCIAL AND HEALTH19SERVICES20

Western State Hospital - Forensic Services: Two Wards Addition21(30002765)22Appropriation:23

State Building Construction Account—State. . . . . . . $1,800,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . $20,700,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,500,00027

NEW SECTION. Sec. 2015. FOR THE DEPARTMENT OF SOCIAL AND HEALTH28SERVICES29

Western State Hospital - East Campus: Psychiatric Intensive Care30Unit and Competency Restoration (30002773)31Appropriation:32

State Building Construction Account—State. . . . . . . $2,200,00033

Code Rev/AL:akl 60 H-2429.2/15 2nd draft

Page 62: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,200,0003

NEW SECTION. Sec. 2016. FOR THE DEPARTMENT OF SOCIAL AND HEALTH4SERVICES5

Eastern State Hospital - Water System: Improvements (30003215)6Appropriation:7

State Building Construction Account—State. . . . . . . $2,115,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,115,00011

NEW SECTION. Sec. 2017. FOR THE DEPARTMENT OF SOCIAL AND HEALTH12SERVICES13

Western State Hospital - South Hall: Wards Preservation and14Renewal (30003240)15Appropriation:16

State Building Construction Account—State. . . . . . . $1,350,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,350,00020

NEW SECTION. Sec. 2018. FOR THE DEPARTMENT OF SOCIAL AND HEALTH21SERVICES22

Special Commitment Center: Kitchen and Dining Room Upgrades23(20081506)24Appropriation:25

State Building Construction Account—State. . . . . . . $3,760,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,760,00029

NEW SECTION. Sec. 2019. FOR THE DEPARTMENT OF SOCIAL AND HEALTH30SERVICES31

Western State Hospital - East Campus: Wards Preservation and32Renewal (30003241)33

Code Rev/AL:akl 61 H-2429.2/15 2nd draft

Page 63: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1State Building Construction Account—State. . . . . . . $1,600,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,600,0005

NEW SECTION. Sec. 2020. FOR THE DEPARTMENT OF SOCIAL AND HEALTH6SERVICES7

Western State Hospital - East Campus: Building Systems8Replacement (30003244)9Appropriation:10

State Building Construction Account—State. . . . . . . $3,600,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,600,00014

NEW SECTION. Sec. 2021. FOR THE DEPARTMENT OF SOCIAL AND HEALTH15SERVICES16

Eastern State Hospital and Western State Hospital - All Wards:17Patient Safety Improvements (91000019)18Reappropriation:19

Charitable, Educational, Penal, and Reformatory20Institutions Account—State. . . . . . . . . . . . $2,000,00021

Appropriation:22Charitable, Educational, Penal, and Reformatory23

Institutions Account—State. . . . . . . . . . . . $2,569,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $2,800,00025Future Biennia (Projected Costs). . . . . . . . . . . $3,180,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,549,00027

NEW SECTION. Sec. 2022. FOR THE DEPARTMENT OF HEALTH28Newborn Screening Wing Addition (30000301)29

Appropriation:30State Building Construction Account—State. . . . . . . $3,049,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 62 H-2429.2/15 2nd draft

Page 64: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,049,0001

NEW SECTION. Sec. 2023. FOR THE DEPARTMENT OF HEALTH2Newborn Screening Lab Conversion (30000302)3

Appropriation:4State Building Construction Account—State. . . . . . . $1,141,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,141,0008

NEW SECTION. Sec. 2024. FOR THE DEPARTMENT OF HEALTH9Minor Works - Program (30000315)10

Appropriation:11State Building Construction Account—State. . . . . . . . $322,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $322,00015

NEW SECTION. Sec. 2025. FOR THE DEPARTMENT OF HEALTH16Drinking Water Assistance Program (30000323)17

Reappropriation:18Drinking Water Assistance Account—Federal. . . . . . $23,225,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $5,575,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,800,00022

NEW SECTION. Sec. 2026. FOR THE DEPARTMENT OF HEALTH23Minor Works - Facility Preservation (30000328)24

Appropriation:25State Building Construction Account—State. . . . . . . . $277,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $277,00029

NEW SECTION. Sec. 2027. FOR THE DEPARTMENT OF HEALTH30Drinking Water Preconstruction Loans (30000334)31

Code Rev/AL:akl 63 H-2429.2/15 2nd draft

Page 65: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1Drinking Water Assistance Repayment Account—State. . . $6,000,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $24,000,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,000,0005

NEW SECTION. Sec. 2028. FOR THE DEPARTMENT OF HEALTH6Drinking Water Assistance Program (30000336)7

Appropriation:8Drinking Water Assistance Account—Federal. . . . . . $32,000,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . $128,000,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $160,000,00012

NEW SECTION. Sec. 2029. FOR THE DEPARTMENT OF HEALTH13Safe Reliable Drinking Water Grants (92000002)14

Reappropriation:15State Building Construction Account—State. . . . . . . $1,428,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $10,210,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,638,00019

NEW SECTION. Sec. 2030. FOR THE DEPARTMENT OF VETERANS AFFAIRS20Walla Walla Nursing Facility (20082008)21

Reappropriation:22State Building Construction Account—State. . . . . . $14,357,00023General Fund—Federal. . . . . . . . . . . . . . . . . $24,000,00024

Subtotal Reappropriation. . . . . . . . . . . . . $38,357,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $2,568,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,925,00028

NEW SECTION. Sec. 2031. FOR THE DEPARTMENT OF VETERANS AFFAIRS29Minor Works Facilities Preservation (30000094)30

Reappropriation:31State Building Construction Account—State. . . . . . . . $675,00032

Code Rev/AL:akl 64 H-2429.2/15 2nd draft

Page 66: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . $638,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,313,0003

NEW SECTION. Sec. 2032. FOR THE DEPARTMENT OF VETERANS AFFAIRS4Feasibility Study/Predesign for Western State Hospital Skilled5

Nursing Replacement (30000090)6Appropriation:7

Charitable, Educational, Penal, and Reformatory8Institutions Account—State. . . . . . . . . . . . . $125,0009

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $125,00012

NEW SECTION. Sec. 2033. FOR THE DEPARTMENT OF VETERANS AFFAIRS13Minor Works Facilities Preservation (30000174)14

Appropriation:15State Building Construction Account—State. . . . . . . $3,095,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . $9,690,00018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,785,00019

NEW SECTION. Sec. 2034. FOR THE DEPARTMENT OF VETERANS AFFAIRS20South Central Washington State Veterans Cemetery Feasibility21

(30000151)22Appropriation:23

Charitable, Educational, Penal, and Reformatory24Institutions Account—State. . . . . . . . . . . . . $100,00025

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $100,00028

NEW SECTION. Sec. 2035. FOR THE DEPARTMENT OF VETERANS AFFAIRS29Eastern Washington Cemetery Upgrade (30000152)30

Appropriation:31State Building Construction Account—State. . . . . . . . $270,00032General Fund—Federal. . . . . . . . . . . . . . . . . $2,422,00033

Code Rev/AL:akl 65 H-2429.2/15 2nd draft

Page 67: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Subtotal Appropriation. . . . . . . . . . . . . . $2,692,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,692,0004

NEW SECTION. Sec. 2036. FOR THE DEPARTMENT OF CORRECTIONS5Monroe Correctional Complex: Close Sewer Lagoon (20082022)6

Reappropriation:7State Building Construction Account—State. . . . . . . . $214,0008

Appropriation:9State Building Construction Account—State. . . . . . . $8,801,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $1,177,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,192,00013

NEW SECTION. Sec. 2037. FOR THE DEPARTMENT OF CORRECTIONS14Washington Corrections Center: Transformers and Switches15

(30000143)16Appropriation:17

State Building Construction Account—State. . . . . . . . $150,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . $12,699,00020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,849,00021

NEW SECTION. Sec. 2038. FOR THE DEPARTMENT OF CORRECTIONS22Washington Corrections Center: Roof and Equipment Replacement23

(30000195)24Appropriation:25

State Building Construction Account—State. . . . . . . $5,658,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,658,00029

NEW SECTION. Sec. 2039. FOR THE DEPARTMENT OF CORRECTIONS30Clallam Bay Corrections Center: MSC and Rec Building Roofs31

(30000548)32Appropriation:33Code Rev/AL:akl 66 H-2429.2/15 2nd draft

Page 68: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . $1,808,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,808,0004

NEW SECTION. Sec. 2040. FOR THE DEPARTMENT OF CORRECTIONS5Airway Heights Corrections Center: CI Food Factory Remodel6

(30000567)7Appropriation:8

State Building Construction Account—State. . . . . . . $2,163,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,163,00012

NEW SECTION. Sec. 2041. FOR THE DEPARTMENT OF CORRECTIONS13Monroe Correctional Complex: WSR Replace Fire Alarm System14

(30000724)15Reappropriation:16

State Building Construction Account—State. . . . . . . $2,001,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . $615,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,616,00020

NEW SECTION. Sec. 2042. FOR THE DEPARTMENT OF CORRECTIONS21Airway Heights Corrections Center: Replace Fire Alarm System22

(30000725)23Reappropriation:24

State Building Construction Account—State. . . . . . . $1,950,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $1,449,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,399,00028

NEW SECTION. Sec. 2043. FOR THE DEPARTMENT OF CORRECTIONS29Airway Heights Corrections Center: Security Electronics30

Renovations (30000726)31Reappropriation:32

State Building Construction Account—State. . . . . . . $3,830,00033Code Rev/AL:akl 67 H-2429.2/15 2nd draft

Page 69: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,217,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,047,0003

NEW SECTION. Sec. 2044. FOR THE DEPARTMENT OF CORRECTIONS4Washington Corrections Center for Women: Replace Fire Alarm5

System (30000727)6Reappropriation:7

State Building Construction Account—State. . . . . . . . $950,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $1,699,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,649,00011

NEW SECTION. Sec. 2045. FOR THE DEPARTMENT OF CORRECTIONS12Monroe Correctional Complex: TRU Support Building Repair Fire13

Detection System (30000733)14Reappropriation:15

State Building Construction Account—State. . . . . . . . $250,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . $808,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,058,00019

NEW SECTION. Sec. 2046. FOR THE DEPARTMENT OF CORRECTIONS20Monroe Correctional Complex: TRU Security Video System (30000801)21

Reappropriation:22State Building Construction Account—State. . . . . . . $2,908,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . $968,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,876,00026

NEW SECTION. Sec. 2047. FOR THE DEPARTMENT OF CORRECTIONS27Washington Corrections Center: Security Video System (30000791)28

Reappropriation:29State Building Construction Account—State. . . . . . . $4,363,00030Prior Biennia (Expenditures). . . . . . . . . . . . . $2,609,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

Code Rev/AL:akl 68 H-2429.2/15 2nd draft

Page 70: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,972,0001

NEW SECTION. Sec. 2048. FOR THE DEPARTMENT OF CORRECTIONS2Monroe Correctional Complex: WSR Security Video System (30000795)3

Reappropriation:4State Building Construction Account—State. . . . . . . $3,843,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $1,390,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,233,0008

NEW SECTION. Sec. 2049. FOR THE DEPARTMENT OF CORRECTIONS9Minor Works Preservation (30000734)10

Reappropriation:11State Building Construction Account—State. . . . . . . $1,500,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $8,600,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,100,00015

NEW SECTION. Sec. 2050. FOR THE DEPARTMENT OF CORRECTIONS16Clallam Bay Corrections Center: Security Video System (30000800)17

Appropriation:18State Building Construction Account—State. . . . . . . $6,038,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,038,00022

NEW SECTION. Sec. 2051. FOR THE DEPARTMENT OF CORRECTIONS23Washington Corrections Center for Women: Security Video System24

(30000802)25Reappropriation:26

State Building Construction Account—State. . . . . . . $2,150,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $1,271,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,421,00030

NEW SECTION. Sec. 2052. FOR THE DEPARTMENT OF CORRECTIONS31Monroe Correctional Complex: SOU IMU Security Video (30000803)32

Code Rev/AL:akl 69 H-2429.2/15 2nd draft

Page 71: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1State Building Construction Account—State. . . . . . . $1,806,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . $834,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,640,0005

NEW SECTION. Sec. 2053. FOR THE DEPARTMENT OF CORRECTIONS6Washington State Penitentiary: Education Building Roof (30000820)7

Appropriation:8State Building Construction Account—State. . . . . . . $1,525,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,525,00012

NEW SECTION. Sec. 2054. FOR THE DEPARTMENT OF CORRECTIONS13Monroe Correctional Complex: MSU Bathroom Renovation (30000975)14

Appropriation:15State Building Construction Account—State. . . . . . . $1,720,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,720,00019

NEW SECTION. Sec. 2055. FOR THE DEPARTMENT OF CORRECTIONS20Statewide: Minor Works - Preservation Projects (30001013)21

Appropriation:22State Building Construction Account—State. . . . . . $25,181,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . $65,095,00025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $90,276,00026

NEW SECTION. Sec. 2056. FOR THE DEPARTMENT OF CORRECTIONS27Clallam Bay Corrections Center: Access Road Culvert Replacement28

and Road Resurfacing (30001078)29Appropriation:30

State Building Construction Account—State. . . . . . . $1,500,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032

Code Rev/AL:akl 70 H-2429.2/15 2nd draft

Page 72: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,0002

NEW SECTION. Sec. 2057. FOR THE DEPARTMENT OF CORRECTIONS3Washington State Penitentiary: Program and Support Building4

(30001101)5Appropriation:6

State Building Construction Account—State. . . . . . . $1,900,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . $15,014,0009

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,914,00010

NEW SECTION. Sec. 2058. FOR THE DEPARTMENT OF CORRECTIONS11Prison Capacity Expansion (30001105)12The appropriation in this section is subject to the following13

conditions and limitations: The department shall research best14practices for treatment of mental illness for offenders, and design15and construct the facility to provide this treatment. The department16shall also include costs for continuing mental health supervision17with community supervision in the predesign. The department may18assign minimum security offenders for maintenance or other activities19as needed.20Appropriation:21

State Building Construction Account—State. . . . . . . $5,300,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . $184,000,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $189,300,00025

NEW SECTION. Sec. 2059. FOR THE CRIMINAL JUSTICE TRAINING26COMMISSION27

Omnibus Minor Works (30000017)28Appropriation:29

State Building Construction Account—State. . . . . . . . $456,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $456,00033

Code Rev/AL:akl 71 H-2429.2/15 2nd draft

Page 73: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(End of part)

Code Rev/AL:akl 72 H-2429.2/15 2nd draft

Page 74: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

PART 31NATURAL RESOURCES2

NEW SECTION. Sec. 3001. FOR THE DEPARTMENT OF ECOLOGY3Water Supply Facilities (19742006)4

Reappropriation:5State and Local Improvements Revolving Account (Water6

Supply Facilities)—State. . . . . . . . . . . . . . $345,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $20,205,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,550,00010

NEW SECTION. Sec. 3002. FOR THE DEPARTMENT OF ECOLOGY11Low-Level Nuclear Waste Disposal Trench Closure (19972012)12

Reappropriation:13Site Closure Account—State. . . . . . . . . . . . . . $10,917,00014

Appropriation:15Site Closure Account—State. . . . . . . . . . . . . . $3,675,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $4,516,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,108,00019

NEW SECTION. Sec. 3003. FOR THE DEPARTMENT OF ECOLOGY20Twin Lake Aquifer Recharge Project (20042951)21

Reappropriation:22State Building Construction Account—State. . . . . . . . $156,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . $594,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $750,00026

NEW SECTION. Sec. 3004. FOR THE DEPARTMENT OF ECOLOGY27Water Supply Facilities (20044006)28

Reappropriation:29State and Local Improvements Revolving Account (Water30

Supply Facilities)—State. . . . . . . . . . . . . . . $50,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $13,468,00032

Code Rev/AL:akl 73 H-2429.2/15 2nd draft

Page 75: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,518,0002

NEW SECTION. Sec. 3005. FOR THE DEPARTMENT OF ECOLOGY3Quad Cities Water Right Mitigation (20052852)4

Reappropriation:5State Building Construction Account—State. . . . . . . . $421,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $1,179,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,600,0009

NEW SECTION. Sec. 3006. FOR THE DEPARTMENT OF ECOLOGY10Watershed Plan Implementation and Flow Achievement (20062003)11The reappropriation in this section is subject to the following12

conditions and limitations: The reappropriation is subject to the13provisions in section 136, chapter 371, Laws of 2006.14Reappropriation:15

State Building Construction Account—State. . . . . . . . $317,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $12,483,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,800,00019

NEW SECTION. Sec. 3007. FOR THE DEPARTMENT OF ECOLOGY20Columbia River Basin Water Supply Development Program (20062950)21The reappropriations in this section are subject to the following22

conditions and limitations: The reappropriations are subject to the23provisions of section 3008, chapter 49, Laws of 2011 1st sp. sess.24Reappropriation:25

Columbia River Basin Taxable Bond Water Supply26Development Account—State. . . . . . . . . . . . . $1,770,00027

Columbia River Basin Water Supply Development Account—28State. . . . . . . . . . . . . . . . . . . . . . . $6,075,00029Subtotal Reappropriation. . . . . . . . . . . . . $7,845,00030

Prior Biennia (Expenditures). . . . . . . . . . . . . $83,655,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . $91,500,00033

Code Rev/AL:akl 74 H-2429.2/15 2nd draft

Page 76: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3008. FOR THE DEPARTMENT OF ECOLOGY1Transfer of Water Rights for Cabin Owners (20081951)2

Reappropriation:3State Building Construction Account—State. . . . . . . . $161,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . $289,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $450,0007

NEW SECTION. Sec. 3009. FOR THE DEPARTMENT OF ECOLOGY8Remedial Action Grants (20084008)9

Reappropriation:10State Building Construction Account—State. . . . . . $11,754,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $81,121,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $92,875,00014

NEW SECTION. Sec. 3010. FOR THE DEPARTMENT OF ECOLOGY15Centennial Clean Water Program (20084010)16

Reappropriation:17Water Quality Capital Account—State. . . . . . . . . . . $43,00018State Toxics Control Account—State. . . . . . . . . . . $570,00019

Subtotal Reappropriation. . . . . . . . . . . . . . $613,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $66,036,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $66,649,00023

NEW SECTION. Sec. 3011. FOR THE DEPARTMENT OF ECOLOGY24Water Pollution Control Loan Program (20084011)25

Reappropriation:26Water Pollution Control Revolving Account—State. . . $14,581,00027Prior Biennia (Expenditures). . . . . . . . . . . . $125,419,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $140,000,00030

NEW SECTION. Sec. 3012. FOR THE DEPARTMENT OF ECOLOGY31Yakima River Basin Water Storage Feasibility Study (20084026)32

Code Rev/AL:akl 75 H-2429.2/15 2nd draft

Page 77: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is subject to the2provisions in section 3035, chapter 497, Laws of 2009.3Reappropriation:4

State Building Construction Account—State. . . . . . . . $82,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $5,168,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,250,0008

NEW SECTION. Sec. 3013. FOR THE DEPARTMENT OF ECOLOGY9Watershed Plan Implementation and Flow Achievement (20084029)10The reappropriation in this section is subject to the following11

conditions and limitations: The reappropriation is subject to the12provisions in section 3054, chapter 520, Laws of 2007.13Reappropriation:14

State Building Construction Account—State. . . . . . . $1,456,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $12,544,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,00018

NEW SECTION. Sec. 3014. FOR THE DEPARTMENT OF ECOLOGY19Water Pollution Control Revolving Fund Program (30000007)20

Reappropriation:21Water Pollution Control Revolving Account—Federal22

ARRA. . . . . . . . . . . . . . . . . . . . . . . . $766,00023Water Pollution Control Revolving Account—State. . . . $3,970,00024

Subtotal Reappropriation. . . . . . . . . . . . . $4,736,00025Prior Biennia (Expenditures). . . . . . . . . . . . $173,964,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $178,700,00028

NEW SECTION. Sec. 3015. FOR THE DEPARTMENT OF ECOLOGY29Centennial Clean Water Program (30000008)30

Reappropriation:31State Building Construction Account—State. . . . . . . $3,838,00032Prior Biennia (Expenditures). . . . . . . . . . . . . $26,162,00033

Code Rev/AL:akl 76 H-2429.2/15 2nd draft

Page 78: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,000,0002

NEW SECTION. Sec. 3016. FOR THE DEPARTMENT OF ECOLOGY3Watershed Plan Implementation and Flow Achievement (30000028)4

Reappropriation:5State Building Construction Account—State. . . . . . . . $715,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $5,285,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,0009

NEW SECTION. Sec. 3017. FOR THE DEPARTMENT OF ECOLOGY10Kittitas Groundwater Study (30000029)11The reappropriation in this section is subject to the following12

conditions and limitations: The reappropriation is subject to the13provisions in section 3001, chapter 36, Laws of 2010 1st sp. sess.14Reappropriation:15

State and Local Improvements Revolving Account (Water16Supply Facilities)—State. . . . . . . . . . . . . . . $76,00017

Prior Biennia (Expenditures). . . . . . . . . . . . . . $624,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $700,00020

NEW SECTION. Sec. 3018. FOR THE DEPARTMENT OF ECOLOGY21Remedial Action Grant Program (30000039)22The reappropriations in this section are subject to the following23

conditions and limitations: The reappropriations are subject to the24provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.25Reappropriation:26

State Building Construction Account—State. . . . . . . $1,327,00027Local Toxics Control Account—State. . . . . . . . . . $9,165,00028

Subtotal Reappropriation. . . . . . . . . . . . . $10,492,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $65,419,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,911,00032

NEW SECTION. Sec. 3019. FOR THE DEPARTMENT OF ECOLOGY33Code Rev/AL:akl 77 H-2429.2/15 2nd draft

Page 79: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Water Pollution Control Revolving Fund Program (30000142)1Reappropriation:2

Water Pollution Control Revolving Account—Federal. . . $1,792,0003Water Pollution Control Revolving Account—State. . . $21,050,0004

Subtotal Reappropriation. . . . . . . . . . . . . $22,842,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $14,158,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,000,0008

NEW SECTION. Sec. 3020. FOR THE DEPARTMENT OF ECOLOGY9Clean Up Toxics Sites - Puget Sound (30000144)10The reappropriations in this section are subject to the following11

conditions and limitations: The reappropriations are subject to the12provisions of section 3021, chapter 48, Laws of 2011 1st sp. sess.13Reappropriation:14

Cleanup Settlement Account—State. . . . . . . . . . . $1,959,00015State Toxics Control Account—State. . . . . . . . . . $3,666,00016

Subtotal Reappropriation. . . . . . . . . . . . . $5,625,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $35,573,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $41,198,00020

NEW SECTION. Sec. 3021. FOR THE DEPARTMENT OF ECOLOGY21Settlement Funding to Clean Up Toxic Sites (30000145)22

Reappropriation:23Cleanup Settlement Account—State. . . . . . . . . . . . $185,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $8,315,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,00027

NEW SECTION. Sec. 3022. FOR THE DEPARTMENT OF ECOLOGY28Centennial Clean Water Program (30000208)29The reappropriation in this section is subject to the following30

conditions and limitations: The reappropriation is subject to the31provisions of section 3024, chapter 48, Laws of 2011 1st sp. sess.32Reappropriation:33

Code Rev/AL:akl 78 H-2429.2/15 2nd draft

Page 80: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Toxics Control Account—State. . . . . . . . . . $12,341,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $21,759,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,100,0004

NEW SECTION. Sec. 3023. FOR THE DEPARTMENT OF ECOLOGY5Water Pollution Control Revolving Fund Program (30000209)6

Reappropriation:7Water Pollution Control Revolving Account—Federal. . $51,095,0008Water Pollution Control Revolving Account—State. . . $85,631,0009

Subtotal Reappropriation. . . . . . . . . . . . $136,726,00010Prior Biennia (Expenditures). . . . . . . . . . . . . $55,418,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $192,144,00013

NEW SECTION. Sec. 3024. FOR THE DEPARTMENT OF ECOLOGY14Watershed Plan Implementation and Flow Achievement (30000213)15The reappropriation in this section is subject to the following16

conditions and limitations: The reappropriation is subject to the17provisions of section 3030, chapter 49, Laws of 2011 1st sp. sess.18Reappropriation:19

State Building Construction Account—State. . . . . . . $2,254,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $5,746,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00023

NEW SECTION. Sec. 3025. FOR THE DEPARTMENT OF ECOLOGY24Remedial Action Grant Program (30000216)25

Reappropriation:26Local Toxics Control Account—State. . . . . . . . . . $32,216,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $31,618,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $63,834,00030

NEW SECTION. Sec. 3026. FOR THE DEPARTMENT OF ECOLOGY31Eastern Washington Clean Sites Initiative (30000217)32

Code Rev/AL:akl 79 H-2429.2/15 2nd draft

Page 81: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1State Toxics Control Account—State. . . . . . . . . . $2,117,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $3,883,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,0005

NEW SECTION. Sec. 3027. FOR THE DEPARTMENT OF ECOLOGY6Safe Soils Remediation Program - Central Washington (30000263)7

Reappropriation:8State Toxics Control Account—State. . . . . . . . . . . $682,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $3,029,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,711,00012

NEW SECTION. Sec. 3028. FOR THE DEPARTMENT OF ECOLOGY13Clean Up Toxics Sites - Puget Sound (30000265)14

Reappropriation:15State Toxics Control Account—State. . . . . . . . . . $1,896,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $14,504,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,400,00019

NEW SECTION. Sec. 3029. FOR THE DEPARTMENT OF ECOLOGY20Yakima Basin Integrated Water Management Plan Implementation21

(30000278)22Reappropriation:23

State Building Construction Account—State. . . . . . . . $208,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $1,792,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00027

NEW SECTION. Sec. 3030. FOR THE DEPARTMENT OF ECOLOGY28ASARCO - Tacoma Smelter Plume and Mines (30000280)29

Reappropriation:30Cleanup Settlement Account—State. . . . . . . . . . . $6,841,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $13,806,00032

Code Rev/AL:akl 80 H-2429.2/15 2nd draft

Page 82: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,647,0002

NEW SECTION. Sec. 3031. FOR THE DEPARTMENT OF ECOLOGY3Padilla Bay Federal Capital Projects (30000282)4

Reappropriation:5General Fund—Federal. . . . . . . . . . . . . . . . . . $791,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . $9,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,0009

NEW SECTION. Sec. 3032. FOR THE DEPARTMENT OF ECOLOGY10Coastal Wetlands Federal Funds Administration (30000283)11

Reappropriation:12General Fund—Federal. . . . . . . . . . . . . . . . . $10,695,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $12,505,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,200,00016

NEW SECTION. Sec. 3033. FOR THE DEPARTMENT OF ECOLOGY17Statewide Storm Water Projects (30000294)18The reappropriation in this section is subject to the following19

conditions and limitations: The reappropriation is subject to the20provisions of section 3041, chapter 4, Laws of 2011 1st sp. sess.21Reappropriation:22

Local Toxics Control Account—State. . . . . . . . . . $14,411,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $15,589,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,000,00026

NEW SECTION. Sec. 3034. FOR THE DEPARTMENT OF ECOLOGY27Waste Tire Pile Cleanup and Prevention (30000322)28

Reappropriation:29Waste Tire Removal Account—State. . . . . . . . . . . . $388,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . $612,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

Code Rev/AL:akl 81 H-2429.2/15 2nd draft

Page 83: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0001

NEW SECTION. Sec. 3035. FOR THE DEPARTMENT OF ECOLOGY2Mercury Switch Removal (30000323)3

Reappropriation:4State Toxics Control Account—State. . . . . . . . . . . $365,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . $135,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,0008

NEW SECTION. Sec. 3036. FOR THE DEPARTMENT OF ECOLOGY9Reducing Toxic Diesel Emissions (30000324)10

Reappropriation:11State Toxics Control Account—State. . . . . . . . . . $2,380,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $2,120,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,500,00015

NEW SECTION. Sec. 3037. FOR THE DEPARTMENT OF ECOLOGY16Reducing Toxic Wood Stove Emissions (30000325)17

Reappropriation:18State Toxics Control Account—State. . . . . . . . . . $2,180,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $1,820,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00022

NEW SECTION. Sec. 3038. FOR THE DEPARTMENT OF ECOLOGY23Centennial Clean Water Program (30000326)24The reappropriation in this section is subject to the following25

conditions and limitations: The reappropriation is subject to the26provisions of section 3066, chapter 19, Laws of 2013 2nd sp. sess.27Reappropriation:28

Environmental Legacy Stewardship Account—State. . . . $36,634,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $13,366,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00032

Code Rev/AL:akl 82 H-2429.2/15 2nd draft

Page 84: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3039. FOR THE DEPARTMENT OF ECOLOGY1Water Pollution Control Revolving Program (30000327)2The reappropriations in this section are subject to the following3

conditions and limitations: The reappropriations are subject to the4provisions of section 3067, chapter 19, Laws of 2013 2nd sp. sess.5Reappropriation:6

Water Pollution Control Revolving Account—Federal. . $50,000,0007Water Pollution Control Revolving Account—State. . . $184,110,0008

Subtotal Reappropriation. . . . . . . . . . . . $234,110,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $15,890,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $250,000,00012

NEW SECTION. Sec. 3040. FOR THE DEPARTMENT OF ECOLOGY13Coastal Wetlands Federal Funds (30000328)14

Reappropriation:15General Fund—Federal. . . . . . . . . . . . . . . . . $9,800,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,800,00019

NEW SECTION. Sec. 3041. FOR THE DEPARTMENT OF ECOLOGY20Watershed Plan Implementation and Flow Achievement (30000331)21

Reappropriation:22State Building Construction Account—State. . . . . . . $8,695,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $1,305,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00026

NEW SECTION. Sec. 3042. FOR THE DEPARTMENT OF ECOLOGY27Sunnyside Valley Irrigation District Water Conservation28

(30000332)29Reappropriation:30

State Building Construction Account—State. . . . . . . $3,048,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . $7,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 83 H-2429.2/15 2nd draft

Page 85: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,055,0001

NEW SECTION. Sec. 3043. FOR THE DEPARTMENT OF ECOLOGY2Dungeness Water Supply and Mitigation (30000333)3The reappropriation in this section is subject to the following4

conditions and limitations: The reappropriation is subject to the5provisions in section 3082, chapter 19, Laws of 2013 2nd sp. sess.6Reappropriation:7

State Building Construction Account—State. . . . . . . $2,003,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . $47,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,050,00011

NEW SECTION. Sec. 3044. FOR THE DEPARTMENT OF ECOLOGY12ASARCO Cleanup (30000334)13The reappropriations in this section are subject to the following14

conditions and limitations: The reappropriations are subject to the15provisions of section 3072, chapter 19, Laws of 2013 2nd sp. sess.16Reappropriation:17

State Building Construction Account—State. . . . . . . . $717,00018Cleanup Settlement Account—State. . . . . . . . . . . $26,672,00019

Subtotal Reappropriation. . . . . . . . . . . . . $27,389,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $7,271,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,660,00023

NEW SECTION. Sec. 3045. FOR THE DEPARTMENT OF ECOLOGY24Padilla Bay Federal Capital Projects - Programmatic (30000335)25

Reappropriation:26General Fund—Federal. . . . . . . . . . . . . . . . . . $500,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00030

NEW SECTION. Sec. 3046. FOR THE DEPARTMENT OF ECOLOGY31Clean Up Toxics Sites - Puget Sound (30000337)32

Code Rev/AL:akl 84 H-2429.2/15 2nd draft

Page 86: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1Environmental Legacy Stewardship Account—State. . . . $19,100,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $12,400,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $31,500,0005

NEW SECTION. Sec. 3047. FOR THE DEPARTMENT OF ECOLOGY6Eastern Washington Clean Sites Initiative (30000351)7

Reappropriation:8Environmental Legacy Stewardship Account—State. . . . $6,735,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $3,565,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,300,00012

NEW SECTION. Sec. 3048. FOR THE DEPARTMENT OF ECOLOGY13Columbia River Water Supply Development Program (30000372)14

Reappropriation:15Columbia River Basin Water Supply Development Account—16

State. . . . . . . . . . . . . . . . . . . . . . $16,052,00017Columbia River Basin Taxable Bond Water Supply18

Development Account—State. . . . . . . . . . . . $28,113,00019Subtotal Reappropriation. . . . . . . . . . . . . $44,165,00020

Prior Biennia (Expenditures). . . . . . . . . . . . . $30,335,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $74,500,00023

NEW SECTION. Sec. 3049. FOR THE DEPARTMENT OF ECOLOGY24Local Toxics Grants for Cleanup and Prevention (20064008)25

Reappropriation:26State Building Construction Account—State. . . . . . . $8,296,00027Prior Biennia (Expenditures). . . . . . . . . . . . . $90,604,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $98,900,00030

NEW SECTION. Sec. 3050. FOR THE DEPARTMENT OF ECOLOGY31Yakima River Basin Water Supply (30000373)32

Code Rev/AL:akl 85 H-2429.2/15 2nd draft

Page 87: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1State Building Construction Account—State. . . . . . $12,162,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $19,938,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,100,0005

NEW SECTION. Sec. 3051. FOR THE DEPARTMENT OF ECOLOGY6Remedial Action Grants (30000374)7

Reappropriation:8Local Toxics Control Account—State. . . . . . . . . . $45,779,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $16,758,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $62,537,00012

NEW SECTION. Sec. 3052. FOR THE DEPARTMENT OF ECOLOGY13Water Irrigation Efficiencies Program (30000389)14The reappropriation in this section is subject to the following15

conditions and limitations: The reappropriation is subject to the16provisions of section 3080, chapter 19, Laws of 2013 2nd sp. sess.17Reappropriation:18

State Building Construction Account—State. . . . . . . $3,804,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . $196,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00022

NEW SECTION. Sec. 3053. FOR THE DEPARTMENT OF ECOLOGY23Coordinated Prevention Grants (CPG) (30000426)24

Appropriation:25State Building Construction Account—State. . . . . . $15,000,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . $120,000,00028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $135,000,00029

NEW SECTION. Sec. 3054. FOR THE DEPARTMENT OF ECOLOGY30Centennial Clean Water Program (30000427)31

Code Rev/AL:akl 86 H-2429.2/15 2nd draft

Page 88: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The appropriations in this section are subject to the following1conditions and limitations:2

(1) For projects involving repair, replacement, or improvement of3a wastewater treatment plant or other public works facility for which4an investment grade efficiency audit is obtainable, the department of5ecology must require as a contract condition that the project sponsor6undertake an investment grade efficiency audit. The project sponsor7may finance the costs of the audit as part of its centennial clean8water program grant.9

(2) The agency must encourage local government use of federally10funded water pollution control infrastructure programs operated by11the United States Department of Agriculture - Rural Development.12Appropriation:13

State Building Construction Account—State. . . . . . $10,000,00014Local Toxics Control Account—State. . . . . . . . . . $10,000,00015

Subtotal Appropriation. . . . . . . . . . . . . . $20,000,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . $160,000,00018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $180,000,00019

NEW SECTION. Sec. 3055. FOR THE DEPARTMENT OF ECOLOGY20Reducing Toxic Diesel Emissions (30000428)21

Appropriation:22State Toxics Control Account—State. . . . . . . . . . $1,000,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . $8,000,00025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,00026

NEW SECTION. Sec. 3056. FOR THE DEPARTMENT OF ECOLOGY27Reducing Toxic Woodstove Emissions (30000429)28

Appropriation:29State Toxics Control Account—State. . . . . . . . . . $2,000,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . $8,000,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00033

NEW SECTION. Sec. 3057. FOR THE DEPARTMENT OF ECOLOGY34Code Rev/AL:akl 87 H-2429.2/15 2nd draft

Page 89: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Swift Creek Natural Asbestos Flood Control and Cleanup (30000430)1Appropriation:2

State Building Construction Account—State. . . . . . . $3,800,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . $11,200,0005

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,0006

NEW SECTION. Sec. 3058. FOR THE DEPARTMENT OF ECOLOGY7Waste Tire Pile Cleanup and Prevention (30000431)8

Appropriation:9Waste Tire Removal Account—State. . . . . . . . . . . $1,000,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . $4,000,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00013

NEW SECTION. Sec. 3059. FOR THE DEPARTMENT OF ECOLOGY14Eastern Washington Clean Sites Initiative (30000432)15

Appropriation:16State Toxics Control Account—State. . . . . . . . . . $11,000,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . $13,772,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,772,00020

NEW SECTION. Sec. 3060. FOR THE DEPARTMENT OF ECOLOGY21Remedial Action Grants (30000458)22

Appropriation:23State Building Construction Account—State. . . . . . . $5,000,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . $280,000,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $285,000,00027

NEW SECTION. Sec. 3061. FOR THE DEPARTMENT OF ECOLOGY28Leaking Tank Model Remedies (30000490)29

Appropriation:30State Toxics Control Account—State. . . . . . . . . . $2,000,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032

Code Rev/AL:akl 88 H-2429.2/15 2nd draft

Page 90: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . $8,000,0001TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0002

NEW SECTION. Sec. 3062. FOR THE DEPARTMENT OF ECOLOGY3Water Pollution Control Revolving Program (30000534)4The appropriations in this section are subject to the following5

conditions and limitations:6(1) $6,000,000 of the state building construction account—state7

for fiscal year 2016 and $6,000,000 of the state building8construction account—state for fiscal year 2017 is provided solely as9state match for federal clean water funds.10

(2) For projects involving repair, replacement, or improvement of11a wastewater treatment plant or other public works facility for which12an investment grade efficiency audit is obtainable, the department of13ecology must require as a contract condition that the project sponsor14undertake an investment grade efficiency audit. The project sponsor15may finance the costs of the audit as part of its water pollution16control program loan.17

(3) The agency must encourage local government use of federally18funded water pollution control infrastructure programs operated by19the United States Department of Agriculture - Rural Development.20Appropriation:21

Water Pollution Control Revolving Account—Federal. . $50,000,00022Water Pollution Control Revolving Account—State. . . $141,000,00023

Subtotal Appropriation. . . . . . . . . . . . . $191,000,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . $800,000,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $991,000,00027

NEW SECTION. Sec. 3063. FOR THE DEPARTMENT OF ECOLOGY28Stormwater Financial Assistance Program (30000535)29

Appropriation:30Local Toxics Control Account—State. . . . . . . . . . $3,000,00031State Building Construction Account—State. . . . . . $60,000,00032

Subtotal Appropriation. . . . . . . . . . . . . . $63,000,00033Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034Future Biennia (Projected Costs). . . . . . . . . . $280,000,00035

TOTAL. . . . . . . . . . . . . . . . . . . . . . $343,000,00036Code Rev/AL:akl 89 H-2429.2/15 2nd draft

Page 91: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3064. FOR THE DEPARTMENT OF ECOLOGY1Coastal Wetlands Federal Funds (30000536)2

Appropriation:3General Fund—Federal. . . . . . . . . . . . . . . . . $10,000,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . $40,000,0006

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0007

NEW SECTION. Sec. 3065. FOR THE DEPARTMENT OF ECOLOGY8Floodplains by Design (30000537)9

Appropriation:10State Building Construction Account—State. . . . . . $43,000,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . $92,000,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $135,000,00014

NEW SECTION. Sec. 3066. FOR THE DEPARTMENT OF ECOLOGY15ASARCO Cleanup (30000538)16The appropriation in this section is subject to the following17

conditions and limitations: Up to $400,000 of the appropriation in18this section is provided solely for the department to contract, after19a competitive bidding process, for the cleanup and remediation of the20former Ruston Way tunnel.21Appropriation:22

Cleanup Settlement Account—State. . . . . . . . . . . $12,146,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . $67,900,00025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $80,046,00026

NEW SECTION. Sec. 3067. FOR THE DEPARTMENT OF ECOLOGY27Cleanup Toxics Sites – Puget Sound (30000542)28

Appropriation:29State Toxics Control Account—State. . . . . . . . . . $15,000,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . $72,763,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . . $87,763,00033

Code Rev/AL:akl 90 H-2429.2/15 2nd draft

Page 92: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3068. FOR THE DEPARTMENT OF ECOLOGY1Water Irrigation Efficiencies Program (30000587)2The appropriation in this section is subject to the following3

conditions and limitations:4(1) The appropriation is provided solely for technical assistance5

and grants to conservation districts for the purpose of implementing6water conservation measures and irrigation efficiencies. The7department of ecology and the state conservation commission shall8give preference in order of priority to projects located in the 169fish critical basins, other water short basins, and basins with10significant water resource and instream flow problems. Projects that11are not within basins as described in this subsection are also12eligible to receive funding.13

(2) Conservation districts statewide are eligible for grants14listed in subsection (1) of this section. A conservation district15receiving funds shall manage each grant to ensure that a portion of16the water saved by the water conservation measure or irrigation17efficiency will be placed as a purchase or a lease in the trust water18rights program to enhance instream flows. The proportion of saved19water placed in the trust water rights program must be equal to the20percentage of the public investment in the conservation measure or21irrigation efficiency. The percentage of the public investment may22not exceed eighty-five percent of the total cost of the conservation23measure or irrigation efficiency.24

(3) Up to $300,000 of the appropriation in this section may be25allocated for the purchase and installation of flow meters that are26implemented in cooperation with the Washington State Department of27Fish and Wildlife fish screening program authorized under RCW2877.57.070.29Appropriation:30

State Building Construction Account—State. . . . . . . $4,000,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . $16,000,00033

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,00034

NEW SECTION. Sec. 3069. FOR THE DEPARTMENT OF ECOLOGY35Columbia River Water Supply Development Program (30000588)36

Code Rev/AL:akl 91 H-2429.2/15 2nd draft

Page 93: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The appropriations in this section are subject to the following1conditions and limitations:2

(1) $2,000,000 of the Columbia River basin water supply3development account—state is provided solely for the Sullivan Lake4water supply project to replace funds that were diverted to fund5repairs to the Moses Lake irrigation and reclamation district dam.6

(2) $2,000,000 of the Columbia River basin water supply7development account—state is provided solely for water conservation8projects identified in the coordinated water conservation plan9prepared jointly by irrigation districts and the office of Columbia10River.11

(3) $1,000,000 of the Columbia River basin water supply12development account—state is provided solely for Walla Walla13integrated planning.14

(4) $1,000,000 of the Columbia River basin water supply15development account—state is provided solely for the Methow Valley16irrigation district instream flow improvement project.17

(5) $800,000 of the Columbia River basin water supply development18account—state is provided solely for department costs for project19management, oversight, technical assistance, financial management and20administration related to implementing capital projects.21

(6) $1,000,000 of the Columbia River basin water supply revenue22recovery account—state is provided solely for water leased from the23port of Walla Walla that will be provided by the office of Columbia24River on a temporary permit basis to end users.25

(7) $1,200,000 of the Columbia River basin water supply revenue26recovery account—state is provided solely for a water service27contract with the United States bureau of reclamation to provide28water from Lake Roosevelt to end users.29Appropriation:30

Columbia River Basin Water Supply Revenue Recovery31Account—State. . . . . . . . . . . . . . . . . . . $2,200,00032

Columbia River Basin Water Supply Development Account—33State. . . . . . . . . . . . . . . . . . . . . . . $6,800,00034Subtotal Appropriation. . . . . . . . . . . . . . $9,000,00035

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $036Future Biennia (Projected Costs). . . . . . . . . . . $19,761,00037

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,761,00038

Code Rev/AL:akl 92 H-2429.2/15 2nd draft

Page 94: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3070. FOR THE DEPARTMENT OF ECOLOGY1Sunnyside Valley Irrigation District Water Conservation2

(30000589)3Appropriation:4

State Building Construction Account—State. . . . . . . $3,055,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $15,600,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,655,0008

NEW SECTION. Sec. 3071. FOR THE DEPARTMENT OF ECOLOGY9Yakima River Basin Water Supply (30000590)10The appropriations in this section are subject to the following11

conditions and limitations:12(1) $2,200,000 of the state building construction account—state13

is provided solely for a fish habitat enhancement program to address14mainstem and tributary habitat restoration priorities.15

(2) $4,900,000 of the state taxable building construction account16—bonds is provided solely for a downstream/upstream fish passage17facility at the Cle Elum reservoir.18

(3) $2,000,000 of the state taxable building construction account19—bonds is provided solely for the Keechelus to Kachess pipeline.20

(4) $2,900,000 of the state taxable building construction account21—bonds is provided solely for the Kachess inactive storage project.22

(5) $300,000 of the state taxable building construction account—23bonds is provided solely for the Kittitas county aquifer storage and24recovery project.25

(6) $2,200,000 of the state building construction account—state26is provided solely for agricultural conservation projects.27

(7) $500,000 of the state building construction account—state is28provided solely for water bank/exchange programs.29Appropriation:30

State Building Construction Account—State. . . . . . . $4,900,00031State Taxable Building Construction32

Account—State. . . . . . . . . . . . . . . . . . $10,100,00033Subtotal Appropriation. . . . . . . . . . . . . . $15,000,00034

Prior Biennia (Expenditures). . . . . . . . . . . . . $32,100,00035Future Biennia (Projected Costs). . . . . . . . . . $120,000,00036

Code Rev/AL:akl 93 H-2429.2/15 2nd draft

Page 95: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $167,100,0001

NEW SECTION. Sec. 3072. FOR THE DEPARTMENT OF ECOLOGY2Watershed Plan Implementation and Flow Achievement (30000591)3

Appropriation:4State Building Construction Account—State. . . . . . . $8,000,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $20,000,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,000,0008

NEW SECTION. Sec. 3073. FOR THE DEPARTMENT OF ECOLOGY9Habitat Mitigation (91000007)10

Reappropriation:11State Building Construction Account—State. . . . . . . $3,051,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $1,349,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,400,00015

NEW SECTION. Sec. 3074. FOR THE DEPARTMENT OF ECOLOGY16Clean Up Toxics Sites - Puget Sound (91000032)17

Reappropriation:18State Toxics Control Account—State. . . . . . . . . . $6,637,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $2,633,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,270,00022

NEW SECTION. Sec. 3075. FOR THE DEPARTMENT OF ECOLOGY23FY 2012 Statewide Stormwater Grant Program (91000053)24

Reappropriation:25Local Toxics Control Account—State. . . . . . . . . . $14,789,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $9,284,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,073,00029

NEW SECTION. Sec. 3076. FOR THE DEPARTMENT OF ECOLOGY30Stormwater Retrofit and LID Competitive Grants (91000054)31

Code Rev/AL:akl 94 H-2429.2/15 2nd draft

Page 96: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1Local Toxics Control Account—State. . . . . . . . . . $6,952,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $7,511,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,463,0005

NEW SECTION. Sec. 3077. FOR THE DEPARTMENT OF ECOLOGY6Skagit Mitigation (91000181)7

Reappropriation:8State Building Construction Account—State. . . . . . . $1,423,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . $802,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,225,00012

NEW SECTION. Sec. 3078. FOR THE DEPARTMENT OF ECOLOGY13Protect Communities from Flood and Drought (92000002)14

Reappropriation:15State Building Construction Account—State. . . . . . . . $228,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $14,747,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,975,00019

NEW SECTION. Sec. 3079. FOR THE DEPARTMENT OF ECOLOGY20Wastewater Treatment and Water Reclamation (92000041)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 3016, chapter 36, Laws of 2010 1st sp. sess.24Reappropriation:25

State Building Construction Account—State. . . . . . . . $151,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $3,279,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,430,00029

NEW SECTION. Sec. 3080. FOR THE DEPARTMENT OF ECOLOGY30Flood Levee Improvements (92000057)31

Code Rev/AL:akl 95 H-2429.2/15 2nd draft

Page 97: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The reappropriations in this section are subject to the following1conditions and limitations: The reappropriations are subject to the2provisions of section 503, chapter 1, Laws of 2012 2nd sp. sess.3Reappropriation:4

State Building Construction Account—State. . . . . . . . $301,0005Local Toxics Control Account—State. . . . . . . . . . $2,510,0006

Subtotal Reappropriation. . . . . . . . . . . . . $2,811,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $5,689,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,00010

NEW SECTION. Sec. 3081. FOR THE DEPARTMENT OF ECOLOGY11Ground Water Management Yakima Basin (92000061)12

Reappropriation:13Columbia River Basin Water Supply Development Account—14

State. . . . . . . . . . . . . . . . . . . . . . . . $189,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . $261,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $450,00018

NEW SECTION. Sec. 3082. FOR THE DEPARTMENT OF ECOLOGY19Storm Water Improvements (92000076)20The reappropriation in this section is subject to the following21

conditions and limitations: The reappropriation is subject to the22provisions of section 3081, chapter 19, Laws of 2013 2nd sp. sess.23Reappropriation:24

Environmental Legacy Stewardship Account—State. . . . $91,456,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $8,544,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $100,000,00028

NEW SECTION. Sec. 3083. FOR THE DEPARTMENT OF ECOLOGY29Floodplain Management and Control Grants (92000078)30The reappropriation in this section is subject to the following31

conditions and limitations: The reappropriation is subject to the32provisions of section 3069, chapter 19, Laws of 2013 2nd sp. sess.33

Code Rev/AL:akl 96 H-2429.2/15 2nd draft

Page 98: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1State Building Construction Account—State. . . . . . $40,389,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $9,611,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0005

NEW SECTION. Sec. 3084. FOR THE DEPARTMENT OF ECOLOGY6Lower Yakima GWMA Program Development (92000085)7

Reappropriation:8State Building Construction Account—State. . . . . . . $1,614,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,614,00012

NEW SECTION. Sec. 3085. FOR THE POLLUTION LIABILITY INSURANCE13AGENCY14

Underground Storage Tank Capital Program Demonstration and Design15(30000001)16

The appropriation in this section is subject to the following17conditions and limitations:18

(1) The appropriation in this section must be used for projects19that provide a benefit to the public through removal, replacement or20upgrade of underground storage tank fuel systems, retrofit existing21systems to disperse renewable or alternative fuels, and cleanup of22contamination caused by legacy petroleum releases. All projects must23develop and acquire assets that have a useful life of at least24thirteen years. These requirements must be specified in funding25agreements issued by the agency.26

(2)(a) $1,800,000 of the appropriation is provided solely to27design a capital financial assistance program to provide underground28storage tank owners and operators with financial resources to remove,29replace or upgrade underground storage tank fuel systems, retrofit30existing systems to disperse renewable or alternative fuels, and to31clean up contamination caused by legacy petroleum releases.32

(b) The design must:33(i) Assess options for program structure and administration, and34

develop a recommended program design, financial management plan and35staffing model;36Code Rev/AL:akl 97 H-2429.2/15 2nd draft

Page 99: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(ii) Include data and legal analysis of statewide need,1availability of existing fund sources for grants and loans,2assessment of owner and operator willingness to participate and3potential environmental and economic impacts of the loan program.4

(iii) As part of the program design, the agency must conduct a5pilot demonstration of a capital grant program that includes three6study sites with aging tanks, demonstrated impact to either soil or7groundwater, or both, and serious financial hardship, as defined in8chapter 374-60 WAC. Each study site may not cost more than $600,000.9

(3) The agency shall conduct the study in consultation with the10office of financial management, and internal and external agency11stakeholders.12

(4) The agency must provide a final report of the program design,13as well as any associated legislative and budget recommendations, to14the governor and legislature by October 1, 2015.15

Appropriation:16Pollution Liability Insurance Program Trust17

Account—State. . . . . . . . . . . . . . . . . . . $1,800,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,800,00021

NEW SECTION. Sec. 3086. FOR THE STATE PARKS AND RECREATION22COMMISSION23

Dosewallips Wastewater Treatment System (30000523)24Reappropriation:25

State Building Construction Account—State. . . . . . . . $27,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $4,505,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,532,00029

NEW SECTION. Sec. 3087. FOR THE STATE PARKS AND RECREATION30COMMISSION31

Lewis & Clark Replace Wastewater System (30000544)32Reappropriation:33

State Building Construction Account—State. . . . . . . . $695,00034Prior Biennia (Expenditures). . . . . . . . . . . . . . $382,00035

Code Rev/AL:akl 98 H-2429.2/15 2nd draft

Page 100: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,077,0002

NEW SECTION. Sec. 3088. FOR THE STATE PARKS AND RECREATION3COMMISSION4

Deception Pass - Kukutali Access and Interpretation (30000774)5Reappropriation:6

State Building Construction Account—State. . . . . . . . $161,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . . $64,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $225,00010

NEW SECTION. Sec. 3089. FOR THE STATE PARKS AND RECREATION11COMMISSION12

Flaming Geyser State Park Infrastructure (30000810)13Reappropriation:14

State Building Construction Account—State. . . . . . . . $848,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . $477,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,325,00018

NEW SECTION. Sec. 3090. FOR THE STATE PARKS AND RECREATION19COMMISSION20

Millersylvania Replace Environmental Learning Center Cabins21(30000821)22Reappropriation:23

State Building Construction Account—State. . . . . . . . $481,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . $608,00025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,089,00027

NEW SECTION. Sec. 3091. FOR THE STATE PARKS AND RECREATION28COMMISSION29

Minor Works - Facility and Infrastructure Preservation (30000845)30Reappropriation:31

State Building Construction Account—State. . . . . . . $1,797,00032Prior Biennia (Expenditures). . . . . . . . . . . . . $8,203,00033

Code Rev/AL:akl 99 H-2429.2/15 2nd draft

Page 101: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0002

NEW SECTION. Sec. 3092. FOR THE STATE PARKS AND RECREATION3COMMISSION4

Wallace Falls Footbridge (91000047)5Reappropriation:6

State Building Construction Account—State. . . . . . . . $150,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . $336,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $486,00010

NEW SECTION. Sec. 3093. FOR THE STATE PARKS AND RECREATION11COMMISSION12

Spencer Spit Water System Replacement (30000140)13Reappropriation:14

State Building Construction Account—State. . . . . . . . $695,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . $288,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $983,00018

NEW SECTION. Sec. 3094. FOR THE STATE PARKS AND RECREATION19COMMISSION20

Fort Worden - Housing Areas Exterior Improvements (30000287)21Appropriation:22

State Building Construction Account—State. . . . . . . . $500,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . $2,858,00025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,358,00026

NEW SECTION. Sec. 3095. FOR THE STATE PARKS AND RECREATION27COMMISSION28

Mount Spokane Road Improvements, Stage 2D (30000693)29Appropriation:30

State Building Construction Account—State. . . . . . . $2,400,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 100 H-2429.2/15 2nd draft

Page 102: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,400,0001

NEW SECTION. Sec. 3096. FOR THE STATE PARKS AND RECREATION2COMMISSION3

Camano Island Day Use Access and Facility Renovation (30000782)4Reappropriation:5

State Building Construction Account—State. . . . . . . . $107,0006Appropriation:7

State Building Construction Account—State. . . . . . . $1,212,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . $194,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,513,00011

NEW SECTION. Sec. 3097. FOR THE STATE PARKS AND RECREATION12COMMISSION13

Belfair Replace Failing Electrical Supply to Main Camp Loop14(30000813)15Appropriation:16

State Building Construction Account—State. . . . . . . $1,180,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,180,00020

NEW SECTION. Sec. 3098. FOR THE STATE PARKS AND RECREATION21COMMISSION22

Fort Flagler - Replace Failing Electrical Power Historic District23(30000815)24Appropriation:25

State Building Construction Account—State. . . . . . . $1,173,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,173,00029

NEW SECTION. Sec. 3099. FOR THE STATE PARKS AND RECREATION30COMMISSION31

Kopachuck Day Use Development (30000820)32Reappropriation:33Code Rev/AL:akl 101 H-2429.2/15 2nd draft

Page 103: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . . $10,0001Appropriation:2

State Building Construction Account—State. . . . . . . $1,341,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . $309,0004Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,660,0006

NEW SECTION. Sec. 3100. FOR THE STATE PARKS AND RECREATION7COMMISSION8

Flaming Geyser Day Use Renovation (30000832)9Reappropriation:10

State Building Construction Account—State. . . . . . . . $642,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . $360,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,002,00014

NEW SECTION. Sec. 3101. FOR THE STATE PARKS AND RECREATION15COMMISSION16

Minor Works - Health and Safety (30000839)17Appropriation:18

State Building Construction Account—State. . . . . . . $5,160,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,160,00022

NEW SECTION. Sec. 3102. FOR THE STATE PARKS AND RECREATION23COMMISSION24

Twanoh State Park Stormwater Improvements (30000851)25Reappropriation:26

State Building Construction Account—State. . . . . . . . $160,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . $194,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $354,00030

NEW SECTION. Sec. 3103. FOR THE STATE PARKS AND RECREATION31COMMISSION32

Rocky Reach - Trail Development (30000853)33Code Rev/AL:akl 102 H-2429.2/15 2nd draft

Page 104: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1State Building Construction Account—State. . . . . . . . $535,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $3,220,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,755,0005

NEW SECTION. Sec. 3104. FOR THE STATE PARKS AND RECREATION6COMMISSION7

Fish Barrier Removal (30000854)8Reappropriation:9

State Building Construction Account—State. . . . . . . . $767,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . $281,00011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,048,00013

NEW SECTION. Sec. 3105. FOR THE STATE PARKS AND RECREATION14COMMISSION15

Clean Vessel Boating Pump-Out Grants (30000856)16Appropriation:17

General Fund—Federal. . . . . . . . . . . . . . . . . $2,600,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $2,600,00019Future Biennia (Projected Costs). . . . . . . . . . . $10,400,00020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,600,00021

NEW SECTION. Sec. 3106. FOR THE STATE PARKS AND RECREATION22COMMISSION23

Local Grant Authority (30000857)24Appropriation:25

Parks Renewal and Stewardship Account—Private/Local. . $1,000,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $1,200,00027Future Biennia (Projected Costs). . . . . . . . . . . $4,000,00028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,200,00029

NEW SECTION. Sec. 3107. FOR THE STATE PARKS AND RECREATION30COMMISSION31

Federal Grant Authority (30000858)32

Code Rev/AL:akl 103 H-2429.2/15 2nd draft

Page 105: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1General Fund—Federal. . . . . . . . . . . . . . . . . . $750,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $1,750,0003Future Biennia (Projected Costs). . . . . . . . . . . $3,000,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,500,0005

NEW SECTION. Sec. 3108. FOR THE STATE PARKS AND RECREATION6COMMISSION7

Sequim Bay Address Failing Retaining Wall (30000861)8Appropriation:9

State Building Construction Account—State. . . . . . . $1,122,00010Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,122,00013

NEW SECTION. Sec. 3109. FOR THE STATE PARKS AND RECREATION14COMMISSION15

Mount Spokane - Nordic Area Improvements and Horse Camp16Development (30000877)17Appropriation:18

State Building Construction Account—State. . . . . . . $6,042,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,042,00022

NEW SECTION. Sec. 3110. FOR THE STATE PARKS AND RECREATION23COMMISSION24

Statewide - Cabins, Yurts, and Associated Park Improvement25(30000883)26Appropriation:27

State Building Construction Account—State. . . . . . . $1,153,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,153,00031

NEW SECTION. Sec. 3111. FOR THE STATE PARKS AND RECREATION32COMMISSION33Code Rev/AL:akl 104 H-2429.2/15 2nd draft

Page 106: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Fish Barrier Removal (Lawsuit) (30000944)1Appropriation:2

State Building Construction Account—State. . . . . . . $2,034,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,034,0006

NEW SECTION. Sec. 3112. FOR THE STATE PARKS AND RECREATION7COMMISSION8

Statewide - Facility and Infrastructure Backlog Reduction9(30000946)10Appropriation:11

State Building Construction Account—State. . . . . . . $6,000,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . $18,000,00014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,000,00015

NEW SECTION. Sec. 3113. FOR THE STATE PARKS AND RECREATION16COMMISSION17

Fort Flagler - WWI Historic Facilities Preservation (30000100)18Appropriation:19

State Building Construction Account—State. . . . . . . $5,970,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,970,00023

NEW SECTION. Sec. 3114. FOR THE STATE PARKS AND RECREATION24COMMISSION25

Riverside Fisk Property Lake Spokane (Long Lake) Initial Park26Access (30000971)27Appropriation:28

State Building Construction Account—State. . . . . . . $1,072,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,072,00032

Code Rev/AL:akl 105 H-2429.2/15 2nd draft

Page 107: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3115. FOR THE STATE PARKS AND RECREATION1COMMISSION2

Minor Works - Facilities and Infrastructures (30000947)3Appropriation:4

State Building Construction Account—State. . . . . . $11,117,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . . $250,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,367,0008

NEW SECTION. Sec. 3116. FOR THE STATE PARKS AND RECREATION9COMMISSION10

Steamboat Rock - Replace Failing Sewage Lift Stations (30000948)11Appropriation:12

State Building Construction Account—State. . . . . . . $1,229,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,229,00016

NEW SECTION. Sec. 3117. FOR THE STATE PARKS AND RECREATION17COMMISSION18

Mount Spokane - Maintenance Facility Relocation from Harms Way19(30000959)20Appropriation:21

State Building Construction Account—State. . . . . . . $2,557,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,557,00025

NEW SECTION. Sec. 3118. FOR THE STATE PARKS AND RECREATION26COMMISSION27

Parkland Acquisition (30000976)28The appropriation in this section is subject to the following29

conditions and limitations: $225,000 or thereabouts must be used for30the purchase of Young Island.31Appropriation:32

Parkland Acquisition Account—State. . . . . . . . . . $2,000,00033

Code Rev/AL:akl 106 H-2429.2/15 2nd draft

Page 108: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . $8,000,0002

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0003

NEW SECTION. Sec. 3119. FOR THE STATE PARKS AND RECREATION4COMMISSION5

Backlog Repairs and Enhanced Amenities (92000007)6Reappropriation:7

State Building Construction Account—State. . . . . . . . $794,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $8,610,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,404,00011

NEW SECTION. Sec. 3120. FOR THE RECREATION AND CONSERVATION12FUNDING BOARD13

Washington Wildlife Recreation Grants (20084011)14The reappropriations in this section are subject to the following15

conditions and limitations: The reappropriations are subject to the16provisions of section 3146, chapter 520, Laws of 2007.17Reappropriation:18

Outdoor Recreation Account—State. . . . . . . . . . . . $291,00019Habitat Conservation Account—State. . . . . . . . . . $2,523,00020

Subtotal Reappropriation. . . . . . . . . . . . . $2,814,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $95,678,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $98,492,00024

NEW SECTION. Sec. 3121. FOR THE RECREATION AND CONSERVATION25FUNDING BOARD26

Salmon Recovery Funding Board Programs (20084851)27Reappropriation:28

State Building Construction Account—State. . . . . . . . $639,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $59,361,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $60,000,00032

Code Rev/AL:akl 107 H-2429.2/15 2nd draft

Page 109: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3122. FOR THE RECREATION AND CONSERVATION1FUNDING BOARD2

Washington Wildlife Recreation Grants (30000002)3Reappropriation:4

Farmlands Preservation Account—State. . . . . . . . . . $257,0005Outdoor Recreation Account—State. . . . . . . . . . . . $307,0006Riparian Protection Account—State. . . . . . . . . . . . $911,0007Habitat Conservation Account—State. . . . . . . . . . $3,672,0008

Subtotal Reappropriation. . . . . . . . . . . . . $5,147,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $64,298,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $69,445,00012

NEW SECTION. Sec. 3123. FOR THE RECREATION AND CONSERVATION13FUNDING BOARD14

Puget Sound Acquisition and Restoration (30000080)15Reappropriation:16

State Building Construction Account—State. . . . . . . . $366,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $32,634,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,000,00020

NEW SECTION. Sec. 3124. FOR THE RECREATION AND CONSERVATION21FUNDING BOARD22

Boating Facilities Program (30000138)23Reappropriation:24

Recreation Resources Account—State. . . . . . . . . . $1,589,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $6,411,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00028

NEW SECTION. Sec. 3125. FOR THE RECREATION AND CONSERVATION29FUNDING BOARD30

Washington Wildlife Recreation Grants (30000139)31The reappropriations in this section are subject to the following32

conditions and limitations: The reappropriations are provided solely33

Code Rev/AL:akl 108 H-2429.2/15 2nd draft

Page 110: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

for the list of projects in LEAP capital document No. 2011-3A,1developed May 24, 2011.2Reappropriation:3

Farmlands Preservation Account—State. . . . . . . . . . $195,0004Outdoor Recreation Account—State. . . . . . . . . . . $3,694,0005Habitat Conservation Account—State. . . . . . . . . . $3,985,0006

Subtotal Reappropriation. . . . . . . . . . . . . $7,874,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $34,126,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,000,00010

NEW SECTION. Sec. 3126. FOR THE RECREATION AND CONSERVATION11FUNDING BOARD12

Salmon Recovery Funding Board Programs (30000140)13Reappropriation:14

State Building Construction Account—State. . . . . . . $3,497,00015General Fund—Federal. . . . . . . . . . . . . . . . . $23,169,00016

Subtotal Reappropriation. . . . . . . . . . . . . $26,666,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $43,396,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,062,00020

NEW SECTION. Sec. 3127. FOR THE RECREATION AND CONSERVATION21FUNDING BOARD22

Land and Water Conservation Fund (30000142)23Reappropriation:24

General Fund—Federal. . . . . . . . . . . . . . . . . $1,313,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $2,687,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00028

NEW SECTION. Sec. 3128. FOR THE RECREATION AND CONSERVATION29FUNDING BOARD30

Aquatic Lands Enhancement Account (30000143)31The reappropriation in this section is subject to the following32

conditions and limitations: The reappropriation is provided solely33

Code Rev/AL:akl 109 H-2429.2/15 2nd draft

Page 111: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

for the list of projects in LEAP capital document No. 2011-3B,1revised April 10, 2013.2Reappropriation:3

Aquatic Lands Enhancement Account—State. . . . . . . . . $845,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $5,616,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,461,0007

NEW SECTION. Sec. 3129. FOR THE RECREATION AND CONSERVATION8FUNDING BOARD9

Recreational Trails Program (30000146)10Reappropriation:11

General Fund—Federal. . . . . . . . . . . . . . . . . $1,328,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $3,672,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00015

NEW SECTION. Sec. 3130. FOR THE RECREATION AND CONSERVATION16FUNDING BOARD17

Puget Sound Restoration (30000147)18The reappropriation in this section is subject to the following19

conditions and limitations: The reappropriation may not be expended20on the acquisition of lands by state agencies.21Reappropriation:22

State Building Construction Account—State. . . . . . . $2,975,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $12,025,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,00026

NEW SECTION. Sec. 3131. FOR THE RECREATION AND CONSERVATION27FUNDING BOARD28

Puget Sound Estuary and Salmon Restoration Program (30000148)29The reappropriation in this section is subject to the following30

conditions and limitations: The reappropriation may not be expended31on the acquisition of lands by state agencies.32Reappropriation:33

Code Rev/AL:akl 110 H-2429.2/15 2nd draft

Page 112: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . . $560,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $4,440,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0004

NEW SECTION. Sec. 3132. FOR THE RECREATION AND CONSERVATION5FUNDING BOARD6

Washington Wildlife Recreation Grants (30000205)7The reappropriations in this section are subject to the following8

conditions and limitations: The reappropriations are subject to the9provisions of section 3161, chapter 19, Laws of 2013 2nd sp. sess.10Reappropriation:11

Farmlands Preservation Account—State. . . . . . . . . $3,218,00012Riparian Protection Account—State. . . . . . . . . . . $4,973,00013Habitat Conservation Account—State. . . . . . . . . . $14,918,00014Outdoor Recreation Account—State. . . . . . . . . . . $14,918,00015

Subtotal Reappropriation. . . . . . . . . . . . . $38,027,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $26,973,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $65,000,00019

NEW SECTION. Sec. 3133. FOR THE RECREATION AND CONSERVATION20FUNDING BOARD21

Salmon Recovery Funding Board Programs (30000206)22The reappropriations in this section are subject to the following23

conditions and limitations: The reappropriations are subject to the24provisions of section 3162, chapter 19, Laws of 2013 2nd sp. sess.25Reappropriation:26

State Building Construction Account—State. . . . . . . $7,886,00027General Fund—Federal. . . . . . . . . . . . . . . . . $37,278,00028

Subtotal Reappropriation. . . . . . . . . . . . . $45,164,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $29,836,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,000,00032

NEW SECTION. Sec. 3134. FOR THE RECREATION AND CONSERVATION33FUNDING BOARD34

Code Rev/AL:akl 111 H-2429.2/15 2nd draft

Page 113: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Boating Facilities Program (30000207)1Reappropriation:2

Recreation Resources Account—State. . . . . . . . . . $3,309,0003Prior Biennia (Expenditures). . . . . . . . . . . . . $3,054,0004Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,363,0006

NEW SECTION. Sec. 3135. FOR THE RECREATION AND CONSERVATION7FUNDING BOARD8

Nonhighway Off-Road Vehicle Activities (30000208)9Reappropriation:10

NOVA Program Account—State. . . . . . . . . . . . . . $5,100,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $3,400,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,00014

NEW SECTION. Sec. 3136. FOR THE RECREATION AND CONSERVATION15FUNDING BOARD16

Aquatic Lands Enhancement Account (30000210)17The reappropriation in this section is subject to the following18

conditions and limitations: The reappropriation in this section is19provided solely for the list of projects in LEAP capital document No.202013-2B, developed April 10, 2013.21Reappropriation:22

Aquatic Lands Enhancement Account—State. . . . . . . . $3,900,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $2,100,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00026

NEW SECTION. Sec. 3137. FOR THE RECREATION AND CONSERVATION27FUNDING BOARD28

Puget Sound Acquisition and Restoration (30000211)29Reappropriation:30

State Building Construction Account—State. . . . . . $44,058,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $25,942,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 112 H-2429.2/15 2nd draft

Page 114: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,000,0001

NEW SECTION. Sec. 3138. FOR THE RECREATION AND CONSERVATION2FUNDING BOARD3

Puget Sound Estuary and Salmon Restoration Program (30000212)4Reappropriation:5

State Building Construction Account—State. . . . . . . $5,500,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $4,500,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0009

NEW SECTION. Sec. 3139. FOR THE RECREATION AND CONSERVATION10FUNDING BOARD11

Firearms and Archery Range Recreation (30000213)12The reappropriation in this section is subject to the following13

conditions and limitations: The reappropriation is subject to the14provisions of section 3168, chapter 19, Laws of 2013 2nd sp. sess.15Reappropriation:16

Firearms Range Account—State. . . . . . . . . . . . . . $315,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . $485,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,00020

NEW SECTION. Sec. 3140. FOR THE RECREATION AND CONSERVATION21FUNDING BOARD22

Recreational Trails Program (30000214)23Reappropriation:24

General Fund—Federal. . . . . . . . . . . . . . . . . $1,500,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $3,500,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00028

NEW SECTION. Sec. 3141. FOR THE RECREATION AND CONSERVATION29FUNDING BOARD30

Boating Infrastructure Grants (30000215)31Reappropriation:32

General Fund—Federal. . . . . . . . . . . . . . . . . . $880,00033Code Rev/AL:akl 113 H-2429.2/15 2nd draft

Page 115: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,320,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,200,0003

NEW SECTION. Sec. 3142. FOR THE RECREATION AND CONSERVATION4FUNDING BOARD5

Land and Water Conservation (30000216)6Reappropriation:7

General Fund—Federal. . . . . . . . . . . . . . . . . $3,400,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . $600,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00011

NEW SECTION. Sec. 3143. FOR THE RECREATION AND CONSERVATION12FUNDING BOARD13

Family Forest Fish Passage Program (30000218)14Reappropriation:15

State Building Construction Account—State. . . . . . . . $990,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $1,010,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00019

NEW SECTION. Sec. 3144. FOR THE RECREATION AND CONSERVATION20FUNDING BOARD21

Washington Wildlife Recreation Grants (30000220)22The appropriations in this section are subject to the following23

conditions and limitations: The appropriations in this section are24provided solely for the list of projects in LEAP capital document No.252015-2, developed March 27, 2015.26Appropriation:27

Farmlands Preservation Account—State. . . . . . . . . $6,500,00028Riparian Protection Account—State. . . . . . . . . . $12,500,00029Habitat Conservation Account—State. . . . . . . . . . $28,000,00030Outdoor Recreation Account—State. . . . . . . . . . . $28,000,00031

Subtotal Appropriation. . . . . . . . . . . . . . $75,000,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . $300,000,00034

Code Rev/AL:akl 114 H-2429.2/15 2nd draft

Page 116: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $375,000,0001

NEW SECTION. Sec. 3145. FOR THE RECREATION AND CONSERVATION2FUNDING BOARD3

Salmon Recovery Funding Board Programs (30000221)4The appropriation in this section is subject to the following5

conditions and limitations: $500,000 of the state building6construction account—state appropriation is provided solely for the7city of Bothell to preserve the Wayne golf course land, situated8along the Sammamish river and Burke-Gilman trail, for fish habitat.9Appropriation:10

State Building Construction Account—State. . . . . . $40,000,00011General Fund—Federal. . . . . . . . . . . . . . . . . $60,000,00012

Subtotal Appropriation. . . . . . . . . . . . . $100,000,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . $400,000,00015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $500,000,00016

NEW SECTION. Sec. 3146. FOR THE RECREATION AND CONSERVATION17FUNDING BOARD18

Boating Facilities Program (30000222)19Appropriation:20

Recreation Resources Account—State. . . . . . . . . . $9,360,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022Future Biennia (Projected Costs). . . . . . . . . . . $37,800,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $47,160,00024

NEW SECTION. Sec. 3147. FOR THE RECREATION AND CONSERVATION25FUNDING BOARD26

Nonhighway Off-Road Vehicle Activities (30000223)27Appropriation:28

NOVA Program Account—State. . . . . . . . . . . . . . $8,670,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . $34,770,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $43,440,00032

Code Rev/AL:akl 115 H-2429.2/15 2nd draft

Page 117: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3148. FOR THE RECREATION AND CONSERVATION1FUNDING BOARD2

Youth Athletic Facilities (30000224)3Appropriation:4

State Building Construction Account—State. . . . . . . $3,000,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $12,000,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,0008

NEW SECTION. Sec. 3149. FOR THE RECREATION AND CONSERVATION9FUNDING BOARD10

Aquatic Lands Enhancement Account (30000225)11The appropriation in this section is subject to the following12

conditions and limitations: The appropriation in this section is13provided solely for the list of projects in LEAP capital document No.142015-3, developed March 27, 2015.15Appropriation:16

Aquatic Lands Enhancement Account—State. . . . . . . . $5,000,00017State Building Construction Account—State. . . . . . . $4,500,00018

Subtotal Appropriation. . . . . . . . . . . . . . $9,500,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . $26,400,00021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $35,900,00022

NEW SECTION. Sec. 3150. FOR THE RECREATION AND CONSERVATION23FUNDING BOARD24

Puget Sound Acquisition and Restoration (30000226)25Appropriation:26

State Building Construction Account—State. . . . . . $40,000,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . $160,000,00029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,000,00030

NEW SECTION. Sec. 3151. FOR THE RECREATION AND CONSERVATION31FUNDING BOARD32

Puget Sound Estuary and Salmon Restoration Program (30000227)33Appropriation:34Code Rev/AL:akl 116 H-2429.2/15 2nd draft

Page 118: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . $10,000,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02Future Biennia (Projected Costs). . . . . . . . . . . $40,000,0003

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0004

NEW SECTION. Sec. 3152. FOR THE RECREATION AND CONSERVATION5FUNDING BOARD6

Firearms and Archery Range Recreation (30000228)7Appropriation:8

Firearms Range Account—State. . . . . . . . . . . . . . $580,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $2,320,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,900,00012

NEW SECTION. Sec. 3153. FOR THE RECREATION AND CONSERVATION13FUNDING BOARD14

Recreational Trails Program (30000229)15Appropriation:16

General Fund—Federal. . . . . . . . . . . . . . . . . $5,000,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00020

NEW SECTION. Sec. 3154. FOR THE RECREATION AND CONSERVATION21FUNDING BOARD22

Boating Infrastructure Grants (30000230)23Appropriation:24

General Fund—Federal. . . . . . . . . . . . . . . . . $2,200,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . $8,800,00027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,000,00028

NEW SECTION. Sec. 3155. FOR THE RECREATION AND CONSERVATION29FUNDING BOARD30

Land and Water Conservation (30000231)31Appropriation:32

General Fund—Federal. . . . . . . . . . . . . . . . . $4,000,00033Code Rev/AL:akl 117 H-2429.2/15 2nd draft

Page 119: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . $16,000,0002

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,0003

NEW SECTION. Sec. 3156. FOR THE RECREATION AND CONSERVATION4FUNDING BOARD5

Family Forest Fish Passage Program (30000233)6Appropriation:7

State Building Construction Account—State. . . . . . . $5,000,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00011

NEW SECTION. Sec. 3157. FOR THE RECREATION AND CONSERVATION12FUNDING BOARD13

Family Forest Fish Passage Program (91000097)14Reappropriation:15

State Toxics Control Account—State. . . . . . . . . . $1,118,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $8,882,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00019

NEW SECTION. Sec. 3158. FOR THE RECREATION AND CONSERVATION20FUNDING BOARD21

Coastal Restoration Grants (91000448)22The appropriation in this section is subject to the following23

conditions and limitations: The appropriation is provided solely for24the following list of projects:25 26 Project Authorized Amount

27 Black river watershed conservation and restoration $650,000

28 Cathlamet selective fisheries $300,000

29 Coal creek culvert to bridge $162,000

30 Darlin creek conservation and restoration $1,300,000

31 Ellsworth creek watershed restoration $950,000

32 Greenhead slough barrier removal $75,000

Code Rev/AL:akl 118 H-2429.2/15 2nd draft

Page 120: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

1 Improved gears for the lower Columbia fishery $200,000

2 Lower Forks creek restoration $2,150,000

3 Makah tribe salmon restoration $174,000

4 Middle fork Hoquiam culvert correction $76,000

5 Middle fork Satsop culvert correction $97,000

6 Pulling together: Jobs in restoration $550,000

7 Quinault nearshore habitat restoration $343,000

8 Restoration of Elochoman and Grays river basins $535,000

9 Restoration of prairies and wetlands $200,000

10 Satsop river watershed restoration $150,000

11 Scammon creek barrier removal $188,000

12 West fork Satsop culvert correction $96,000

13 Total $8,196,000

Appropriation:14State Building Construction Account—State. . . . . . . $8,196,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,196,00018

NEW SECTION. Sec. 3159. FOR THE RECREATION AND CONSERVATION19FUNDING BOARD20

Youth Recreation Grants (92000055)21The reappropriation in this section is subject to the following22

conditions and limitations: The reappropriation is subject to the23provisions of section 3173, chapter 19, Laws of 2013, 2nd sp. sess.24Reappropriation:25

State Building Construction Account—State. . . . . . . $1,942,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $1,688,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,630,00029

NEW SECTION. Sec. 3160. FOR THE STATE CONSERVATION COMMISSION30CREP Riparian Cost Share - State Match (30000009)31

Reappropriation:32

Code Rev/AL:akl 119 H-2429.2/15 2nd draft

Page 121: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . . $800,0001Appropriation:2

State Building Construction Account—State. . . . . . . $2,600,0003Prior Biennia (Expenditures). . . . . . . . . . . . . $1,790,0004Future Biennia (Projected Costs). . . . . . . . . . . $11,400,0005

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,590,0006

NEW SECTION. Sec. 3161. FOR THE STATE CONSERVATION COMMISSION7Natural Resources Investment for the Economy and Environment8

(30000010)9The appropriation in this section is subject to the following10

conditions and limitations: The appropriation is provided solely for11grants to complete natural resource enhancement projects necessary to12improve water quality in nonshellfish growing areas.13Reappropriation:14

General Fund—Federal. . . . . . . . . . . . . . . . . $1,000,00015State Building Construction Account—State. . . . . . . $1,250,00016

Subtotal Reappropriation. . . . . . . . . . . . . $2,250,00017Appropriation:18

State Building Construction Account—State. . . . . . . $4,000,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $7,750,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,00022

NEW SECTION. Sec. 3162. FOR THE STATE CONSERVATION COMMISSION23CREP PIP Loan Program (30000011)24

Reappropriation:25Conservation Assistance Revolving Account—State. . . . . $150,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . $30,00027Future Biennia (Projected Costs). . . . . . . . . . . . $400,00028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $580,00029

NEW SECTION. Sec. 3163. FOR THE STATE CONSERVATION COMMISSION30CREP Riparian Contract Funding (30000012)31

Reappropriation:32State Building Construction Account—State. . . . . . . . $500,00033

Code Rev/AL:akl 120 H-2429.2/15 2nd draft

Page 122: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1State Building Construction Account—State. . . . . . . $1,000,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $1,731,0003Future Biennia (Projected Costs). . . . . . . . . . . $8,924,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,155,0005

NEW SECTION. Sec. 3164. FOR THE STATE CONSERVATION COMMISSION6Match for Federal RCPP Program (30000017)7The appropriations in this section are subject to the following8

conditions and limitations:9(1) The general fund—federal appropriation is provided solely for10

implementation of the five conservation projects in Washington state11approved for grant awards as part of the United States department of12agriculture regional conservation partnership program authorized13under the 2014 farm bill:14

(a) Palouse river watershed implementation partnership;15(b) Precision conservation for salmon and water quality in the16

Puget Sound;17(c) Upper Columbia irrigation enhancement project;18(d) Yakama nation on-reservation lower Yakima basin restoration19

project; and20(e) Confederated tribes of the Colville reservation water quality21

and habitat improvement project.22(2) The state building construction account—state appropriation23

is provided solely for state match to the United States department of24agriculture regional conservation partnership program.25Appropriation:26

State Building Construction Account—State. . . . . . . $5,000,00027General Fund—Federal. . . . . . . . . . . . . . . . . $23,000,00028

Subtotal Appropriation. . . . . . . . . . . . . . $28,000,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,000,00032

NEW SECTION. Sec. 3165. FOR THE STATE CONSERVATION COMMISSION33Improve Shellfish Growing Areas (30000018)34

Code Rev/AL:akl 121 H-2429.2/15 2nd draft

Page 123: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The appropriation in this section is subject to the following1conditions and limitations: The appropriation is provided solely for2grants to complete natural resource enhancement projects necessary to3improve water quality in shellfish growing areas.4Appropriation:5

State Building Construction Account—State. . . . . . . $4,000,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . $16,000,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,0009

NEW SECTION. Sec. 3166. FOR THE DEPARTMENT OF FISH AND WILDLIFE10Deschutes Watershed Center (20062008)11The reappropriation in this section is subject to the following12

conditions and limitations: The reappropriation is subject to the13provisions of section 3205, chapter 19, Laws of 2013 2nd sp. sess.14Reappropriation:15

State Building Construction Account—State. . . . . . . $7,004,00016Appropriation:17

State Building Construction Account—State. . . . . . $10,000,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $3,491,00019Future Biennia (Projected Costs). . . . . . . . . . . $21,454,00020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $41,949,00021

NEW SECTION. Sec. 3167. FOR THE DEPARTMENT OF FISH AND WILDLIFE22Voights Creek Hatchery (20081003)23

Reappropriation:24State Building Construction Account—State. . . . . . . $3,398,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $11,899,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,297,00028

NEW SECTION. Sec. 3168. FOR THE DEPARTMENT OF FISH AND WILDLIFE29Migratory Waterfowl Habitat (20082045)30

Appropriation:31State Wildlife Account—State. . . . . . . . . . . . . . $600,00032Prior Biennia (Expenditures). . . . . . . . . . . . . $1,080,00033

Code Rev/AL:akl 122 H-2429.2/15 2nd draft

Page 124: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . $2,400,0001TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,080,0002

NEW SECTION. Sec. 3169. FOR THE DEPARTMENT OF FISH AND WILDLIFE3Mitigation Projects and Dedicated Funding (20082048)4The reappropriation in this section is subject to the following5

conditions and limitations: The reappropriation is subject to the6provisions of section 3191, chapter 19, Laws of 2013 2nd sp. sess.7Reappropriation:8

State Wildlife Account—State. . . . . . . . . . . . . . $500,0009Special Wildlife Account—Private/Local. . . . . . . . $1,077,00010General Fund—Private/Local. . . . . . . . . . . . . . $1,866,00011General Fund—Federal. . . . . . . . . . . . . . . . . $27,008,00012

Subtotal Reappropriation. . . . . . . . . . . . . $30,451,00013Appropriation:14

State Wildlife Account—State. . . . . . . . . . . . . . $500,00015General Fund—Private/Local. . . . . . . . . . . . . . $1,000,00016Special Wildlife Account—Federal. . . . . . . . . . . $1,000,00017Special Wildlife Account—Private/Local. . . . . . . . $1,000,00018General Fund—Federal. . . . . . . . . . . . . . . . . $9,000,00019

Subtotal Appropriation. . . . . . . . . . . . . . $12,500,00020Prior Biennia (Expenditures). . . . . . . . . . . . $104,524,00021Future Biennia (Projected Costs). . . . . . . . . . . $54,000,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $201,475,00023

NEW SECTION. Sec. 3170. FOR THE DEPARTMENT OF FISH AND WILDLIFE24Lake Rufus Woods Fishing Access (91000151)25

Appropriation:26State Building Construction Account—State. . . . . . . $2,000,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . $1,000,00029

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00030

NEW SECTION. Sec. 3171. FOR THE DEPARTMENT OF FISH AND WILDLIFE31Minor Works Preservation (30000727)32

Appropriation:33State Building Construction Account—State. . . . . . . $9,780,00034

Code Rev/AL:akl 123 H-2429.2/15 2nd draft

Page 125: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01Future Biennia (Projected Costs). . . . . . . . . . . $80,000,0002

TOTAL. . . . . . . . . . . . . . . . . . . . . . $89,780,0003

NEW SECTION. Sec. 3172. FOR THE DEPARTMENT OF FISH AND WILDLIFE4Kalama Falls Hatchery Renovate Adult Handling Facilities5

(30000480)6Appropriation:7

State Building Construction Account—State. . . . . . . $4,300,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,300,00011

NEW SECTION. Sec. 3173. FOR THE DEPARTMENT OF FISH AND WILDLIFE12Wooten Wildlife Area Improve Flood Plain (30000481)13The reappropriations in this section are subject to the following14

conditions and limitations: The reappropriation is subject to the15provisions of section 3207, chapter 19, Laws of 2013 2nd sp. sess.16Reappropriation:17

State Building Construction Account—State. . . . . . . . $106,00018General Fund—Federal. . . . . . . . . . . . . . . . . $1,000,00019

Subtotal Reappropriation. . . . . . . . . . . . . $1,106,00020Appropriation:21

General Fund—Federal. . . . . . . . . . . . . . . . . $2,600,00022State Building Construction Account—State. . . . . . . $2,000,00023

Subtotal Appropriation. . . . . . . . . . . . . . $4,600,00024Prior Biennia (Expenditures). . . . . . . . . . . . . $1,994,00025Future Biennia (Projected Costs). . . . . . . . . . . $12,722,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,422,00027

NEW SECTION. Sec. 3174. FOR THE DEPARTMENT OF FISH AND WILDLIFE28Puyallup Hatchery Rebuild (30000589)29

Appropriation:30State Building Construction Account—State. . . . . . . . $571,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032Future Biennia (Projected Costs). . . . . . . . . . . $9,177,00033

Code Rev/AL:akl 124 H-2429.2/15 2nd draft

Page 126: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,748,0001

NEW SECTION. Sec. 3175. FOR THE DEPARTMENT OF FISH AND WILDLIFE2Eells Spring Hatchery Renovation (30000214)3

Appropriation:4State Building Construction Account—State. . . . . . . . $500,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $11,722,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,222,0008

NEW SECTION. Sec. 3176. FOR THE DEPARTMENT OF FISH AND WILDLIFE9Samish Hatchery Intakes (30000276)10

Appropriation:11State Building Construction Account—State. . . . . . . . $700,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . $4,221,00014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,921,00015

NEW SECTION. Sec. 3177. FOR THE DEPARTMENT OF FISH AND WILDLIFE16Minter Hatchery Intakes (30000277)17

Appropriation:18State Building Construction Account—State. . . . . . . . $250,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . $7,948,00021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,198,00022

NEW SECTION. Sec. 3178. FOR THE DEPARTMENT OF FISH AND WILDLIFE23Hoodsport Hatchery Adult Pond Renovation (30000686)24

Appropriation:25State Building Construction Account—State. . . . . . . . $700,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . $3,346,00028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,046,00029

NEW SECTION. Sec. 3179. FOR THE DEPARTMENT OF FISH AND WILDLIFE30Nasselle Hatchery Renovation (30000671)31

Code Rev/AL:akl 125 H-2429.2/15 2nd draft

Page 127: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1State Building Construction Account—State. . . . . . . . $275,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $13,556,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,831,0005

NEW SECTION. Sec. 3180. FOR THE DEPARTMENT OF FISH AND WILDLIFE6Replace Fire Damaged Fencing (30000655)7

Reappropriation:8State Building Construction Account—State. . . . . . . $1,225,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . $387,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,612,00012

NEW SECTION. Sec. 3181. FOR THE DEPARTMENT OF FISH AND WILDLIFE13Soos Creek Hatchery Renovation (30000661)14

Appropriation:15State Building Construction Account—State. . . . . . $17,000,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . $9,103,00018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,103,00019

NEW SECTION. Sec. 3182. FOR THE DEPARTMENT OF FISH AND WILDLIFE20Edmonds Pier Renovation (30000664)21

Appropriation:22State Building Construction Account—State. . . . . . . . $800,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,00026

NEW SECTION. Sec. 3183. FOR THE DEPARTMENT OF FISH AND WILDLIFE27Marblemount Hatchery - Renovating Jordan Creek Intake (30000666)28

Appropriation:29State Building Construction Account—State. . . . . . . $2,293,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

Code Rev/AL:akl 126 H-2429.2/15 2nd draft

Page 128: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,293,0001

NEW SECTION. Sec. 3184. FOR THE DEPARTMENT OF FISH AND WILDLIFE2Lake Whatcom Hatchery - Replace Intake and Pipeline (30000667)3

Appropriation:4State Building Construction Account—State. . . . . . . $1,354,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,354,0008

NEW SECTION. Sec. 3185. FOR THE DEPARTMENT OF FISH AND WILDLIFE9Fir Island Farm Estuary Restoration Project (30000673)10

Appropriation:11State Building Construction Account—State. . . . . . . . $500,00012General Fund—Federal. . . . . . . . . . . . . . . . . $15,500,00013

Subtotal Appropriation. . . . . . . . . . . . . . $16,000,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,000,00017

NEW SECTION. Sec. 3186. FOR THE DEPARTMENT OF FISH AND WILDLIFE18Minor Works - Programmatic (30000682)19

Appropriation:20General Fund—Federal. . . . . . . . . . . . . . . . . . $375,00021State Building Construction Account—State. . . . . . . . $725,00022

Subtotal Appropriation. . . . . . . . . . . . . . $1,100,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,100,00026

NEW SECTION. Sec. 3187. FOR THE DEPARTMENT OF FISH AND WILDLIFE27Eells Springs Production Shift (30000723)28

Appropriation:29State Building Construction Account—State. . . . . . . $4,620,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,620,00033Code Rev/AL:akl 127 H-2429.2/15 2nd draft

Page 129: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3188. FOR THE DEPARTMENT OF FISH AND WILDLIFE1Mitchell Act Federal Grant (91000021)2

Reappropriation:3General Fund—Federal. . . . . . . . . . . . . . . . . $1,014,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $1,986,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,0007

NEW SECTION. Sec. 3189. FOR THE DEPARTMENT OF FISH AND WILDLIFE8Fishway Improvements/Diversions (91000033)9

Reappropriation:10State Building Construction Account—State. . . . . . . $7,003,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . $997,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00014

NEW SECTION. Sec. 3190. FOR THE DEPARTMENT OF FISH AND WILDLIFE15Hatchery Improvements (91000036)16

Reappropriation:17State Building Construction Account—State. . . . . . $16,109,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $18,666,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,775,00021

NEW SECTION. Sec. 3191. FOR THE DEPARTMENT OF FISH AND WILDLIFE22Minor Works - Access Sites (91000044)23

Reappropriation:24State Building Construction Account—State. . . . . . . $2,518,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $4,888,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,406,00028

NEW SECTION. Sec. 3192. FOR THE DEPARTMENT OF FISH AND WILDLIFE29Minor Works - Fish Passage Barriers (Culverts) (91000045)30

Reappropriation:31State Building Construction Account—State. . . . . . . . $515,00032

Code Rev/AL:akl 128 H-2429.2/15 2nd draft

Page 130: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Prior Biennia (Expenditures). . . . . . . . . . . . . . $980,0001Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,495,0003

NEW SECTION. Sec. 3193. FOR THE DEPARTMENT OF FISH AND WILDLIFE4Leque Island Highway 532 Road Protection (92000019)5

Reappropriation:6State Building Construction Account—State. . . . . . . . $390,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . $290,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $680,00010

NEW SECTION. Sec. 3194. FOR THE DEPARTMENT OF FISH AND WILDLIFE11Beebe Springs Development (92000026)12

Reappropriation:13State Building Construction Account—State. . . . . . . . $640,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $1,251,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,891,00017

NEW SECTION. Sec. 3195. FOR THE DEPARTMENT OF FISH AND WILDLIFE18Beebe Springs (92000034)19

Reappropriation:20State Building Construction Account—State. . . . . . . . $497,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . . $3,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00024

NEW SECTION. Sec. 3196. FOR THE DEPARTMENT OF FISH AND WILDLIFE25Minor Works Preservation (30000479)26

Reappropriation:27State Building Construction Account—State. . . . . . . $2,500,00028Prior Biennia (Expenditures). . . . . . . . . . . . . $7,475,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,975,00031

Code Rev/AL:akl 129 H-2429.2/15 2nd draft

Page 131: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3197. FOR THE PUGET SOUND PARTNERSHIP1Community Partnership Restoration Grants (30000007)2

Reappropriation:3General Fund—Federal. . . . . . . . . . . . . . . . . $1,575,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . $50,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,625,0007

NEW SECTION. Sec. 3198. FOR THE DEPARTMENT OF NATURAL RESOURCES8Land Acquisition Grants (20052021)9

Reappropriation:10General Fund—Federal. . . . . . . . . . . . . . . . . $2,360,00011

Appropriation:12General Fund—Federal. . . . . . . . . . . . . . . . . $5,000,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $82,158,00014Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $109,518,00016

NEW SECTION. Sec. 3199. FOR THE DEPARTMENT OF NATURAL RESOURCES17Forest Legacy (30000060)18

Reappropriation:19General Fund—Federal. . . . . . . . . . . . . . . . . $4,020,00020

Appropriation:21General Fund—Federal. . . . . . . . . . . . . . . . . $14,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $16,980,00023Future Biennia (Projected Costs). . . . . . . . . . . $56,000,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $91,000,00025

NEW SECTION. Sec. 3200. FOR THE DEPARTMENT OF NATURAL RESOURCES26Forest Riparian Easement Program (30000198)27

Appropriation:28State Building Construction Account—State. . . . . . . $3,500,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $2,999,00030Future Biennia (Projected Costs). . . . . . . . . . . $14,000,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,499,00032

Code Rev/AL:akl 130 H-2429.2/15 2nd draft

Page 132: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3201. FOR THE DEPARTMENT OF NATURAL RESOURCES1Trust Land Transfer (30000200)2The appropriation in this section is subject to the following3

conditions and limitations:4(1) The appropriation is provided solely to the department to5

transfer from trust status, or enter into fifty year leases for,6certain trust lands of statewide significance deemed appropriate for7state park, fish and wildlife habitat, natural area preserve, natural8resources conservation area, DNR community forest open space, or9recreation purposes. The approved list of properties for lease or10transfer is identified in the LEAP capital document No. 2015-4,11developed March 27, 2015.12

(2) Property transferred under this section must be appraised and13transferred at fair market value. By September 30, 2015, the14department must deposit in the common school construction account the15portion of the appropriation in this section that represents the16estimated value of the timber on the transferred properties. This17transfer must be made in the same manner as timber revenues from18other common school trust lands. No deduction may be made for the19resource management cost account under RCW 79.64.040. The portion of20the appropriation in this section that represents the value of the21land transferred must be deposited in the natural resources real22property replacement account.23

(3) Property subject to lease agreements under this section must24be appraised at fair market value. Lease terms must be fifty years25with options to renew for an additional fifty years. Lease payments26must be lump sum payments for the entire term of the lease at the27beginning of the lease. The department shall calculate such lump sum28payments using professional appraisal standards. These lease payments29may not exceed the fee simple purchase price based on current fair30market value and must be deposited by the department to the common31school construction account in the same manner as lease revenues from32other common school trust lands. No deduction may be made for the33resource management cost account under RCW 79.64.040. No later than34September 30, 2015, the department must transfer to the common school35construction account the portion of the appropriation in this section36that is attributable to receipts from lease payments.37

(4) All reasonable costs incurred by the department to implement38this section are authorized to be paid out of the appropriations.39

Code Rev/AL:akl 131 H-2429.2/15 2nd draft

Page 133: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Authorized costs include the actual cost of appraisals, staff time,1environmental reviews, surveys, and other similar costs and may not2exceed one and nine-tenths percent of the appropriation.3

(5) Intergrant exchanges between common school and other trust4lands of equal value may occur if the exchange is in the interest of5each trust, as determined by the board of natural resources.6

(6) Prior to or concurrent with conveyance of these properties,7the department, with full cooperation of the receiving agencies,8shall execute and record a real property instrument that dedicates9the transferred properties to the purposes identified in subsection10(1) of this section. Fee transfer agreements for properties11identified in subsection (1) of this section must include terms that12perpetually restrict the use of the property to the intended purpose.13Lease agreements for properties identified in subsection (1) of this14section must include terms that restrict use of the property to the15intended purpose for the term of the lease. Transfer and lease16agreements may include provisions for receiving agencies to request17alternative uses of the property, provided the alternative uses are18compatible with the originally intended public purpose and the19department and legislature approves such uses.20

(7) The department and receiving agencies shall work in good21faith to carry out the intent of this section. However, the22department or receiving agencies may remove a property from the23transfer list based on new, substantive information, if it is24determined that transfer of the property is not in the statewide25interest of either the common school trust or the receiving agency.26

(8) $26,422,000 of the appropriation must be deposited in the27common school construction account by September 30, 2015. The28department shall execute trust land transfers so that after the29deduction of reasonable costs as provided in subsection (4) of this30section on an aggregate basis eighty percent or more of the total31appropriation value is timber value or lease payments and is32deposited in the common school construction account. To achieve the33eighty percent requirement, the department may choose to lease34properties originally intended as transfers or transfer properties35originally intended as leases.36

(9) By June 30, 2017, the state treasurer shall transfer to the37common school construction account any unexpended balance of the38appropriation in this section.39

Code Rev/AL:akl 132 H-2429.2/15 2nd draft

Page 134: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1State Building Construction Account—State. . . . . . $37,746,0002Prior Biennia (Expenditures). . . . . . . . . . . . $115,735,0003Future Biennia (Projected Costs). . . . . . . . . . $240,000,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $393,481,0005

NEW SECTION. Sec. 3202. FOR THE DEPARTMENT OF NATURAL RESOURCES6Sustainable Recreation (30000207)7

Appropriation:8State Building Construction Account—State. . . . . . . $4,600,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $2,500,00010Future Biennia (Projected Costs). . . . . . . . . . . $18,400,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,500,00012

NEW SECTION. Sec. 3203. FOR THE DEPARTMENT OF NATURAL RESOURCES13Road Maintenance and Abandonment Plans (RMAP) (30000211)14

Reappropriation:15State Building Construction Account—State. . . . . . . . $138,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $1,862,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00019

NEW SECTION. Sec. 3204. FOR THE DEPARTMENT OF NATURAL RESOURCES20Community Forest Trust (30000217)21

Appropriation:22State Building Construction Account—State. . . . . . . $3,442,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,442,00026

NEW SECTION. Sec. 3205. FOR THE DEPARTMENT OF NATURAL RESOURCES27Rivers and Habitat Open Space Program (30000221)28

Appropriation:29State Building Construction Account—State. . . . . . . $2,000,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . $500,00031Future Biennia (Projected Costs). . . . . . . . . . . $8,000,00032

Code Rev/AL:akl 133 H-2429.2/15 2nd draft

Page 135: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,500,0001

NEW SECTION. Sec. 3206. FOR THE DEPARTMENT OF NATURAL RESOURCES2Trust Land Replacement (30000222)3

Appropriation:4Nat Res Real Property Replacement—State. . . . . . . $15,000,0005Resources Management Cost Account—State. . . . . . . $15,000,0006

Subtotal Appropriation. . . . . . . . . . . . . . $30,000,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $50,500,0008Future Biennia (Projected Costs). . . . . . . . . . $242,000,0009

TOTAL. . . . . . . . . . . . . . . . . . . . . . $322,500,00010

NEW SECTION. Sec. 3207. FOR THE DEPARTMENT OF NATURAL RESOURCES11State Forest Land Replacement (30000223)12The appropriation in this section is subject to the following13

conditions and limitations:14(1) The appropriation in this section is provided solely to the15

department to transfer from state forest land status to natural16resources conservation area status certain state forest lands in17counties with a population of twenty-five thousand or less which are18subject to timber harvest deferrals greater than thirty years due to19the presence of wildlife species listed as endangered or threatened20under the federal endangered species act. The total appropriation is21to be used equally for the transfer of qualifying state forest lands22in the qualifying counties.23

(2) Property transferred under this section must be appraised and24transferred at fair market value, without consideration of management25or regulatory encumbrances associated with wildlife species listed26under the federal endangered species act. The value of the timber and27other valuable materials transferred must be distributed as provided28in RCW 79.64.110. The value of the land transferred must be deposited29in the park land trust revolving account and be used solely to buy30replacement state forest land, consistent with RCW 79.22.060.31

(3) Prior to or concurrent with conveyance of these properties,32the department shall execute and record a real property instrument33that dedicates the transferred properties to the purposes identified34in subsection (1) of this section. Transfer agreements for properties35identified in subsection (1) of this section must include terms that36restrict the use of the property to the intended purpose.37Code Rev/AL:akl 134 H-2429.2/15 2nd draft

Page 136: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(4) The department and applicable counties shall work in good1faith to carry out the intent of this section. The department shall2identify eligible properties for transfer, consistent with subsection3(1) of this section, in consultation with the applicable counties,4and may not execute any property transfers that are not in the5statewide interest of either the state forest trust or the natural6resources conservation area program.7Appropriation:8

State Building Construction Account—State. . . . . . . $1,500,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $1,500,00010Future Biennia (Projected Costs). . . . . . . . . . . $6,000,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,00012

NEW SECTION. Sec. 3208. FOR THE DEPARTMENT OF NATURAL RESOURCES13Forest Hazard Reduction (30000224)14The appropriation in this section is subject to the following15

conditions and limitations: The appropriation is provided solely for16forest health restoration treatments on state lands. The17appropriation may be used for project planning, site preparation,18permitting, mechanical treatments, thinning treatments, or prescribed19burning.20Appropriation:21

State Building Construction Account—State. . . . . . . $5,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $4,000,00023Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,000,00025

NEW SECTION. Sec. 3209. FOR THE DEPARTMENT OF NATURAL RESOURCES26DNR Olympic Region Shop Fire Recovery (30000225)27

Appropriation:28State Building Construction Account—State. . . . . . . . $544,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $544,00032

NEW SECTION. Sec. 3210. FOR THE DEPARTMENT OF NATURAL RESOURCES33Blanchard Working Forest (30000231)34

Code Rev/AL:akl 135 H-2429.2/15 2nd draft

Page 137: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1State Building Construction Account—State. . . . . . . $2,000,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $5,500,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,500,0005

NEW SECTION. Sec. 3211. FOR THE DEPARTMENT OF NATURAL RESOURCES62015-2017 Minor Works Programmatic (30000237)7

Appropriation:8State Building Construction Account—State. . . . . . . . $540,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $540,00012

NEW SECTION. Sec. 3212. FOR THE DEPARTMENT OF NATURAL RESOURCES132015-2017 Minor Works Preservation (30000238)14

Appropriation:15State Building Construction Account—State. . . . . . . $4,500,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,500,00019

NEW SECTION. Sec. 3213. FOR THE DEPARTMENT OF NATURAL RESOURCES20Contaminated Sites Cleanup and Settlement (30000240)21The appropriation in this section is subject to the following22

conditions and limitations:23(1) $261,000 is provided solely for the state's share of24

liability under the model toxics control act for the cleanup of lead25contamination at a rock pit now owned by plum creek timber company.26

(2) $95,000 is provided solely for the contaminated soils cleanup27at the Cedar creek correction center.28

(3) $125,000 is provided solely for the webster nursery29pesticides and groundwater cleanup.30

(4) $375,000 is provided solely for the underground storage tank31cleanup of contaminated soils of an old fueling station at the32department of natural resources, SE region headquarters' parking lot33

Code Rev/AL:akl 136 H-2429.2/15 2nd draft

Page 138: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

that is within the city of Ellensburg new drinking water supply1wellhead protection area.2Appropriation:3

Environmental Legacy Stewardship Account—State. . . . . $856,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $856,0007

NEW SECTION. Sec. 3214. FOR THE DEPARTMENT OF NATURAL RESOURCES8Natural Areas Facilities Preservation and Access (30000241)9

Appropriation:10State Building Construction Account—State. . . . . . . $3,100,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . $8,000,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,100,00014

NEW SECTION. Sec. 3215. FOR THE DEPARTMENT OF NATURAL RESOURCES15Road Maintenance and Abandonment Plan (RMAP) (91000040)16

Reappropriation:17State Building Construction Account—State. . . . . . . . $240,00018

Appropriation:19State Building Construction Account—State. . . . . . . $7,900,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $6,594,00021Future Biennia (Projected Costs). . . . . . . . . . . $2,524,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,258,00023

NEW SECTION. Sec. 3216. FOR THE DEPARTMENT OF NATURAL RESOURCES24Puget Sound Corps (91000046)25

Reappropriation:26Aquatic Lands Enhancement Account—State. . . . . . . . . $200,00027

Appropriation:28State Building Construction Account—State. . . . . . . $6,000,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $12,800,00030Future Biennia (Projected Costs). . . . . . . . . . . $24,000,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $43,000,00032

Code Rev/AL:akl 137 H-2429.2/15 2nd draft

Page 139: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 3217. FOR THE DEPARTMENT OF NATURAL RESOURCES1Barbeque Flats Road Access (91000081)2

Reappropriation:3State Building Construction Account—State. . . . . . . . $480,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . $20,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,0007

NEW SECTION. Sec. 3218. FOR THE DEPARTMENT OF NATURAL RESOURCES8Quinault Coastal Forest and Watershed Restoration Grant9

(92000019)10Reappropriation:11

State Building Construction Account—State. . . . . . . . $500,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $1,300,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,800,00015

NEW SECTION. Sec. 3219. FOR THE DEPARTMENT OF AGRICULTURE16Animal Disease Traceability (91000004)17The reappropriation in this section is subject to the following18

conditions and limitations: The reappropriation in this section is19provided solely for the department to work with industry partners to20continue and to enhance development of the in-state animal disease21traceability system. The reappropriation shall be used to develop or22enhance electronic cattle transaction reporting, electronic23certificate of veterinary inspection, and, as resources permit,24electronic livestock inspection systems.25Reappropriation:26

Public Facility Construction Loan Revolving27Account—State. . . . . . . . . . . . . . . . . . . . $249,00028

Prior Biennia (Expenditures). . . . . . . . . . . . . . $632,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $881,00031

(End of part)

Code Rev/AL:akl 138 H-2429.2/15 2nd draft

Page 140: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

PART 41TRANSPORTATION2

NEW SECTION. Sec. 4001. FOR THE WASHINGTON STATE PATROL3FTA Access Road Reconstruction (30000059)4

Appropriation:5Fire Service Training Account—State. . . . . . . . . . $1,000,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . . $950,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,950,0009

NEW SECTION. Sec. 4002. FOR THE WASHINGTON STATE PATROL10Fire Training Academy Burn Building Replacement (30000071)11

Reappropriation:12Fire Service Training Account—State. . . . . . . . . . . $200,00013

Appropriation:14State Building Construction Account—State. . . . . . . $5,000,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $1,300,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,500,00018

(End of part)

Code Rev/AL:akl 139 H-2429.2/15 2nd draft

Page 141: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

PART 51EDUCATION2

NEW SECTION. Sec. 5001. FOR THE SUPERINTENDENT OF PUBLIC3INSTRUCTION4

Pierce County Skills Center (20084856)5Reappropriation:6

State Building Construction Account—State. . . . . . . $5,432,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $30,083,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $35,515,00010

NEW SECTION. Sec. 5002. FOR THE SUPERINTENDENT OF PUBLIC11INSTRUCTION12

2009-11 School Construction Asst. Grant Program (30000031)13The reappropriation in this section is subject to the following14

conditions and limitations: The reappropriation is subject to the15provisions of section 5004, chapter 19, Laws of 2013 2nd sp. sess.16Reappropriation:17

Common School Construction Account—State. . . . . . . $7,968,00018Prior Biennia (Expenditures). . . . . . . . . . . . $389,161,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $397,129,00021

NEW SECTION. Sec. 5003. FOR THE SUPERINTENDENT OF PUBLIC22INSTRUCTION23

2011-13 School Construction Assistance Program (30000071)24Reappropriation:25

Common School Construction Account—State. . . . . . . $59,299,00026Prior Biennia (Expenditures). . . . . . . . . . . . $497,839,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . $557,138,00029

NEW SECTION. Sec. 5004. FOR THE SUPERINTENDENT OF PUBLIC30INSTRUCTION31

Yakima Valley Technical Skills Center (30000076)32Reappropriation:33Code Rev/AL:akl 140 H-2429.2/15 2nd draft

Page 142: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . $2,060,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $21,503,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,563,0004

NEW SECTION. Sec. 5005. FOR THE SUPERINTENDENT OF PUBLIC5INSTRUCTION6

SEA-Tech Branch Campus of Tri-Tech Skills Center (30000078)7Reappropriation:8

State Building Construction Account—State. . . . . . . . $338,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $11,181,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,519,00012

NEW SECTION. Sec. 5006. FOR THE SUPERINTENDENT OF PUBLIC13INSTRUCTION14

Grant County Branch Campus of Wenatchee Valley Skills Center15(30000091)16Reappropriation:17

State Building Construction Account—State. . . . . . . $1,183,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $18,225,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,408,00021

NEW SECTION. Sec. 5007. FOR THE SUPERINTENDENT OF PUBLIC22INSTRUCTION23

Clark County Skills Center (30000093)24Reappropriation:25

State Building Construction Account—State. . . . . . . $1,100,00026Prior Biennia (Expenditures). . . . . . . . . . . . . $6,801,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,901,00029

NEW SECTION. Sec. 5008. FOR THE SUPERINTENDENT OF PUBLIC30INSTRUCTION31

2013-15 School Construction Assistance Program - Maintenance32(30000145)33

Code Rev/AL:akl 141 H-2429.2/15 2nd draft

Page 143: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The reappropriation in this section is subject to the following1conditions and limitations: The reappropriation is subject to the2provisions of section 5020, chapter 19, Laws of 2013 2nd sp. sess.3Reappropriation:4

State Building Construction Account—State. . . . . . $154,741,0005Common School Construction Account—State. . . . . . $100,456,0006

Subtotal Reappropriation. . . . . . . . . . . . $255,197,0007Prior Biennia (Expenditures). . . . . . . . . . . . $132,250,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $387,447,00010

NEW SECTION. Sec. 5009. FOR THE SUPERINTENDENT OF PUBLIC11INSTRUCTION12

Tri-Tech Skills Center East Growth (30000159)13The appropriations in this section are subject to the following14

conditions and limitations: Funding is provided solely as a grant to15constitute local funding available to the Tri-tech skills center in16order to be eligible for state funding assistance through the school17construction assistance program pursuant to RCW 28A.525.166.18Appropriation:19

State Building Construction Account—State. . . . . . . $1,702,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,702,00023

NEW SECTION. Sec. 5010. FOR THE SUPERINTENDENT OF PUBLIC24INSTRUCTION25

Clark County Building 100 Modernization (30000160)26The appropriations in this section are subject to the following27

conditions and limitations: Funding is provided solely as a grant to28constitute local funding available to the Clark county skills center29in order to be eligible for state funding assistance through the30school construction assistance program pursuant to RCW 28A.525.166.31Appropriation:32

State Building Construction Account—State. . . . . . . . $300,00033Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034

Code Rev/AL:akl 142 H-2429.2/15 2nd draft

Page 144: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,0002

NEW SECTION. Sec. 5011. FOR THE SUPERINTENDENT OF PUBLIC3INSTRUCTION4

Tri-Tech Skills Center Core Growth (30000161)5The appropriations in this section are subject to the following6

conditions and limitations: Funding is provided solely as a grant to7constitute local funding available to the Tri-tech skills center in8order to be eligible for state funding assistance through the school9construction assistance program pursuant to RCW 28A.525.166.10Appropriation:11

State Building Construction Account—State. . . . . . . . $325,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $325,00015

NEW SECTION. Sec. 5012. FOR THE SUPERINTENDENT OF PUBLIC16INSTRUCTION17

Capital Program Administration (30000165)18The appropriation in this section is subject to the following19

conditions and limitations:20(1) The superintendent of public instruction will publish to its21

web site and report to the office of financial management, the22appropriate committees of the legislature, and the legislative23evaluation and accountability program a list of local school district24projects submitted for school construction assistance within seven25business days of the grant program deadline. The report must be26updated within seven days following the superintendent of public27instruction's final grant award decisions. The report must include,28but not be limited to:29

(a) School district;30(b) Project name;31(c) Estimated square footage by proposed project type;32(d) Estimated total of all project costs and estimated total33

construction contract cost;34(e) Funding sources and election dates, if applicable; and35(f) Intent to front-fund the project.36

Code Rev/AL:akl 143 H-2429.2/15 2nd draft

Page 145: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(2) The superintendent of public instruction will provide to the1office of financial management and the legislative evaluation and2accountability program committee in electronic database form the3following:4

(a) Study and survey information beginning with grants awarded5July 1, 2015; and6

(b) All available inventory and condition of schools data.7Appropriation:8

Common School Construction Account—State. . . . . . . $2,924,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $12,244,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,168,00012

NEW SECTION. Sec. 5013. FOR THE SUPERINTENDENT OF PUBLIC13INSTRUCTION14

2015-17 Energy Grants (30000167)15The appropriation in this section is subject to the following16

conditions and limitations:17(1)(a) Grants shall be awarded for projects that use the energy18

savings performance contracting method under chapter 39.35C RCW or an19equivalent method of evaluating and delivering energy operational20costs savings improvements.21

(b) Projects that do not use energy savings performance22contracting must: (i) Verify energy and operational cost savings for23ten years or until the energy and operational costs savings pay for24the project, whichever is shorter; (ii) follow the department of25enterprise service's energy savings performance contracting method26guidelines; and (iii) employ a licensed engineer for the energy27audit, design, and construction.28

(c) The office of the superintendent of public instruction may29require third-party verification of savings if a project is not30implemented by an energy savings performance contracting method as31outlined in chapter 39.35C RCW. If required, third-party verification32must be conducted either by an energy savings performance contractor33qualified by the department of enterprise services, or a licensed34engineer that is a certified energy manager.35

(2) Projects must be weighted and prioritized based on the36following criteria and in the following order: (a) Healthiest next37generation initiative: Priority consideration shall be given to38Code Rev/AL:akl 144 H-2429.2/15 2nd draft

Page 146: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

applicants that demonstrate improved health and safety through (i)1reduced exposure to polychlorinated biphenyl; or (ii) replacing2outdated heating systems that use oil or propane as fuel sources as3identified by the Washington state university extension energy4program; (b) prior grant award: Priority consideration must be given5to applicants that did not receive grant awards from appropriations6provided in section 5023, chapter 19, Laws of 2013 2nd sp. sess.; (c)7leverage ratio: The higher the leverage ratio of guaranteed energy8savings and utility or other incentives to state grant, the higher9the project ranking; (d) energy savings: The higher the simple10payback for energy savings, not to exceed the useful life of the11energy conservation measure, the higher the project ranking; and (e)12persistence: The more extensively a project ensures the persistence13of energy operational cost savings through ongoing measurement,14verification, and reporting over the life of a project, the higher15the project ranking.16

(3) In order to be eligible for energy cost savings grants under17this section, school districts must complete an investment grade18audit prior to application or have completed an audit in the192015-2017 biennium.20

(4)(a) The superintendent of public instruction must pay one-half21of the preliminary audit, up to five cents per square foot, if the22project does not meet the school district's predetermined cost-23effectiveness criteria. Public school districts must pay the other24one-half of the cost of the preliminary audit if the project does not25meet their predetermined cost-effectiveness criteria.26

(b) The energy savings performance contractor may not charge for27an investment grade audit if the project does not meet the school28district's predetermined cost-effectiveness criteria. Public school29districts must pay the full price of an investment grade audit if30they do not proceed with a project that meets the school district's31predetermined cost-effectiveness criteria.32

(5) Applicants must submit documentation that demonstrates energy33and operational cost savings resulting from the installation of the34energy equipment and improvements. The energy savings analysis must35be performed by a licensed engineer and the documentation must36include, but is not limited to, the following:37

(a) A description of the energy equipment and improvements; and38(b) A description of the energy and operational cost savings.39

Code Rev/AL:akl 145 H-2429.2/15 2nd draft

Page 147: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(6) Each school district is limited to one grant award and no1more than $1,000,000.2

(7) The office of the superintendent of public instruction may3charge fees consistent with capital budget guidelines established by4the office of financial management for administering the grants.5

(8) The superintendent of public instruction must report to the6appropriate committees of the legislature and the office of financial7management on the timing and use of the funds by the end of each8fiscal year, until the funds are fully expended.9Appropriation:10

State Building Construction Account—State. . . . . . . $8,000,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . $40,000,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,000,00014

NEW SECTION. Sec. 5014. FOR THE SUPERINTENDENT OF PUBLIC15INSTRUCTION16

2015-17 School Construction Assistance Program (30000169)17The appropriations in this section are subject to the following18

conditions and limitations:19(1) $771,000 of the common school construction account—state20

appropriation is provided solely for mapping the design of new21facilities and remapping the design of facilities to be remodeled,22for school construction projects funded through the school23construction assistance program.24

(2) The office of the superintendent of public instruction, in25consultation with the technical advisory committee, must develop a26formula-based method of allocating energy incentives that would be27administered through the school construction assistance program to28increase energy efficiency and the use of renewable resources. The29recommended formula-based method must be submitted to the office of30financial management and the appropriate committees of the31legislature by December 31, 2015.32

(3) The office of the superintendent of public instruction must33weight and prioritize grant requests on the following criteria and in34the following order: (a) Will provide facility capacity needs to35reduce kindergarten through third grade class sizes at high poverty36schools; (b) will provide facility capacity needs to reduce37kindergarten through third grade class sizes in remaining schools.38Code Rev/AL:akl 146 H-2429.2/15 2nd draft

Page 148: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(4) The office of the superintendent of public instruction must1expedite allocation and distribution of any eligible funds under the2school construction assistance grant program to the Marysville school3district to replace the school cafeteria.4

(5) The office of the superintendent of public instruction must5expedite allocation and distribution of any eligible funds under the6school construction assistance grant program for the appropriations7provided to the superintendent of public instruction in this act for8distressed schools, STEM pilot projects, or skill centers. Eligible9area must be calculated as follows for STEM pilot projects and skill10centers: (a) Eligible area for STEM pilot projects is one thousand,11four hundred, forty square feet per science lab and/or classroom12combination; and one thousand, forty square feet per science13classroom; and (b) eligible area for skill centers is gross square14feet of the proposed project as submitted to the office of financial15management as requested by the superintendent for consideration in16the 2015-2017 capital budget.17Appropriation:18

State Building Construction Account—State. . . . . . $387,667,00019Common School Construction Account—State. . . . . . $235,162,00020Common School Construction Account—Federal. . . . . . $4,650,00021

Subtotal Appropriation. . . . . . . . . . . . . $627,479,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . $3,637,893,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . $4,265,372,00025

NEW SECTION. Sec. 5015. FOR THE SUPERINTENDENT OF PUBLIC26INSTRUCTION27

Full Day Kindergarten Capacity Grants (30000174)28The appropriation in this section is subject to the following29

conditions and limitations:30(1) The appropriation is provided solely for providing space to31

support full-day kindergarten enrollment to those school districts32with a demonstrated need. Grants may be applied for new construction,33portable classrooms, or retrofits to existing facilities to34accommodate kindergarten enrollment.35

(2) The office of the superintendent of public instruction shall36develop criteria for providing funding for specific projects to stay37

Code Rev/AL:akl 147 H-2429.2/15 2nd draft

Page 149: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

within the appropriation level provided in this section. The criteria1must include, but are not limited to, the following: (a) Prioritizing2districts eligible to receive the grant to those that have a lower3ending fund balance; (b) considering a district's ability to raise4funds through levies or bonds in the prior ten year period; (c)5prioritizing projects that will provide full-day kindergarten at high6poverty schools; and (d) requiring any district receiving funding7provided in this section to demonstrate an inability to provide space8for full-day kindergarten enrollment within existing school9facilities.10

(3) Portable classrooms funded through this grant program do not11count against a district's eligibility for the school construction12assistance program.13

(4) The office of the state treasurer must manage the issuance of14bonds associated with these grants so as to incur the lowest possible15debt service costs by aligning their final maturities with the short16useful life of the portables being financed.17Appropriation:18

State Building Construction Account—State. . . . . . $10,000,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00022

NEW SECTION. Sec. 5016. FOR THE SUPERINTENDENT OF PUBLIC23INSTRUCTION24

Healthy Kids - Healthy Schools Grants (91000406)25The appropriation in this section is subject to the following26

conditions and limitations:27(1) The office of the superintendent of public instruction, after28

consulting with maintenance and operations administrators of school29districts and the department of health, shall develop criteria for30providing funding and outcomes for specific projects to stay within31the appropriation level provided in this section consistent with the32healthiest next generation priorities. The criteria must include, but33are not limited to, the following: (a) Districts or schools may apply34for grants but no single district may receive more than $200,000 of35the appropriation; (b) requiring any district receiving funding36provided in this section to demonstrate a consistent commitment to37addressing school facilities' needs; (c) requiring any district38Code Rev/AL:akl 148 H-2429.2/15 2nd draft

Page 150: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

receiving funding provided in this section to demonstrate a1consistent commitment to support Washington's healthiest next2generation efforts; and (d) prioritizing applicants with a high3percentage of students who are eligible and enrolled in the free and4reduced-price meals program.5

(2) A maximum of $2,000,000 of the appropriation is for6competitive equipment assistance grants consistent with7chapter . . ., Laws of 2015 (House Bill No. 1164).8

(3) A maximum of $1,000,000 of the appropriation is for the9purchase and installation of water bottle filling stations.10

(4) The remainder of the appropriation may be used to purchase11equipment or make repairs and renovations related to improving12children's health and may include, but are not limited to, the13following: (a) Fitness playground equipment, covered play, physical14education equipment or related structures or renovation; (b) garden15related structures and greenhouses to provide students access to16fresh produce; and (c) kitchen equipment or upgrades.17

(5) If grant applications for purposes of subsections (2) and (3)18of this section are insufficient to exhaust the maximum amounts19specified in those subsections, the remaining amounts may be expended20for purposes of subsection (4) of this section.21

(6) The office of the state treasurer must manage the issuance of22bonds associated with these grants so as to incur the lowest possible23debt service costs by aligning their final maturities with the short24useful life of the equipment being financed.25Appropriation:26

State Building Construction Account—State. . . . . . . $5,000,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00030

NEW SECTION. Sec. 5017. FOR THE SUPERINTENDENT OF PUBLIC31INSTRUCTION32

Energy Efficiency Grants for K-12 Schools (91000017)33Reappropriation:34

State Building Construction Account—State. . . . . . . . $415,00035Prior Biennia (Expenditures). . . . . . . . . . . . . $39,585,00036Future Biennia (Projected Costs). . . . . . . . . . . . . . . $037

Code Rev/AL:akl 149 H-2429.2/15 2nd draft

Page 151: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,0001

NEW SECTION. Sec. 5018. FOR THE SUPERINTENDENT OF PUBLIC2INSTRUCTION3

Distressed Schools (91000024)4The reappropriation in this section is subject to the following5

conditions and limitations: The reappropriation is subject to the6provisions of section 5021, chapter 19, Laws of 2013 2nd sp. sess.7Reappropriation:8

State Building Construction Account—State. . . . . . $10,000,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00012

NEW SECTION. Sec. 5019. FOR THE SUPERINTENDENT OF PUBLIC13INSTRUCTION14

Energy Efficiency Grants for K-12 Schools (91000025)15Reappropriation:16

State Building Construction Account—State. . . . . . . $4,186,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $2,814,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,00020

NEW SECTION. Sec. 5020. FOR THE SUPERINTENDENT OF PUBLIC21INSTRUCTION22

San Juan Island School District STEM Vocational Bldg Renovation23(91000027)24Reappropriation:25

State Building Construction Account—State. . . . . . . . $166,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . $834,00027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00029

NEW SECTION. Sec. 5021. FOR THE SUPERINTENDENT OF PUBLIC30INSTRUCTION31

Wenatchee Valley Skills Center (92000004)32Reappropriation:33Code Rev/AL:akl 150 H-2429.2/15 2nd draft

Page 152: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . $2,167,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $7,333,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,500,0004

NEW SECTION. Sec. 5022. FOR THE SUPERINTENDENT OF PUBLIC5INSTRUCTION6

NEWTECH (Spokane Area Professional-Technical Skills Center)7(92000005)8

The appropriations in this section are subject to the following9conditions and limitations: Funding is provided solely as a grant to10constitute local funding available to NEWTECH (Spokane area11professional-technical skills center) in order to be eligible for12state funding assistance through the school construction assistance13program pursuant to RCW 28A.525.166.14Reappropriation:15

State Building Construction Account—State. . . . . . . $7,786,00016Appropriation:17

School Construction and Skill Centers Building18Account. . . . . . . . . . . . . . . . . . . . . . . $500,00019

Prior Biennia (Expenditures). . . . . . . . . . . . . $5,901,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,187,00022

NEW SECTION. Sec. 5023. FOR THE SUPERINTENDENT OF PUBLIC23INSTRUCTION24

Puget Sound Skills Center (92000007)25The appropriations in this section are subject to the following26

conditions and limitations: Funding is provided solely as a grant to27constitute local funding available to the Puget Sound skills center28in order to be eligible for state funding assistance through the29school construction assistance program pursuant to RCW 28A.525.166.30Appropriation:31

State Building Construction Account—State. . . . . . . $3,600,00032Prior Biennia (Expenditures). . . . . . . . . . . . . $1,500,00033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,100,00035Code Rev/AL:akl 151 H-2429.2/15 2nd draft

Page 153: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5024. FOR THE SUPERINTENDENT OF PUBLIC1INSTRUCTION2

Distressed Schools (92000009)3The reappropriation in this section is subject to the following4

conditions and limitations: The reappropriation is subject to the5provisions of section 602, chapter 1, Laws of 2012 2nd sp. sess.6Reappropriation:7

State Building Construction Account—State. . . . . . . . $510,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $26,890,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,400,00011

NEW SECTION. Sec. 5025. FOR THE SUPERINTENDENT OF PUBLIC12INSTRUCTION13

Yakima Valley Technical Skills Center Sunnyside Satellite14(92000013)15Reappropriation:16

State Building Construction Account—State. . . . . . . . $343,00017Prior Biennia (Expenditures). . . . . . . . . . . . . $5,882,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,225,00020

NEW SECTION. Sec. 5026. FOR THE SUPERINTENDENT OF PUBLIC21INSTRUCTION22

School Security Improvement Grants (92000015)23The reappropriation in this section is subject to the following24

conditions and limitations: The reappropriation is subject to the25provisions of section 5025, chapter 19, Laws of 2013 2nd sp. sess.26Reappropriation:27

State Building Construction Account—State. . . . . . . $5,756,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . $900,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,656,00031

NEW SECTION. Sec. 5027. FOR THE SUPERINTENDENT OF PUBLIC32INSTRUCTION33

Delta High School (92000017)34Code Rev/AL:akl 152 H-2429.2/15 2nd draft

Page 154: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1State Building Construction Account—State. . . . . . . $3,227,0002Prior Biennia (Expenditures). . . . . . . . . . . . . $2,173,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,400,0005

NEW SECTION. Sec. 5028. FOR THE SUPERINTENDENT OF PUBLIC6INSTRUCTION7

STEM Pilot Program (91000402)8The appropriation in this section is subject to the following9

conditions and limitations:10(1) The amounts in this section are provided solely for the11

superintendent of public instruction to provide STEM pilot project12grants to school districts. These grants constitute the districts'13local funding for purposes of eligibility for the school construction14assistance program under RCW 28A.525.166. Subject to the terms in15this section, school districts are eligible to receive grants if they16have a special housing burden due to lack of sufficient space for17science classrooms and labs to enable students to meet statutory18graduation requirements.19

(2) The superintendent shall award grants to eligible school20districts under the following conditions:21

(a) A district must demonstrate a lack of sufficient space of22science classrooms and labs to facilitate meeting statutory23graduation requirements;24

(b) The district has secured private donations of cash, like-25kind, or equipment in a value of no less than two-hundred fifty26thousand dollars. Before the superintendent may provide funding27assistance through the school construction assistance program, the28district must provide verification of the donation to the29superintendent;30

(c) At least one grant award is made to school districts located31in southwest Washington;32

(d) At least one grant award is made to school districts located33in the Puget Sound region; and34

(e) At least two grant awards are made to school districts35located east of the Cascade mountains.36

(3) The superintendent, in consultation with the Washington STEM37education innovation alliance, shall develop criteria for providing38Code Rev/AL:akl 153 H-2429.2/15 2nd draft

Page 155: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

funding for specific projects to stay within the appropriation level1provided in this section. The criteria must include, but are not2limited to, the following:3

(a) Priority for school districts that secure private donations4of cash, like-kind, or equipment in value no less than two-hundred5fifty thousand dollars weighted by the ratio of school district6enrollments to value of donation;7

(b) A district's ability to raise funds through levies or bonds8in the prior ten-year period; and9

(c) Priority for applicants with a high percentage of students10who are eligible and enrolled in the free and reduced-price meals11program.12

(4) For purposes of grant applications made in the 2015-201713biennium, additional square footage funded through this grant program14is excluded from the school district's inventory of available15educational space for determining eligibility for state assistance16for new construction for (a) five years following acceptance of the17project by the school district board of directors, or (b) the date of18the final review of the latest study and survey of the affected19school district following acceptance of the project by the school20district board of directors; whichever date is earliest.21

(5) Each school district is limited to one grant award of no more22than $3,000,000.23

(6) The office of the superintendent of public instruction may24charge fees consistent with capital budget guidelines established by25the office of financial management for administering the grants.26

(7) The superintendent of public instruction must report to the27appropriate committees of the legislature and the office of financial28management on the timing and use of the funds by the end of each29fiscal year, until the funds are fully expended.30Appropriation:31

State Building Construction Account—State. . . . . . $15,000,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,00035

NEW SECTION. Sec. 5029. FOR THE SUPERINTENDENT OF PUBLIC36INSTRUCTION37

Distressed Schools (91000404)38

Code Rev/AL:akl 154 H-2429.2/15 2nd draft

Page 156: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The appropriation in this section is subject to the following1conditions and limitations:2

(1) $10,000,000 of the appropriation in this section is provided3solely for renovations of Magnolia elementary school and E.C. Hughes4elementary school.5

(2) $5,000,000 of the appropriation is provided solely for the6replacement of the Marysville Pilchuck high school cafeteria.7Appropriation:8

State Building Construction Account—State. . . . . . $15,000,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,00012

NEW SECTION. Sec. 5030. FOR THE STATE SCHOOL FOR THE BLIND13General Campus Preservation (30000033)14

Reappropriation:15State Building Construction Account—State. . . . . . . . $100,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . $400,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00019

NEW SECTION. Sec. 5031. FOR THE STATE SCHOOL FOR THE BLIND20General Campus Preservation (30000088)21

Appropriation:22State Building Construction Account—State. . . . . . . . $820,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . $1,920,00025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,740,00026

NEW SECTION. Sec. 5032. FOR THE WASHINGTON STATE CENTER FOR27CHILDHOOD DEAFNESS AND HEARING LOSS28

Minor Public Works (30000023)29Reappropriation:30

State Building Construction Account—State. . . . . . . . $972,00031Prior Biennia (Expenditures). . . . . . . . . . . . . . . $28,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 155 H-2429.2/15 2nd draft

Page 157: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0001

NEW SECTION. Sec. 5033. FOR THE WASHINGTON STATE CENTER FOR2CHILDHOOD DEAFNESS AND HEARING LOSS3

Minor Works - Preservation (30000025)4Appropriation:5

State Building Construction Account—State. . . . . . . . $500,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . $2,000,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,0009

NEW SECTION. Sec. 5034. FOR THE UNIVERSITY OF WASHINGTON10Denny Hall Renovation (20081002)11

Reappropriation:12State Building Construction Account—State. . . . . . $27,300,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $5,590,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,890,00016

NEW SECTION. Sec. 5035. FOR THE UNIVERSITY OF WASHINGTON17Lewis Hall Renovation (20081003)18

Reappropriation:19State Building Construction Account—State. . . . . . . . $150,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $3,915,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,065,00023

NEW SECTION. Sec. 5036. FOR THE UNIVERSITY OF WASHINGTON24Burke Museum (20082850)25

Reappropriation:26State Building Construction Account—State. . . . . . . . $650,00027

Appropriation:28State Building Construction Account—State. . . . . . $26,000,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $3,150,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,800,00032

Code Rev/AL:akl 156 H-2429.2/15 2nd draft

Page 158: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5037. FOR THE UNIVERSITY OF WASHINGTON1Health Sciences Education Phase I - T-Wing Renovation/Addition2

(30000486)3Appropriation:4

State Building Construction Account—State. . . . . . . . $623,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $93,377,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $94,000,0008

NEW SECTION. Sec. 5038. FOR THE UNIVERSITY OF WASHINGTON9University of Washington Bothell (30000378)10The appropriation in this section is subject to the following11

conditions and limitations: The appropriation in this section is12provided solely for predesign, which may also serve as bridging13documents, design, competition honoraria, project management, and14other planning activities including permits. The building must be15delivered using design build, as defined by chapter 39.10 RCW with a16guarantee for energy, operations, and maintenance performance. The17term for performance guarantee must not be less than one year. The18state may use state employees for services not related to building19performance. Criteria for selecting the design build contractor must20include life cycle costs, energy costs, or energy use index.21Contractors, and architectural and engineering firms may be eligible22for additional points during the scoring process if they have23experience with the state agency, or if they are considered a small24business. The building must be built using sustainable building25standards as defined in section 7008 of this act.26Appropriation:27

State Building Construction Account—State. . . . . . . . $500,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . $57,600,00030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $58,100,00031

NEW SECTION. Sec. 5039. FOR THE UNIVERSITY OF WASHINGTON32University of Washington Minor Capital Repairs - Preservation33

(30000494)34Reappropriation:35

Code Rev/AL:akl 157 H-2429.2/15 2nd draft

Page 159: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

University of Washington Building Account—State. . . . $4,200,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $42,554,0002

TOTAL. . . . . . . . . . . . . . . . . . . . . . $46,754,0003

NEW SECTION. Sec. 5040. FOR THE UNIVERSITY OF WASHINGTON4School of Nursing Simulation Learning Lab (30000600)5

Appropriation:6State Building Construction Account—State. . . . . . . $4,000,0007Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00010

NEW SECTION. Sec. 5041. FOR THE UNIVERSITY OF WASHINGTON11Health Sciences Interprofessional Education Classroom Phase I12

(30000602)13Appropriation:14

State Building Construction Account—State. . . . . . . $3,000,00015Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00018

NEW SECTION. Sec. 5042. FOR THE UNIVERSITY OF WASHINGTON19Computer Science and Engineering Expansion (30000603)20

Appropriation:21State Building Construction Account—State. . . . . . . $6,033,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . $33,967,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00025

NEW SECTION. Sec. 5043. FOR THE UNIVERSITY OF WASHINGTON26University of Washington Minor Capital Repairs - Preservation27

(30000604)28Appropriation:29

University of Washington Building Account—State. . . $43,175,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . $172,700,00032

Code Rev/AL:akl 158 H-2429.2/15 2nd draft

Page 160: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $215,875,0001

NEW SECTION. Sec. 5044. FOR THE UNIVERSITY OF WASHINGTON2Preventive Facility Maintenance and Building System Repairs3

(30000714)4Appropriation:5

University of Washington Building Account—State. . . $25,825,0006Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . $103,300,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . $129,125,0009

NEW SECTION. Sec. 5045. FOR THE UNIVERSITY OF WASHINGTON10University of Washington Tacoma Urban/Science Education Facility11

(91000014)12Reappropriation:13

State Building Construction Account—State. . . . . . . . $500,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $1,400,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,900,00017

NEW SECTION. Sec. 5046. FOR THE UNIVERSITY OF WASHINGTON18University of Washington Tacoma Campus Soil Remediation19

(92000002)20Appropriation:21

State Building Construction Account—State. . . . . . . $1,000,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . $4,000,00024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00025

NEW SECTION. Sec. 5047. FOR THE WASHINGTON STATE UNIVERSITY26Washington State University Pullman - Troy Hall Renovation27

(20061030)28Reappropriation:29

State Building Construction Account—State. . . . . . . . $850,00030Washington State University Building Account—State. . . $400,00031

Subtotal Reappropriation. . . . . . . . . . . . . $1,250,00032Appropriation:33Code Rev/AL:akl 159 H-2429.2/15 2nd draft

Page 161: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . $30,282,0001Prior Biennia (Expenditures). . . . . . . . . . . . . . $771,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,303,0004

NEW SECTION. Sec. 5048. FOR THE WASHINGTON STATE UNIVERSITY5Clean Technology Laboratory (30000069)6

Reappropriation:7State Building Construction Account—State. . . . . . . $8,000,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $24,835,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,835,00011

NEW SECTION. Sec. 5049. FOR THE WASHINGTON STATE UNIVERSITY122013-15 Minor Works - Preservation, Safety, and Infrastructure13

(30000849)14Reappropriation:15

State Building Construction Account—State. . . . . . . . $650,00016Washington State University Building17

Account—State. . . . . . . . . . . . . . . . . . . $1,720,00018Subtotal Reappropriation. . . . . . . . . . . . . $2,370,00019

Prior Biennia (Expenditures). . . . . . . . . . . . . $26,194,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,564,00022

NEW SECTION. Sec. 5050. FOR THE WASHINGTON STATE UNIVERSITY232015-17 Minor Works - Preservation (30001188)24

Appropriation:25Washington State University Building Account—26

State. . . . . . . . . . . . . . . . . . . . . . $41,885,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028Future Biennia (Projected Costs). . . . . . . . . . $134,340,00029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $176,225,00030

NEW SECTION. Sec. 5051. FOR THE WASHINGTON STATE UNIVERSITY31Washington State University Tri-Cities - Academic Building32

(30001190)33

Code Rev/AL:akl 160 H-2429.2/15 2nd draft

Page 162: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1State Building Construction Account—State. . . . . . . . $400,0002Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $68,600,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $69,000,0005

NEW SECTION. Sec. 5052. FOR THE WASHINGTON STATE UNIVERSITY6Global Animal Health Building (30001322)7

Appropriation:8State Building Construction Account—State. . . . . . . $1,900,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010Future Biennia (Projected Costs). . . . . . . . . . . $59,400,00011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $61,300,00012

NEW SECTION. Sec. 5053. FOR THE WASHINGTON STATE UNIVERSITY13Preventive Facility Maintenance and Building System Repairs14

(30001324)15Appropriation:16

Washington State University Building Account—17State. . . . . . . . . . . . . . . . . . . . . . $10,115,00018

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,115,00021

NEW SECTION. Sec. 5054. FOR THE WASHINGTON STATE UNIVERSITY22Everett University Center (91000026)23

Reappropriation:24State Building Construction Account—State. . . . . . . $4,000,00025

Appropriation:26State Building Construction Account—State. . . . . . . . $54,563,00027

Prior Biennia (Expenditures). . . . . . . . . . . . . $6,000,00028Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $64,563,00030

NEW SECTION. Sec. 5055. FOR THE WASHINGTON STATE UNIVERSITY31Joint Center for Deployment and Research in Earth Abundant32

Materials (91000029)33Code Rev/AL:akl 161 H-2429.2/15 2nd draft

Page 163: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The appropriation in this section is subject to the following1conditions and limitations:2

(1) Funding is provided solely for capital improvements,3infrastructure, and equipment, to support: (a) A transformative4program in earth-abundant materials to accelerate the development of5next generation clean energy and transportation technologies in6Washington; (b) a coordinated framework and resources that can7facilitate and promote multi-institution collaborations to drive8research, development, and deployment efforts in the use of earth-9abundant materials for manufactured clean technologies or recycling10of advanced materials used in clean technologies; and (c)11environmentally responsible processes in the areas of manufacturing12and recycling of advanced materials used in clean technologies.13

(2) Administration of the appropriation is under the joint14authority of the Washington State University and the University of15Washington. Washington State University and the University of16Washington, in consultation with the regional universities, the17Pacific Northwest national laboratory, and industry experts, shall18develop criteria for providing funding for specific projects at19public four-year institutions of higher education to stay within the20appropriation level provided in this section. Funding for21administrative offices may be provided for administrative offices22west of the crest of the Cascade mountains only.23

(3) The office of the state treasurer must manage the issuance of24bonds associated with approved equipment funding so as to incur the25lowest possible debt service costs by aligning their final maturities26with the short useful life of the equipment being financed.27Appropriation:28

State Building Construction Account—State. . . . . . . $2,000,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00032

NEW SECTION. Sec. 5056. FOR THE WASHINGTON STATE UNIVERSITY33Inventory and Condition of Schools Data Collection (91000033)34The appropriation in this section is subject to the following35

conditions and limitations:36

Code Rev/AL:akl 162 H-2429.2/15 2nd draft

Page 164: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(1) The appropriation is provided solely for the Washington State1University extension energy office to complete collection, input, and2verification of data of public school facilities in the inventory and3condition of schools system administered and maintained by the4superintendent of public instruction.5

(2) The legislature intends to complete the data collection,6input, and verification of the inventory and condition of public7school facilities in order to make informed decisions about K-128school facility and capacity needs to fulfill current educational9graduation requirements and class-size ratios. These decisions are10best made when based on accurate data collected in a thorough and11consistent manner by professionals experienced in making such12inventory and condition assessments for public institutions.13

(3) The Washington State University extension energy office shall14conduct on-site visits to assess inventory and condition of all15facilities for school districts that have no current study and survey16as defined in RCW 28A.525.050 on file with the superintendent of17public instruction as of July 1, 2015, or no pending study and survey18to be filed with the superintendent through an outstanding study and19survey grant award. The data collected through on-site visits must be20input into the inventory and condition of schools system.21

(4) The Washington State University extension energy office shall22input into the inventory and condition of schools system applicable23data of inventory and condition of school facilities from all current24studies and surveys on file with the superintendent of public25instruction as of July 1, 2015. The data must be input into the26system in a manner that captures older information and data first. As27studies and surveys from outstanding grant awards are filed with the28superintendent, the Washington State University extension energy29office shall input data into the system once current study and survey30data has been input. Activities conducted pursuant to this subsection31must occur concurrently with activities in subsection (3) of this32section.33

(5) The Washington State University extension energy office shall34conduct on-site verification of data for school districts whose35current studies and surveys on file with the superintendent will36expire by June 30, 2017. Data verification must be conducted to37evaluate the study and survey process as a tool to collect accurate38inventory and condition of schools data upon which policymakers can39make informed decisions regarding school facility and capacity needs.40Code Rev/AL:akl 163 H-2429.2/15 2nd draft

Page 165: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Activities conducted pursuant to this subsection must occur1concurrently with activities in subsection (3) of this section and2once sufficient data has been input into the system per subsection3(4) of this section to conduct on-site visits to verification.4

(6) As a general condition of appropriations provided to the5superintendent of public instruction in this act, the superintendent6of public instruction and each state school district shall provide7requested facilities information and access to facilities in a timely8manner to enable the Washington State University extension energy9office to complete the tasks, oversight, and reporting requirements10assigned in this section.11

(7) The Washington State University extension energy office shall12report progress of data collection, input, and verification to the13appropriate committees of the legislature no later than December 1,142015. The Washington State University extension energy office must15complete all work in this section and make a final report to the16appropriate committees of the legislature no later than December 1,172016.18Appropriation:19

Common School Construction Account—State. . . . . . . $1,500,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00023

NEW SECTION. Sec. 5057. FOR THE EASTERN WASHINGTON UNIVERSITY24University Science Center - Science I (30000001)25

Appropriation:26State Building Construction Account—State. . . . . . . $4,791,00027Prior Biennia (Expenditures). . . . . . . . . . . . . . $400,00028Future Biennia (Projected Costs). . . . . . . . . . . $55,444,00029

TOTAL. . . . . . . . . . . . . . . . . . . . . . $60,635,00030

NEW SECTION. Sec. 5058. FOR THE EASTERN WASHINGTON UNIVERSITY31Upgrade/Repair Campus Water System (30000422)32

Reappropriation:33State Building Construction Account—State. . . . . . . $3,533,00034Eastern Washington University Capital Projects Account—35

State. . . . . . . . . . . . . . . . . . . . . . . $1,770,00036Code Rev/AL:akl 164 H-2429.2/15 2nd draft

Page 166: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Subtotal Reappropriation. . . . . . . . . . . . . $5,303,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $1,975,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,278,0004

NEW SECTION. Sec. 5059. FOR THE EASTERN WASHINGTON UNIVERSITY5University Science Center - Science II (30000466)6

Appropriation:7State Building Construction Account—State. . . . . . . $5,575,0008Prior Biennia (Expenditures). . . . . . . . . . . . . . $350,0009Future Biennia (Projected Costs). . . . . . . . . . . $67,290,00010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $73,215,00011

NEW SECTION. Sec. 5060. FOR THE EASTERN WASHINGTON UNIVERSITY12Eastern Washington University Minor Works Preservation (30000468)13

Reappropriation:14Eastern Washington University Capital Projects15

Account—State. . . . . . . . . . . . . . . . . . . $2,293,00016Prior Biennia (Expenditures). . . . . . . . . . . . . $6,207,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,00019

NEW SECTION. Sec. 5061. FOR THE EASTERN WASHINGTON UNIVERSITY20Infrastructure Renewal I (30000506)21

Appropriation:22State Building Construction Account—State. . . . . . . $9,949,00023Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,949,00026

NEW SECTION. Sec. 5062. FOR THE EASTERN WASHINGTON UNIVERSITY27Renovate Science (30000507)28

Appropriation:29State Building Construction Account—State. . . . . . . . $350,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . $52,000,00032

Code Rev/AL:akl 165 H-2429.2/15 2nd draft

Page 167: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $52,350,0001

NEW SECTION. Sec. 5063. FOR THE EASTERN WASHINGTON UNIVERSITY2Minor Works - Facility Preservation (30000513)3

Appropriation:4State Building Construction Account—State. . . . . . . $8,167,0005Eastern Washington University Capital Projects Account—6

State. . . . . . . . . . . . . . . . . . . . . . . $3,500,0007Subtotal Appropriation. . . . . . . . . . . . . . $11,667,0008

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . $56,000,00010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $67,667,00011

NEW SECTION. Sec. 5064. FOR THE EASTERN WASHINGTON UNIVERSITY12Minor Works - Program (30000516)13

Appropriation:14Eastern Washington University Capital Projects Account—15

State. . . . . . . . . . . . . . . . . . . . . . . $3,500,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . $16,000,00018

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,500,00019

NEW SECTION. Sec. 5065. FOR THE EASTERN WASHINGTON UNIVERSITY20Preventive Maintenance and Building System Repairs (30000547)21

Appropriation:22Eastern Washington University Capital Projects Account—23

State. . . . . . . . . . . . . . . . . . . . . . . $2,217,00024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . $8,868,00026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,085,00027

NEW SECTION. Sec. 5066. FOR THE CENTRAL WASHINGTON UNIVERSITY28Science Building (30000045)29

Reappropriation:30State Building Construction Account—State. . . . . . $42,000,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $21,771,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

Code Rev/AL:akl 166 H-2429.2/15 2nd draft

Page 168: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

TOTAL. . . . . . . . . . . . . . . . . . . . . . $63,771,0001

NEW SECTION. Sec. 5067. FOR THE CENTRAL WASHINGTON UNIVERSITY2Samuelson Communication and Technology Center (SCTC) (30000451)3

Reappropriation:4State Building Construction Account—State. . . . . . . $1,600,0005

Appropriation:6State Building Construction Account—State. . . . . . $58,677,0007Prior Biennia (Expenditures). . . . . . . . . . . . . $3,400,0008Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09

TOTAL. . . . . . . . . . . . . . . . . . . . . . $63,677,00010

NEW SECTION. Sec. 5068. FOR THE CENTRAL WASHINGTON UNIVERSITY11Combined Utilities (30000448)12

Reappropriation:13State Building Construction Account—State. . . . . . . . $430,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $9,780,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,210,00017

NEW SECTION. Sec. 5069. FOR THE CENTRAL WASHINGTON UNIVERSITY18Nutrition Science (30000456)19

Appropriation:20State Building Construction Account—State. . . . . . . $4,300,00021Prior Biennia (Expenditures). . . . . . . . . . . . . . $281,00022Future Biennia (Projected Costs). . . . . . . . . . . $44,400,00023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,981,00024

NEW SECTION. Sec. 5070. FOR THE CENTRAL WASHINGTON UNIVERSITY25Brooks Library Learning Commons (30000530)26

Appropriation:27State Building Construction Account—State. . . . . . . $4,900,00028Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,900,00031

Code Rev/AL:akl 167 H-2429.2/15 2nd draft

Page 169: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5071. FOR THE CENTRAL WASHINGTON UNIVERSITY1Minor Works Preservation (30000615)2

Reappropriation:3Central Washington University Capital Projects4

Account—State. . . . . . . . . . . . . . . . . . . $1,500,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $5,500,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,0008

NEW SECTION. Sec. 5072. FOR THE CENTRAL WASHINGTON UNIVERSITY9Minor Works Preservation (30000684)10

Appropriation:11State Building Construction Account—State. . . . . . . $6,659,00012Central Washington University Capital Projects Account—13

State. . . . . . . . . . . . . . . . . . . . . . . . $787,00014Subtotal Appropriation. . . . . . . . . . . . . . $7,446,00015

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016Future Biennia (Projected Costs). . . . . . . . . . . $20,640,00017

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,086,00018

NEW SECTION. Sec. 5073. FOR THE CENTRAL WASHINGTON UNIVERSITY19Bouillon Hall Renovation (30000711)20

Appropriation:21State Building Construction Account—State. . . . . . . $4,977,00022Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,977,00025

NEW SECTION. Sec. 5074. FOR THE CENTRAL WASHINGTON UNIVERSITY26Minor Works Program (30000723)27

Appropriation:28Central Washington University Capital Projects Account—29

State. . . . . . . . . . . . . . . . . . . . . . . $3,777,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . $4,768,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,545,00033

Code Rev/AL:akl 168 H-2429.2/15 2nd draft

Page 170: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5075. FOR THE CENTRAL WASHINGTON UNIVERSITY1Lind Hall Renovation (30000738)2

Appropriation:3State Building Construction Account—State. . . . . . . $4,900,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,900,0007

NEW SECTION. Sec. 5076. FOR THE CENTRAL WASHINGTON UNIVERSITY8Combined Utilities (30000740)9

Appropriation:10State Building Construction Account—State. . . . . . . $8,000,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . $32,000,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00014

NEW SECTION. Sec. 5077. FOR THE CENTRAL WASHINGTON UNIVERSITY15Old Heat - Plant Annex (30000767)16

Appropriation:17State Building Construction Account—State. . . . . . . $4,900,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,900,00021

NEW SECTION. Sec. 5078. FOR THE CENTRAL WASHINGTON UNIVERSITY22Preventive Maintenance and Building System Repairs (30000770)23

Appropriation:24Central Washington University Capital Projects Account—25

State. . . . . . . . . . . . . . . . . . . . . . . $2,422,00026Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,422,00029

NEW SECTION. Sec. 5079. FOR THE EVERGREEN STATE COLLEGE30Facility Preservation (30000084)31

Reappropriation:32

Code Rev/AL:akl 169 H-2429.2/15 2nd draft

Page 171: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The Evergreen State College Capital Projects1Account—State. . . . . . . . . . . . . . . . . . . . $100,0002

Prior Biennia (Expenditures). . . . . . . . . . . . . $6,600,0003Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,700,0005

NEW SECTION. Sec. 5080. FOR THE EVERGREEN STATE COLLEGE6Science Center - Lab II, 2nd Floor Renovation (30000117)7

Reappropriation:8State Building Construction Account—State. . . . . . . . $575,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $4,119,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,694,00012

NEW SECTION. Sec. 5081. FOR THE EVERGREEN STATE COLLEGE13Science Center - Lab I Basement Renovation (30000118)14

Reappropriation:15State Building Construction Account—State. . . . . . . $1,525,00016

Appropriation:17State Building Construction Account—State. . . . . . . $3,240,00018Prior Biennia (Expenditures). . . . . . . . . . . . . . $280,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,045,00021

NEW SECTION. Sec. 5082. FOR THE EVERGREEN STATE COLLEGE22Seminar I Renovation (30000125)23

Appropriation:24State Building Construction Account—State. . . . . . . . $400,00025Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026Future Biennia (Projected Costs). . . . . . . . . . . $23,318,00027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,718,00028

NEW SECTION. Sec. 5083. FOR THE EVERGREEN STATE COLLEGE29Facilities Preservation (30000457)30

Appropriation:31State Building Construction Account—State. . . . . . . $4,720,00032

Code Rev/AL:akl 170 H-2429.2/15 2nd draft

Page 172: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

The Evergreen State College Capital Projects Account—1State. . . . . . . . . . . . . . . . . . . . . . . $5,628,0002Subtotal Appropriation. . . . . . . . . . . . . . $10,348,0003

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . $40,180,0005

TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,528,0006

NEW SECTION. Sec. 5084. FOR THE EVERGREEN STATE COLLEGE7Minor Works Program (30000487)8

Appropriation:9The Evergreen State College Capital Projects10

Account—State. . . . . . . . . . . . . . . . . . . $1,164,00011Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012Future Biennia (Projected Costs). . . . . . . . . . . $9,140,00013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,304,00014

NEW SECTION. Sec. 5085. FOR THE EVERGREEN STATE COLLEGE15Lecture Hall Remodel (30000493)16

Reappropriation:17State Building Construction Account—State. . . . . . . . $300,00018

Appropriation:19State Building Construction Account—State. . . . . . $16,310,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $1,251,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,861,00023

NEW SECTION. Sec. 5086. FOR THE EVERGREEN STATE COLLEGE24Preventive Facility Maintenance and Building System Repairs25

(30000612)26Appropriation:27

The Evergreen State College Capital Projects Account—28State. . . . . . . . . . . . . . . . . . . . . . . . $783,00029

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . $3,132,00031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,915,00032

NEW SECTION. Sec. 5087. FOR THE WESTERN WASHINGTON UNIVERSITY33Code Rev/AL:akl 171 H-2429.2/15 2nd draft

Page 173: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Carver Academic Renovation (20081060)1Reappropriation:2

State Building Construction Account—State. . . . . . . . $323,0003Appropriation:4

State Building Construction Account—State. . . . . . $48,903,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $7,051,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $56,277,0008

NEW SECTION. Sec. 5088. FOR THE WESTERN WASHINGTON UNIVERSITY9North Campus Utility Upgrade (30000426)10

Reappropriation:11State Building Construction Account—State. . . . . . . . $600,00012Prior Biennia (Expenditures). . . . . . . . . . . . . $2,982,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,582,00015

NEW SECTION. Sec. 5089. FOR THE WESTERN WASHINGTON UNIVERSITY16Performing Arts Exterior Renewal (30000428)17

Reappropriation:18State Building Construction Account—State. . . . . . . . $387,00019Prior Biennia (Expenditures). . . . . . . . . . . . . $2,560,00020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,947,00022

NEW SECTION. Sec. 5090. FOR THE WESTERN WASHINGTON UNIVERSITY23Classroom and Lab Upgrades Phase 2 (30000518)24

Reappropriation:25State Building Construction Account—State. . . . . . . $1,800,00026Western Washington University Capital Projects Account—27

State. . . . . . . . . . . . . . . . . . . . . . . . $400,00028Subtotal Reappropriation. . . . . . . . . . . . . $2,200,00029

Prior Biennia (Expenditures). . . . . . . . . . . . . $2,546,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,746,00032

Code Rev/AL:akl 172 H-2429.2/15 2nd draft

Page 174: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5091. FOR THE WESTERN WASHINGTON UNIVERSITY1Minor Works - Preservation (30000524)2

Reappropriation:3Western Washington University Capital Projects4

Account—State. . . . . . . . . . . . . . . . . . . . $750,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $6,750,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,500,0008

NEW SECTION. Sec. 5092. FOR THE WESTERN WASHINGTON UNIVERSITY9Science Building Renovation and Addition (30000598)10

Appropriation:11State Building Construction Account—State. . . . . . . . $500,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . $97,215,00014

TOTAL. . . . . . . . . . . . . . . . . . . . . . $97,715,00015

NEW SECTION. Sec. 5093. FOR THE WESTERN WASHINGTON UNIVERSITY162015-17 Classroom and Lab Upgrades (30000600)17

Appropriation:18Western Washington University Capital Projects Account—19

State. . . . . . . . . . . . . . . . . . . . . . . $4,400,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,400,00023

NEW SECTION. Sec. 5094. FOR THE WESTERN WASHINGTON UNIVERSITY24Minor Works - Preservation (30000615)25

Appropriation:26State Building Construction Account—State. . . . . . . $7,035,00027Western Washington University Capital Projects28

Account—State. . . . . . . . . . . . . . . . . . . $4,886,00029Subtotal Appropriation. . . . . . . . . . . . . . $11,921,00030

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031Future Biennia (Projected Costs). . . . . . . . . . . $64,422,00032

TOTAL. . . . . . . . . . . . . . . . . . . . . . $76,343,00033

Code Rev/AL:akl 173 H-2429.2/15 2nd draft

Page 175: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5095. FOR THE WESTERN WASHINGTON UNIVERSITY1Preventive Facility Maintenance and Building System Repairs2

(30000757)3Appropriation:4

Western Washington University Capital Projects Account—5State. . . . . . . . . . . . . . . . . . . . . . . $3,614,0006

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07Future Biennia (Projected Costs). . . . . . . . . . . $14,456,0008

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,070,0009

NEW SECTION. Sec. 5096. FOR THE WASHINGTON STATE HISTORICAL10SOCIETY11

Washington Heritage Grants (20074004)12The reappropriation in this section is subject to the following13

conditions and limitations:14(1) The reappropriation in this section is subject to the15

provisions of RCW 27.34.330.16(2) The reappropriation in this section is subject to the project17

list in section 5137, chapter 520, Laws of 2007.18(3) The reappropriation in this section is subject to the19

provisions of section 5044, chapter 36, Laws of 2010 1st sp. sess.20Reappropriation:21

State Building Construction Account—State. . . . . . . . $340,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $9,565,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,905,00025

NEW SECTION. Sec. 5097. FOR THE WASHINGTON STATE HISTORICAL26SOCIETY27

Washington Heritage Project Capital Grants (30000011)28The reappropriation in this section is subject to the following29

conditions and limitations:30(1) The reappropriation in this section is subject to the31

provisions of section 5120, chapter 497, Laws of 2009.32(2) The reappropriation in this section is subject to the33

provisions of section 5045, chapter 36, Laws of 2010 1st sp. sess.34Reappropriation:35

Code Rev/AL:akl 174 H-2429.2/15 2nd draft

Page 176: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . . $200,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $9,225,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,425,0004

NEW SECTION. Sec. 5098. FOR THE WASHINGTON STATE HISTORICAL5SOCIETY6

Washington Heritage Grants (30000117)7The reappropriation in this section is subject to the following8

conditions and limitations:9(1) The reappropriation in this section is subject to the10

provisions of RCW 27.34.330.11(2) The reappropriation in this section is subject to the12

provisions of section 622, chapter 1, Laws of 2012 2nd sp. sess.13Reappropriation:14

State Building Construction Account—State. . . . . . . . $300,00015Prior Biennia (Expenditures). . . . . . . . . . . . . $6,782,00016Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,082,00018

NEW SECTION. Sec. 5099. FOR THE WASHINGTON STATE HISTORICAL19SOCIETY20

Facilities Preservation - Minor Works Projects (30000164)21Reappropriation:22

State Building Construction Account—State. . . . . . . . $830,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $1,653,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,483,00026

NEW SECTION. Sec. 5100. FOR THE WASHINGTON STATE HISTORICAL27SOCIETY28

Heritage Capital Grants Projects (30000170)29The reappropriation in this section is subject to the following30

conditions and limitations:31(1) The reappropriation in this section is subject to the32

provisions of RCW 27.34.330.33

Code Rev/AL:akl 175 H-2429.2/15 2nd draft

Page 177: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(2) The reappropriation in this section is subject to the project1list in section 5093, chapter 19, Laws of 2013 2nd sp. sess.2Reappropriation:3

State Building Construction Account—State. . . . . . . $4,700,0004Prior Biennia (Expenditures). . . . . . . . . . . . . $5,131,0005Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,831,0007

NEW SECTION. Sec. 5101. FOR THE WASHINGTON STATE HISTORICAL8SOCIETY9

History Museum Membrane System Replacement (30000220)10Appropriation:11

State Building Construction Account—State. . . . . . . $1,805,00012Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,805,00015

NEW SECTION. Sec. 5102. FOR THE WASHINGTON STATE HISTORICAL16SOCIETY17

Facilities Preservation – Minor Works Projects (30000222)18Appropriation:19

State Building Construction Account—State. . . . . . . $2,515,00020Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . $10,000,00022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,515,00023

NEW SECTION. Sec. 5103. FOR THE WASHINGTON STATE HISTORICAL24SOCIETY25

Washington Heritage Grants (30000237)26The appropriation in this section is subject to the following27

conditions and limitations:28(1) The appropriation is subject to the provisions of RCW29

27.34.330.30(2) The appropriation is provided solely for the following list31

of projects:32Project Authorized Amount33Pantages centennial: Façade restoration. . . . . . . . . . . $685,00034Code Rev/AL:akl 176 H-2429.2/15 2nd draft

Page 178: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Chong Wa parapet preservation. . . . . . . . . . . . . . . . $66,0001Rehabilitation of historic structures. . . . . . . . . . . . $750,0002Renovation heating of interior space of Balfour dock. . . $1,000,0003Town hall historic restoration: Phase one of construction. $1,000,0004Washington hall restoration. . . . . . . . . . . . . . . . . $452,0005Rehabilitation of Ritzville library for ADA compliance. . . $138,0006Quartermaster and dental surgery renovation project. . . . . $309,0007Skagit city school restoration. . . . . . . . . . . . . . . . $91,0008Yamasaki courtyard restoration project. . . . . . . . . . . $129,0009Prairie line trail historic interpretation project. . . . . $400,00010Ancich netshed restoration. . . . . . . . . . . . . . . . . $662,00011Chimney, gutter, and kitchen restoration. . . . . . . . . . . $11,00012Federal building rehabilitation - phases II and III. . . . . $920,00013Preservation of the Colville Indian agency cabin in Chewelah. $33,00014Arthur Foss preservation and restoration phase II. . . . . . $166,00015Seaport landing development - renovation of building #8. . $1,000,00016Si view community center rehabilitation project phase II. . $130,00017Revitalization to historic wells house for community use. . . $26,00018Chiyo's garden phase II. . . . . . . . . . . . . . . . . . . $108,00019Historic community center, library, and city hall restoration $185,00020Sea mar latino history and cultural center. . . . . . . . . $654,00021Olympia waldorf school - the next 100 years. . . . . . . . . $20,00022Chinook school restoration - final phase. . . . . . . . . . . $79,00023Phase III of Worthington park - Quilcene. . . . . . . . . . $244,00024El centro de la raza community access and security project. $100,00025Steam locomotives changed everything. . . . . . . . . . . . $199,00026The artifact/exhibit environmental conservation project. . . . $8,00027F/V Shenandoah restoration project - phase three. . . . . . . $41,00028Henderson house and Tumwater historic district interpretive. $50,00029Carnegie library renovation phase II. . . . . . . . . . . . $344,00030Total. . . . . . . . . . . . . . . . . . . . . . . . . . $10,000,00031Appropriation:32

State Building Construction Account—State. . . . . . $10,000,00033Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034Future Biennia (Projected Costs). . . . . . . . . . . . . . . $035

TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00036

NEW SECTION. Sec. 5104. FOR THE EASTERN WASHINGTON STATE37HISTORICAL SOCIETY38

Code Rev/AL:akl 177 H-2429.2/15 2nd draft

Page 179: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Minor Works - Preservation (30000038)1Appropriation:2

State Building Construction Account—State. . . . . . . . $702,0003Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $702,0006

NEW SECTION. Sec. 5105. FOR THE COMMUNITY AND TECHNICAL COLLEGE7SYSTEM8

Spokane Falls Community College: Campus Classrooms (20062696)9Reappropriation:10

State Building Construction Account—State. . . . . . . . $417,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $19,199,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,616,00014

NEW SECTION. Sec. 5106. FOR THE COMMUNITY AND TECHNICAL COLLEGE15SYSTEM16

South Puget Sound Community College: Learning Resource Center17(20062698)18Reappropriation:19

State Building Construction Account—State. . . . . . . . $953,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $32,708,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,661,00023

NEW SECTION. Sec. 5107. FOR THE COMMUNITY AND TECHNICAL COLLEGE24SYSTEM25

Clover Park Technical College: Allied Health Care Facility26(20062699)27Reappropriation:28

State Building Construction Account—State. . . . . . . . $944,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $21,389,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,333,00032

Code Rev/AL:akl 178 H-2429.2/15 2nd draft

Page 180: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5108. FOR THE COMMUNITY AND TECHNICAL COLLEGE1SYSTEM2

Spokane Community College: Technical Education Building3(20081220)4Reappropriation:5

State Building Construction Account—State. . . . . . . $3,294,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $23,136,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,430,0009

NEW SECTION. Sec. 5109. FOR THE COMMUNITY AND TECHNICAL COLLEGE10SYSTEM11

Everett Community College: Index Hall Replacement (20081221)12Reappropriation:13

State Building Construction Account—State. . . . . . . $1,194,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $35,120,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,314,00017

NEW SECTION. Sec. 5110. FOR THE COMMUNITY AND TECHNICAL COLLEGE18SYSTEM19

Green River Community College: Trades and Industry Building20(20081222)21Reappropriation:22

State Building Construction Account—State. . . . . . $11,606,00023Prior Biennia (Expenditures). . . . . . . . . . . . . $17,013,00024Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025

TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,619,00026

NEW SECTION. Sec. 5111. FOR THE COMMUNITY AND TECHNICAL COLLEGE27SYSTEM28

Grays Harbor College: Science and Math Building (20081226)29Reappropriation:30

State Building Construction Account—State. . . . . . $14,700,00031Prior Biennia (Expenditures). . . . . . . . . . . . . $29,444,00032Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033

TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,144,00034Code Rev/AL:akl 179 H-2429.2/15 2nd draft

Page 181: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5112. FOR THE COMMUNITY AND TECHNICAL COLLEGE1SYSTEM2

Tacoma Community College: Health Careers Center (20082701)3Reappropriation:4

State Building Construction Account—State. . . . . . . $7,639,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $33,534,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . . . $41,173,0008

NEW SECTION. Sec. 5113. FOR THE COMMUNITY AND TECHNICAL COLLEGE9SYSTEM10

Bellevue Community College: Health Science Building (20082702)11Reappropriation:12

State Building Construction Account—State. . . . . . . $9,636,00013Prior Biennia (Expenditures). . . . . . . . . . . . . $22,090,00014Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $31,726,00016

NEW SECTION. Sec. 5114. FOR THE COMMUNITY AND TECHNICAL COLLEGE17SYSTEM18

Bates Technical College: Mohler Communications Technology Center19(20082703)20Reappropriation:21

State Building Construction Account—State. . . . . . $15,428,00022Prior Biennia (Expenditures). . . . . . . . . . . . . $11,019,00023Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,447,00025

NEW SECTION. Sec. 5115. FOR THE COMMUNITY AND TECHNICAL COLLEGE26SYSTEM27

Columbia Basin College: Social Science Center (20082704)28Reappropriation:29

State Building Construction Account—State. . . . . . . . $595,00030Appropriation:31

State Building Construction Account—State. . . . . . $14,505,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . $481,00033

Code Rev/AL:akl 180 H-2429.2/15 2nd draft

Page 182: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,581,0002

NEW SECTION. Sec. 5116. FOR THE COMMUNITY AND TECHNICAL COLLEGE3SYSTEM4

Clark College: Health and Advanced Technologies Building5(20082705)6Reappropriation:7

State Building Construction Account—State. . . . . . $29,979,0008Prior Biennia (Expenditures). . . . . . . . . . . . . $7,073,0009Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,052,00011

NEW SECTION. Sec. 5117. FOR THE COMMUNITY AND TECHNICAL COLLEGE12SYSTEM13

Peninsula College: Fort Worden Building 202 (30000114)14Reappropriation:15

State Building Construction Account—State. . . . . . . $3,876,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . $501,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,377,00019

NEW SECTION. Sec. 5118. FOR THE COMMUNITY AND TECHNICAL COLLEGE20SYSTEM21

Seattle Central Community College: Seattle Maritime Academy22(30000120)23Reappropriation:24

State Building Construction Account—State. . . . . . $14,590,00025Prior Biennia (Expenditures). . . . . . . . . . . . . $2,238,00026Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,828,00028

NEW SECTION. Sec. 5119. FOR THE COMMUNITY AND TECHNICAL COLLEGE29SYSTEM30

Yakima Valley Community College: Palmer Martin Building31(30000121)32Reappropriation:33

Code Rev/AL:akl 181 H-2429.2/15 2nd draft

Page 183: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . . $5,947,0001Prior Biennia (Expenditures). . . . . . . . . . . . . $14,293,0002Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,240,0004

NEW SECTION. Sec. 5120. FOR THE COMMUNITY AND TECHNICAL COLLEGE5SYSTEM6

Olympic College: College Instruction Center (30000122)7Reappropriation:8

State Building Construction Account—State. . . . . . . $1,152,0009Appropriation:10

State Building Construction Account—State. . . . . . $48,516,00011Prior Biennia (Expenditures). . . . . . . . . . . . . $2,472,00012Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013

TOTAL. . . . . . . . . . . . . . . . . . . . . . $52,140,00014

NEW SECTION. Sec. 5121. FOR THE COMMUNITY AND TECHNICAL COLLEGE15SYSTEM16

Centralia Community College: Student Services (30000123)17Reappropriation:18

State Building Construction Account—State. . . . . . . . $631,00019Appropriation:20

State Building Construction Account—State. . . . . . $31,385,00021Prior Biennia (Expenditures). . . . . . . . . . . . . $1,886,00022Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023

TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,902,00024

NEW SECTION. Sec. 5122. FOR THE COMMUNITY AND TECHNICAL COLLEGE25SYSTEM26

Peninsula College: Allied Health and Early Childhood Development27Center (30000126)28Reappropriation:29

State Building Construction Account—State. . . . . . . . $903,00030Appropriation:31

State Building Construction Account—State. . . . . . $23,790,00032Prior Biennia (Expenditures). . . . . . . . . . . . . . $907,00033

Code Rev/AL:akl 182 H-2429.2/15 2nd draft

Page 184: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,600,0002

NEW SECTION. Sec. 5123. FOR THE COMMUNITY AND TECHNICAL COLLEGE3SYSTEM4

South Seattle Community College: Cascade Court (30000128)5Reappropriation:6

State Building Construction Account—State. . . . . . . . $983,0007Appropriation:8

State Building Construction Account—State. . . . . . $28,231,0009Prior Biennia (Expenditures). . . . . . . . . . . . . $1,104,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,318,00012

NEW SECTION. Sec. 5124. FOR THE COMMUNITY AND TECHNICAL COLLEGE13SYSTEM14

North Seattle Community College: Technology Building Renewal15(30000129)16Reappropriation:17

State Building Construction Account—State. . . . . . . $1,922,00018Prior Biennia (Expenditures). . . . . . . . . . . . . $23,497,00019Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020

TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,419,00021

NEW SECTION. Sec. 5125. FOR THE COMMUNITY AND TECHNICAL COLLEGE22SYSTEM23

Renton Technical College: Automotive Complex Renovation24(30000134)25Reappropriation:26

State Building Construction Account—State. . . . . . . . $449,00027Appropriation:28

State Building Construction Account—State. . . . . . $15,250,00029Prior Biennia (Expenditures). . . . . . . . . . . . . $1,134,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,833,00032

Code Rev/AL:akl 183 H-2429.2/15 2nd draft

Page 185: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5126. FOR THE COMMUNITY AND TECHNICAL COLLEGE1SYSTEM2

Edmonds Community College: Science, Engineering, Technology3Building (30000137)4Reappropriation:5

State Building Construction Account—State. . . . . . . $6,581,0006Prior Biennia (Expenditures). . . . . . . . . . . . . $1,239,0007Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,820,0009

NEW SECTION. Sec. 5127. FOR THE COMMUNITY AND TECHNICAL COLLEGE10SYSTEM11

Whatcom Community College: Learning Commons (30000138)12Reappropriation:13

State Building Construction Account—State. . . . . . . $1,029,00014Prior Biennia (Expenditures). . . . . . . . . . . . . . $793,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,822,00017

NEW SECTION. Sec. 5128. FOR THE COMMUNITY AND TECHNICAL COLLEGE18SYSTEM19

Minor Works - Program (30000723)20Reappropriation:21

Community/Technical College Capital Projects22Account—State. . . . . . . . . . . . . . . . . . . $1,765,00023

Community and Technical College Forest Reserve24Account—State. . . . . . . . . . . . . . . . . . . . $60,00025

Gardner-Evans Higher Education Construction26Account—State. . . . . . . . . . . . . . . . . . . . $115,00027Subtotal Reappropriation. . . . . . . . . . . . . $1,940,00028

Prior Biennia (Expenditures). . . . . . . . . . . . . $16,852,00029Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030

TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,792,00031

NEW SECTION. Sec. 5129. FOR THE COMMUNITY AND TECHNICAL COLLEGE32SYSTEM33

Minor Works - Preservation (30000779)34

Code Rev/AL:akl 184 H-2429.2/15 2nd draft

Page 186: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Reappropriation:1Community/Technical College Capital Projects2

Account—State. . . . . . . . . . . . . . . . . . . . $965,0003Prior Biennia (Expenditures). . . . . . . . . . . . . $16,635,0004Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,600,0006

NEW SECTION. Sec. 5130. FOR THE COMMUNITY AND TECHNICAL COLLEGE7SYSTEM8

Roof Repairs (30000844)9Reappropriation:10

Community/Technical College Capital Projects11Account—State. . . . . . . . . . . . . . . . . . . . $554,00012

Prior Biennia (Expenditures). . . . . . . . . . . . . $7,231,00013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,785,00015

NEW SECTION. Sec. 5131. FOR THE COMMUNITY AND TECHNICAL COLLEGE16SYSTEM17

Facility Repairs (30000897)18Reappropriation:19

State Building Construction Account—State. . . . . . . $2,905,00020Prior Biennia (Expenditures). . . . . . . . . . . . . $19,229,00021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,134,00023

NEW SECTION. Sec. 5132. FOR THE COMMUNITY AND TECHNICAL COLLEGE24SYSTEM25

Site Repairs (30000941)26Reappropriation:27

Community/Technical College Capital Projects28Account—State. . . . . . . . . . . . . . . . . . . . $71,00029

Prior Biennia (Expenditures). . . . . . . . . . . . . $2,503,00030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,574,00032

Code Rev/AL:akl 185 H-2429.2/15 2nd draft

Page 187: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 5133. FOR THE COMMUNITY AND TECHNICAL COLLEGE1SYSTEM2

Edmonds Community College: Washington Aerospace Training and3Research Center (30000979)4

The reappropriation in this section is subject to the following5conditions and limitations: The reappropriation is subject to the6provisions of section 4, chapter 1, Laws of 2013, 3rd sp. sess.7Reappropriation:8

State Building Construction Account—State. . . . . . . . $840,0009Prior Biennia (Expenditures). . . . . . . . . . . . . . $660,00010Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00012

NEW SECTION. Sec. 5134. FOR THE COMMUNITY AND TECHNICAL COLLEGE13SYSTEM14

Big Bend: Professional-Technical Education Center (30000981)15Appropriation:16

State Building Construction Account—State. . . . . . . $2,040,00017Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . $34,490,00019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,530,00020

NEW SECTION. Sec. 5135. FOR THE COMMUNITY AND TECHNICAL COLLEGE21SYSTEM22

Spokane: Main Building South Wing Renovation (30000982)23The appropriation in this section is subject to the following24

conditions and limitations: The appropriation in this section is25provided solely for predesign, which may also serve as bridging26documents, design, competition honoraria, project management, and27other planning activities including permits. The building must be28delivered using design build, as defined by chapter 39.10 RCW with a29guarantee for energy, operations, and maintenance performance. The30term for performance guarantee must not be less than one year. The31state may use state employees for services not related to building32performance. Criteria for selecting the design build contractor must33include life cycle costs, energy costs, or energy use index.34Contractors, and architectural and engineering firms may be eligible35for additional points during the scoring process if they have36Code Rev/AL:akl 186 H-2429.2/15 2nd draft

Page 188: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

experience with the state agency, or if they are considered a small1business. The building must be built using sustainable building2standards as defined in section 7008 of this act.3Appropriation:4

State Building Construction Account—State. . . . . . . $2,823,0005Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06Future Biennia (Projected Costs). . . . . . . . . . . $24,742,0007

TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,565,0008

NEW SECTION. Sec. 5136. FOR THE COMMUNITY AND TECHNICAL COLLEGE9SYSTEM10

Highline: Health and Life Sciences (30000983)11Appropriation:12

State Building Construction Account—State. . . . . . . $2,932,00013Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014Future Biennia (Projected Costs). . . . . . . . . . . $23,850,00015

TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,782,00016

NEW SECTION. Sec. 5137. FOR THE COMMUNITY AND TECHNICAL COLLEGE17SYSTEM18

Minor Works - Program (30001038)19Appropriation:20

State Building Construction Account—State. . . . . . $22,456,00021Community/Technical College Capital Projects Account—22

State. . . . . . . . . . . . . . . . . . . . . . . $1,744,00023Subtotal Appropriation. . . . . . . . . . . . . . $24,200,00024

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,200,00027

NEW SECTION. Sec. 5138. FOR THE COMMUNITY AND TECHNICAL COLLEGE28SYSTEM29

Minor Works - Preservation (30001106)30Appropriation:31

Community/Technical College Capital Projects Account—32State. . . . . . . . . . . . . . . . . . . . . . $19,360,00033

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034Code Rev/AL:akl 187 H-2429.2/15 2nd draft

Page 189: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,360,0002

NEW SECTION. Sec. 5139. FOR THE COMMUNITY AND TECHNICAL COLLEGE3SYSTEM4

Roof Repairs (30001155)5Appropriation:6

Community/Technical College Capital Projects Account—7State. . . . . . . . . . . . . . . . . . . . . . $12,534,0008

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010

TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,534,00011

NEW SECTION. Sec. 5140. FOR THE COMMUNITY AND TECHNICAL COLLEGE12SYSTEM13

Facility Repairs (30001182)14Appropriation:15

Community/Technical College Capital Projects Account—16State. . . . . . . . . . . . . . . . . . . . . . $20,733,00017

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,733,00020

NEW SECTION. Sec. 5141. FOR THE COMMUNITY AND TECHNICAL COLLEGE21SYSTEM22

Site Repairs (30001216)23Appropriation:24

Community/Technical College Capital Projects Account—25State. . . . . . . . . . . . . . . . . . . . . . . $2,829,00026

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,829,00029

NEW SECTION. Sec. 5142. FOR THE COMMUNITY AND TECHNICAL COLLEGE30SYSTEM31

Preventive Maintenance and Building System Repairs (30001286)32Appropriation:33

Code Rev/AL:akl 188 H-2429.2/15 2nd draft

Page 190: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Community/Technical College Capital Projects Account—1State. . . . . . . . . . . . . . . . . . . . . . $22,800,0002

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03Future Biennia (Projected Costs). . . . . . . . . . . $91,200,0004

TOTAL. . . . . . . . . . . . . . . . . . . . . . $114,000,0005

(End of part)

Code Rev/AL:akl 189 H-2429.2/15 2nd draft

Page 191: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

PART 612015 SUPPLEMENTAL CAPITAL BUDGET2

NEW SECTION. Sec. 6001. A new section is added to 2013 2nd3sp.s. c 19 (uncodified) to read as follows:4FOR THE DEPARTMENT OF COMMERCE5

Building for the Arts Grants (30000006)6The reappropriation in this section is subject to the following7

conditions and limitations:8(1) The reappropriation in this section is subject to the9

provisions of section 1011, chapter 36, Laws of 2010 1st sp. sess.10(2) The reappropriation in this section is provided solely for11

the Federal Way performing arts center.12Reappropriation:13

State Building Construction Account—State. . . . . . . . $218,00014Prior Biennia (Expenditures). . . . . . . . . . . . . $8,481,00015Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,699,00017

Sec. 6002. 2013 2nd sp.s. c 19 s 1073 (uncodified) is amended to18read as follows:19FOR THE DEPARTMENT OF COMMERCE20

Drinking Water State Revolving Fund Loan Program (30000189)21The appropriations in this section are subject to the following22

conditions and limitations:23(1) (($4,400,000 for fiscal year 2014 and)) $4,400,000 from the24

drinking water assistance account—state for fiscal year 2015 is25provided solely as state match for federal safe drinking water funds.26

(2) For projects involving repair, replacement, or improvement of27a clean water infrastructure facility or other public works facility28for which an investment grade efficiency audit is obtainable, the29public works board must require as a contract condition that the30project sponsor undertake an investment grade efficiency audit. The31project sponsor may finance the costs of the audit as part of its32drinking water state revolving fund program loan.33Appropriation:34

((State Building Construction Account—State. . . . . $8,800,000))35Drinking Water Assistance Account—State. . . . . . . . $4,400,00036

Code Rev/AL:akl 190 H-2429.2/15 2nd draft

Page 192: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Drinking Water Assistance Repayment Account—1State. . . . . . . . . . . . . . . . . . . . . . $200,000,0002Subtotal Appropriation. . . . . . . . . . . (($208,800,000))3

$204,400,0004Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . $680,000,0006

TOTAL. . . . . . . . . . . . . . . . . . . . (($888,800,000))7$884,400,0008

Sec. 6003. 2013 3rd sp.s. c 1 s 3 (uncodified) is amended to9read as follows:10FOR THE DEPARTMENT OF COMMERCE11

Renton Aerospace Training Center Construction (((92000151)))12(30000724)13

The appropriation in this section is subject to the following14conditions and limitations: The appropriation in this section is15provided solely for construction of the Renton aerospace training16center.17Appropriation:18

State Building Construction Account—State. . . . . (($5,000,000))19 $10,000,00020

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022

TOTAL. . . . . . . . . . . . . . . . . . . . . (($5,000,000))23$10,000,00024

Sec. 6004. 2013 2nd sp.s. c 19 s 1074 (uncodified) is amended to25read as follows:26FOR THE DEPARTMENT OF COMMERCE27

Clean Energy and Energy Freedom Program (91000582)28The appropriations in this section are subject to the following29

conditions and limitations:30(1) All expenditures from the state taxable building construction31

account—state appropriation in this section must be used for projects32that provide a benefit to the public through development,33demonstration, and deployment of clean energy technologies that save34energy and reduce energy costs, reduce harmful air emissions or35otherwise increase energy independence for the state. All36Code Rev/AL:akl 191 H-2429.2/15 2nd draft

Page 193: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

expenditures must be used for projects that develop and acquire1assets that have a useful life of at least thirteen years. These2requirements must be specified in funding agreements issued by the3department.4

(2) For any project funded from the state taxable building5construction account—state appropriation in this section, state funds6must not exceed fifty percent of the estimated cost of a project, and7funding preference must be provided to projects that offer a higher8percentage of nonstate match funds.9

(3)(a) $15,000,000 of the state taxable building construction10account—state appropriation in this section is provided solely to11create a revolving loan fund to support the widespread use of proven12building energy efficiency and renewable energy technologies now13inhibited by lack of access to capital.14

(b) To create the loan fund, the department shall provide grant15funds to a competitively selected nonprofit lender that will provide16matching private capital and will administer the loan fund. The17department must select the loan fund administrator through a18competitive process, with scoring conducted by a group of qualified19experts, applying criteria specified by the department.20

(c) The department must establish guidelines for the lender21related to applicant eligibility, the screening process, and22evaluation and selection criteria. The criteria must include23requiring evidence of support for the proposed project from the24impacted community and consistency with economic growth strategies25and plans of the affected local governments. Applications for loans26from the revolving fund must disclose all sources of public funding27to be provided for a project. The nonprofit lender must use the28revolving loan fund to make affordable loans for projects including,29but not limited to: Residential and commercial energy retrofits,30residential and community-scale solar installations, anaerobic31digesters to treat dairy and organic waste, and combined heat and32power projects using woody biomass as a fuel source.33

(d) The department must conduct due diligence activities34associated with the use of public funds, including oversight of the35project selection process and project monitoring.36

(e) Projects seeking financing of solar installations under this37section must agree in contract to not participate in the cost-38recovery program under RCW 82.16.120.39

Code Rev/AL:akl 192 H-2429.2/15 2nd draft

Page 194: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(4) $15,000,000 of the state taxable building construction1account—state appropriation in this section is provided solely for2grants to advance renewable energy technologies by public and private3electrical utilities that serve retail customers in the state. The4department shall work with utilities to offer matching grants for5projects that demonstrate new smart grid technologies. The department6shall develop a grant application process to competitively select7projects for grant awards, to include scoring conducted by a group of8qualified experts with application of criteria specified by the9department. Applications for grants must disclose all sources of10public funding to be provided for a project. The grant funds must be11used to fund projects that demonstrate how to: Integrate intermittent12renewables through energy storage and information technology,13dispatch energy storage resources from utility control rooms, use the14thermal properties and electric load of commercial buildings and15district energy systems to store energy, or otherwise improve the16reliability and reduce the costs of intermittent or distributed17renewable energy.18

(5) $6,000,000 of the state taxable building construction account19—state appropriation in this section is provided solely for grants to20match federal funds used to develop and demonstrate clean energy21technologies. The department shall work with the University of22Washington, Washington State University, and the Pacific Northwest23National Laboratory to offer matching funds for projects including,24but not limited to: Advancing energy storage and solar technologies,25and federal manufacturing innovation centers related to use of light-26weight carbon fiber components to advance energy efficiency in the27aeronautical, automotive, and marine sectors.28

(6) The department must report on number and results of projects29funded through the clean energy fund, including the number of job30hours created and the number of jobs maintained and created, to the31governor and the legislature, by November 1, 2014.32

(7) The energy recovery act account—federal appropriation in this33section is provided solely for loans, loan guarantees, and grants34that encourage the establishment of innovative and sustainable35industries for renewable energy and energy efficiency technology,36consistent with provisions of RCW 43.325.040 (energy freedom37account).38Appropriation:39

Code Rev/AL:akl 193 H-2429.2/15 2nd draft

Page 195: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Taxable Building Construction Account—1State. . . . . . . . . . . . . . . . . . . . . . $36,000,0002

Energy Recovery Act Account—((Federal)) State. . . . . $4,000,0003Subtotal Appropriation. . . . . . . . . . . . . . $40,000,0004

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,0007

Sec. 6005. 2013 2nd sp.s. c 19 s 1077 (uncodified) is amended to8read as follows:9FOR THE DEPARTMENT OF COMMERCE10

Projects for Jobs and Economic Development (92000151)11The appropriations in this section are subject to the following12

conditions and limitations:13(1) Except as directed otherwise prior to the effective date of14

this section, the department shall not expend the appropriations in15this section unless and until the nonstate share of project costs16have been either expended, or firmly committed, or both, in an amount17sufficient to complete the project or a distinct phase of the project18that is useable to the public for the purpose intended by the19legislature. This requirement does not apply to projects where a20share of the appropriations are released for design costs only.21

(2) Prior to receiving funds, project recipients must demonstrate22that the project site is under control for a minimum of ten years,23either through ownership or a long-term lease. This requirement does24not apply to appropriations for preconstruction activities or25appropriations whose sole purpose is to purchase real property that26does not include a construction or renovation component.27

(3) Projects funded in this section may be required to comply28with Washington's high performance building standards as required by29chapter 39.35D RCW.30

(4) Project funds are available on a reimbursement basis only,31and shall not be advanced under any circumstances.32

(5) Projects funded in this section must be held by the recipient33for a minimum of ten years and used for the same purpose or purposes34intended by the legislature as required in RCW 43.63A.125(6).35

(6) Projects funded in this section, including those that are36owned and operated by nonprofit organizations, are generally required37to pay state prevailing wages.38Code Rev/AL:akl 194 H-2429.2/15 2nd draft

Page 196: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(7) The appropriations are provided solely for the following list1of projects:2 3 Projects for Jobs & Economic Development Authorized Amount

4 City of Bremerton Puget Sound Naval Safety Project $1,300,000

5 Fairchild Airforce Base $2,700,000

6 City of Lynnwood Main Street Improvements $250,000

7 Port of Everett: Roll-On/Roll-Off Cargo Berth $1,500,000

8 Kittitas County Infrastructure and Facilities $5,000,000

9 City of Kennewick Industrial Land $1,000,000

10 Perry Tech Institute Building $1,000,000

11 City of Buckley Drinking Water Improvements $350,000

12 ((Coronado)) Carbonado Reservoir Replacement $525,000

13 Hopelink Cleveland Street Project $1,000,000

14 Redmond Connector $1,300,000

15 Washougal ((Storm Water Decant Facility)) Wastewater Treatment Plant $1,000,000

16 Roslyn Renaissance Northwest Improvement Company Building $500,000

17 Everett/Tulalip Water Pipeline Construction $1,000,000

18 ((Renton Aerospace Training Center Construction $5,000,000))

19 Renton Riverview Bridge Replacement $1,100,000

20 Omak City Sewer, Collection System, and Treatment Plant $2,000,000

21 Harper Pier Replacement $800,000

22 University Place Main Street Redevelopment $975,000

23 Sultan Alder Avenue Water/Sewer Line Replacement $185,000

24 Quincy Industrial Water Reclamation & Reuse $700,000

25 NW Medical School $136,000

26 Ione - 8th St Lift Station Replacement $165,000

27 Stevens PUD Projects $532,000

28 Port Orchard Bay St. Pedestrian Path - Phase 2 $336,000

29 Dekalb Pier - Phase 2 $255,000

30 Kenmore Village $300,000

31 South Kirkland TOD/Cross Kirkland Corridor $1,300,000

32 Washington Agriculture Discovery Center $100,000

Code Rev/AL:akl 195 H-2429.2/15 2nd draft

Page 197: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

1 Mountlake Terrace Mainstreet Grant $2,000,000

2 Issaquah - North Roadway Network Improvement $5,000,000

3 TRIDEC Development of Small Modular Reactor Proposal $500,000

4 City of Shelton Wastewater $1,500,000

5 Port of Moses Lake Firefighting System $300,000

6 Seattle Chinatown/ID Development $500,000

7

8 9

TOTAL (($42,109,000))

$37,109,000

Appropriation:10State Building Construction Account—State. . . . (($35,009,000))11

$30,009,00012Public Facility Construction Loan Revolving13

Account—State. . . . . . . . . . . . . . . . . . . $7,100,00014Subtotal Appropriation. . . . . . . . . . . . (($42,109,000))15

$37,109,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . (($42,109,000))19$37,109,00020

Sec. 6006. 2013 2nd sp.s. c 19 s 1078 (uncodified) is amended to21read as follows:22FOR THE DEPARTMENT OF COMMERCE23

Projects That Strengthen Communities and Quality of Life24(92000230)25

The appropriations in this section are subject to the following26conditions and limitations:27

(1) Except as directed otherwise prior to the effective date of28this section, the department shall not expend the appropriation in29this section unless and until the nonstate share of project costs30have been either expended, or firmly committed, or both, in an amount31sufficient to complete the project or a distinct phase of the project32that is useable to the public for the purpose intended by the33legislature. This requirement does not apply to projects where a34share of the appropriation is released for design costs only.35

Code Rev/AL:akl 196 H-2429.2/15 2nd draft

Page 198: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(2) Prior to receiving funds, project recipients must demonstrate1that the project site is under control for a minimum of ten years,2either through ownership or a long-term lease. This requirement does3not apply to appropriations for preconstruction activities or4appropriations whose sole purpose is to purchase real property that5does not include a construction or renovation component.6

(3) Projects funded in this section may be required to comply7with Washington's high performance building standards as required by8chapter 39.35D RCW.9

(4) Project funds are available on a reimbursement basis only,10and shall not be advanced under any circumstances.11

(5) Projects funded in this section must be held by the recipient12for a minimum of ten years and used for the same purpose or purposes13intended by the legislature as required in RCW 43.63A.125(6).14

(6) Projects funded in this section, including those that are15owned and operated by nonprofit organizations, are generally required16to pay state prevailing wages.17

(7) $1,500,000 of the appropriation in this section from the18state building construction account—state is provided solely for19design development to align ongoing planning for the replacement of20the Seattle multimodal terminal at Colman dock with the creation of a21public park. The scope of work must provide a design plan that22includes an elevated park and corresponding amenities above the23terminal. Design development shall be delivered through the city of24Seattle. The scope of this project does not preclude any current25plans for Colman dock to replace or seismically upgrade the facility,26nor does it reduce the amount of general and commercial traffic, high27occupancy vehicles, transit, bicyclist and pedestrian movement.28

(8) $500,000 of the appropriation from the environmental legacy29stewardship account—state is provided solely for an investigation of30possible contaminated soils around the Colman dock.31

(9) The appropriation is provided solely for the following list32of projects:33 34 Projects that Strengthen Communities & Quality of Life Authorized Amount

35 Ft. Vancouver - Mother Joseph Academy & Infantry Barracks $1,000,000

36 LaConner Boardwalk $1,600,000

37 Kent Interurban Trail Connector $750,000

38 Town of Concrete Public Safety Building $785,000

Code Rev/AL:akl 197 H-2429.2/15 2nd draft

Page 199: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

1 Complete Development of Ashford Park Facilities $1,000,000

2 Jackson Park Renovation $1,000,000

3 South Whatcom Library Construction $90,000

4 Guemes Channel Trail Project $700,000

5 Seabrook Trail $437,000

6 Vashon Island Allied Arts $2,000,000

7 Federal Way Performing Arts $2,000,000

8 Japanese Gulch Land Acquisition $1,000,000

9 Milton - Triangle Park ADA Upgrades $225,000

10 Langston Hughes Performing Arts Center - Storage $150,000

11 Wood Pellet Heat in Schools Pilot $500,000

12 ((Snohomish County Sheriff's Office South Precinct)) Young Island $1,000,000

13 Ravensdale Park $650,000

14 Worthington Park $210,000

15 Eastside Tacoma Community Center $400,000

16 ((228th Street Trail $500,000))

17 Institute for Community Leadership $275,000

18 FISH of Vancouver/Nonprofit Community Service Center $1,000,000

19 Yelm Community Center $1,000,000

20 Ellensburg Depot $500,000

21 Roslyn City Hall $400,000

22 Northwest Carriage Museum $375,000

23 People's Community Center and Pool $500,000

24 ((Town of Concrete Fire and Life Safety Facility $500,000))

25 Chehalis Pool $250,000

26 Mount Rainier Park Ranger Memorial $60,000

27 McAllister Air Museum $500,000

28 Repairs to Stevenson Grange $50,000

29 Meydenbauer Park Improvements $3,000,000

30 Sixty Acres Park Enhancements $750,000

31 Covington Community Park Phase 2 $2,100,000

32 Johnson Farm Museum - Anderson Island $250,000

Code Rev/AL:akl 198 H-2429.2/15 2nd draft

Page 200: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

1 Nikolai Project $40,000

2 Ft. Steilacoom Building Preservation $250,000

3 Plaza Roberto Maestas - Building the Beloved Community $1,000,000

4 Seattle Multimodal Terminal at Colman Dock/Public Park $2,000,000

5 Confluence Project $747,000

6 Castle Rock Citywide Residential Street Project $504,000

7 UWAVE $30,000

8 Transit-Community Center $800,000

9 Mt. Spokane Lodge $250,000

10

11 12

TOTAL (($33,128,000))

$32,128,000

Appropriation:13State Building Construction Account—State. . . . (($32,628,000))14

$31,628,00015Environmental Legacy Stewardship Account—16

State. . . . . . . . . . . . . . . . . . . . . . . . $500,00017Subtotal Appropriation. . . . . . . . . . . . (($33,128,000))18

$32,128,00019Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021

TOTAL. . . . . . . . . . . . . . . . . . . . (($33,128,000))22$32,128,00023

Sec. 6007. 2013 2nd sp.s. c 19 s 1090 (uncodified) is amended to24read as follows:25FOR THE OFFICE OF FINANCIAL MANAGEMENT26

Higher Education Preservation Information (91000427)27((The appropriations in this section are subject to the following28

conditions and limitations: The appropriations are provided solely to29refresh preservation information that resides in the state's30comparable framework for higher education buildings including any31necessary revisions or adjustments that will enable more direct32translation of information, updates for last renewal or replacement33of major systems, and quality assurance field sampling. In executing34this continued capital study, the office of financial management35Code Rev/AL:akl 199 H-2429.2/15 2nd draft

Page 201: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

shall consult the legislative fiscal committees about its workplan to1ensure field sampling of facilities prioritized for renovation or2replacement, and timely delivery of assembled facilities information3and related capital models in an easy to understand format. As a4general condition, upon appropriations provided to higher education5agencies in this act, the state board for community and technical6colleges and each state baccalaureate institution shall provide7requested facilities information in a timely manner to enable the8office of financial management to complete the tasks and oversight9assigned in this section.)) The appropriations in this section are10subject to the following conditions and limitations: Funding is11provided solely to further develop a comparable framework methodology12to equalize the facility condition assessments by higher education13institutions. The methodology will improve upon the existing state14facility inventory and condition assessment systems to collect and15convey the information. The inventory system may include facility16system replacement or renewals including costs, quality assurance17field sampling data, and tracking of condition rating adjustments.18Appropriation:19

University of Washington Building Account—State. . . (($130,000))20 $116,00021

Washington State University Building22Account—State. . . . . . . . . . . . . . . . . . (($94,000))23

$85,00024Eastern Washington University Capital Projects25

Account—State. . . . . . . . . . . . . . . . . . (($23,000))26 $21,00027

Central Washington University Capital Projects28Account—State. . . . . . . . . . . . . . . . . . (($19,000))29

$17,00030The Evergreen State College Capital Projects31

Account—State. . . . . . . . . . . . . . . . . . (($13,000))32 $12,00033

Western Washington University Capital Projects34Account—State. . . . . . . . . . . . . . . . . . (($21,000))35

$19,00036Subtotal Appropriation. . . . . . . . . . . . . (($300,000))37

$270,00038Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $039

Code Rev/AL:akl 200 H-2429.2/15 2nd draft

Page 202: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01TOTAL. . . . . . . . . . . . . . . . . . . . . . (($300,000))2

$270,0003

Sec. 6008. 2013 2nd sp.s. c 19 s 1091 (uncodified) is amended to4read as follows:5FOR THE OFFICE OF FINANCIAL MANAGEMENT6

Construction Contingency Pool (91000428)7The appropriation in this section is subject to the following8

conditions and limitations: The appropriation in this section is9provided solely for construction projects that confront emergent and10unavoidable costs in excess of the construction contingency and11management reserves included in the project appropriation. For12requests occurring during a legislative session, an agency must13notify the legislative fiscal committees before requesting14contingency funds from the office of financial management. Eligible15agencies that may apply to the pool include higher education16institutions, the state parks and recreation commission, the17department of corrections, the department of enterprise services, and18the department of health. Eligible construction projects are only19projects that had project cost reductions. The office of financial20management must notify the legislative evaluation and accountability21program committee, the house capital budget committee, and senate22ways and means committee as projects are approved for funding.23Appropriation:24

State Building Construction Account—State. . . . . (($4,000,000))25 $1,875,00026

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028

TOTAL. . . . . . . . . . . . . . . . . . . . . (($4,000,000))29$1,875,00030

Sec. 6009. 2013 2nd sp. s. c 19 s 1093 (uncodified) is amended31to read as follows:32FOR THE DEPARTMENT OF ENTERPRISE SERVICES33

Natural Resource Building Roof Replacement/Exterior Foam34Insulation Repairs (30000546)35Reappropriation:36

Code Rev/AL:akl 201 H-2429.2/15 2nd draft

Page 203: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

State Building Construction Account—State. . . . . . (($510,000))1 $33,0002

Prior Biennia (Expenditures). . . . . . . . . . . (($3,972,000))3 $4,409,0004

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05TOTAL. . . . . . . . . . . . . . . . . . . . . (($4,482,000))6

$4,442,0007

Sec. 6010. 2013 2nd sp.s. c 19 s 1099 (uncodified) is amended to8read as follows:9FOR THE DEPARTMENT OF ENTERPRISE SERVICES10

Legislative Building Critical Hydronic Loop Repairs (30000584)11Reappropriation:12

State Building Construction Account—State. . . . . (($1,075,000))13 $1,013,00014Appropriation:15

State Building Construction Account—State. . . . . . (($851,000))16 $410,00017

Prior Biennia (Expenditures). . . . . . . . . . . . (($104,000))18 $166,00019

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020TOTAL. . . . . . . . . . . . . . . . . . . . . (($2,030,000))21

$1,589,00022

Sec. 6011. 2013 2nd sp.s. c 19 s 1108 (uncodified) is amended to23read as follows:24FOR THE DEPARTMENT OF ENTERPRISE SERVICES25

Legislative Building Exterior Repairs (30000604)26Appropriation:27

State Building Construction Account—State. . . . . (($1,000,000))28 $1,075,00029

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,000,000))32$1,075,00033

Code Rev/AL:akl 202 H-2429.2/15 2nd draft

Page 204: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Sec. 6012. 2013 2nd sp.s. c 19 s 1104 (uncodified) is amended to1read as follows:2FOR THE DEPARTMENT OF ENTERPRISE SERVICES3

Capitol Campus Underground Utility Repairs (30000687)4Appropriation:5

State Building Construction Account—State. . . . . (($1,983,000))6 $2,613,0007

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08Future Biennia (Projected Costs). . . . . . . . . . . $8,827,0009

TOTAL. . . . . . . . . . . . . . . . . . . . (($10,810,000))10$11,440,00011

Sec. 6013. 2013 2nd sp.s. c 19 s 1105 (uncodified) is amended to12read as follows:13FOR THE DEPARTMENT OF ENTERPRISE SERVICES14

Natural Resource Building Repairs Phase 1 (91000009)15The appropriations in this section are subject to the following16

conditions and limitations: The natural resource building repairs17phase 1 project must include at a minimum the multipurpose room water18infiltration project and the roof project. After this work is19completed, the department may include work that was in the20department's 2013-2015 capital budget request for other repairs to21the building.22Appropriation:23

State Building Construction Account—State. . . . . (($4,161,000))24 $4,041,00025

Thurston County Capital Facilities Construction26Account—State. . . . . . . . . . . . . . . . . . . . $940,00027Subtotal Appropriation. . . . . . . . . . . . (($5,101,000))28

$4,981,00029Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031

TOTAL. . . . . . . . . . . . . . . . . . . . . (($5,101,000))32$4,981,00033

Sec. 6014. 2013 2nd sp.s. c 19 s 2024 (uncodified) is amended to34read as follows:35FOR THE DEPARTMENT OF CORRECTIONS36Code Rev/AL:akl 203 H-2429.2/15 2nd draft

Page 205: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Monroe Corrections Center: WSR Living Units Roofs (30000542)1Appropriation:2

State Building Construction Account—State. . . . . (($1,785,000))3 $1,868,0004

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,785,000))7$1,868,0008

Sec. 6015. 2013 2nd sp.s. c 19 s 2028 (uncodified) is amended to9read as follows:10FOR THE DEPARTMENT OF CORRECTIONS11

Washington Corrections Center for Women: Replace Fire Alarm12System (30000727)13Appropriation:14

State Building Construction Account—State. . . . . (($2,569,000))15 $2,649,00016

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . (($2,569,000))19$2,649,00020

Sec. 6016. 2013 2nd sp.s. c 19 s 3067 (uncodified) is amended to21read as follows:22FOR THE DEPARTMENT OF ECOLOGY23

Water Pollution Control Revolving Program (30000327)24The appropriations in this section are subject to the following25

conditions and limitations:26(1) (($7,750,000 for fiscal year 2014 and $7,750,000))27

$15,500,000 for fiscal year 2015 of the ((state building28construction)) water pollution control revolving account—state is29provided solely as state match for federal clean water funds.30

(2) For projects involving repair, replacement, or improvement of31a wastewater treatment plant or other public works facility for which32an investment grade efficiency audit is obtainable, the department of33ecology must require as a contract condition that the project sponsor34undertake an investment grade efficiency audit. The project sponsor35

Code Rev/AL:akl 204 H-2429.2/15 2nd draft

Page 206: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

may finance the costs of the audit as part of its water pollution1control loan program ((loan)).2Appropriation:3

((State Building Construction Account—State. . . . $15,500,000))4Water Pollution Control Revolving Account—5

State. . . . . . . . . . . . . . . . . . . . (($184,500,000))6 $200,000,0007

Water Pollution Control Revolving8Account—Federal. . . . . . . . . . . . . . . . . $50,000,0009Subtotal Appropriation. . . . . . . . . . . . . $250,000,00010

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011Future Biennia (Projected Costs). . . . . . . . . . $510,000,00012

TOTAL. . . . . . . . . . . . . . . . . . . . . . $760,000,00013

Sec. 6017. 2013 2nd sp.s. c 19 s 3058 (uncodified) is amended to14read as follows:15FOR THE DEPARTMENT OF ECOLOGY16

Skagit Mitigation (91000181)17The reappropriation in this section is subject to the following18

conditions and limitations: The reappropriation in this section is19provided solely for the department to develop mitigation options and20alternative water sources or tools to make water available for stream21flows and for rural domestic permit-exempt uses within the22((Carpenter/Fisher, East Nookachamps, and Upper Nookachamps23subbasins)) Skagit River watershed. Up to $500,000 of the amount24specified shall be used to develop a rural domestic demonstration25project to determine if surface or groundwater infiltration can26mitigate for ground water use during low flow periods to meet the27mitigation requirements of chapter 173-503 WAC.28Reappropriation:29

State Building Construction Account—State. . . . . . . $2,156,00030Prior Biennia (Expenditures). . . . . . . . . . . . . . . $69,00031Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032

TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,225,00033

Sec. 6018. 2013 2nd sp.s. c 19 s 3101 (uncodified) is amended to34read as follows:35FOR THE STATE PARKS AND RECREATION COMMISSION36Code Rev/AL:akl 205 H-2429.2/15 2nd draft

Page 207: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Dosewallips: Wastewater Treatment System (30000523)1Appropriation:2

State Building Construction Account—State. . . . . (($4,079,000))3 $4,532,0004

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06

TOTAL. . . . . . . . . . . . . . . . . . . . . (($4,079,000))7$4,532,0008

Sec. 6019. 2013 2nd sp.s. c 19 s 3190 (uncodified) is amended to9read as follows:10FOR THE DEPARTMENT OF FISH AND WILDLIFE11

Mitchell Act Federal Grant (91000021)12Reappropriation:13

General Fund—Federal. . . . . . . . . . . . . . . . . $2,328,00014Appropriation:15

General Fund—Federal. . . . . . . . . . . . . . . . . $4,000,00016Prior Biennia (Expenditures). . . . . . . . . . . . . . $672,00017Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018

TOTAL. . . . . . . . . . . . . . . . . . . . . (($3,000,000))19$7,000,00020

Sec. 6020. 2013 2nd sp.s. c 19 s 3212 (uncodified) is amended to21read as follows:22FOR THE PUGET SOUND PARTNERSHIP23

Community Partnership Restoration Grants (30000007)24Reappropriation:25

General Fund—Federal. . . . . . . . . . . . . . . (($1,155,000))26 $1,575,00027

Prior Biennia (Expenditures). . . . . . . . . . . . (($445,000))28 $50,00029

Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,600,000))31

$1,625,00032

Sec. 6021. 2013 2nd sp.s. c 19 s 5007 (uncodified) is amended to33read as follows:34

Code Rev/AL:akl 206 H-2429.2/15 2nd draft

Page 208: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION1Yakima Valley Technical Skills Center (30000076)2

Reappropriation:3State Building Construction Account—State. . . . (($12,962,000))4

$11,082,0005Prior Biennia (Expenditures). . . . . . . . . . . . . $12,481,0006Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07

TOTAL. . . . . . . . . . . . . . . . . . . . (($25,443,000))8$23,563,0009

Sec. 6022. 2013 2nd sp.s. c 19 s 5020 (uncodified) is amended to10read as follows:11FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION12

2013-2015 School Construction Assistance Program - Maintenance13(30000145)14

The appropriations in this section are subject to the following15conditions and limitations:16

(1) $1,340,000 of the common school construction account—state17appropriation is provided solely for study and survey grants and for18completing inventory and building condition assessments for all19public school districts once every six years.20

(2) $933,000 of the common school construction account—state21appropriation is provided solely for mapping the design of new22facilities and remapping the design of facilities to be remodeled,23for school construction projects funded through the school24construction assistance program.25

(3) The office of the superintendent of public instruction must26improve web-based access by taxpayers to school capacity and actual27enrollment in order to understand possible opportunities to increase28efficiency through consolidation. The office of the superintendent of29public instruction must post this capacity and enrollment information30on its web site.31

(4) Funds from this appropriation may be used to match federal32dollars provided by the office of economic adjustment for school33replacement facilities located on military bases.34

(5) The office of the superintendent of public instruction must35expedite allocation and distribution of any eligible funds under the36school construction assistance grant program to the Evergreen (Clark37

Code Rev/AL:akl 207 H-2429.2/15 2nd draft

Page 209: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

County) School District to address the school construction emergency1resulting from the fire that destroyed the Crestline School.2

(6) The space allocations for state funding assistance purposes3for districts with senior or four-year high schools with fewer than4four hundred students, as outlined in WAC 392-343-035, must be5computed in accordance with the following formula:6 7 8

Number of Headcount

Student-Grades 9-12

Maximum Space

Allocation Per Facility

9 0-200 42,000 square feet

10 201-300 48,000 square feet

11 301-or more 52,000 square feet

Appropriation:12State Building Construction Account—State. . . . . . $285,355,00013Common School Construction Account—State. . . . (($208,232,000))14

$100,593,00015Common School Construction Account—Federal. . . . . . $1,500,00016

Subtotal Appropriation. . . . . . . . . . . (($495,087,000))17$387,448,00018

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019Future Biennia (Projected Costs). . . . . . . (($3,099,310,000))20

$3,099,270,00021TOTAL. . . . . . . . . . . . . . . . . . . (($3,594,397,000))22

$3,486,718,00023

Sec. 6023. 2013 2nd sp.s. c 19 s 5015 (uncodified) is amended to24read as follows:25FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION26

WA-NIC (Washington Network for Innovative Careers) Skills Center27- Snoqualmie Valley School District/Bellevue Community College28(92000006)29Reappropriation:30

State Building Construction Account—State. . . . . (($1,715,000))31 $31,00032

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034

TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,715,000))35$31,00036

Code Rev/AL:akl 208 H-2429.2/15 2nd draft

Page 210: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Sec. 6024. 2013 2nd sp.s. c 19 s 5025 (uncodified) is amended to1read as follows:2FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION3

School Security Improvement Grants (92000015)4The appropriation in this section is subject to the following5

conditions and limitations: The appropriation is provided solely for6nonrecurring costs associated with school facility safety projects7consistent with chapter 233, Laws of 2013 (Second Engrossed8Substitute Senate Bill No. 5197).9Appropriation:10

State Building Construction Account—State. . . . (($10,000,000))11 $6,656,00012

Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014

TOTAL. . . . . . . . . . . . . . . . . . . . (($10,000,000))15$6,656,00016

Sec. 6025. 2013 2nd sp.s. c 19 s 5055 (uncodified) is amended to17read as follows:18FOR THE WASHINGTON STATE UNIVERSITY19

Washington State University Pullman Pedestrian Bridge (91000028)20Appropriation:21

Washington State University Building22Account—State. . . . . . . . . . . . . . . . . (($1,500,000))23

$024Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026

TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,500,000))27$028

Sec. 6026. 2013 2nd sp.s. c 19 s 5108 (uncodified) is amended to29read as follows:30FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM31

Bates Technical College: Mohler Communications Technology Center32(20082703)33Reappropriation:34

State Building Construction Account—State. . . . . . . . $219,00035

Code Rev/AL:akl 209 H-2429.2/15 2nd draft

Page 211: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Appropriation:1State Building Construction Account—State. . . . (($23,808,000))2

$24,519,0003Prior Biennia (Expenditures). . . . . . . . . . . . . $1,709,0004Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05

TOTAL. . . . . . . . . . . . . . . . . . . . (($25,736,000))6$26,447,0007

Sec. 6027. 2013 2nd sp.s. c 19 s 5110 (uncodified) is amended to8read as follows:9FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM10

Clark College: Health and Advanced Technologies Building11(20082705)12Reappropriation:13

State Building Construction Account—State. . . . . . . $1,335,00014Appropriation:15

State Building Construction Account—State. . . . (($33,784,000))16 $34,478,00017

Prior Biennia (Expenditures). . . . . . . . . . . . . $1,239,00018Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019

TOTAL. . . . . . . . . . . . . . . . . . . . (($36,358,000))20$37,052,00021

Sec. 6028. 2013 2nd sp.s. c 19 s 7043 (uncodified) is amended to22read as follows:23FOR THE STATE TREASURER—TRANSFERS24State Toxic Control Account: For transfer to the25

Local Toxic Control Account. . . . . . . . . . . . . . $4,000,00026Environmental Legacy Stewardship Account: For27

transfer to the Local Toxic Control Account. . . . . $12,000,00028State Taxable Building Construction Account: For29

transfer to the drinking water assistance30account, $4,400,000 for fiscal year 2015. . . . . . . $4,400,00031

State Taxable Building Construction Account: For32transfer to the water pollution control33revolving account, $15,500,000 for fiscal34year 2015. . . . . . . . . . . . . . . . . . . . . . $15,500,00035

Code Rev/AL:akl 210 H-2429.2/15 2nd draft

Page 212: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Sec. 6029. RCW 43.160.080 and 2010 1st sp.s. c 36 s 6011 are1each amended to read as follows:2

There shall be a fund in the state treasury known as the public3facilities construction loan revolving account, which shall consist4of all moneys collected under this chapter and any moneys5appropriated to it by law. Disbursements from the revolving account6shall be on authorization of the board. In order to maintain an7effective expenditure and revenue control, the public facilities8construction loan revolving account shall be subject in all respects9to chapter 43.88 RCW. ((During the 2009-2011 biennium, sums in the10public facilities construction loan revolving account may be used for11community economic revitalization board export assistance grants and12loans in section 1018, chapter 36, Laws of 2010 1st sp. sess. and for13matching funds for the federal energy regional innovation cluster in14section 1017, chapter 36, Laws of 2010 1st sp. sess.)) During the152013-2015 biennium, amounts in the public facilities construction16loan revolving account may be used for the animal disease17traceability project in section 3247, chapter 19, Laws of 2013 2nd18sp. sess., administered by the department of agriculture. During the192013-2015 biennium, sums in the public facilities construction loan20revolving account may be used for the clean energy partnership21project in section 1038, chapter 19, Laws of 2013 2nd sp. sess.22

NEW SECTION. Sec. 6030. A new section is added to 2013 2nd23sp.s. c 19 (uncodified) to read as follows:24

To the extent that any appropriation authorizes expenditures of25state funds from the state building construction account, or from any26other capital project account in the state treasury, for a capital27project or program that is specified to be funded with proceeds from28the sale of bonds, the legislature declares that any such29expenditures for that project or program made prior to the issue date30of the applicable bonds are intended to be reimbursed from proceeds31of those bonds in a maximum amount equal to the amount of such32appropriation.33

NEW SECTION. Sec. 6031. 2013 2nd sp.s. c 19 s 7013 (uncodified)34is repealed.35

(End of part)

Code Rev/AL:akl 211 H-2429.2/15 2nd draft

Page 213: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

PART 71MISCELLANEOUS PROVISIONS2

NEW SECTION. Sec. 7001. RCW 43.88.031 requires the disclosure3of the estimated debt service costs associated with new capital bond4appropriations. The estimated debt service costs for the5appropriations contained in this act are thirty-six million nine6hundred sixty-four thousand dollars for the 2015-2017 biennium, two7hundred thirty-one million four hundred thirty-nine thousand dollars8for the 2017-2019 biennium, and three hundred twenty-four million six9hundred three thousand dollars for the 2019-2021 biennium.10

NEW SECTION. Sec. 7002. ACQUISITION OF PROPERTIES AND11FACILITIES THROUGH FINANCIAL CONTRACTS. (1) The following agencies12may enter into financial contracts, paid from any funds of an agency,13appropriated or nonappropriated, for the purposes indicated and in14not more than the principal amounts indicated, plus financing15expenses and required reserves pursuant to chapter 39.94 RCW. When16securing properties under this section, agencies shall use the most17economical financial contract option available, including long-term18leases, lease-purchase agreements, lease-development with option to19purchase agreements or financial contracts using certificates of20participation. Expenditures made by an agency for one of the21indicated purposes before the issue date of the authorized financial22contract and any certificates of participation therein are intended23to be reimbursed from proceeds of the financial contract and any24certificates of participation therein to the extent provided in the25agency's financing plan approved by the state finance committee.26

State agencies may enter into agreements with the department of27enterprise services and the state treasurer's office to develop28requests to the legislature for acquisition of properties and29facilities through financial contracts. The agreements may include30charges for services rendered.31

(2) Those noninstructional facilities of higher education32institutions authorized in this section to enter into financial33contracts are not eligible for state funded maintenance and34operations. Instructional space that is available for regularly35scheduled classes for academic transfer, basic skills, and workforce36training programs may be eligible for state funded maintenance and37operations.38Code Rev/AL:akl 212 H-2429.2/15 2nd draft

Page 214: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(3) Criminal justice training commission: Enter into a financing1contract for up to $6,672,000 plus financing expenses and required2reserves pursuant to chapter 39.94 RCW to renovate the dormitory.3

(4) Department of enterprise services: Enter into a financing4contract for up to $63,500,000 plus financing expenses and required5reserves pursuant to chapter 39.94 RCW to construct a new building6for the utility and transportation commission, and other agencies as7identified by the office of financial management, at the pro arts8site on the capitol campus.9

(5) Department of enterprise services: Enter into a financing10contract for up to $20,000,000 plus financing expenses and required11reserves pursuant to chapter 39.94 RCW to purchase the Seattle12community justice center.13

(6) Department of enterprise services: Enter into a financing14contract for up to $69,000,000 plus financing expenses and required15reserves pursuant to chapter 39.94 RCW to construct a new office16building at 1063 Capitol Way South, Olympia.17

(7) Department of ecology: Enter into a financing contract for up18to $180,000 plus financing expenses and required reserves pursuant to19chapter 39.94 RCW for programmatic improvements to the headquarters20building and the eastern regional office.21

(8) Department of ecology: Enter into a financing contract for up22to $760,000 plus financing expenses and required reserves pursuant to23chapter 39.94 RCW for preservation improvements to the headquarters24building.25

(9) Central Washington University: Enter into a financing26contract for up to $8,414,000 plus financing expenses and required27reserves pursuant to chapter 39.94 RCW to construct a welcome center.28

(10) The Evergreen State College: Enter into a financing contract29for up to $12,500,000 plus financing expenses and required reserves30pursuant to chapter 39.94 RCW to purchase a permanent location for31the Tacoma program.32

(11) Western Washington University: Enter into a financing33contract for up to $16,310,000 plus financing expenses and required34reserves pursuant to chapter 39.94 RCW for the carver building35renovation.36

(12) Eastern Washington University: Enter into a financing37contract for up to $10,000,000 plus financing expenses and required38reserves pursuant to chapter 39.94 RCW for the Washington street39facility project.40Code Rev/AL:akl 213 H-2429.2/15 2nd draft

Page 215: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(13) Community and technical colleges:1(a) Enter into a financing contract on behalf of Centralia2

Community College for up to $5,000,000 plus financing expenses and3required reserves pursuant to chapter 39.94 RCW to renovate the4student services building.5

(b) Enter into a financing contract on behalf of Centralia6Community College for up to $3,000,000 plus financing expenses and7required reserves pursuant to chapter 39.94 RCW to purchase or8construct student housing.9

(c) Enter into a financing contract on behalf of Clark College10for up to $8,500,000 plus financing expenses and required reserves11pursuant to chapter 39.94 RCW to renovate the culinary arts facility.12

(d) Enter into a financing contract on behalf of Clark College13for up to $35,000,000 plus financing expenses and required reserves14pursuant to chapter 39.94 RCW to design and construct a student15recreation center.16

(e) Enter into a financing contract on behalf of Columbia Basin17College for up to $7,000,000 plus financing expenses and required18reserves pursuant to chapter 39.94 RCW to design and construct a19health science center.20

(f) Enter into a financing contract on behalf of Green River21College for up to $15,000,000 plus financing expenses and required22reserves pursuant to chapter 39.94 RCW to construct an aviation23program center.24

(g) Enter into a financing contract on behalf of Highline College25for up to $1,500,000 plus financing expenses and required reserves26pursuant to chapter 39.94 RCW to renovate the maintenance and grounds27building.28

(h) Enter into a financing contract on behalf of Lower Columbia29College for up to $3,000,000 plus financing expenses and required30reserves pursuant to chapter 39.94 RCW to renovate the main building.31

(i) Enter into a financing contract on behalf of Lower Columbia32College for up to $3,000,000 plus financing expenses and required33reserves pursuant to chapter 39.94 RCW to renovate and expand the34Myklebust gymnasium.35

(j) Enter into a financing contract on behalf of Tacoma Community36College for up to $12,000,000 plus financing expenses and required37reserves pursuant to chapter 39.94 RCW to expand a health and38wellness center.39

Code Rev/AL:akl 214 H-2429.2/15 2nd draft

Page 216: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(k) Enter into a financing contract on behalf of Walla Walla1Community College for up to $1,500,000 plus financing expenses and2required reserves pursuant to chapter 39.94 RCW to construct a3workforce and business development center.4

(14) Enter into a financing contract on behalf of the department5of fish and wildlife for up to $12,000,000 plus financing expenses6and required reserves pursuant to chapter 39.94 RCW to design and7construct or purchase a new office and warehouse building near8Vancouver.9

NEW SECTION. Sec. 7003. (1) The legislature finds that use of10life-cycle cost analysis will aid public entities, architects,11engineers, and contractors in making design and construction12decisions that positively impact both the initial construction cost13and the ongoing operating and maintenance cost of a project. To14ensure that the total cost of a project is accounted for and the most15reasonable and cost efficient design is used, agencies shall develop16life-cycle costs for any construction project over $10,000,000. The17life-cycle costs must represent the present value sum of capital18costs, installation costs, operating costs, and maintenance costs19over the life expectancy of the project. The legislature further20finds the most effective approach to the life-cycle cost analysis is21to integrate it into the early part of the design process.22

(2) Agencies shall develop a minimum of three project23alternatives for use in the life-cycle cost analysis. These24alternatives must be both distinctly different and viable solutions25to the issue being addressed. The chosen alternative must be the most26reasonable and cost-effective solution. A brief description of each27project alternative and why it was chosen must be included in the28life-cycle cost analysis section of the predesign.29

(3) The office of financial management shall: (a) Make available30a life-cycle cost model to be used for analysis; (b) in consultation31with the department of enterprise services, provide assistance in32using the life-cycle cost model; and (c) update the life-cycle cost33model annually including assumptions for inflation rates, discount34rates, and energy rates.35

(4) Agencies shall consider architectural and engineering firms'36and general contractors' experience using life-cycle costs, operating37costs, and energy efficiency measures when selecting an architectural38

Code Rev/AL:akl 215 H-2429.2/15 2nd draft

Page 217: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

and engineering firm, or when selecting contractors using alternative1contracting methods.2

NEW SECTION. Sec. 7004. To ensure that major construction3projects are carried out in accordance with legislative and executive4intent, appropriations in this act in excess of $10,000,000 may not5be expended or encumbered until the office of financial management6has reviewed and approved the agency's predesign. The predesign7document must include, but not be limited to, program, site, and cost8analysis, including life-cycle cost, in accordance with the predesign9manual adopted by the office of financial management. The results of10life-cycle cost analysis must be a primary consideration in the11selection of a building design. Construction may proceed only upon12providing to the office of financial management the life-cycle costs.13To improve monitoring of major construction projects, progress14reports must be submitted by the agency administering the project to15the office of financial management and to the fiscal committees of16the house of representatives and senate. Reports must be submitted on17July 1st and December 31st each year in a format to be developed by18the office of financial management.19

NEW SECTION. Sec. 7005. (1) Allotments for appropriations in20this act shall be provided in accordance with the capital project21review requirements adopted by the office of financial management and22in compliance with RCW 43.88.110. Projects that will be employing23alternative public works construction procedures under chapter 39.1024RCW are subject to the allotment procedures defined in this section25and RCW 43.88.110.26

(2) Each project is defined as proposed in the legislative budget27notes or in the governor's budget document.28

NEW SECTION. Sec. 7006. (1) The office of financial management29may authorize a transfer of appropriation authority provided for a30capital project that is in excess of the amount required for the31completion of such project to another capital project for which the32appropriation is insufficient. No such transfer may be used to expand33the capacity of any facility beyond that intended in making the34appropriation. Such transfers may be effected only between capital35appropriations to a specific department, commission, agency, or36institution of higher education and only between capital projects37Code Rev/AL:akl 216 H-2429.2/15 2nd draft

Page 218: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

that are funded from the same fund or account. No transfers may occur1between projects to local government agencies except where the grants2are provided within a single omnibus appropriation and where such3transfers are specifically authorized by the implementing statutes4that govern the grants.5

(2) The office of financial management may find that an amount is6in excess of the amount required for the completion of a project only7if: (a) The project as defined in the notes to the budget document is8substantially complete and there are funds remaining; or (b) bids9have been let on a project and it appears to a substantial certainty10that the project as defined in the notes to the budget document can11be completed within the biennium for less than the amount12appropriated in this act.13

(3) For the purposes of this section, the intent is that each14project be defined as proposed to the legislature in the governor's15budget document, unless it clearly appears from the legislative16history that the legislature intended to define the scope of a17project in a different way.18

(4) A report of any transfer effected under this section, except19emergency projects or any transfer under $250,000, shall be filed20with the legislative fiscal committees of the senate and house of21representatives by the office of financial management at least thirty22days before the date the transfer is effected. The office of23financial management shall report all emergency or smaller transfers24within thirty days from the date of transfer.25

NEW SECTION. Sec. 7007. (1) It is expected that projects be26ready to proceed in a timely manner depending on the type or phase of27the project or program that is the subject of the appropriation in28this act. Except for major projects that customarily may take more29than two biennia to complete from predesign to the end of30construction, or large infrastructure grant or loan programs31supporting projects that often take more than two biennia to32complete, the legislature generally does not intend to reappropriate33funds more than once, particularly for smaller grant programs, local/34community projects, and minor works.35

(2) Agencies shall expedite the expenditure of reappropriations36and appropriations in this act in order to: (a) Rehabilitate37infrastructure resources; (b) accelerate environmental rehabilitation38and restoration projects for the improvement of the state's natural39Code Rev/AL:akl 217 H-2429.2/15 2nd draft

Page 219: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

environment; (c) reduce additional costs associated with acquisition1and construction inflationary pressures; and (d) provide additional2employment opportunities associated with capital expenditures.3

(3) To the extent feasible, agencies are directed to accelerate4expenditure rates at their current level of permanent employees and5shall use contracted design and construction services wherever6necessary to meet the goals of this section.7

NEW SECTION. Sec. 7008. (1) Any building project that receives8funding from the capital budget must be built to sustainable9standards. "Sustainable building" means a building that integrates10and optimizes all major high-performance building attributes,11including energy efficiency, durability, life-cycle performance, and12occupant productivity. The following design and construction13attributes must be integrated into the building project:14

(a) Employ integrated design principles: Use a collaborative,15integrated planning and design process that initiates and maintains16an integrated project team in all stages of a project's planning and17delivery. Establish performance goals for siting, energy, water,18materials, and indoor environmental quality along with other19comprehensive design goals and ensures incorporation of these goals20throughout the design and life-cycle of the building. Considers all21stages of the building's life-cycle, including deconstruction.22

(b) Commissioning: Employ commissioning practices tailored to the23size and complexity of the building and its system components in24order to verify performance of building components and systems and25help ensure that design requirements are met. This should include an26experienced commissioning provider, inclusion of commissioning27requirements in construction documents, a commissioning plan,28verification of the installation and performance of systems to be29commissioned, and a commissioning report.30

(c) Optimize energy performance: Establish a whole building31performance target that takes into account the intended use,32occupancy, operations, plug loads, other energy demands, and design33to earn the ENERGY STAR targets for new construction and major34renovation where applicable. For new construction target low energy35use index. For major renovations, reduce the energy use by fifty36percent below pre-renovations baseline.37

(d) On-site renewable energy: Meet at least thirty percent of the38hot water demand through the installation of solar hot water heaters,39Code Rev/AL:akl 218 H-2429.2/15 2nd draft

Page 220: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

when life-cycle cost effective. Implement renewable energy generation1projects on agency property for agency use, when life-cycle cost2effective.3

(e) Measurement and verification: Install building level4electricity meters in new major construction and renovation projects5to track and continuously optimize performance. Include equivalent6meters for natural gas and steam, where natural gas and steam are7used. Install dashboards inside buildings to display and incentivize8occupants on energy use.9

(f) Benchmarking: Compare actual performance data from the first10year of operation with the energy design target. Verify that the11building performance meets or exceeds the design target. For other12building and space types, use an equivalent benchmarking tool for13laboratory buildings. Web-based data collection and dashboards must14also be provided.15

NEW SECTION. Sec. 7009. State agencies, including institutions16of higher education, shall allot and report full-time equivalent17staff for capital projects in a manner comparable to staff reporting18for operating expenditures.19

NEW SECTION. Sec. 7010. Executive Order No. 05-05,20archaeological and cultural resources, was issued effective November2110, 2005. Agencies and higher education institutions shall comply22with the requirements set forth in this executive order.23

NEW SECTION. Sec. 7011. PUGET SOUND PROTECTION AND RESTORATION.24Consistent with RCW 90.71.340, when expending appropriations under25this act that contribute to Puget Sound protection and recovery,26agencies shall consult with the Puget Sound partnership to ensure27that projects and expenditures are either in, or consistent with the282020 action agenda. These consultations shall include the exchange of29information on specific actions, projects, associated funding,30performance measures, and other information necessary to track31project implementation and ensure alignment with the action agenda.32In situations where the Puget Sound partnership finds that a project33is not in, or is not consistent with the action agenda, Puget Sound34partnership shall document this finding and report back to the35governor and legislative fiscal committees.36

Code Rev/AL:akl 219 H-2429.2/15 2nd draft

Page 221: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 7012. FOR THE ARTS COMMISSION—ART WORK1ALLOWANCE. (1) One-half of one percent of moneys appropriated in this2act for original construction of school plant facilities is provided3solely for the purposes of RCW 28A.335.210.4

(2) One-half of one percent of moneys appropriated in this act5for original construction or any major renovation or remodel work6exceeding $200,000 by colleges or universities is provided solely for7the purposes of RCW 28B.10.027.8

(3) One-half of one percent of moneys appropriated in this act9for original construction of any public building by a state agency10identified in RCW 43.17.020 is provided solely for the purposes of11RCW 43.17.200.12

(4) At least eighty-five percent of the moneys spent by the13Washington state arts commission during the 2015-2017 biennium for14the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be15expended solely for direct acquisition of works of art. Art16allocations not expended within the ensuing two biennia will lapse.17The commission may use up to $100,000 of this amount to conserve or18maintain existing pieces in the state art collection pursuant to RCW1928A.335.210.20

(5) The executive director of the arts commission shall appoint a21study group to review the operations of the one-half of one percent22for works of art purchased or commissioned as required by RCW2328A.335.210, 28B.10.027, and 43.17.200. The findings of the review24must be reported annually to the office of financial management and25the fiscal committees of the legislature by August 15th. The review26must include, but is not limited to, the following: (a) Projects27purchased or commissioned per biennium; (b) partner agencies; (c)28funding sources by fiscal year; (d) artwork costs; (e) administrative29costs; (f) collection care costs; and (g) project status.30

NEW SECTION. Sec. 7013. It is confirmed that the director of31the department of enterprise services is authorized under chapter3235A.14 RCW to petition for annexation of the former northern state33hospital property to the city of Sedro-Woolley upon the director's34determination that such annexation is appropriate and in furtherance35of the interests of the state. The director shall consult with the36office of financial management prior to making such determination.37

Code Rev/AL:akl 220 H-2429.2/15 2nd draft

Page 222: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Sec. 7014. RCW 27.34.330 and 2006 c 371 s 232 are each amended1to read as follows:2

The Washington state historical society shall establish a3competitive process to solicit proposals for and prioritize heritage4capital projects for potential funding in the state capital budget.5The society shall adopt rules governing project eligibility and6evaluation criteria. Application for funding of specific projects may7be made to the society by local governments, public development8authorities, nonprofit corporations, tribal governments, and other9entities, as determined by the society. The society, with the advice10of leaders in the heritage field, including but not limited to11representatives from the office of the secretary of state, the12eastern Washington state historical society, and the department of13archaeology and historic preservation, shall establish and submit a14prioritized list of heritage capital projects to the governor and the15legislature in the society's biennial capital budget request. The16list shall include a description of each project, the amount of17recommended state funding, and documentation of nonstate funds to be18used for the project. The total amount of recommended state funding19for projects on a biennial project list shall not exceed ten million20dollars. The prioritized list shall be developed through open and21public meetings and the amount of state funding shall not exceed22thirty-three and thirty-three one hundredths percent of the total23cost of the project. The nonstate portion of the total project cost24may include cash, the value of real property when acquired solely for25the purpose of the project, and in-kind contributions. The department26shall not sign contracts or otherwise financially obligate funds27under this section until the legislature has approved a specific list28of projects. In contracts for grants authorized under this section,29the society shall include provisions requiring that capital30improvements be held by the grantee for a specified period of time31appropriate to the amount of the grant and that facilities be used32for the express purpose of the grant. If the grantee is found to be33out of compliance with provisions of the contract, the grantee shall34repay to the state general fund the principal amount of the grant35plus interest calculated at the rate of interest on state of36Washington general obligation bonds issued most closely to the date37of authorization of the grant.38

Code Rev/AL:akl 221 H-2429.2/15 2nd draft

Page 223: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

NEW SECTION. Sec. 7015. To carry out the provisions of this1act, the governor may assign responsibility for predesign, design,2construction, and other related activities to any appropriate agency.3

NEW SECTION. Sec. 7016. If any federal moneys appropriated by4this act for capital projects are not received by the state, the5department or agency to which the moneys were appropriated may6replace the federal moneys with funds available from private or local7sources. No replacement may occur under this section without the8prior approval of the director of financial management in9consultation with the senate ways and means committee and the house10of representatives capital budget committee.11

NEW SECTION. Sec. 7017. (1) Unless otherwise stated, for all12appropriations under this act that require a match of nonstate money13or in-kind contributions, the following requirement, consistent with14RCW 43.88.150, shall apply: Expenditures of state money shall be15timed so that the state share of project expenditures never exceeds16the intended state share of total project costs.17

(2) Provision of the full amount of required matching funds is18not required to permit the expenditure of capital budget19appropriations for phased projects if a proportional amount of the20required matching funds is provided for each distinct, identifiable21phase of the project.22

Sec. 7018. RCW 28A.525.166 and 2013 2nd sp.s. c 18 s 514 are23each amended to read as follows:24

Allocations to school districts of state funds provided by RCW2528A.525.162 through 28A.525.180 shall be made by the superintendent26of public instruction and the amount of state funding assistance to a27school district in financing a school plant project shall be28determined in the following manner:29

(1) The boards of directors of the districts shall determine the30total cost of the proposed project, which cost may include the cost31of acquiring and preparing the site, the cost of constructing the32building or of acquiring a building and preparing the same for school33use, the cost of necessary equipment, taxes chargeable to the34project, necessary architects' fees, and a reasonable amount for35contingencies and for other necessary incidental expenses: PROVIDED,36

Code Rev/AL:akl 222 H-2429.2/15 2nd draft

Page 224: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

That the total cost of the project shall be subject to review and1approval by the superintendent.2

(2) The state funding assistance percentage for a school district3shall be computed by the following formula:4

The ratio of the school district's adjusted valuation per pupil5divided by the ratio of the total state adjusted valuation per pupil6shall be subtracted from three, and then the result of the foregoing7shall be divided by three plus (the ratio of the school district's8adjusted valuation per pupil divided by the ratio of the total state9adjusted valuation per pupil).10

11 District adjusted Total state

12 3-valuation ÷ adjusted valuation

13 Computed per pupil per pupil State

14 State = ———————————————— = - % Funding

15 Ratio District adjusted Total state Assistance

16 3+valuation ÷ adjusted valuation

17 per pupil per pupil

PROVIDED, That in the event the state funding assistance percentage18to any school district based on the above formula is less than twenty19percent and such school district is otherwise eligible for state20funding assistance under RCW 28A.525.162 through 28A.525.180, the21superintendent may establish for such district a state funding22assistance percentage not in excess of twenty percent of the approved23cost of the project, if the superintendent finds that such additional24assistance is necessary to provide minimum facilities for housing the25pupils of the district.26

(3) In addition to the computed state funding assistance27percentage developed in subsection (2) of this section, a school28district shall be entitled to additional percentage points determined29by the average percentage of growth for the past three years. One30percent shall be added to the computed state funding assistance31percentage for each percent of growth, with a maximum of twenty32percent.33

(4) In computing the state funding assistance percentage in34subsection (2) of this section and adjusting the percentage under35subsection (3) of this section, students residing outside the school36district who are enrolled in alternative learning experience courses37under RCW 28A.232.010 shall be excluded from the count of total38Code Rev/AL:akl 223 H-2429.2/15 2nd draft

Page 225: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

pupils. In lieu of the exclusion in this subsection, a district may1submit an alternative calculation for excluding students enrolled in2alternative learning experience courses. The alternative calculation3must show the student headcount use of district classroom facilities4on a regular basis for a reasonable duration by out-of-district5alternative learning experience students subtracted by the headcount6of in-district alternative learning experience students not using7district classroom facilities on a regular basis for a reasonable8duration. The alternative calculation must be submitted in a form9approved by the office of the superintendent of public instruction.10The office of the superintendent of public instruction must develop11rules to define "regular basis" and "reasonable duration."12

(5) The approved cost of the project determined in the manner13prescribed in this section multiplied by the state funding assistance14percentage derived as provided for in this section shall be the15amount of state funding assistance to the district for the financing16of the project: PROVIDED, That need therefor has been established to17the satisfaction of the superintendent: PROVIDED, FURTHER, That18additional state funding assistance may be allowed if it is found by19the superintendent, considering policy recommendations from the20school facilities citizen advisory panel that such assistance is21necessary in order to meet (a) a school housing emergency resulting22from the destruction of a school building by fire, the condemnation23of a school building by properly constituted authorities, a sudden24excessive and clearly foreseeable future increase in school25population, or other conditions similarly emergent in nature; or (b)26a special school housing burden resulting from projects of statewide27significance or imposed by virtue of the admission of nonresident28students into educational programs established, maintained and29operated in conformity with the requirements of law; or (c) a30deficiency in the capital funds of the district resulting from31financing, subsequent to April 1, 1969, and without benefit of the32state funding assistance provided by prior state assistance programs,33the construction of a needed school building project or projects34approved in conformity with the requirements of such programs, after35having first applied for and been denied state funding assistance36because of the inadequacy of state funds available for the purpose,37or (d) a condition created by the fact that an excessive number of38students live in state owned housing, or (e) a need for the39construction of a school building to provide for improved school40Code Rev/AL:akl 224 H-2429.2/15 2nd draft

Page 226: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

district organization or racial balance, or (f) conditions similar to1those defined under (a), (b), (c), (d), and (e) of this subsection,2creating a like emergency.3

(6) For the 2015-2017 biennium, schools determined to have a lack4of sufficient space to provide all-day kindergarten, reduce class5sizes, or provide science classrooms or labs to meet the requirements6of law, have a special housing burden condition similar to those7defined under subsection (5)(b) of this section, creating a like8emergency. For the 2015-2017 biennium, school districts are entitled9to additional percentage points for school construction projects that10have a special housing burden condition only. The additional11percentage points are determined by (a) student enrollments in the12free and reduced price meals program, and (b) donations of cash,13like-kind, or equipment from private sources. The additional14percentage points under (a) of this subsection are twenty percent of15the percent of student enrollments eligible and enrolled in the free16and reduced price meals program. The additional percentage points17under (b) of this subsection are determined by enrollments of the18school district and the value of the private donation as follows:19 20 21District Enrollments $250K-$499K Value of Donation

$500K-$1M

>$1M

22 Less than 2,000 10 15 20

23 2,000-4,000 5 10 15

24 More than 4,000 0 5 10

Sec. 7019. RCW 28A.525.172 and 2006 c 263 s 314 are each amended25to read as follows:26

All applications by school districts for state assistance in27providing school plant facilities shall be made to the superintendent28of public instruction in conformity with rules adopted by the29superintendent of public instruction, considering policy30recommendations from the school facilities citizen advisory panel.31Studies and surveys shall be conducted by the superintendent for the32purpose of securing information relating to (((a) [(1)])) (1) the33kind and extent of the school plant facilities required and the34urgency of need for such facilities in districts that seek state35assistance, (((b) [(2)])) (2) the ability of such districts to36provide capital funds by local effort, (((c) [(3)])) (3) the need for37

Code Rev/AL:akl 225 H-2429.2/15 2nd draft

Page 227: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

improvement of school administrative units and school attendance1areas among or within such districts, and (((d) [(4)])) (4) any other2pertinent matters. For the 2015-2017 biennium, the superintendent may3not conduct studies and surveys for the purpose of this section.4

NEW SECTION. Sec. 7020. NONTAXABLE AND TAXABLE BOND PROCEEDS.5Portions of the appropriation authority granted by this act from the6state building construction account, or any other account receiving7bond proceeds, may be transferred to the state taxable building8construction account as deemed necessary by the state finance9committee to comply with the federal internal revenue service rules10and regulations pertaining to the use of nontaxable bond proceeds.11Portions of the general obligation bond proceeds authorized by12chapter . . ., Laws of 2015 (Substitute House Bill No. 1166, the13general obligation bond bill) for deposit into the state taxable14building construction account that are in excess of amounts required15to comply with the federal internal revenue service rules and16regulations shall be deposited into the state building construction17account. The state treasurer shall submit written notification to the18director of financial management if it is determined that a shift of19appropriation authority between the state building construction20account, or any other account receiving bond proceeds, and the state21taxable building construction account is necessary, or that a shift22of appropriation authority from the state taxable building23construction account to the state building construction account may24be made.25

NEW SECTION. Sec. 7021. COLUMBIA RIVER BASIN NONTAXABLE AND26TAXABLE BOND PROCEEDS. Portions of the appropriation authority27granted by this act from the Columbia river basin water supply28development account may be transferred to the Columbia river basin29taxable bond water supply development account as deemed necessary by30the state finance committee to comply with the federal internal31revenue service rules and regulations pertaining to the use of32nontaxable bond proceeds. The state treasurer shall submit written33notification to the director of financial management if it is34determined that a shift of appropriation authority between the35Columbia river basin water supply development account and the36Columbia river basin taxable bond water supply development account is37necessary, or that a shift of appropriation authority from the38Code Rev/AL:akl 226 H-2429.2/15 2nd draft

Page 228: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Columbia river basin taxable bond water supply development account to1the Columbia river basin water supply development account may be2made.3

NEW SECTION. Sec. 7022. The office of financial management, in4consultation with the fiscal committees of the legislature, may5select capital projects that have completed predesign to undergo a6budget evaluation study. The budget evaluation study team approach7using value engineering techniques and life cycle cost analysis must8be utilized by the office of financial management in conducting the9studies. The office of financial management shall select the budget10evaluation team members, contract for the study, and report the11results to the legislature and agencies in a timely manner following12the study. Funds from the project appropriation must be used by the13office of financial management through an interagency agreement with14the affected agencies to cover the cost of the study.15

NEW SECTION. Sec. 7023. RESEARCH ON TRANSFER OF FEDERAL LANDS16TO WASHINGTON STATE. Staff from the appropriate legislative17committees shall use existing studies and available literature to18research the potential costs, revenues, and policy impacts of19transferring federal lands to state ownership. The research must20include:21

(1) Costs to the state of: (a) Land management related to22wildfires, forest health, invasive species management, and public23access; (b) addressing deferred forest health issues and ongoing24maintenance; (c) payments in lieu of taxes; (d) state program25development; and (e) other potential costs.26

(2) Revenues to the state from: (a) Current and increased timber27cut-rates; (b) mineral lease revenues; (c) recreation fees; (d)28grazing fees; (e) permanent common school account investment income;29and (f) other potential revenues.30

(3) Policy research related to the endangered species act, the31mining law of 1872, and other federal-state impacts.32

(4) The research may not include consideration of revenues or33costs of transferring public lands into private ownership status.34

(5) A report on this research must be provided to appropriate35legislative committees by December 1, 2015.36

Code Rev/AL:akl 227 H-2429.2/15 2nd draft

Page 229: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Sec. 7024. RCW 28B.20.725 and 2013 2nd sp.s. c 19 s 7027 are1each amended to read as follows:2

The board is hereby empowered:3(1) To reserve the right to issue bonds later on a parity with4

any bonds being issued;5(2) To authorize the investing of moneys in the bond retirement6

fund and any reserve account therein;7(3) To authorize the transfer of money from the University of8

Washington building account to the bond retirement fund when9necessary to prevent a default in the payments required to be made10out of such fund;11

(4) To create a reserve account or accounts in the bond12retirement fund to secure the payment of the principal of and13interest on any bonds;14

(5) To authorize the transfer to the University of Washington15building account of any money on deposit in the bond retirement fund16in excess of debt service for a period of three years from the date17of such transfer on all outstanding bonds payable out of such fund.18((However, during the 2011-2013 fiscal biennium, the legislature may19transfer to the University of Washington building account moneys that20are in excess of the debt service due within one year of the date of21transfer on all outstanding bonds payable out of the bond retirement22fund.)) However, during the 2013-2015 fiscal biennium, the23legislature may transfer to the University of Washington building24account moneys that are in excess of the debt service due within the252013-2015 fiscal biennium from the date of such transfer on all26outstanding bonds payable out of the bond retirement fund. However,27during the 2015-2017 fiscal biennium, the legislature may transfer to28the University of Washington building account moneys that are in29excess of the debt service due within the 2015-2017 fiscal biennium30from the date of such transfer on all outstanding bonds payable out31of the bond retirement fund.32

Sec. 7025. RCW 28B.15.310 and 2013 2nd sp.s. c 19 s 7028 are33each amended to read as follows:34

Within thirty-five days from the date of collection thereof, all35building fees shall be paid and credited as follows: To the36Washington State University bond retirement fund, one-half or such37larger portion as may be necessary to prevent a default in the38payments required to be made out of such bond retirement fund; and39Code Rev/AL:akl 228 H-2429.2/15 2nd draft

Page 230: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

the remainder thereof to the Washington State University building1account.2

The sum so credited to the Washington State University building3account shall be expended by the board of regents for buildings,4equipment, or maintenance on the campus of Washington State5University as may be deemed most advisable and for the best interests6of the university, and for certificates of participation under7chapter 39.94 RCW, except for any sums transferred as authorized by8law. ((During the 2011-2013 biennium, sums credited to the Washington9State University building account shall also be used for routine10facility maintenance and utility costs.)) During the 2013-201511biennium, sums credited to the Washington State University building12account shall also be used for routine facility maintenance, utility13costs, and facility condition assessments. During the 2015-201714biennium, sums credited to the Washington State University building15account shall also be used for routine facility maintenance, utility16costs, and facility condition assessments. Expenditures so made shall17be accounted for in accordance with existing law and shall not be18expended until appropriated by the legislature.19

The sum so credited to the Washington State University bond20retirement fund shall be used to pay and secure the payment of the21principal of and interest on building bonds issued by the university,22except for any sums which may be transferred out of such fund as23authorized by law.24

Sec. 7026. RCW 28B.15.210 and 2013 2nd sp.s. c 19 s 7026 are25each amended to read as follows:26

Within thirty-five days from the date of collection thereof, all27building fees at the University of Washington, including building28fees to be charged students registering in the schools of medicine29and dentistry, shall be paid into the state treasury and credited as30follows:31

One-half or such larger portion as may be necessary to prevent a32default in the payments required to be made out of the bond33retirement fund to the "University of Washington bond retirement34fund" and the remainder thereof to the "University of Washington35building account." The sum so credited to the University of36Washington building account shall be used exclusively for the purpose37of erecting, altering, maintaining, equipping, or furnishing38buildings, and for certificates of participation under chapter 39.9439Code Rev/AL:akl 229 H-2429.2/15 2nd draft

Page 231: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

RCW, except for any sums transferred as authorized in RCW128B.20.725(3). The sum so credited to the University of Washington2bond retirement fund shall be used for the payment of principal of3and interest on bonds outstanding as provided by chapter 28B.20 RCW4except for any sums transferred as authorized in RCW 28B.20.725(5).5During the 2013-2015 biennium, sums credited to the University of6Washington building account shall also be used for routine facility7maintenance, utility costs, and facility condition assessments.8During the 2015-2017 biennium, sums credited to the University of9Washington building account shall also be used for routine facility10maintenance, utility costs, and facility condition assessments.11

Sec. 7027. RCW 28B.30.750 and 2013 2nd sp.s. c 19 s 7029 are12each amended to read as follows:13

The board is hereby empowered:14(1) To reserve the right to issue bonds later on a parity with15

any bonds being issued;16(2) To authorize the investing of moneys in the bond retirement17

fund and any reserve account therein;18(3) To authorize the transfer of money from the Washington State19

University building account to the bond retirement fund when20necessary to prevent a default in the payments required to be made21out of such fund;22

(4) To create a reserve account or accounts in the bond23retirement fund to secure the payment of the principal of and24interest on any bonds;25

(5) To authorize the transfer to the Washington State University26building account of any money on deposit in the bond retirement fund27in excess of debt service for a period of three years from the date28of such transfer on all outstanding bonds payable out of such fund.29((However, during the 2011-2013 fiscal biennium, the legislature may30transfer to the Washington State University building account moneys31that are in excess of the debt service due within one year of the32date of transfer on all outstanding bonds payable out of the bond33retirement fund.)) However, during the 2013-2015 fiscal biennium, the34legislature may transfer to the Washington State University building35account moneys that are in excess of the debt service due within the362013-2015 fiscal biennium from the date of such transfer on all37outstanding bonds payable out of the bond retirement fund. However,38during the 2015-2017 fiscal biennium, the legislature may transfer to39Code Rev/AL:akl 230 H-2429.2/15 2nd draft

Page 232: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

the Washington State University building account moneys that are in1excess of the debt service due within the 2015-2017 fiscal biennium2from the date of such transfer on all outstanding bonds payable out3of the bond retirement fund.4

Sec. 7028. RCW 28B.35.370 and 2013 2nd sp.s. c 19 s 7030 are5each amended to read as follows:6

Within thirty-five days from the date of collection thereof all7building fees of each regional university and The Evergreen State8College shall be paid into the state treasury and these together with9such normal school fund revenues as provided in RCW 28B.35.751 as are10received by the state treasury shall be credited as follows:11

(1) On or before June 30th of each year the board of trustees of12each regional university and The Evergreen State College, if issuing13bonds payable out of its building fees and above described normal14school fund revenues, shall certify to the state treasurer the15amounts required in the ensuing twelve months to pay and secure the16payment of the principal of and interest on such bonds. The amounts17so certified by each regional university and The Evergreen State18College shall be a prior lien and charge against all building fees19and above described normal school fund revenues of such institution.20The state treasurer shall thereupon deposit the amounts so certified21in the Eastern Washington University capital projects account, the22Central Washington University capital projects account, the Western23Washington University capital projects account, or The Evergreen24State College capital projects account respectively, which accounts25are hereby created in the state treasury. The amounts deposited in26the respective capital projects accounts shall be used to pay and27secure the payment of the principal of and interest on the building28bonds issued by such regional universities and The Evergreen State29College as authorized by law. If in any twelve month period it shall30appear that the amount certified by any such board of trustees is31insufficient to pay and secure the payment of the principal of and32interest on the outstanding building and above described normal33school fund revenue bonds of its institution, the state treasurer34shall notify the board of trustees and such board shall adjust its35certificate so that all requirements of moneys to pay and secure the36payment of the principal of and interest on all such bonds then37outstanding shall be fully met at all times.38

Code Rev/AL:akl 231 H-2429.2/15 2nd draft

Page 233: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(2) All normal school fund revenue pursuant to RCW 28B.35.7511shall be deposited in the Eastern Washington University capital2projects account, the Central Washington University capital projects3account, the Western Washington University capital projects account,4or The Evergreen State College capital projects account respectively,5which accounts are hereby created in the state treasury. The sums6deposited in the respective capital projects accounts shall be7appropriated and expended to pay and secure the payment of the8principal of and interest on bonds payable out of the building fees9and normal school revenue and for the construction, reconstruction,10erection, equipping, maintenance, demolition and major alteration of11buildings and other capital assets, and the acquisition of sites,12rights-of-way, easements, improvements or appurtenances in relation13thereto except for any sums transferred therefrom as authorized by14law. ((During the 2011-2013 biennium, sums in the respective capital15accounts shall also be used for routine facility maintenance and16utility costs.)) However, during the 2013-2015 biennium, sums in the17respective capital accounts shall also be used for routine facility18maintenance, utility costs, and facility condition assessments.19However, during the 2015-2017 biennium, sums in the respective20capital accounts shall also be used for routine facility maintenance,21utility costs, and facility condition assessments.22

(3) Funds available in the respective capital projects accounts23may also be used for certificates of participation under chapter2439.94 RCW.25

Sec. 7029. RCW 28B.50.360 and 2013 2nd sp.s. c 19 s 7031 are26each amended to read as follows:27

Within thirty-five days from the date of start of each quarter28all collected building fees of each such community and technical29college shall be paid into the state treasury, and shall be credited30as follows:31

(1) On or before June 30th of each year the college board if32issuing bonds payable out of building fees shall certify to the state33treasurer the amounts required in the ensuing twelve-month period to34pay and secure the payment of the principal of and interest on such35bonds. The state treasurer shall thereupon deposit the amounts so36certified in the community and technical college capital projects37account. Such amounts of the funds deposited in the community and38technical college capital projects account as are necessary to pay39Code Rev/AL:akl 232 H-2429.2/15 2nd draft

Page 234: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

and secure the payment of the principal of and interest on the1building bonds issued by the college board as authorized by this2chapter shall be devoted to that purpose. If in any twelve-month3period it shall appear that the amount certified by the college board4is insufficient to pay and secure the payment of the principal of and5interest on the outstanding building bonds, the state treasurer shall6notify the college board and such board shall adjust its certificate7so that all requirements of moneys to pay and secure the payment of8the principal and interest on all such bonds then outstanding shall9be fully met at all times.10

(2) The community and technical college capital projects account11is hereby created in the state treasury. The sums deposited in the12capital projects account shall be appropriated and expended to pay13and secure the payment of the principal of and interest on bonds14payable out of the building fees and for the construction,15reconstruction, erection, equipping, maintenance, demolition and16major alteration of buildings and other capital assets owned by the17state board for community and technical colleges in the name of the18state of Washington, and the acquisition of sites, rights-of-way,19easements, improvements or appurtenances in relation thereto,20engineering and architectural services provided by the department of21enterprise services, and for the payment of principal of and interest22on any bonds issued for such purposes. ((During the 2011-201323biennium, sums in the capital projects account shall also be used for24routine facility maintenance and utility costs.)) However, during the252013-2015 biennium, sums in the capital projects account shall also26be used for routine facility maintenance and utility costs. However,27during the 2015-2017 biennium, sums in the capital projects account28shall also be used for routine facility maintenance and utility29costs.30

(3) Funds available in the community and technical college31capital projects account may also be used for certificates of32participation under chapter 39.94 RCW.33

Sec. 7030. RCW 43.34.080 and 2013 2nd sp.s. c 19 s 7015 are each34amended to read as follows:35

(1) The capitol campus design advisory committee is established36as an advisory group to the capitol committee and the director of37enterprise services to review programs, planning, design, and38landscaping of state capitol facilities and grounds and to make39Code Rev/AL:akl 233 H-2429.2/15 2nd draft

Page 235: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

recommendations that will contribute to the attainment of1architectural, aesthetic, functional, and environmental excellence in2design and maintenance of capitol facilities on campus and located in3neighboring communities.4

(2) The advisory committee shall consist of the following persons5who shall be appointed by and serve at the pleasure of the director6of enterprise services:7

(a) Two architects;8(b) A landscape architect; and9(c) An urban planner.10The director of enterprise services shall appoint the chair and11

vice chair and shall provide the staff and resources necessary for12implementing this section. The advisory committee shall meet at least13once every ninety days and at the call of the chair.14

The members of the committee shall be reimbursed as provided in15RCW 43.03.220 and 44.04.120.16

(3) The advisory committee shall also consist of the secretary of17state and two members of the house of representatives, one from each18caucus, who shall be appointed by the speaker of the house of19representatives, and two members of the senate, one from each caucus,20who shall be appointed by the president of the senate.21

(4) The advisory committee shall review plans and designs22affecting state capitol facilities as they are developed. The23advisory committee's review shall include:24

(a) The process of solicitation and selection of appropriate25professional design services including design-build proposals;26

(b) Compliance with the capitol campus master plan and design27concepts as adopted by the capitol committee;28

(c) The design, siting, and grouping of state capitol facilities29relative to the service needs of state government and the impact upon30the local community's economy, environment, traffic patterns, and31other factors;32

(d) The relationship of overall state capitol facility planning33to the respective comprehensive plans for long-range urban34development of the cities of Olympia, Lacey, and Tumwater, and35Thurston county; and36

(e) Landscaping plans and designs, including planting proposals,37street furniture, sculpture, monuments, and access to the capitol38campus and buildings.39

Code Rev/AL:akl 234 H-2429.2/15 2nd draft

Page 236: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(5) For development of the property known as the 1063 block, the1committee may review the proposal selected by the department of2enterprise services but must not propose changes that will affect the3scope, budget, or schedule of the project.4

(6) During the 2015-2017 fiscal biennium, for development of the5property known as the pro arts site, the committee may review the6proposal selected by the department of enterprise services but must7not propose changes that will affect the scope, budget, or schedule8of the project.9

Sec. 7031. RCW 43.155.050 and 2013 2nd sp.s. c 4 s 983 are each10amended to read as follows:11

The public works assistance account is hereby established in the12state treasury. Money may be placed in the public works assistance13account from the proceeds of bonds when authorized by the legislature14or from any other lawful source. Money in the public works assistance15account shall be used to make loans and to give financial guarantees16to local governments for public works projects. Moneys in the account17may also be appropriated to provide for state match requirements18under federal law for projects and activities conducted and financed19by the board under the drinking water assistance account. Not more20than fifteen percent of the biennial capital budget appropriation to21the public works board from this account may be expended or obligated22for preconstruction loans, emergency loans, or loans for capital23facility planning under this chapter; of this amount, not more than24ten percent of the biennial capital budget appropriation may be25expended for emergency loans and not more than one percent of the26biennial capital budget appropriation may be expended for capital27facility planning loans. During the ((2011-2013 and 2013-2015))282015-2017 fiscal biennium, the legislature may transfer from the29public works assistance account to ((the general fund,)) the water30pollution control revolving account((,)) and the drinking water31assistance account such amounts as reflect the excess fund balance of32the account. ((During the 2011-2013 fiscal biennium, the legislature33may appropriate moneys from the account for economic development,34innovation, and export grants, including brownfields; main street35improvement grants; and the loan program consolidation board.))36During the 2013-2015 fiscal biennium, the legislature may transfer37from the public works assistance account to the education legacy38trust account such amounts as specified by the legislature.39Code Rev/AL:akl 235 H-2429.2/15 2nd draft

Page 237: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Sec. 7032. RCW 43.155.070 and 2013 2nd sp.s. c 19 s 7032 are1each amended to read as follows:2

(1) To qualify for financial assistance under this chapter the3board must determine that a local government meets all of the4following conditions:5

(a) The city or county must be imposing a tax under chapter 82.466RCW at a rate of at least one-quarter of one percent;7

(b) The local government must have developed a capital facility8plan; and9

(c) The local government must be using all local revenue sources10which are reasonably available for funding public works, taking into11consideration local employment and economic factors.12

(2) Except where necessary to address a public health need or13substantial environmental degradation, a county, city, or town14planning under RCW 36.70A.040 may not receive financial assistance15under this chapter unless it has adopted a comprehensive plan,16including a capital facilities plan element, and development17regulations as required by RCW 36.70A.040. This subsection does not18require any county, city, or town planning under RCW 36.70A.040 to19adopt a comprehensive plan or development regulations before20requesting or receiving financial assistance under this chapter if21such request is made before the expiration of the time periods22specified in RCW 36.70A.040. A county, city, or town planning under23RCW 36.70A.040 that has not adopted a comprehensive plan and24development regulations within the time periods specified in RCW2536.70A.040 may apply for and receive financial assistance under this26chapter if the comprehensive plan and development regulations are27adopted as required by RCW 36.70A.040 before executing a contractual28agreement for financial assistance with the board.29

(3) In considering awarding financial assistance for public30facilities to special districts requesting funding for a proposed31facility located in a county, city, or town planning under RCW3236.70A.040, the board must consider whether the county, city, or town33planning under RCW 36.70A.040 in whose planning jurisdiction the34proposed facility is located has adopted a comprehensive plan and35development regulations as required by RCW 36.70A.040.36

(4) The board must develop a priority process for public works37projects as provided in this section. The intent of the priority38process is to maximize the value of public works projects39accomplished with assistance under this chapter. The board must40Code Rev/AL:akl 236 H-2429.2/15 2nd draft

Page 238: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

attempt to assure a geographical balance in assigning priorities to1projects. The board must consider at least the following factors in2assigning a priority to a project:3

(a) Whether the local government receiving assistance has4experienced severe fiscal distress resulting from natural disaster or5emergency public works needs;6

(b) Except as otherwise conditioned by RCW 43.155.110, whether7the entity receiving assistance is a Puget Sound partner, as defined8in RCW 90.71.010;9

(c) Whether the project is referenced in the action agenda10developed by the Puget Sound partnership under RCW 90.71.310;11

(d) Whether the project is critical in nature and would affect12the health and safety of a great number of citizens;13

(e) Whether the applicant's permitting process has been certified14as streamlined by the office of regulatory assistance;15

(f) Whether the applicant has developed and adhered to guidelines16regarding its permitting process for those applying for development17permits consistent with section 1(2), chapter 231, Laws of 2007;18

(g) The cost of the project compared to the size of the local19government and amount of loan money available;20

(h) The number of communities served by or funding the project;21(i) Whether the project is located in an area of high22

unemployment, compared to the average state unemployment;23(j) Whether the project is the acquisition, expansion,24

improvement, or renovation by a local government of a public water25system that is in violation of health and safety standards, including26the cost of extending existing service to such a system;27

(k) Except as otherwise conditioned by RCW 43.155.120, and28effective one calendar year following the development of model29evergreen community management plans and ordinances under RCW3035.105.050, whether the entity receiving assistance has been31recognized, and what gradation of recognition was received, in the32evergreen community recognition program created in RCW 35.105.030;33

(l) The relative benefit of the project to the community,34considering the present level of economic activity in the community35and the existing local capacity to increase local economic activity36in communities that have low economic growth; and37

(m) Other criteria that the board considers advisable.38

Code Rev/AL:akl 237 H-2429.2/15 2nd draft

Page 239: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(5) For the ((2013-2015)) 2015-2017 fiscal biennium, in place of1the criteria, ranking, and submission processes for construction loan2lists provided in subsections (4) and (7) of this section:3

(a) The board must develop a process for numerically ranking4applications for construction loans submitted by local governments.5The board must consider, at a minimum and in any order, the following6factors in assigning a numerical ranking to a project:7

(i) Whether the project is critical in nature and would affect8the health and safety of many people;9

(ii) The extent to which the project leverages nonstate funds;10(iii) The extent to which the project is ready to proceed to11

construction;12(iv) Whether the project is located in an area of high13

unemployment, compared to the average state unemployment;14(v) Whether the project promotes the sustainable use of resources15

and environmental quality;16(vi) Whether the project consolidates or regionalizes systems;17(vii) Whether the project encourages economic development through18

mixed-use and mixed income development consistent with chapter 36.70A19RCW;20

(viii) Whether the system is being well-managed in the present21and for long-term sustainability;22

(ix) Achieving equitable distribution of funds by geography and23population;24

(x) The extent to which the project meets the following state25policy objectives:26

(A) Efficient use of state resources;27(B) Preservation and enhancement of health and safety;28(C) Abatement of pollution and protection of the environment;29(D) Creation of new, family wage jobs, and avoidance of shifting30

existing jobs from one Washington state community to another;31(E) Fostering economic development consistent with chapter 36.70A32

RCW;33(F) Efficiency in delivery of goods and services, public transit,34

and transportation;35(G) Avoidance of additional costs to state and local governments36

that adversely impact local residents and small businesses; and37(H) Reduction of the overall cost of public infrastructure; and38(xi) Other criteria that the board considers necessary to achieve39

the purposes of this chapter.40Code Rev/AL:akl 238 H-2429.2/15 2nd draft

Page 240: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(b) Before November 1, ((2014)) 2016, the board must develop and1submit to the appropriate fiscal committees of the senate and house2of representatives a ranked list of qualified public works projects3which have been evaluated by the board and are recommended for4funding by the legislature. The maximum amount of funding that the5board may recommend for any jurisdiction is ten million dollars per6biennium. For each project on the ranked list, as well as for7eligible projects not recommended for funding, the board must8document the numerical ranking that was assigned.9

(6) Existing debt or financial obligations of local governments10may not be refinanced under this chapter. Each local government11applicant must provide documentation of attempts to secure additional12local or other sources of funding for each public works project for13which financial assistance is sought under this chapter.14

(7) Before November 1st of each even-numbered year, the board15must develop and submit to the appropriate fiscal committees of the16senate and house of representatives a description of the loans made17under RCW 43.155.065, 43.155.068, and subsection (10) of this section18during the preceding fiscal year and a prioritized list of projects19which are recommended for funding by the legislature, including one20copy to the staff of each of the committees. The list must include,21but not be limited to, a description of each project and recommended22financing, the terms and conditions of the loan or financial23guarantee, the local government jurisdiction and unemployment rate,24demonstration of the jurisdiction's critical need for the project and25documentation of local funds being used to finance the public works26project. The list must also include measures of fiscal capacity for27each jurisdiction recommended for financial assistance, compared to28authorized limits and state averages, including local government29sales taxes; real estate excise taxes; property taxes; and charges30for or taxes on sewerage, water, garbage, and other utilities.31

(8) The board may not sign contracts or otherwise financially32obligate funds from the public works assistance account before the33legislature has appropriated funds for a specific list of public34works projects. The legislature may remove projects from the list35recommended by the board. The legislature may not change the order of36the priorities recommended for funding by the board.37

(9) Subsection (8) of this section does not apply to loans made38under RCW 43.155.065, 43.155.068, and subsection (10) of this39section.40Code Rev/AL:akl 239 H-2429.2/15 2nd draft

Page 241: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(10) Loans made for the purpose of capital facilities plans are1exempted from subsection (8) of this section.2

(11) To qualify for loans or pledges for solid waste or recycling3facilities under this chapter, a city or county must demonstrate that4the solid waste or recycling facility is consistent with and5necessary to implement the comprehensive solid waste management plan6adopted by the city or county under chapter 70.95 RCW.7

(12) After January 1, 2010, any project designed to address the8effects of storm water or wastewater on Puget Sound may be funded9under this section only if the project is not in conflict with the10action agenda developed by the Puget Sound partnership under RCW1190.71.310.12

(13) During the ((2013-2015)) 2015-2017 fiscal biennium, for13projects involving repair, replacement, or improvement of a14wastewater treatment plant or other public works facility for which15an investment grade efficiency audit is obtainable, the public works16board must require as a contract condition that the project sponsor17undertake an investment grade efficiency audit. The project sponsor18may finance the costs of the audit as part of its public works19assistance account program loan.20

(14)(a) ((For public works assistance account application rounds21conducted during the 2013-2015 fiscal biennium, the board must22implement policies and procedures designed to maximize local23government use of federally funded drinking water and clean water24state revolving funds operated by the state departments of health and25ecology. The board, department of ecology, and department of health26must jointly develop evaluation criteria and application procedures27that will increase access of eligible drinking water and wastewater28projects to the public works assistance account for short-term29preconstruction financing and to the federally funded state revolving30funds for construction financing. The procedures must also strengthen31coordinated funding of preconstruction and construction projects.))32For public works assistance account application rounds conducted33during the 2015-2017 fiscal biennium, the board must implement34policies and procedures designed to maximize local government use of35federal funds to finance local infrastructure including, but not36limited to, drinking water and clean water state revolving funds37operated by the state departments of health and ecology.38

(b) For all construction loan projects proposed to the39legislature for funding during the ((2013-2015)) 2015-2017 fiscal40Code Rev/AL:akl 240 H-2429.2/15 2nd draft

Page 242: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

biennium, the board must base interest rates on the average daily1market interest rate for tax-exempt municipal bonds as published in2the bond buyer's index for the period from sixty to thirty days3before the start of the application cycle. For projects with a4repayment period between five and twenty years, the rate must be5sixty percent of the market rate. For projects with a repayment6period under five years, the rate must be thirty percent of the7market rate. The board must also provide reduced interest rates,8extended repayment periods, or forgivable principal loans for9projects that meet financial hardship criteria as measured by the10affordability index or similar standard measure of financial11hardship.12

(((c) By December 1, 2013, the board must recommend to the13appropriate committees of the legislature statutory language to make14permanent these new criteria, procedures, and financing policies.))15

Sec. 7033. RCW 43.160.080 and 2010 1st sp.s. c 36 s 6011 are16each amended to read as follows:17

There shall be a fund in the state treasury known as the public18facilities construction loan revolving account, which shall consist19of all moneys collected under this chapter and any moneys20appropriated to it by law. Disbursements from the revolving account21shall be on authorization of the board. In order to maintain an22effective expenditure and revenue control, the public facilities23construction loan revolving account shall be subject in all respects24to chapter 43.88 RCW. ((During the 2009-2011 biennium, sums in the25public facilities construction loan revolving account may be used for26community economic revitalization board export assistance grants and27loans in section 1018, chapter 36, Laws of 2010 1st sp. sess. and for28matching funds for the federal energy regional innovation cluster in29section 1017, chapter 36, Laws of 2010 1st sp. sess.)) During the302015-2017 biennium, sums in the public facilities construction loan31revolving account may be used to continue and enhance the animal32disease traceability project in section 3247, chapter 19, Laws of332013 2nd sp. sess., administered by the department of agriculture.34During the 2015-2017 biennium, sums in the public facilities35construction loan revolving account may be used for the clean energy36partnership project in section 1038, chapter 19, Laws of 2013 2nd sp.37sess.38

Code Rev/AL:akl 241 H-2429.2/15 2nd draft

Page 243: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

Sec. 7034. RCW 70.105D.070 and 2013 2nd sp.s. c 19 s 7033 and12013 2nd sp.s. c 4 s 992 are each reenacted and amended to read as2follows:3

(1) The state toxics control account and the local toxics control4account are hereby created in the state treasury.5

(2)(a) Moneys collected under RCW 82.21.030 must be deposited as6follows: Fifty-six percent to the state toxics control account under7subsection (3) of this section and forty-four percent to the local8toxics control account under subsection (4) of this section. When the9cumulative amount of deposits made to the state and local toxics10control accounts under this section reaches the limit during a fiscal11year as established in (b) of this subsection, the remainder of the12moneys collected under RCW 82.21.030 during that fiscal year must be13deposited into the environmental legacy stewardship account created14in RCW 70.105D.170.15

(b) The limit on distributions of moneys collected under RCW1682.21.030 to the state and local toxics control accounts for the17fiscal year beginning July 1, 2013, is one hundred forty million18dollars.19

(c) In addition to the funds required under (a) of this20subsection, the following moneys must be deposited into the state21toxics control account: (i) The costs of remedial actions recovered22under this chapter or chapter 70.105A RCW; (ii) penalties collected23or recovered under this chapter; and (iii) any other money24appropriated or transferred to the account by the legislature.25

(3) Moneys in the state toxics control account must be used only26to carry out the purposes of this chapter, including but not limited27to the following activities:28

(a) The state's responsibility for hazardous waste planning,29management, regulation, enforcement, technical assistance, and public30education required under chapter 70.105 RCW;31

(b) The state's responsibility for solid waste planning,32management, regulation, enforcement, technical assistance, and public33education required under chapter 70.95 RCW;34

(c) The hazardous waste clean-up program required under this35chapter;36

(d) State matching funds required under federal cleanup law;37(e) Financial assistance for local programs in accordance with38

chapters 70.95, 70.95C, 70.95I, and 70.105 RCW;39

Code Rev/AL:akl 242 H-2429.2/15 2nd draft

Page 244: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(f) State government programs for the safe reduction, recycling,1or disposal of paint and hazardous wastes from households, small2businesses, and agriculture;3

(g) Oil and hazardous materials spill prevention, preparedness,4training, and response activities;5

(h) Water and environmental health protection and monitoring6programs;7

(i) Programs authorized under chapter 70.146 RCW;8(j) A public participation program;9(k) Public funding to assist potentially liable persons to pay10

for the costs of remedial action in compliance with clean-up11standards under RCW 70.105D.030(2)(e) but only when the amount and12terms of such funding are established under a settlement agreement13under RCW 70.105D.040(4) and when the director has found that the14funding will achieve both: (i) A substantially more expeditious or15enhanced cleanup than would otherwise occur; and (ii) the prevention16or mitigation of unfair economic hardship;17

(l) Development and demonstration of alternative management18technologies designed to carry out the hazardous waste management19priorities of RCW 70.105.150;20

(m) State agriculture and health programs for the safe use,21reduction, recycling, or disposal of pesticides;22

(n) Storm water pollution control projects and activities that23protect or preserve existing remedial actions or prevent hazardous24clean-up sites;25

(o) Funding requirements to maintain receipt of federal funds26under the federal solid waste disposal act (42 U.S.C. Sec. 6901 et27seq.);28

(p) Air quality programs and actions for reducing public exposure29to toxic air pollution;30

(q) Public funding to assist prospective purchasers to pay for31the costs of remedial action in compliance with clean-up standards32under RCW 70.105D.030(2)(e) if:33

(i) The facility is located within a redevelopment opportunity34zone designated under RCW 70.105D.150;35

(ii) The amount and terms of the funding are established under a36settlement agreement under RCW 70.105D.040(5); and37

(iii) The director has found the funding meets any additional38criteria established in rule by the department, will achieve a39substantially more expeditious or enhanced cleanup than would40Code Rev/AL:akl 243 H-2429.2/15 2nd draft

Page 245: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

otherwise occur, and will provide a public benefit in addition to1cleanup commensurate with the scope of the public funding;2

(r) Petroleum-based plastic or expanded polystyrene foam debris3cleanup activities in fresh or marine waters;4

(s) Appropriations to the local toxics control account or the5environmental legacy stewardship account created in RCW 70.105D.170,6if the legislature determines that priorities for spending exceed7available funds in those accounts;8

(t) During the 2013-2015 and 2015-2017 fiscal ((biennium))9biennia, the department of ecology's water quality, shorelands,10environmental assessment, administration, and air quality programs;11

(u) During the 2013-2015 fiscal biennium, actions at the state12conservation commission to improve water quality for shellfish;13((and))14

(v) During the 2013-2015 fiscal biennium, actions at the15University of Washington for reducing ocean acidification;16

(w) For the 2013-2015 fiscal biennium, moneys in the state toxics17control account may be spent on projects in section ((3159)) 3160,18chapter 19, Laws of 2013 2nd sp. sess. and for transfer to the local19toxics control account; and20

(x) For the 2013-2015 fiscal biennium, moneys in the state toxics21control account may be transferred to the radioactive mixed waste22account.23

(4)(a) The department shall use moneys deposited in the local24toxics control account for grants or loans to local governments for25the following purposes in descending order of priority:26

(i) Extended grant agreements entered into under (((c)[(e)])) (e)27(i) of this subsection;28

(ii) Remedial actions, including planning for adaptive reuse of29properties as provided for under (((c)[(e)])) (e)(iv) of this30subsection. The department must prioritize funding of remedial31actions at:32

(A) Facilities on the department's hazardous sites list with a33high hazard ranking for which there is an approved remedial action34work plan or an equivalent document under federal cleanup law;35

(B) Brownfield properties within a redevelopment opportunity zone36if the local government is a prospective purchaser of the property37and there is a department-approved remedial action work plan or38equivalent document under the federal cleanup law;39

Code Rev/AL:akl 244 H-2429.2/15 2nd draft

Page 246: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(iii) Storm water pollution source projects that: (A) Work in1conjunction with a remedial action; (B) protect completed remedial2actions against recontamination; or (C) prevent hazardous clean-up3sites;4

(iv) Hazardous waste plans and programs under chapter 70.105 RCW;5(v) Solid waste plans and programs under chapters 70.95, 70.95C,6

70.95I, and 70.105 RCW;7(vi) Petroleum-based plastic or expanded polystyrene foam debris8

cleanup activities in fresh or marine waters; and9(vii) Appropriations to the state toxics control account or the10

environmental legacy stewardship account created in RCW 70.105D.170,11if the legislature determines that priorities for spending exceed12available funds in those accounts.13

(b) Funds for plans and programs must be allocated consistent14with the priorities and matching requirements established in chapters1570.105, 70.95C, 70.95I, and 70.95 RCW.16

(c) During the 2013-2015 fiscal biennium, the local toxics17control account may also be used for local government storm water18planning and implementation activities.19

(d) During the 2013-2015 fiscal biennium, the legislature may20transfer from the local toxics control account to the state general21fund, such amounts as reflect the excess fund balance in the account.22

(e) To expedite cleanups throughout the state, the department may23use the following strategies when providing grants to local24governments under this subsection:25

(i) Enter into an extended grant agreement with a local26government conducting remedial actions at a facility where those27actions extend over multiple biennia and the total eligible cost of28those actions exceeds twenty million dollars. The agreement is29subject to the following limitations:30

(A) The initial duration of such an agreement may not exceed ten31years. The department may extend the duration of such an agreement32upon finding substantial progress has been made on remedial actions33at the facility;34

(B) Extended grant agreements may not exceed fifty percent of the35total eligible remedial action costs at the facility; and36

(C) The department may not allocate future funding to an extended37grant agreement unless the local government has demonstrated to the38department that funds awarded under the agreement during the previous39

Code Rev/AL:akl 245 H-2429.2/15 2nd draft

Page 247: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

biennium have been substantially expended or contracts have been1entered into to substantially expend the funds;2

(ii) Enter into a grant agreement with a local government3conducting a remedial action that provides for periodic reimbursement4of remedial action costs as they are incurred as established in the5agreement;6

(iii) Enter into a grant agreement with a local government prior7to it acquiring a property or obtaining necessary access to conduct8remedial actions, provided the agreement is conditioned upon the9local government acquiring the property or obtaining the access in10accordance with a schedule specified in the agreement;11

(iv) Provide integrated planning grants to local governments to12fund studies necessary to facilitate remedial actions at brownfield13properties and adaptive reuse of properties following remediation.14Eligible activities include, but are not limited to: Environmental15site assessments; remedial investigations; health assessments;16feasibility studies; site planning; community involvement; land use17and regulatory analyses; building and infrastructure assessments;18economic and fiscal analyses; and any environmental analyses under19chapter 43.21C RCW;20

(v) Provide grants to local governments for remedial actions21related to area-wide groundwater contamination. To receive the22funding, the local government does not need to be a potentially23liable person or be required to seek reimbursement of grant funds24from a potentially liable person;25

(vi) The director may alter grant matching requirements to create26incentives for local governments to expedite cleanups when one of the27following conditions exists:28

(A) Funding would prevent or mitigate unfair economic hardship29imposed by the clean-up liability;30

(B) Funding would create new substantial economic development,31public recreational opportunities, or habitat restoration32opportunities that would not otherwise occur; or33

(C) Funding would create an opportunity for acquisition and34redevelopment of brownfield property under RCW 70.105D.040(5) that35would not otherwise occur;36

(vii) When pending grant applications under (((c)[(e)])) (e)(iv)37and (v) of this subsection (4) exceed the amount of funds available,38designated redevelopment opportunity zones must receive priority for39distribution of available funds.40Code Rev/AL:akl 246 H-2429.2/15 2nd draft

Page 248: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

(((d) [(f)])) (f) To expedite multiparty clean-up efforts, the1department may purchase remedial action cost-cap insurance. For the22013-2015 fiscal biennium, moneys in the local toxics control account3may be spent on projects in sections 3024, 3035, 3036, and 3059,4chapter 19, Laws of 2013 2nd sp. sess.5

(5) Except for unanticipated receipts under RCW 43.79.260 through643.79.282, moneys in the state and local toxics control accounts may7be spent only after appropriation by statute.8

(6) No moneys deposited into either the state or local toxics9control account may be used for: Natural disasters where there is no10hazardous substance contamination; high performance buildings; solid11waste incinerator facility feasibility studies, construction,12maintenance, or operation; or after January 1, 2010, for projects13designed to address the restoration of Puget Sound, funded in a14competitive grant process, that are in conflict with the action15agenda developed by the Puget Sound partnership under RCW 90.71.310.16However, this subsection does not prevent an appropriation from the17state toxics control account to the department of revenue to enforce18compliance with the hazardous substance tax imposed in chapter 82.2119RCW.20

(7) Except during the 2011-2013 fiscal biennium, one percent of21the moneys collected under RCW 82.21.030 shall be allocated only for22public participation grants to persons who may be adversely affected23by a release or threatened release of a hazardous substance and to24not-for-profit public interest organizations. The primary purpose of25these grants is to facilitate the participation by persons and26organizations in the investigation and remedying of releases or27threatened releases of hazardous substances and to implement the28state's solid and hazardous waste management priorities. No grant may29exceed sixty thousand dollars. Grants may be renewed annually. Moneys30appropriated for public participation that are not expended at the31close of any biennium revert to the state toxics control account.32

(8) The department shall adopt rules for grant or loan issuance33and performance. To accelerate both remedial action and economic34recovery, the department may expedite the adoption of rules necessary35to implement chapter 1, Laws of 2013 2nd sp. sess. using the36expedited procedures in RCW 34.05.353. The department shall initiate37the award of financial assistance by August 1, 2013. To ensure the38adoption of rules will not delay financial assistance, the department39

Code Rev/AL:akl 247 H-2429.2/15 2nd draft

Page 249: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

may administer the award of financial assistance through interpretive1guidance pending the adoption of rules through July 1, 2014.2

(9) Except as provided under subsection (3)(k) and (q) of this3section, nothing in chapter 1, Laws of 2013 2nd sp. sess. effects4[affects] the ability of a potentially liable person to receive5public funding.6

(10) During the ((2013-2015)) 2015-2017 fiscal biennium the local7toxics control account may also be used for the centennial clean8water program ((and for storm water grants)) and for the storm water9financial assistance program administered by the department of10ecology.11

NEW SECTION. Sec. 7035. (1) Funds appropriated in this act for12minor works may not be allotted until final project lists are13submitted to the office of financial management. Revisions to the14project lists are allowed for projects not anticipated at the time of15budget development but must be submitted to the office of financial16management, the house of representatives capital budget committee,17and the senate ways and means committee for review and comment and18must include an explanation of variances from the prior lists before19funds may be expended on the revisions. Any project list revisions20must be approved by the office of financial management before funds21may be expended from the minor works appropriation.22

(2)(a) Minor works project lists are single line appropriations23that include multiple projects of a similar nature and that are24valued between $25,000 and $1,000,000 each, with the exception of25higher education minor works projects that may be valued up to26$2,000,000. All projects must meet the criteria included in this27subsection (2)(a). These projects should be completed within two28years of the appropriation with the funding provided. Agencies are29prohibited from including projects on their minor works lists that30are a phase of a larger project, and that if combined over a31continuous period of time, would exceed $1,000,000, or $2,000,000 for32higher education minor works projects. Improvements for accessibility33in compliance with the Americans with disabilities act may be34included in any of the minor works categories.35

(b) Minor works appropriations may not be used for the following:36Studies, except for technical or engineering reviews or designs that37lead directly to and support a project on the same minor works list;38planning; design outside the scope of work on a minor works list;39Code Rev/AL:akl 248 H-2429.2/15 2nd draft

Page 250: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

moveable, temporary, and traditionally funded operating equipment not1in compliance with the equipment criteria established by the office2of financial management; software not dedicated to control of a3specialized system; moving expenses; land or facility acquisition;4rolling stock; computers; or to supplement funding for projects with5funding shortfalls unless expressly authorized. The office of6financial management may make an exception to the limitations7described in this subsection (2)(b) for exigent circumstances after8notifying the legislative fiscal committees and waiting ten days for9comments by the legislature regarding the proposed exception.10

(c) Minor works preservation projects may include program11improvements of no more than twenty-five percent of the individual12minor works preservation project cost.13

NEW SECTION. Sec. 7036. FOR THE STATE TREASURER—TRANSFERS14Public works assistance account—state: For transfer15

to the water pollution control revolving account,16$6,000,000 for fiscal year 2016 and $6,000,000 for17fiscal year 2017. . . . . . . . . . . . . . . . . . . . . $12,000,00018

Public works assistance account—state: For transfer19to the drinking water assistance account, $4,400,00020for fiscal year 2016 and $4,400,000 for fiscal21year 2017. . . . . . . . . . . . . . . . . . . . . . . . . $8,800,00022

NEW SECTION. Sec. 7037. To the extent that any appropriation23authorizes expenditures of state funds from the state building24construction account, or from any other capital project account in25the state treasury, for a capital project or program that is26specified to be funded with proceeds from the sale of bonds, the27legislature declares that any such expenditures for that project or28program made prior to the issue date of the applicable bonds are29intended to be reimbursed from proceeds of those bonds in a maximum30amount equal to the amount of such appropriation.31

NEW SECTION. Sec. 7038. The office of financial management, in32accordance with RCW 28B.77.070 and 43.88D.010, shall include the33following in the scoring process:34

(1) The office of financial management shall develop a single35prioritized list that includes all projects requesting funding, with36

Code Rev/AL:akl 249 H-2429.2/15 2nd draft

Page 251: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

the exception of minor works and predesign requests. Predesigns must1be on a separate prioritized list.2

(2) The office of financial management shall weight the3reasonableness of cost criteria based on the following criteria in4the following order: (a) Expected maximum allowable construction5costs per square foot; and (b) life-cycle cost analysis using the6office of financial management's life-cycle cost tool.7

(3) Prior legislative commitment to the project funding of8predesign or design must be included in the scoring criteria.9

(4) Projects must be scored only once unless the office of10financial management, or the requesting school, find that the project11scope or budget has significantly changed.12

Sec. 7039. RCW 43.131.413 and 2010 c 245 s 12 are each amended13to read as follows:14

The alternative process for awarding contracts established in RCW1528B.20.744 terminates June 30, ((2015)) 2017, as provided in RCW1643.131.414.17

Sec. 7040. RCW 43.131.414 and 2010 c 245 s 13 are each amended18to read as follows:19

RCW 28B.20.744, as now existing or hereafter amended, is20repealed, effective June 30, ((2016)) 2018.21

NEW SECTION. Sec. 7041. This act is necessary for the immediate22preservation of the public peace, health, or safety, or support of23the state government and its existing public institutions, and takes24effect immediately.25

(End of Bill)

Code Rev/AL:akl 250 H-2429.2/15 2nd draft

Page 252: BILL REQ. #: H-2429.2/15 2nd draft ATTY/TYPIST: …leap.leg.wa.gov/leap/Budget/Detail/2015/hcBillPSHB1115...1 (2) The definitions in this subsection apply throughout this act 2 unless

INDEX PAGE #CENTRAL WASHINGTON UNIVERSITY . . . . . . . . . . . . . . . . . . 166COMMUNITY AND TECHNICAL COLLEGE SYSTEM . . . . . . . . . . . . . 178DEPARTMENT OF COMMERCE . . . . . . . . . . . . . . . . . . . . . . 8DEPARTMENT OF CORRECTIONS . . . . . . . . . . . . . . . . . . . . 66DEPARTMENT OF ECOLOGY . . . . . . . . . . . . . . . . . . . . . . 73DEPARTMENT OF ENTERPRISE SERVICES . . . . . . . . . . . . . . . . 44DEPARTMENT OF FISH AND WILDLIFE . . . . . . . . . . . . . . . . . 122DEPARTMENT OF HEALTH . . . . . . . . . . . . . . . . . . . . . . . 62DEPARTMENT OF NATURAL RESOURCES . . . . . . . . . . . . . . . . . 130DEPARTMENT OF SOCIAL AND HEALTH SERVICES . . . . . . . . . . . . . 57DEPARTMENT OF VETERANS AFFAIRS . . . . . . . . . . . . . . . . . . 64EASTERN WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . 177EASTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . . . . . . . 164MILITARY DEPARTMENT . . . . . . . . . . . . . . . . . . . . . . . 53OFFICE OF FINANCIAL MANAGEMENT . . . . . . . . . . . . . . . . . . 39POLLUTION LIABILITY INSURANCE AGENCY . . . . . . . . . . . . . . . 97PUGET SOUND PARTNERSHIP . . . . . . . . . . . . . . . . . . . . . 130RECREATION AND CONSERVATION FUNDING BOARD . . . . . . . . . . . . 107SECRETARY OF STATE . . . . . . . . . . . . . . . . . . . . . . . . 2STATE CONSERVATION COMMISSION . . . . . . . . . . . . . . . . . . 119SUPERINTENDENT OF PUBLIC INSTRUCTION . . . . . . . . . . . . . . 140UNIVERSITY OF WASHINGTON . . . . . . . . . . . . . . . . . . . . 156WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . . . . 174WASHINGTON STATE PATROL . . . . . . . . . . . . . . . . . . . . . 139WASHINGTON STATE UNIVERSITY . . . . . . . . . . . . . . . . . . . 159WESTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . . . . . . . 171

--- END ---

Code Rev/AL:akl 251 H-2429.2/15 2nd draft