PROPOSED CONVERSION OF THE OLD KITCHEN BUILDING INTO A CARDIAC CENTER FOR THE NAIROBI HOSPITAL. BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS) PROJECT TEAM. PSRM CONSULTANTS LTD MUTISO MENEZES INTERNATIONAL LTD PROJECT MANAGERS PROJECT ARCHITECTS P.O. BOX 60824-00200, P.O. BOX 44934 - 00100, NAIROBI, KENYA NAIROBI, KENYA [email protected] [email protected] LINEAR PROJECTS LTD. NATCONSULT CONSULTING ENGINEERS LTD PROJECT QUANTITY SURVEYORS PROJECT CIVIL / STRUCTURAL ENGINEERS P.O. BOX 106188 - 00101, P.O. BOX 3975 - 00506, NAIROBI, KENYA NAIROBI, KENYA [email protected] [email protected] GEOMAX CONSULTING ENGINEERS LTD PROJECT SERVICES ENGINEERS P.O. BOX 53748 - 00200, NAIROBI, KENYA [email protected] AUGUST, 2021.

Upload: others

Post on 10-Nov-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

PROPOSED CONVERSION OF THE OLD KITCHEN BUILDING INTO A

CARDIAC CENTER FOR THE NAIROBI HOSPITAL.

BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

PROJECT TEAM.

PSRM CONSULTANTS LTD MUTISO MENEZES INTERNATIONAL LTD

PROJECT MANAGERS PROJECT ARCHITECTS

P.O. BOX 60824-00200, P.O. BOX 44934 - 00100,

NAIROBI, KENYA NAIROBI, KENYA

[email protected] [email protected]

LINEAR PROJECTS LTD. NATCONSULT CONSULTING ENGINEERS LTD

PROJECT QUANTITY SURVEYORS PROJECT CIVIL / STRUCTURAL ENGINEERS

P.O. BOX 106188 - 00101, P.O. BOX 3975 - 00506,

NAIROBI, KENYA NAIROBI, KENYA

[email protected] [email protected]

GEOMAX CONSULTING ENGINEERS LTD

PROJECT SERVICES ENGINEERS

P.O. BOX 53748 - 00200,

NAIROBI, KENYA

[email protected]

AUGUST, 2021.

Page 2: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

SEC 1 A : INSTRUCTIONS TO TENDERERS

Page 3: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

BILL OF QUANTITIES

SUPPLIED AS PART OF THE CONTRACT FOR PROPOSED CONVERSION OF THE OLD KITCHEN INTO A CARDIAC

CENTRE

FOR

THE NAIROBI HOSPITAL

P.O BOX 30026 - 00100,

NAIROBI, KENYA.

ISSUED BY:

LINEAR PROJECTS LTD.

QUANTITY SURVEYORS

P.O BOX 106188-00200,

NAIROBI-KENYA

AUGUST, 2021.

The contract for the above mentioned works, entered into this...............................day of .............................................

by the undersigned parties refers to the Bills of Quantities which shall be read and construed as part of the said

contract.

............................................................... ...............................................................

(EMPLOYER) (CONTRACTOR)

DATE..................................................... DATE.....................................................

Page 4: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

SPECIAL NOTES

INSTRUCTION TO TENDERERS

1. TENDER DOCUMENTS

The Tender Documents provided for this project consist of:

a) Instructions to tenderers

b) Form of tender

c) Form of surety undertaking

d) Preliminaries' including contract particular conditions.

e) Specifications

f) Bills of quantities

g) Schedule of Drawings

2. DELIVERY OF TENDERS

Tender documents as specified above shall be delivered in the addressed envelope provided, which should be

properly sealed and delivered at the offices specified in the letter accompanying these tender documents. Tenders

will be opened at the time and date specified in the letter accompanying these tender documents. Tender arriving

late will not be considered.

3. COMPLETION OF TENDERS

a) All documents forming the tenders must be completed in ink and the offer must be made on the Form of the tender.

b) The tender shall be validly witnessed.

c) The Contractor is required to check the number of the pages and should any be found to be missing or in

duplicate or the figures in writing indistinct, he must inform the consultants at once and have the same rectified

should the tenderer be in doubt about the precise meaning of any item, work or figures, he must inform the

Consultant in order that the correct meaning may be decided upon before the date for the submission of the

tender.

d) No liability will be admitted nor claim allowed in respect of errors in the contractor tender due to mistakes in

the Bills of Quantities which should have been rectified in the manner described above.

e) The contractor shall not alter or otherwise qualify the text bills of quantities, any alteration or qualification made

without authority will be ignored and these bills of quantities as printed will be adhered to.

f) The Contractor shall be deemed to have made allowance in his prices generally to cover items of preliminaries

profit and attendance items to Prime Cost sums for other items and for other costs that have not been priced

against the respective items.

g) In no case will any expenses incurred by Contractor in preparation of this tender be reimbursed.

h) The contractor will be solely responsible for the accurate and timely ordering of materials in accordance with

the Drawings and Project Manager's Instructions.

i) The bills must be priced in USD (UNITED STATES OF AMERICA DOLLAR) currency.

j) All rates in Bills of Quantities shall be exclusive of VAT but inclusive of all custom duties, levies, royalties and taxes (please note

VAT is reflected as a separate item in the main summary page and as such should NOT be priced in the unit rates)

Page 5: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

4. CORRECTION OF ERRORS IN TENDERS

All Arithmetical errors shall be subjected to an error correction percentage to the contract sum, whether in addition

or omission without changing the actual tendered contract amount. All pricing errors shall be adjusted to an error

correction percentage to the contract sum without changing the actual tendered contract amount. Corrections shall

also be made to any undue loading preliminary or other items in the measured section of the bills of quantities and all

such items shall be adjusted either as recurrent items or their cost spread over all other items without changing the

actual tendered figure.

5. NOTES CONCERNING QUANTITIES AND PRICING OF TENDERS

a) The contractor to note that the Bill of Quantities is based on Approximate Quantities. The works shall be re-

measured without change in rates regardless of vast disparity in actual re-measured Vis-a-vis Tendered

quantities.

b) The Bills of Quantities have been prepared in accordance with the Standard Method of Measurement of

Building Works for East Africa.(Contractor to refer items as General Specification for divergences from the

standard method of measurement. In any case all queries should be addressed before submission of tenders

as no claims will be allowed for want of knowledge in this respect.

6. RULING LANGUAGE

The ruling language for all purpose in respect of this contract shall be ENGLISH.

7. ALTERNATIVE TENDERS

In case a bidder wants to submit an alternative tender with a different work method / design, then the tenderer will submit TWO

tenders, one contained in these bills and a second one clearly marked "ALTERNATIVE 2"

8. EVALUATION FACTORS

The main factors which will be taken into account when evaluating tenders and comparing bids will be the

tendered price, time for completion, equipment, personnel and previous technical experience. The client reserves the right to

negotiate and agree a lump sum or a fixed price contract with any contractor regardless of their tender standing. Any

bid which is not fully responsive will be rejected.

9. COPY RIGHT

The copy right of these Bills of Quantities is vested in the Quantity Surveyor and no part thereof may be produced

without their express permission given in writing.

10.0 QUALIFICATION OF TENDER

The tender conditions shall not be qualified, amended, deleted or modified in any manner. The tenderer will allow

in his rates for any additional cost he may deem necessary for adherence to the condition as contained herein.

11.0 CLIENT SUPPLIED MATERIALS

Without prejudice to the rights of the tenderers, the client reserves the right to supply any materials to be used

in any part of the works. In such an event, the contractor shall be paid for profit and attendance. No claim for loss of profit will be

allowed.

12.0 CONFIDENTIALITY / NON DISCLOSURE

The Tenderer shall at no time disclose the contents of this project, its owners and other details to third parties without the

consent of the employer. Any disclosures made without the consent of the Employer will result to automatic termination

of the contract and further damages.

Page 6: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

FORM OF TENDER

THE NAIROBI HOSPITAL

P.O BOX 30026 - 00100,

NAIROBI KENYA

Dear Sirs,

PROPOSED CONVERSION OF THE OLD KITCHEN BUILDING INTO A CARDIAC CENTER.

We the undersigned hereby are willing to enter a contract to perform fully (within the time stated below) the

whole of the works in erecting, completing and maintain the works named above in accordance with the conditions

if the Contract all the entire satisfaction of the Project Manager

Tender sum USD......................................................................................................................................................................

........................................................................................................................................................................................

............................................................................................................................................................................(Words)

$ …...................................................................................................................................................................(Figures)

Time for completion …….........................................................................................................................(WEEKS)

NB : Time quoted for completion to include all medical equipment.

Further we the undersigned, agree to complete the whole of the works as per the Completion Time, from the date

of possession of the site as defined within the Conditions of Contract.

If our tender is accepted, we agree to enter into a Bond for due performance of the contract with the Guarantor

described herein. The Guarantor shall be either bank, Insurance Company of Finance Institution; such as guarantor

shall be to the approval of the client.

Further, we agree that until a formal agreement is signed, the tender and your acceptance do not form a binding

contract between us and that this tender is valid for ninety days from the date stated for delivery.

We have visited the site of the works and we have examined all the documents mentioned as forming part of

this contract together with instructions to tenderers and we fully understand their requirements.

Our tender is complete and we have considered our entire obligation on matters necessary for total execution

of this contract.

We understand that the lowest or any tender will not necessarily be accepted and that the clients shall not allow

any claims we incur in preparing this tender.

TENDERER

Signature of Tenderer.........................................................(Company stamp)...................................................

Name of Tenderer.............................................................................................................................................

Address of Tenderer.........................................................................................................................................

Telephone no(office).....................................................Mobile..........................................................................

E-mail Address...................................................................................................................................................

WITNESSED BY:

Signature of Witness...........................................................................................................................................

Name of witness................................................................................................................................................

Address of witness............................................................................................................................................

Telephone no....................................................................................................................................................

Page 7: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

BILL NO 1 : PRELIMINARIES.

Page 8: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Amount

PRELIMINARIES:

PRELIMINARY PARTICULARS OF CONTRACT

A Parties to the Contract:

The ‘Employer’

is

THE NAIROBI HOSPITAL.

P.O. BOX 30026-00100

NAIROBI, KENYA.

The ‘Project Manager’

is

PSRM CONSULTANTS.

P.O BOX 60824-00200,

NAIROBI, KENYA.

The ‘Architect’

is

MUTISO MENEZES INTERNATIONAL.

P.O BOX 44934-00100,

NAIROBI, KENYA.

is

LINEAR PROJECTS LTD.

P.O. BOX 106188-00101,

NAIROBI, KENYA.

The ‘Structural/Civil Engineer’

is

NATCONSULT CONSULTING

ENGINEERS LTD.

P.O BOX 3975 - 00506,

NAIROBI, KENYA.

The ‘Services Engineer’

is

GEOMAX CONSULTING ENGINEERS LTD.

P.O BOX 53748 - 00200,

NAIROBI, KENYA.

Carried to Collection $ -

Description

The ‘Contractor’ is the person or persons, partnership, firm or company whose tender for this work has been

accepted, and who has or have signed this contract and shall include his or their heirs, executors, successors and

duly appointed representatives.

The ‘Quantity Surveyor’

The Consultants above, when performing their respective duties are deemed to be invested with such duties and

representative of the Project Manager.

PRELIMINARIES BILL1 Page 1

Page 9: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Location of site:

B Site Visit:

C Drawings:

D Scope of work:

Carried to Collection $ -

b) New walls, doors and finishes

The site is located along in Argwings Kodhek, Kilimani area Nairobi and can be accessed from Nairobi Hospital

gate 1 or 2 or any other gate that the client may designate for purposes of carrying out these works

The contractor shall visit the site to acquaint himself with the nature and position; nature of ground substrata and

other supplies; access roads or any other limitations. If the contractor is unable to locate the site he can seek

guidance and information from the Project Manager.

No claims whatsoever for extras on account of lack of knowledge in this respect will be considered.

The drawings used in preparing these Bills of Quantities are as in Appendix ‘A’ at the end of these Bills of

Quantities. Further drawings may be inspected at the office of the Project Manager or Quantity Surveyor by prior

appointment.

The scope of works Conversion of the Old Kitchen into a cardiac center for the Nairobi Hospital

a) Demolitions - Wall, finishes and door demolitions

c) External Finishes - Painting

d) Roof - Refurbishment of existing clay tile roof and water proofing of the roof slab

e) Walkway - With steel supports and polycarbonate sheets

PRELIMINARIES BILL1 Page 2

Page 10: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Approximate areas

Ground Floor 1,137 sm

Total Area 1,137 sm

B

-

Carried to Collection $ -

The areas are given without warranty and for the tenderer’s guidance only

GENERAL DESCRIPTION OF THE WORKS

The approximate total area is:

Construction programme of works:

The selected contractor shall submit a programme of the works with days of award.

PRELIMINARIES BILL1 Page 3

Page 11: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

CONTRACT PARTICULARS:

A Form of Contract:

B

C Clause 1 General Provisions

The Defects Notification Period (DNP) IS 365 days.

D Clause 2 The Employer

E Clause 3 The Engineer

Carried to Collection $ -

The Contractor will be required to enter into a contract which will be the current Conditions of Contract for

Construction for Building and Engineering Works Designed by the Employer (Second Edition 2017) published by

International Federation of Consulting Engineers (FIDIC) or as may have been reprinted thereafter (With

Quantities), except in so far as varied hereafter. The Form of Contract can be inspected at the offices of the

Quantity Surveyors.

The Contractor’s attention is drawn to the following Clauses of the Conditions of Contract which shall be read as

incorporated herein and shall allow any sums which he considers necessary for the carrying out and observance

of such Conditions.

The Time for completion shall mean the time agreed in weeks from the from Commencement Date

The Agreed methods of electronic transmission All communication shall be in writing and delivered by hand

(against receipt), sent by mail or courier. In addition copies of all communication shall be sent by email from the

originator to each of the recipients of the original communication using email addresses agreed between

contractor, engineer and employer following contract signing. Such email copies shall be for the convenience of

the parties only and the contractual version of any communication shall be the version in writing and the date and

time of delivery shall be the date and time of the delivery of the version in writing.

The governing law shall be the laws of the Republic of Kenya with the ruling language and language for

communications being English (UK)

Notwithstanding the foregoing, the employer reserves the right to remove any part of the work from the main

contractor and have the same executed by a nominated contractor. The Main Contractor shall not be entitled to

any claim for loss of profit but will be entitled to profit (2%) and attendance (2%)

The term Engineer shall collectively mean the Project Manager and any other Professional Consultants engaged

by the Employer for their respective roles.

All instructions with a cost implication or materially change the nature and scope of the works must be approved

by the Employer prior to execution through a variation order. Full justification for such changes shall be provided

by the Contractor and the respective Consultants.

PRELIMINARIES BILL1 Page 4

Page 12: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Clause 3 The Engineer cnt'd

B Clause 4 The Contractor

Highlights to;

Daily progress reports to be issued complete with progress photos at the Contractor's cost.

C Clause 5 Subcontracting

D Clause 6 Staff and Labour

E Clause 7 Plant Materials and Workmanship

F Clause 8 Commencement, Delays and Suspension

Consequences of Employer’s Suspension clause 8.10 the first paragraph is Deleted.

Carried to Collection $ -

Employer’s Suspension clause 8.9 the first paragraph is Deleted and replaced with:

“The Employer may issue the Engineer with a notice of suspension instructing the Engineer to suspend the

works.”

Payment for Plant and Materials after Employer’s Suspension clause 8.11 is Deleted

Before the commencement of the construction, the Contractor shall avail a comprehensive site security plan to the

Employer. The Employer, together with any other third party as authorized by the Employer, reserves rights to

examine procedures, methods and facilities used by the Contractor to provide security.

Before the commencement of the construction, the Contractor shall avail a comprehensive health and safety plan

to the Employer. The Employer, together with any other third party as authorized by the Employer, reserves rights

to examine procedures, methods and facilities used by the Contractor to provide health and safety to personnel.

Replacement of the Engineer clause 3.6 Paragraph 3 is Deleted and replaced with “The Employer shall have the

right to replace the Engineer at any time with or without the consent of the Contractor on the choice of the

Engineer”.

The performance security will be in the form of an irrevocable and unconditional guarantee from a tier one or

tier two Bank approved by the employer

The performance security shall remain valid for 180 days from the commencement date and shall be extended

should the completion time be extended beyond its validity period.

Training to Employer’s employees to be provided at the end of the contract and is deemed included within the

Contractors tender price.

Extension of Time for Completion; the word ‘epidemic’ is Deleted

Maximum amount of delay damages 10% of the Final Contract Price. The damages will automatically be

chargeable from expiry of the contract period or extended time of the contract and will be recovered from any

amounts due to the Contractor including retention and the performance security.

PRELIMINARIES BILL1 Page 5

Page 13: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Clause 9 Tests on Completion

B Clause 10 Employer's Taking Over

C Clause 11 Defects After Taking Over

D Clause 12 Measurement and Valuation

Percentage profit clause 12.3 shall be a maximum of 15%

E Clause 13 Variations and Adjustments

F Clause 14 Contract Price and Payment

Currency or currencies of advance payment clause 14.2 shall be USD

Number of additional paper copies of statements clause 14.3(b) shall be 4no.

Percentage of retention clause 14.3(iii) shall be 10% of each Interim certificate

Plant and materials for payment when shipped clause 14.5 (b) (i) is N/A

Carried to Collection $ -

Percentage rate to be applied to provisional sums for Overhead charges and profit clause 13.4(b) is Deleted

Period of payment clause 14.3 When payments are 10% of the accepted contract amount less provisional sums.

Limit of retention money (as a percentage of accepted contract amount) clause 14.3(iii) shall be 5% of the

Accepted Contract Price or Provisional Final Account Whichever is higher.

Repayment of the Advance Payment clause 14.2.3 The Advance Payment Guarantee shall be provided at the

cost of the contractor from a Tier (1) or Tier (2) bank and will be equivalent to the advance payment in value.

Standard Method of Measurements of Building and Associated Civil Works for Eastern Africa, Second Edition

2008, published by the Architectural Association of Kenya.

Total amount of advance payment (as a percentage of accepted contract amount) clause 14.2 15% shall be the

maximum percentage of accepted contract sum payable as an advance payment and shall be payable in the

currencies and proportions in which the accepted contract amount is payable upon presentation of an irrevocable

and unconditional performance guarantee from a bank approved by the employer and presentation of an

irrevocable and unconditional advance payment guarantee from a bank approved by the employer.

PRELIMINARIES BILL1 Page 6

Page 14: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Clause 14 Contract Price and Payment cnt'd

Period for payment of advance payment to the Contractor clause 14.7(a) shall be 30 days

Number of additional paper copies of draft final statement clause 14.11.1(b) shall 4 No

Currencies for payment of contract price clause 14.15 shall be in USD

Proportions or amounts of local and foreign currencies clause 14.15(a)(i) is N/A

Rates of exchange clause 14.15(f) is N/A

G Clause 15 Termination by Employer

H Clause 16 Suspension and Termination By Contractor

J Clause 17 Care of the Works and Indemnities

K Clause 18 Exceptional Events

Carried to Collection $ -

Plant and materials for payment clause 14.5 (c) (i) All permanent materials shall be payable as materials on site

as at when they are delivered on site and upon confirmation on their suitability by the Engineer.

Period for the employer to make interim payments to the Contractor [Interim Certificate] clause 14.7(b)(i) shall be

28 days

Period for the employer to make final payment to the Contractor clause 14.7(c) shall be 56 days

Period for the employer to make interim payments to the Contractor [Final Certificate] clause 14.7(b)(ii) shall be

28 days

Financing charges for delayed payment clause 14.8 average Central Bank of Kenya base lending rate

Notice to Correct clause 15.1 The Engineer shall consult with the Employer before issuing Notice to Correct to the

Contractor.

Termination for Contractor’s Default clause 15.2.2 the days of receiving the Notice have been reduced from 14

days to 7 days

Forces of nature, the risks of which are allocated to the Contractor clause 17.2(d) Supply chain risks, availability of

labour and weather

PRELIMINARIES BILL1 Page 7

Page 15: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Clause 19 Insurance

B Clause 20 Employer's and Construction's Claims

C Clause 21 Disputes and Arbitration

Carried to Collection $ -

Delete the following sentence from this Sub-clause:

“…the DAAB for its decision under Sub-Clause 21.4 [Obtaining DAAB’s Decision] without the need for a NOD (and

Sub-Clause 3.5.5 [Dissatisfaction with Employer’s Representative’s determination] and sub-paragraph (a) of Sub-

Clause 21.4.1 [Reference of a Dispute to the DAAB] shall not apply)…”

and replace it with the following sentence:

“Mediation under Clause 21 failing which either Party may refer the Dispute to Arbitration under the provisions of

Clause 21.”

Delete the words “Sub-Clause 21.4 [Obtaining DAAB’s Decision]” and replace it with “Sub-clause 21.4

[Arbitration].”

Delete the sentence “21.6 [Arbitration] in which case the first and the third paragraphs of Sub-Clause 21.7 [Failure

to Comply with DAAB’s Decision] shall apply to such reference in the same manner as these paragraphs apply to

a final and binding decision of the DAAB.” and replace it with:

Permitted deductible limits: clause 19.1 is 100% of the total contract sum

Contractors All risk:

• Insurance required for the works-Insurance required for goods- Nil (No Deductibles)

• Insurance required for liability for breach of professional duty

• Insurance required against liability for fitness for purpose(if any is required)

• Insurance required for injury to employees clause 19.1 Maximum deductible of United Sates of America Dollars

(USD. 235)

• Minimum amount for insurance of the employers risks clause 19.1 Maximum deductible of United Sates of

America Dollars (USD 9,260)

The definition of “DAAB” and “DAAB Agreement” is deleted in its entirety. “Dispute” shall be amended by deleting

the entire paragraph after 1.1.29 (c) which reads as follows “…provided however that a failure by the other Party

(or the Engineer) to oppose or respond to the claim, in whole or in part, may constitute a rejection if, in the

circumstances, the DAAB or the arbitrator(s), as the case may be, deem it reasonable for it to do so…”

PRELIMINARIES BILL1 Page 8

Page 16: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Sufficiency of Tender

B

C Definitions and Abbreviations

“C.M.” Shall mean Cubic Metre.

“S.M” Shall mean Square Metre.

“L.M.” Shall mean Linear Metre.

“mm” Shall mean Millimeter.

“No.” Shall mean Number.

“Kg.” Shall mean Kilogram.

Carried to Collection $ -

GENERAL MATTERS OF CONTRACT

The Contractor shall be deemed to have satisfied himself before tendering as to the correctness and sufficiency of

this tender for the works and of the rates and prices stated in the Priced Bills of Quantities, which rates and prices

shall cover all his obligations under the Contract and all matters that are necessary for the proper completion and

maintenance of the works.

Stamp Charges and Registration of the Contract.

The Contractor shall allow for the payment of all stamp charges and registration in connection with the Contract

Agreement.

The contractor will also be responsible for registration of project with the National Construction Authority (NCA)

which must happen within the 7 days from signing of the contract.

The terms used in the Bills of Quantities shall be interpreted as follows:

“As directed” shall mean as directed by the Project Manager and the Employer in writing.

"K.S" shall mean the current Kenya Standard specification published by the Kenya Bureau of Standards, P.O. Box

54974, NAIROBI, Kenya.

“DO” or Ditto” shall mean the whole of the preceding description except as qualified in the description in which it

occurs.

“As described” shall mean as described previously in a foregoing Bill or Trade Preambles of in the Ministry of

Public Works, General specification for Building Works 1976 Edition or any subsequent revision thereof.

“Approved” shall mean approved by the Project Manager and the Employer in writing.

“B.S.” shall mean the current British Standard Specification published by the British Standards Institution, 2 Park

street, London, W.I., England.

PRELIMINARIES BILL1 Page 9

Page 17: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Progress Schedule

-

B Figured Dimensions:

C Provisional Work:

Carried to Collection $ -

All “provisional” and other work liable to adjust under this Contract shall be left uncovered for a reasonable time to

allow all measurements needed for such adjustment to be taken by the Quantity Surveyor. Immediately the work is

ready for measurement the contractor shall give notice to the Quantity Surveyor.

If the Contractor makes default in these respects, he shall, if the Project Manager so directs, uncover the work at

his own expense to enable measurements to be taken.

The Contractor shall upon receiving instructions to proceed with the work, draw up a time and progress schedule

setting out the order in which the works are to be carried out and stating the appropriate dates. This Time and

Progress Schedule is to be agreed with the Project Manager and the Employer, and no deviation from the order

set out in this schedule will be permitted without the written consent of the Project Manager and the Employer. The

Main Contractor will be responsible for agreeing the above programme with all sub-Contractors including the

Nominated Sub-Contractors and Nominated Suppliers.

Figured dimensions are to be followed in preference to dimensions scaled from the drawings, but whenever

possible dimensions are to be taken on the site or from the buildings. Before any work is commenced by sub-

contractors or specialist firms, dimensions must be checked on the site and/or building and agreed with the

Contractor, irrespective of the comparable dimensions shown on the drawings. The contractor shall be

responsible for the accuracy of such dimensions.

PRELIMINARIES BILL1 Page 10

Page 18: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Existing Services

B Transport to and from the site

C Labour camps

D

E Government Acts regarding Workplace, etc.

No claim in respect of want of knowledge in this connection will be entertained.

-

Carried to Collection $ -

The Contractor shall include in his prices for the transport of materials, workmen, etc. to and from the site of the

proposed works, at such hours and by such routes as are permitted by the authorities.

No labour camps will be allowed on site. The Contractor may however liaise with adjacent property owners and

locate his camp within good distance from the site.

Public and Private Roads, Pavements, etc.

The Contractor will be required to make good, at his own expense, any damage he may cause to the present road

surfaces and pavements during the period of the works. In particular, all existing lawns, gardens, paths, storm

water channels, hedges, fences, etc., which may be destroyed or damaged during the progress of the works are

to be made good by the Contractor to the satisfaction & approval of the Project Manager.

The Contractor must make himself fully acquainted with current Acts and Regulations, including police regulations

regarding the movement, housing, security and control of labour, labour camps, passes for transport, etc. It is

important that the contractor, before tendering, shall obtain from the relevant authority the fullest information

regarding all such regulations and/or restrictions which may affect the organization of the works, supply and

control of labour, etc. and allow accordingly in his tender. The Contractor is especially drawn to the requirement to

provide workers with protective clothing which shall include but not limited to safety helmet, protective overalls and

safety boots. The Employer will enforce this requirement.

Allow for complying with all Government Acts, Orders and Regulations in connection with the Employment of

labour and other matters related to the execution of the works. In particular the Contractor’s attention is drawn to

the provision of the Factory Act 1950 and his tender must include for all costs arising or resulting from compliance

with any Act, Order or Regulation relating to insurance, pension and Holidays for workplace or to the safety, health

or welfare of work people.

Prior to commencement of any work the contractor is to ascertain from the relevant authorities the exact position,

depth and level of existing electric cables, water pipes or other services in the area and he shall make whatever

provisions may be required by the authorities concerned for the support and protection of such services. Any

damage or disturbance caused to any service shall be reported immediately to the Project Manager and the

relevant authority and shall be made good to their satisfaction at the Contractor’s expense.

Particular attention is drawn to the Rules published in Legal Notice 179, dated 02 June 1978 (Building operations

and Work of Engineering Construction)

PRELIMINARIES BILL1 Page 11

Page 19: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Overtime Working

B Firm Price Contract

C Generally:

Carried to Collection $ -

All materials shall be new unless otherwise directed or permitted by the Project Manager and the Employer and in

all cases where the quality of goods or materials is not described or otherwise specified, is to be the best quality

obtainable in the ordinary meaning of the word “best” and not merely a trade signification of the word.

The Contractor shall order all materials to be obtained from overseas immediately after the Contract is signed and

shall also order materials to be obtained from local sources as early as necessary to ensure that such materials

are on site WHEN REQUIRED for use in the works.

The Bills of Quantities shall not be used for the purpose of ordering materials.

The Contractor shall be responsible for and shall replace or make good at his own expense any materials lost or

damaged. The works shall be executed by skilled workmen well versed in their respective trades.

The Nairobi Hospital will supply the contractor with exemption letters to allow movement within curfew hours.

However, the contractor will make arrangements for transport for his/her workers. The Nairobi Hospital will not

take any responsibility for any problems encountered during the curfew hours.

The contractor shall be responsible for any extra costs for overtime working he considers will be necessary in

order to complete the works within the contract period or time for completion.

Unless otherwise specifically stated no claim for increased costs will be entertained excepting only increased

costs arising from fluctuation clause as defined in the Conditions of Contract.

MATERIALS AND WORKMANSHIP

Due to the emergency nature of these works, the contractor shall work 24 hours a day in 3No 8 hour shifts. The

work shall continue for all the seven days in a week until completed.

All materials and workmanship shall unless otherwise specified or described conform to the appropriate British

Standard Institution Specification current at the date of Tender.

PRELIMINARIES BILL1 Page 12

Page 20: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A

B Proprietary Materials

C Samples:

D Concrete Tests

TEMPORARY WORKS

E

Carried to Collection $ -

The Contractor shall obtain the Project Manager’s approval for the siting of all temporary buildings; spoil heaps,

temporary roads, paths and storage areas for materials.

Rejected Workmanship or Materials

Any workmanship or materials not complying with the specific requirements or approved samples or which have

been damaged, contaminated or have deteriorated, must be immediately removed from the site and replaced at

the Contractor’s expense as required.

Where proprietary materials are specified hereinafter the contractor may propose the use of materials of other

manufacturer but equal quality for approval by the Project Manager.

Concrete test cubes, i.e. per set of three as later described including testing fee, labour and material, mould,

transport and handling etc. successful tests only (PROVISIONAL)

Sets of three: No. 20 @ USD *____________

Areas to be occupied by the Contractor:

The cube tests will be done at an approved laboratory. The Structural Engineer reserve the right to conduct non

destructive tests at any single time.

All materials and goods, where specified to be obtained from a particular manufacturer or supplier, are to be used

or fixed strictly in accordance with their instructions.

The Contractor shall furnish at the earliest possible opportunity before work commences and at his own cost, any

samples of materials or workmanship that may be called for by the Project Manager for his approval or rejection

and any further samples in the case of rejection until such samples are approved by the Project Manager and

such samples when approved shall be the minimum standard for the work to which they apply.

PRELIMINARIES BILL1 Page 13

Page 21: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Telephone:

B Plant, Tools and Scaffolding:

C Watching and lighting:

D Temporary Roads:

Carried to Collection $ -

The Contractor shall provide a dedicated mobile/wireless phone for the site which shall be attended at all times,

for the period of the works and shall pay all fees and rentals for the same.

The Contractor shall provide all necessary hoists, tackle, plant, vehicles, tools and appliances of every description

for the due and satisfactory completion of the works and shall remove the same on completion.

The contractor shall provide, erect and maintain all temporary scaffolding, sufficiently strong and efficient for the

due and satisfactory performance of the works, alter and adopt all scaffolding as and when required during the

works and remove on completion and make good.

No timber used for scaffolding, formwork or similar purpose shall be used afterwards in the permanent works.

All such plant, tools and scaffolding shall comply with all regulations whether general or local in force throughout

the period of the Contract and shall be altered or adapted during the Contract as may be necessary to comply with

any amendments in or additions to such regulations.

Scaffolding is not measured hereinafter, and the Contractor must allow here or in his rates for the above.

The Contractor shall provide at his own expense and risk all watching and lighting as necessary to safeguard the

works, plant and materials against damage and theft.

The Contractor is to allow for providing where directed, all execution of the works including making good when no

longer required.

PRELIMINARIES BILL1 Page 14

Page 22: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Existing and Adjacent Property:

B Nuisance:

C Ordering of Materials:

D Domestic Sub-contractors.

Carried to Collection $ -

The Contractor must take all steps necessary to safeguard existing and adjacent property, make good at his own

expense any damage to persons or property caused thereon, and hold the Employer indemnified against any

claim arising.

The Contractor will be held fully responsible for the safety of the existing and adjacent building and for any

damage caused in consequence of these works. He must reinstate all damages at his own expense and indemnify

the Employer against any loss.

The Contractor must take such steps and exercise such care and diligence so as to minimize nuisance from dust,

noise or any other cause, to the occupiers of adjacent properties.

The Contractor must assist in alleviating the effects of possible shortages of materials by advance ordering of

materials in order to maintain a continuous supply. Early delivery of materials will be permitted and included in

interim certificates and upon request by the Project Manager, the Contractor will be required to produce copies of

order forms and invoices to establish that materials have been ordered in sufficient time and to check on material

deliveries.

DOMESTIC SUB-CONTRACTORS.

The Contractor shall be responsible for domestic sub-contractors in every respect and, in particular, it shall be the

Contractor’s responsibility to ensure that each sub-contractor commences and completes the work in such a

manner and is ready on the site with his materials, labour and special plant at such times also as to conform with

the progress schedule, as specified previously and to ensure satisfactory progress.

The Contractor shall also accept liability for and bear cost of general attendance on the sub-contractors which he

shall be deemed to include for:

PRELIMINARIES BILL1 Page 15

Page 23: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Nominated Suppliers

B Prime Cost Sum

Carried to Collection $ -

Allowing the use of standing scaffolding, maintenance and alteration of all scaffolding until such time as all

relevant sub-contractor’s work are complete, and removal of all scaffolding on completion.

Providing space for office accommodation and for storage of plant and materials; allowing use of sanitary

accommodation; the supply of necessary water, power, lighting and watching; and clearing away all rubbish.

The items for “Attendance” given hereinafter following prime cost sums in respect of subcontractor’s work shall be

deemed to include all the above.

The cutting away for and making good after the work of sub-contractors as may be required will be measured and

valued separately by the Quantity Surveyor.

The Main Contractor shall choose the domestic sub-contractors from the provided guidance list. However, the

main contractor will be at the liberty to choose his own preferred sub-contractors in which case he must first seek

approval from the project team.

The cost of (Fix Only) materials to be obtained from nominated suppliers which are covered by prime cost or

provisional sums shall include for taking delivery on site, checking with invoices or indents, reporting and claiming

damages for shortages and damaged goods, defraying demurrage, signing for as having been received in good

order unloading, storing, covering and protecting until the time of fixing, unpacking, replacing anything lost or

damaged, sorting assembling, hoisting to required levels and fixing as described.

Before placing any order with Nominated suppliers the Contractor must ascertain that the terms and conditions of

the quotations and the dates of delivery of materials or execution of work comply with the terms of the contract,

and the progress schedule.

Where description of items includes a P.C. rate per unit, this rate is to cover the Net supply cost of the unit only.

The Contractor's price must include for the cost of the unit at the rate stated plus waste, taking delivery, storage,

fixing in position, profit and overheads.

The net cost per unit will be adjusted within the final account against the P.C rate stated.

PRELIMINARIES BILL1 Page 16

Page 24: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

PROTECTION AND CLEANING

A Protection of Completed Works

B Protection of Trees

-

C Materials on site

-

D Cleaning:

Carried to Collection $ -

The Contractor shall cover up and protect from damage, including damage from inclement rainy weather, all

finished work, and unfixed materials including that of sub-contractors, etc. to the satisfaction of the Project

Manager until the completion of the Contract. No claim for pumping rain water in basements or other damages

occasioned by the above will be allowed.

The Contractor shall in the course of construction take all necessary precautions to preserve any existing trees.

The contractor will not cut down any tree(s) without express authority or written instruction by the Project Manager

and relevant authorities. He must at all times liaise with the Project Manager in this regard. The cost of obtaining

any necessary permits will be borne by the Contractor.

All materials for incorporation in the works must be stored on or adjacent to the site before payment is effected

unless specifically exempted by the Project Manager.

The Contractor shall upon completion of the works, at his own expense, remove and clear away all surplus

excavated materials, plant, rubbish and unused materials including clearing away and making good all traces of

dirt and shall leave the whole of the site and works in a clean and tidy state to the satisfaction of the Project

Manager. Particular care shall be taken to leave clean all floors and windows and remove all paint and cement

stains. He shall also, at the discretion of the Project Manager, remove all rubbish and dirt as it accumulates. The

contractor is to find his own dump and shall pay all charges in connection therewith.

PRELIMINARIES BILL1 Page 17

Page 25: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

A Training Levy

B

C Timely payment for labourers

D Extended Preliminaries

E Additional Items

Carried to Collection $ -

The Contractor shall ensure that his workers are paid their wages promptly and on time. If such payments are

effected weekly the Contractor shall ensure that workers are paid on the appointed day to avoid any disruption of

work occasioned by the failure of the Contractor to pay workers on time and shall be required to furnish proof to

that effect.

In case the Contractor suffers costs due to extended preliminaries as a result of excusable delays. Then the

Employer shall compensate the Contractor the ACTUAL COST of such extended preliminaries plus 10%

administrative costs. Such costs will be proven with payment receipts, payroll etc. No further claims shall be

allowed with respect to the same.

Any additional items(s) which the Tenderer may wish to price separately and which he considers has not been

included in the foregoing conditions, specifications and/or Bills of Quantities.

Description:

…………………………………………………………………………………………………………………………………………………………………...…………………………………………………………………………….

…………………………………...……………………………………………………………………….

………………………………...………………………………………………………………………….

The Contractor’s attention is drawn to Legal Notice No. 237 of October 1971 which requires payments by the

Contractor of a Training Levy at the rate of ¼% of the Contract sum on all contracts of more than USD 463 in

value and his Tender must include for all costs arising or resulting therefrom.

Value Added Tax (VAT) and other taxes

The Contractor’s attention is drawn to V.A.T Public Notice No. 6 of 5th

August 1993 regarding the Finance Bill

1993 which expanded the V.A.T base to cover construction services amongst other items. The Contractor is

required to acquaint himself with such notices and allow in his Bills of Quantities rates (excluding P.C and

Provisional Sums) for the net tax (i.e. less input tax where applicable) as required by law.

The Contractor may seek further direction and assistance regarding the application of this law to the

Commissioner of Domestic Tax.

PRELIMINARIES BILL1 Page 18

Page 26: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item AmountDescription

PRELIMINARIES (SUMMARY)

COLLECTION

From Page Sec 1, Page 1 $ -

From Page Sec 1, Page 2 $ -

From Page Sec 1, Page 3 $ -

From Page Sec 1, Page 4 $ -

From Page Sec 1, Page 5 $ -

From Page Sec 1, Page 6 $ -

From Page Sec 1, Page 7 $ -

From Page Sec 1, Page 8 $ -

From Page Sec 1, Page 9 $ -

From Page Sec 1, Page 10 $ -

From Page Sec 1, Page 11 $ -

From Page Sec 1, Page 12 $ -

From Page Sec 1, Page 13 $ -

From Page Sec 1, Page 14 $ -

From Page Sec 1, Page 15 $ -

From Page Sec 1, Page 16 $ -

From Page Sec 1, Page 17 $ -

From Page Sec 1, Page 18 $ -

$ - Total Amount Carried to Main Summary

PRELIMINARIES BILL1 Page 19

Page 27: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

BILL NO. 2 : DEMOLITIONS

Page 28: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO. 1

DEMOLITIONS (ALL PROVISIONAL).

NOTE : The Contractor is strongly advised to visit the site and

fully ascertain the nature and scope of structures hereafter

described as for demolition before pricing and is requested to

raise any queries that appertain to the structures to be

demolished that may affect or influence the pricing, Such queries

should be addressed to the Project Manager before the tender

closing date.

No claims arising from the tenderers failure to fulfil the above

requirement shall be considered.

The contractor is to allow for all temporary protection required during

the works including ordinary and special dust screens, hoarding,

barriers, warning signs etc. as directed by theProject Manager and as

necessary for the protection of the existing structure and finishing's,

workmen employed upon the site and the general public.

All protective devices are to be removed on completion of the works

and any necessary making good consequent upon this is to be

executed to the satisfaction of the Project Manager.

The works shall be executed in such order and sequence as the

Project Manager may direct and with as little disruption and

inconvenience as possible and shall be caused to the normal

functioning of the employer, the staff and the public including the

adjacent property occupiers.

Demolitions work shall be carefully executed with particular aim of

minimizing damage to adjacent finishes, structure or components not

measured herewith.

All existing works shall be propped, strutted and supported as

necessary before the demolition work is commenced. Prices shall

include for all necessary preparatory work to structure and finishing's

and all making good to finishing's on completion whether or not

specifically described.

Total Carried to Collection. -

DEMOLITIONS BILL 2 Page 1

Page 29: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Unless otherwise described, all arising, debris and surplus materials

resulting from the demolitions shall be carted away from the site and

prices shall be deemed to include all credit allowances, unless an

additional credit is offered by means of a lump sum deduction on the

collection page of this bill. All existing work shall be made good up to

new surface and cleaned to the entire satisfaction of the Project

Manager.

Amounts and rates for demolitions shall include the following in

addition to what is described in the particular item.

a) Making good i.e. reinstatement of any finishes and structures

affected by the demolition work to the original state.

b) Clearing debris with speed on daily basis as they arise, cleaning of

affected surfaces, and removal of the debris from site to approved

dumping sites. Accumulation of debris within the site premises shall not

be allowed.

c) Allowance for all notices, statutory or otherwise required to be

issued before commencement shall be deemed to be included in the

pricing.

d) The amounts quoted shall be deemed to be inclusive of all handling

of the removed items and their removal from the site.

e) Materials deemed by the Engineer as reusable shall be salvaged,

cleaned down, made good as necessary, stored securely and

transported to the premises of the client at a designated area as

directed. The contractor shall allow for proper and neat stacking of the

materials.

f) The Contractor to carefully inspect and demolish the following

structures including breaking up foundations with and including

reinforced concrete structures, walls, roof and carefully disconnecting

and removing all sanitary, electrical or other fixed fittings, joinery,

windows and doors, service pipes and conduits.

Total Carried to Collection. -

DEMOLITIONS BILL 2 Page 2

Page 30: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Demolitions (Including cart away of any debris arising).

Ceramic Floor Tiles

A Carefully strip off existing ceramic floor tile finish including backing

screed on epoxy on reinforced concrete floor and cart away as directed

in ground floor937 SM 4.79 4,487.55

Terrazzo Finish

B Carefully hack existing terrazzo floor finish on concrete floor and cart

away as directed in ground floor119 SM 3.99 474.94

Granite

C Carefully hack existing granite floor finish on concrete floor and cart

away as directed in ground floor8 SM 3.99 31.93

Ground Floor Slab

D Carefully hack and remove existing 300mm thick concrete floor

behind the building to create space for the ramp construction. 62 SM 3.99 247.45

Ceramic Wall Tiles

E Carefully remove and hack existing wall tiles including cement sand

backing in ground floor.627 SM 3.99 2,502.39

Ceiling Finishes

F Carefully remove existing plaster board ceiling complete with all the

tracks, brandering, fittings and edge trims, make good where

necessary and set aside as directed.214 SM 3.99 854.09

G Carefully remove existing 600 x 600mm acoustic ceiling panels

complete with all the aluminium grid work, galvanized support wires,

make good where necessary and set aside as directed.67 SM 3.99 267.40

Walling

I Carefully demolish 200mm thick existing masonry walls and cart away

debris arising therefrom as directed433 SM 3.99 1,728.13

J Ditto 150mm thick 35 SM 3.99 139.69

K Carefully demolish 200mm thick existing styropol and mesh infills to

walls and cart away debris arising therefrom as directed67 SM 2.39 160.44

Total Carried to Collection. 10,894.00

DEMOLITIONS BILL 2 Page 3

Page 31: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

A Carefully cut / hack and make smooth, the existing surfaces of bush

hammered stone walling and cart away debris arising therefrom as

directed72 SM 3.99 287.36

Windows

Carefully demolish existing powder coated aluminium windows

and set aside for client re-use as directed:

B Window overall size 3750 x 2700mm high 4 NO 7.98 31.93

C Window overall size 3550 x 1800mm high 3 NO 7.98 23.95

D Window overall size 3370 x 900mm high 20 NO 7.98 159.64

E Window overall size 2500 x 1800mm high 2 NO 7.98 15.96

F Window overall size 2500 x 900mm high 1 NO 7.98 7.98

G Window overall size 2450 x 1800mm high 13 NO 7.98 103.77

H Window overall size 2200 x 1800mm high 1 NO 7.98 7.98

I Window overall size 2100 x 1800mm high 2 NO 7.98 15.96

J Window overall size 2000 x 900mm high 10 NO 7.98 79.82

K Window overall size 1300 x 1800mm high 4 NO 7.98 31.93

L Window overall size 900 x 1800mm high 2 NO 7.98 15.96

M Window overall size 900 x 900mm high 3 NO 7.98 23.95

Carefully remove existing aluminium louvered windows and set aside

for client re use as directed:

N Window overall size 1000 x 300mm high 3 NO 7.98 23.95

Doors

Carefully remove existing doors including door frame and set aside for

client re use as directed:

External doors

O Flush door overall size 900 x 2400mm high 2 NO 3.99 7.98

Total Carried to Collection. 838.12

DEMOLITIONS BILL 2 Page 4

Page 32: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

A Ditto 1600 x 2400mm high 2 NO 3.99 7.98

B Steel casement door overall size 7000 x 2400mm high 1 NO 19.96 19.96

Demolitions (Continued).

C Aluminium door overall size 2500 x 2400mm high 1 NO 3.99 3.99

D Ditto overall size 1400 x 2400mm 2 NO 3.99 7.98

Internal doors

E Flush door overall size 1500 x 2400mm high 3 NO 3.99 11.97

F Ditto 900 x 2400mm high 9 NO 3.99 35.92

G Ditto 800 x 2400mm high 13 NO 3.99 51.88

H Door frame 6 meters long 2 NO 2.00 3.99

I Aluminium doors overall size 900 x 2400mm high 2 NO 3.99 7.98

Existing Maintenance Structure

H Carefully demolish the existing steel structure with mabati roofing and

cart away arising debris as directed.1 ITEM 159.64 159.64

Existing Walkway structure into the building

I Carefully demolish the existing section of the walkway passing through

the proposed cardiac centre comprising of RHS steel below, steel

chequered plate floor and mabati roofing and cart away arising debris

as directed.

1 ITEM 79.82 79.82

Concrete Columns

J Carefully demolish existing 200x200x3000mm Concrete columns

around the existing rear steel door and cart away arising debris as

directed.2 NO 11.97 23.95

Credit for demolished materials

K Less a discount to the client in lieu of all materials arising from

demolitions1 SUM 399.11 399.11

Total Carried to Collection. 814.18

DEMOLITIONS BILL 2 Page 5

Page 33: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Roof Slab Demolitions

Roof Interlocking Tiles

A

Carefully strip off existing interlocking concrete tiles floor tile finish

including backing screed on reinforced concrete floor and cart away as

directed in the roof terrace floor459 SM 1.60 732.76

Roof EPDM Layers

BCarefully strip off existing EPDM layers on the concrete tiles floor tile

finish and cart away as directed in the roof terrace floor21 SM 1.60 33.52

Roof Ceramic Tiles

C

Carefully strip off existing ceramic floor tiles on top of interlocking

concrete tiles floor tile finish and cart away as directed in the roof

terrace floor96 SM 1.60 153.26

Demolitions

D Carefully demolish the existing storm drain around the building and cart

away arising debris62 LM 3.99 247.45

Total Carried to Collection 1,166.99

COLLECTION

Brought forward from Page 1 $ -

Brought forward from Page 2 $ -

Brought forward from Page 3 $ 10,894.00

Brought forward from Page 4 $ 838.12

Brought forward from Page 5 $ 814.18

Brought forward from Above $ 1,166.99

Total for Demolitions Carried to Main Summary $ 13,713.28

DEMOLITIONS BILL 2 Page 6

Page 34: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

BILL NO 3 : MAIN BUILDING

Page 35: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO. 01 : SUBSTRUCTURES (ALL PROVISIONAL)

Excavations & Disposal including maintaining & supporting sides

& keeping free from water, mud etc. and disposal

Note :

(1). The Tolerances for excavation works shall be +-10mm, any

over excavation shall be corrected with mass concrete class 20 at

the contractor's expense.

(2). Excavations for column bases and strip foundations are

measured net. No working space is allowed, tenderers allow for

working space within their rates.

NOTE : Classes of Rock

(1) Class 1:

Class 1 Rock shall be with compressive strength exceeding 15KN/mm2

This type of rock contains stones and boulders of untethered or

incompletely weathered Tuff, trachyte, black trap or lava with

compressive strength exceeding 15N/mm2 in a formation which is

massive and geologically homogeneous. A boulder or outcrop with

such compressive strength will be deemed to be class 2 rock or Hard

rock.

The opinion of the Engineer in classifying rock shall be final and

binding.

Explosives must not be used without the prior written approval of the

Engineer. Blasting operations are carried out at the contractor's sole

risk and all blasting must be carried out in accordance with

government regulations and approval.

(2) Class 2:

Soft rock of the type know locally as "tuff" or "malady" which in the

opinion of the Engineer cannot be considered as hard rock shall be

known as rock Class 1 rock.

Soft rock shall be rock with compressive strength not exceeding

15N/mm2. Murram and Kunken are specifically excluded and will be

deemed as normal excavation. Extremely weathered and weak tuff

shall also be considered as normal excavation.

Excavations

AExcavate oversite to remove top vegetable soil average 150mm deep

and cart away as directed52 SM 1.60 83.01

BStrip excavations not exceeding 1.50 meters deep from reduced level

24 CM 2.39 57.47

Total Carried to Collection Page 140.49

MAIN BUILDING BILL3 Page 1

Page 36: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Excavations (Continued)

AColumn base excavations not exceeding 1.50 meters deep from

reduced level.8 CM 2.39 19.16

B Extra over excavation for class 1 rock. 6 CM 7.98 51.09

C Extra over excavation for class 2rock. 3 CM 15.96 51.09

DReturn, fill, ram selected excavated material around foundations.

21CM

1.60 34.23

E Dispose surplus excavated material from site. 18 CM 4.79 87.93

Imported Filling & Surface Treatment

F

300mm thick approved imported hardcore filling spread, levelled, well

rammed and consolidated in layers to receive concrete surface bed

(m.s).

114 SM 4.79 545.98

GMurram or quarry dust layer to hardcore prepared to receive surface

bed 50 mm thick.114 SM 0.80 91.00

Damp-proof membranes

HDamp proof membrane over blinded hardcore including 300mm end &

side laps 1000 gauge.114 SM 1.60 181.99

Anti-Termite Treatment

I Chemical anti-termite treatment, executed complete by an approved

specialist under a ten-year guarantee, to surfaces of hard-core.

114 SM 2.79 318.49

Concrete Work

J Plain concrete class 15; 50mm thick blinding under Footings 45 SM 3.99 179.60

K Ditto under column bases 5 SM 3.99 19.96

Vibrated reinforced concrete class 25 (20mm aggregate) to:

L Strip Footings 9 CM 111.75 1,005.75

M Column bases 2 CM 111.75 223.50

N Foundation Columns 1 CM 111.75 111.75

O Thicknessing under new walls 3 CM 111.75 335.25

P Kitchen island drain channel filling 2 CM 111.75 223.50

Q 150mm thick new floor beds 64 SM 16.76 1,072.80

R 150mm thick ramp 50 SM 16.76 838.12

Total Carried to Collection Page 5,391.16

MAIN BUILDING BILL3 Page 2

Page 37: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Steel Reinforcement (All Provisional)

High yield ribbed reinforcement bars to KS ISO 6935-2:2007 to;

A Assorted reinforcement bars 1,700 KG 1.12 1,899.74

Mesh fabric reinforcement to B.S 4483 and setting in concrete bed

including end laps Ref. A142 weighing 2.22kg/m2 to;

B Ground floor slab 64 SM 3.19 204.34

C Ramps 50 SM 3.19 159.64

Formwork

Sawn formwork as described to; allow for setting to curve where

required, special propping, strutting, fillets etc. to;

D Vertical sides of strip footings 25 SM 5.59 139.69

E Column bases 6 SM 5.59 33.52

F Foundation columns 5 SM 5.59 27.94

G Edges of slab 150 mm girth but not exceeding 225 mm girth 111 LM 1.28 141.76

Foundation Walling

H

Natural quarry stone walling bedded and jointed in gauged mortar (1:3)

Foundation Walling 150mm thick including 25mm hoop iron in

alternate courses

123 SM 12.77 1,570.88

Expansion Joints;

IClean, prepare and fill a 20mm thick styropol expansion joint filler or

other equal and approved to the existing expansion joint4 SM 9.58 38.31

J20x20mm "Mastic" or other equal and approved joint sealant to

structural Engineer's approvals27 LM 6.39 172.41

Total Carried to Collection 4,388.25

COLLECTION

Total from page 1 140.49

Total from page 2 5,391.16

Total from Above 4,388.25

Total for Substructures carried to Bill Summary 9,919.89

MAIN BUILDING BILL3 Page 3

Page 38: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO. 02 : REINFORCED CONCRETE FRAME

Concrete Work

Vibrated reinforced concrete class 25 (20mm aggregate) in:

A Beams 10 CM 111.75 1,117.50

B Lintels 1 CM 111.75 111.75

C Columns 1 CM 111.75 111.75

D New RC gutters 5 CM 111.75 558.75

E 150mm thick suspended Slab 55 SM 16.76 921.93

Steel Reinforcement (All Provisional)

High yield ribbed reinforcement bars to KS ISO 6935-2:2007 to;

F Assorted reinforcement bars 2,525 KG 1.12 2,821.68

Formwork

Sawn formwork as described to; allow for setting to curve where

required, special propping, strutting, fillets etc. to;

G Edges of slab 150 mm girth but not exceeding 225 mm girth. 15 LM 1.28 19.16

H Soffits of suspended slabs. 55 SM 5.59 307.31

I Vertical sides and soffits of beams. 80 SM 5.59 447.00

J Vertical sides and soffits of lintels. 18 SM 5.59 100.57

K Vertical sides of columns. 17 SM 5.59 94.99

L Soffits and vertical sides of New RC Gutters 18 SM 5.59 100.57

Total for RC Superstructure carried to Bill Summary 6,712.96

MAIN BUILDING BILL3 Page 4

Page 39: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Structural Steelworks complete with all welding and accessories

as described in BS 449 Part 2.

The following in framed structural Steel works complete with and

including welded and bolted connections; delivery to site and erection

with and including on shop coat red / grey oxide primer; hoisting and

fixing in position average height 9,000mm high from ground level and

finishing with 3 coats zinc chromate enamel paint or other equal and

approved to all exposed surfaces.

Steel Fabrication Notes

All Materials shall be tested for thorough thickness properties to the

specified Class BS 5920-2001,21.2

Manufacturers Certificate of test and inspection shall be issued

conforming to BS EN 10204 stating the process of manufacture and

product grade.

Preloaded fasteners shall generally be HSFG BOLTS with associated

NUTS & WASHERS.

Steel casing and forgings shall conform to BS3100.

Bedding material for steel bases on concrete foundation shall be done

to Engineer's Approval.

Structural steel members shall be positively be identified by a marking

scheme

Cutting shall be by sawing, shearing, cropping or thermal cutting (if

permitted). Hand held cutting shall be used only where it is impractical

to use machine cutting

Cut edges shall be true to profile and free from major notches and

cutting serrations.

Round hole for pines shall be drills, plasma or laser cut.

All weld, bolting's and cuttings shall be approved on site before

fabrication (prepare sample for erection)

All measurements shall be done accurately at all stages. Support to be

provided for roof frame units until they are adequately fixed in the

position as shown.

A UB Beams 605 x 305 x 149 Kg / lm 3,159 KG 2.16 6,808.19

B100 x 50 x 4mm RHS beam above frameless glass partitions and

doors fixed to the suspended slab above963 KG 2.16 2,075.43

C Allow a provisional sum for connectors to be remeasured per kg. SUM 399.11

Total for Superstructural Steel Works carried to Bill Summary 9,282.73

MAIN BUILDING BILL3 Page 5

Page 40: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO.4: WALLING AND PARTITIONS

External Walling

Bush hammered stone walling obtained from an approved quarry

bedded and jointed in gauged mortar (1:3); include for bonding ties

A 200mm thick 117 SM 14.37 1,681.03

Machine cut natural coursed stone walling obtained from an approved

quarry bedded and jointed in gauged mortar (1:3); include for bonding

ties

B 200mm thick 33 SM 12.77 421.46

Internal Walling

Machine cut natural coursed stone walling obtained from an approved

quarry bedded and jointed in gauged mortar (1:3); include for bonding

ties

C 200mm thick walls 811 SM 12.77 10,357.60

D 150mm thick 7 SM 11.97 83.81

E 100mm thick 79 SM 11.17 882.82

Damp proof courses

F 200mm wide 305 LM 3.19 973.82

G 150mm wide 2 LM 3.19 6.39

H 100mm wide 27 LM 3.19 86.21

Internal Partitions

Frameless Glass Partitions

Supply and install frameless glass partitions comprising of 75 x 50mm

RHS frame at the top, 25 x 3mm thick aluminum U-shaped channel at

both the top and bottom and 12mm thick frameless toughened

laminated glass all to specialist's details and Architect's approval,

overall 3000mm high

I All Glass Partitions 261 SM 359.20 93,750.00

J Supply and fix polycarbonate film with a "sand blasted" effect to the

partitions to Architect's details and approvals including CNC cut

patterns / decorations / names / logos.261 SM 7.98 2,083.33

Total Carried to Collection. 110,326.47

MAIN BUILDING BILL3 Page 6

Page 41: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Gypsum Partitions

A

150mm thick moisture proof gypsum half hour fire rated partitions

comprising of 12.5mm thick gypsum board on both sides with rockwool

infill to approval fixed on 50 x 50 x 3mm thick frame, erected and

finished in accordance with Architect's details and manufacturer's

printed instructions

27 SM 47.89 1,293.10

Gypsum cladding to HVAC Ducts

B

Supply and fix 12mm thick moisture proof gypsum board cladding

complete with all necessary fixtures and fittings around the HVAC

ducts at the Cath lab corners

23 SM 23.95 550.77

External Screen Walling

Machine cut natural coursed stone walling obtained from an approved

quarry bedded and jointed in gauged mortar (1:3); include for bonding

ties

C 200mm thick external walls separating the proposed Cath lab from the

maintenance department and power center. 107 SM 12.77 1,366.54

Cement and sand (1:4)

D 15mm thick rendering to surfaces of walls 214 SM 2.79 597.86

Total Carried to Collection 3,808.27

Total Brought forward from Page 6 110,326.47

Total Brought forward from Above 3,808.27

Total for Walling Carried to Section Summary. 114,134.74

MAIN BUILDING BILL3 Page 7

Page 42: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO.5: EXTERNAL FINISHES

WALL FINISHES

Cement and sand (1:4)

A 15mm thick rendering to surfaces of walls, beams and columns.33 SM 2.79 92.19

B 15mm thick rendering to soffits of new slab extension 17 SM 2.79 47.49

Carefully wire brush the bush hammered stone walling surfaces

C In the existing external walls 236 SM 1.20 282.57

D In the new external walls 117 SM 1.20 140.09

Painting and Decorating

Prepare and apply three coats of exterior quality weather proof

polyurethane paint to;

E Surfaces of existing bush hammered stone walling 236 SM 2.79 659.32

F Surfaces of new external walls 117 SM 2.79 326.87

Dust, clean, prepare and apply 2 coats of exterior quality weather

proof paint ;

G to previously painted and new concrete surfaces. 71 SM 2.39 170.02

H to soffits the existing and new slab extensions 175 SM 2.39 419.06

I to vertical sides of the existing and new concrete fascia 48 SM 2.39 114.94

Total for External Finishes Carried to Section Summary. 2,252.55

MAIN BUILDING BILL3 Page 8

Page 43: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO.6: INTERNAL FINISHES

WALL FINISHES

Two coats of internal lime plaster finished with a steel trowel, as

described to:-

A 12mm thick to masonry walls. 1,557 SM 3.99 6,214.08

B To isolated concrete columns 33 SM 3.99 131.70

Painting and Decoration

C Prepare and apply 3 coats silk vinyl paint to plastered surfaces. 1,557 SM 2.79 4,349.86

D To isolated concrete columns 33 SM 3.99 131.70

Cement and sand (1:4) backings, as described, finished to receive wall

finishes

E 12mm thick backing to walls to receive ceramic tiles (m.s). 692 SM 3.99 2,761.81

The following ceramic tiles .

F 600 x 300 x 8mm thick colored glazed ceramic wall tiles bedded and

pointed using an approved tile adhesive and jointed with color

matching water-proof cement grout in washrooms and kitchens. 692 SM 19.96 13,809.07

FLOOR FINISHES.

Cement and sand (1:4) screed as described, finished to receive floor

finishes 32mm thick;

G to receive porcelain tiles (m.s) 141 SM 3.99 562.74

H to receive granite (m.s) 72 SM 3.99 287.36

Cement and sand (1:3) 40mm thick self leveling screed as described,

finished to receive floor finishes ;

I to receive epoxy flooring (m.s) 959 SM 15.96 15,309.71

The following porcelain floor tiles to;

J 600x600x10mm thick non-slip approved porcelain floor tiles fixed on

screeded paving (m.s) with an appropriate and approved tile adhesive

and jointed with color matching water-proof cement grout. 141 SM 19.96 2,813.70

Total Carried to Collection. 46,371.73

MAIN BUILDING BILL3 Page 9

Page 44: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Epoxy flooring

Supply and fix anti-static epoxy resin floor with controlled

conductive properties as Nitoflor Conductive or any other equal

and approved. The system should comprise an epoxy primer,

conductive epoxy undercoat and a 2mm thick epoxy top coat.

The topping shall provide a surface and bulk resistance between

5x104 and 1x106 ohms when tested to DIN 51953 and ASTM F150-

78 respectively to;

A 3mm thick epoxy to floors internally complete with and including coved

junctions between the walls and the floors. 959 SM 47.89 45,929.12

Granite Floor Finish

B 300 x 300 x 20mm thick granite floor tiles on prepared backing (m/s)

including grouting and edge protectors where required to floors 72 SM 83.81 6,034.48

CEILING FINISHES

Medical Acoustic Ceiling

C Supply & fix "AMF" suspended medical acoustic performance mineral

wool ceiling in SYSTEM C metal suspension system, with 24mm wide

visible grid and recessed edges877 SM 23.95 21,000.96

Gypsum Ceiling

D Supply and fix 12mm thick moisture proof gypsum board ceiling on

50mm steel studwork complete with metal edge floor and ceiling trims

in horizontal suspended ceiling

223 SM 21.55 4,806.03

Extra Over Gypsum ceiling bulk heads

E Supply and fix 12mm thick gypsum board ceiling on 50mm steel

studwork complete with metal edge floor and ceiling trims in horizontal

suspended and vertical ceiling

73 SM 19.96 1,456.74

F Extra over for 600 mm x 600 mm ceiling access panel PROFAB 900

SERIES Hinged access panel; with and including Concealed frame

with push catch lock; to Architect's/Interior Designer's approval 10 NO 39.91 399.11

Painting and Decoration

G Prepare and apply 3 coats silk vinyl paint to gypsum board ceiling

surfaces.223 SM 2.79 623.00

Total Carried to collection 80,249.44

MAIN BUILDING BILL3 Page 10

Page 45: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

COLLECTION

Total Brought forward from Page 9 46,371.73

Total Brought forward from Page 10 80,249.44

Total for Internal Finishes Carried to Section Summary 126,621.17

MAIN BUILDING BILL3 Page 11

Page 46: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO.7: DOORS

Hermetic Doors

Supply and install air-tight laminated hermetic doors complete with 200-

300mm natural aluminium frame including architraves and beadings,

all accessories and iron mongery to Architect's details (Layout 29 - 33)

and approval;

ADouble leaf door Overall size 2000 x 2550mm high with 10mm thick

clear glass view pannel to Architect's details - C[31]083 NO 1,724.14 5,172.41

B Ditto size 1800 x 2550mm high ditto - C[32]01b 2 NO 1,465.52 2,931.03

C Ditto size 1600 x 2550mm high ditto - C[31]07 1 NO 1,302.68 1,302.68

D Ditto size 1600 x 2400mm high ditto - C[32]01 8 NO 1,226.05 9,808.43

E Single leaf door Overall size 1100 x 2400mm high ditto - C[32]02 20 NO 842.91 16,858.24

F Ditto size 1100 x 2100mm high - C[32]05 5 NO 737.55 3,687.74

G Ditto size 900 x 2100mm high - C[32]04 16 NO 689.66 11,034.48

H Ditto size 800 x 2100mm high - C[32]06 14 NO 536.40 7,509.58

Supply and install air-tight access controlled laminated hermetic doors

complete with 200-300mm natural aluminium frame including

architraves, beadings and all accessories and iron mongery to

Architect's details (Layout 29 - 33) and approval;

IDouble leaf door Overall size 1600 x 2400mm high with 10mm thick

clear glass view pannel to Architect's details - C[32]012 NO 1,226.05 2,452.11

JDouble swing double leaf door overall size 1600 x 2400mm high ditto -

C[32]012 NO 1,226.05 2,452.11

K Single leaf door Overall size 1100 x 2400mm high C[32]02 1 NO 842.91 842.91

Frameless Glass Doors

Supply and Install 10mm thick toughened Automated frameless Glass

Doors (Automatic locking/opening/sliding), comprising of galvanized

metal steel fascia's, complete with all accessories and fittings.

L Door Overall size 1500 x 2400mm high - C[32]03 7 NO 1,293.10 9,051.72

M Supply and fix polycarbonate film with a sand blasted effect to the

doors to Architect's details and approvals25 SM 7.98 199.55

Total for Doors Carried to Section Summary. 73,303.00

MAIN BUILDING BILL3 Page 12

Page 47: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO. 08 : WINDOWS

Low Level Windows

Supply and fix the following powder coated aluminium windows

comprising 18 gauge aluminium louvres fixed at 45⁰ with10mm thick

one way laminated fixed glass complete with all necessary fittings to

Architect's approvals to;

A Window overall size 3000 X 2350mm high 1 NO 506.47 506.47

B Ditto 2800 X 2350mm 1 NO 472.70 472.70

C Ditto 2400 X 1050mm 12 NO 181.03 2,172.41

D Ditto 2400 X 450mm 8 NO 77.59 620.69

E Ditto 2000 X 2350mm 1 NO 337.64 337.64

F Ditto 1800 X 450mm 5 NO 58.19 290.95

G Ditto 1400 X 450mm 2 NO 45.26 90.52

H Ditto 2400 X 1950mm 8 NO 336.21 2,689.66

I Ditto 2400 X 450mm 3 NO 77.59 232.76

J Ditto 2100 X 450mm 1 NO 67.89 67.89

High Level Windows

Supply and fix the following powder coated aluminium windows

comprising 18 gauge aluminium louvres fixed at 45⁰ with10mm thick

one way laminated fixed glass complete with all necessary fittings to

Architect's approvals to;

K Window overall size 5000 x 900mm high 2 NO 323.28 646.55

L Ditto 4200 x 900mm high 6 NO 271.55 1,629.31

M Ditto 3000 x 900mm 6 NO 193.97 1,163.79

N Ditto 2700 x 900mm 2 NO 174.57 349.14

Total carried to Collection 11,270.47

MAIN BUILDING BILL3 Page 13

Page 48: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Mosquito Gauze

AExtra Over Aluminium windows and curtain walling for approved

integral Aluminium framed sliding mosquito gauze.155 SM 27.94 4,330.30

Window Cill

B300 mm wide x 100 mm thick (extreme) precast concrete window cill

with and including 10 mm drip and 25 mm x 3mm galvanized mild steel

weather bar; sloped; twice weathered; twice throated; reinforced as

necessary for handling; bedding, jointing and pointing in cement

mortar (1:4); all to Architect's approval

166 LM 7.18 1,192.53

Painting and Decoration

C 300 mm wide damp proof course; stepped and bedded in cement sand

mortar (1:3) ; Horizontal 166 LM 2.39 397.51

Window Board

D 100 mm wide x 25 mm thick wrot mahogany window board with

rounded edges all to Architect's approval166 LM 7.98 1,325.03

Prepare and apply one coat aluminium hardwood primer with

approved paint before fixing to:

E Window surround; 100 mm to 200 mm wide 166 LM 0.64 106.00

Total Carried to Collection 7,351.37

COLLECTION

Total brought forward form page 13 11,270.47

Total brought forward form Above 7,351.37

TOTAL FOR WINDOWS CARRIED TO SECTION SUMMARY. 18,621.85

MAIN BUILDING BILL3 Page 14

Page 49: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO. 9: ROOFING

ROOF COVERING.

Lower Roof

A Carefully remove the existing clay tiles, wire brush and set aside for re-

use 831 SM 3.19 2,653.26

B Supply and fix 30 gauge mini corrugation iron sheets to receive clay

roofing tiles (m.s)831 SM 9.58 7,959.77

C Take previously demolished/removed clay roofing tiles and fix

including 50 x 75mm treated cypress battens at 300mm centers 831 SM 6.39 5,306.51

D Allow for replacement of broken roofing tiles with matching clay roofing

tiles including 50 x 75mm treated cypress @ 300mm centers 540 SM 11.97 6,467.31

E Allow a provisional sum for rehabilitation of the existing timber roof

structureSUM 11,973.18

EAVES FILLING (Fixed at approximately 4m high)

Existing Timber Fascia

F Carefully remove the existing timber fascia and cart away as directed.122 LM 9.58 1,168.58

Supply and fix Wrot cypress, prime grade

G 200 x 25mm thick fascia board 122 LM 9.58 1,168.58

Prepare and apply one undercoat and two coats of 'CROWN SOLO' or

other equal and approved super gloss oil paint to:-

H Fascias; 200 to 300mm girth; external 122 LM 0.84 102.25

RAIN WATER GOODS.

Unplasticized PVC rainwater pipes and solvent welded joints plugged

to walls with and including brackets at every 2400mm centers

I 150mm diameter down pipes 58 LM 9.58 555.56

J Extra over 150mm diameter rain water outlet 18 NO 1.60 28.74

K Extra over 150mm diameter shoe / end 18 NO 1.60 28.74

Fullbora

L 150mm diameter cast iron fullbora outlet complete with cover 8 NO 17.56 140.49

Total carried to Collection 37,552.96

MAIN BUILDING BILL3 Page 15

Page 50: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Upper Roof

A Carefully remove the existing clay tiles, wire brush and set aside for re-

use 403 SM 3.19 1,286.72

B Allow a provisional sum for priming of the existing steel membersSUM 239.46

C Take previously demolished/removed clay roofing tiles and fix

including 50 x 75mm treated cypress battens at 300mm centers 403 SM 6.39 2,573.44

D Allow for replacement of broken roofing tiles with matching clay roofing

tiles including 50 x 75mm treated cypress @ 300mm centers 242 SM 11.97 2,895.11

E Allow a provisional sum for rehabilitation of the existing timber

structureSUM 399.11

EAVES FILLING (Fixed at approximately 5m high).

Wrot cypress, prime grade

F 200 x 25mm thick fascia board 78 LM 9.58 747.13

G 200 x 25mm thick barge board 63 LM 9.58 603.45

.

Prepare and apply one undercoat and two coats of 'CROWN SOLO' or

other equal and approved super gloss oil paint to:-

H Fascias; 200 to 300mm girth; external 78 LM 0.84 65.37

I Fascias; 200 to 300mm girth; external 63 LM 0.84 52.80

New Roofing

Dommer Roof Demolitions

J Carefully demolish the existing domer roof around the proposed roof

extension area and cart away as directed.20 SM 5.59 111.75

Roof Covering

Mini Corrugated Sheets

K Supply and fix 30 gauge mini corrugation iron sheets on timber trusses

to receive decra roofing tiles (m.s)89 SM 4.19 372.96

L Ditto to ridge 31 LM 1.20 37.12

Clay Roofing Tiles

M 1340 x 420mm clay roofing tiles including timber battens on 19

degrees roof pitch on timber trusses to S.E's details 89 SM 19.96 1,776.02

Total carried to Collection 11,160.44

MAIN BUILDING BILL3 Page 16

Page 51: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Accessories, fixing as necessary to roof

A 1340 x 420mm ridge tile including bedding in cement mortar (1:4) 31 LM 6.39 197.96

Roof Structure

The following in sawn celcured cypress:

B 150 x 50mm sawn cypress tie beam 123 LM 5.85 719.66

C 150 x 50mm rafters 141 LM 5.85 824.98

D 150 x 50mm wall plate rag-bolted at 1200mm centers with 10mm

diameter bolts26 LM 5.85 152.12

E 150 x 50mm sawn cypress struts and ties 69 LM 5.85 403.71

F 100 x 50mm sawn cypress purlins 150 LM 4.59 688.46

G 225 x 50mm sawn cypress ridge board 31 LM 7.82 242.50

Eaves Filling

Wrot cypress, prime grade

H 200 x 25mm thick fascia board 15 LM 9.58 143.68

Prepare and apply one undercoat and two coats of 'CROWN SOLO' or

other equal and approved super gloss oil paint to:-

I Fascias; 200 to 300mm girth; external 15 LM 0.84 12.57

Roof Slab

Water Proofing

75mm thick (average) light weight roof screed laid to falls; mixture of

cement, sand, pumice (1:3:7); including 10mm thick layer of cement

and sand (1:4) topping; finished to receive cementitious water proofing

material (m.s) in:

J Roof Slab laid to falls and cross-falls on flat roof 459 SM 4.79 2,198.28

K 75mm thick angle fillet 189 LM 2.39 452.59

Cementitious waterproofing coating as Fosroc Indicate CM210 or any

other equal and approved with a minimum of 10 years guarantee

finished laid in accordance with the manufacturer's instructions in;

L Roof Slabs 459 SM 11.17 5,129.31

Total carried to Collection 11,165.80

MAIN BUILDING BILL3 Page 17

Page 52: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Waterproofing Cont'd

40mm (average) protective screed to receive Interlocking Concrete

Tiles (m.s).

A Roof Slabs 459 SM 3.99 1,831.90

B Dress screed around 150x150mm rain water outlets. 8 NO 1.60 12.77

Precast Concrete class 25 (300 x 300) fair faced concrete interlocking

tiles, bedded, jointed and pointed in approved waterproof cement and

sand mortar.

C Roof Slabs 459 SM 12.77 5,862.07

Parapet Wall Finishes

D Allow a provisional sum for repairs of cracks on the parapet wallsSUM 239.46

E

Dust, clean, prepare and apply 2 coats of exterior quality weather

proof paint to previously painted parapet walls and concrete surfaces.

267 SM 2.39 639.37

Concrete Gutter Repairs

75mm thick (average) light weight roof screed laid to falls; mixture of

cement, sand, pumice (1:3:7); including 10mm thick layer of cement

and sand (1:4) topping; finished to receive cementitious water proofing

material (m.s) in:

F Concrete gutters laid to falls and cross-falls on flat roof 159 SM 4.79 761.49

Cementitious waterproofing coating as Fosroc Indicate CM210 or any

other equal and approved with a minimum of 10 years guarantee

finished laid in accordance with the manufacturer's instructions in;

G In concrete Gutters 159 SM 11.17 1,776.82

H Around gutter outlet into the down pipes 3 SM 11.17 33.52

Total carried to Collection 11,157.41

MAIN BUILDING BILL3 Page 18

Page 53: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Expansion Joints;

Water Bar

AApproved water bar dressed to floor and wall joints, girth 250 to the

roof top expansion joints to Structural Engineer's approval27 LM 15.96 431.03

BPrepare and apply 100mm thick plain concrete class 15 along the

expansion joint to the Structural Engineer's approval9 SM 9.58 86.21

C

Clean, prepare and fill a 20mm thick styropol expansion joint filler or

other equal and approved to the existing expansion joint to the

Structural Engineer's approval

8 SM 9.58 76.63

D20x20mm "Mastic" or other equal and approved joint sealant to

structural Engineer's approval27 LM 6.39 172.41

Total Carried to Collection 766.28

COLLECTION

From Page 15 37,552.96

From Page 16 11,160.44

From Page 17 11,165.80

From Page 18 11,157.41

From Above 766.28

Total for Roofing Carried to Main Summary. 71,802.90

MAIN BUILDING BILL3 Page 19

Page 54: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO. 10: BUILDER'S WORK IN CONNECTION WITH

SPECIALIST INSTALLATIONS

Plumbing, Drainage and Fire Fighting Installations

( Provisional)

A Cut chase in concrete block wall for small pipe and later flush

up in cement mortar 1,304 LM 0.24 312.26

B Ditto for medium pipe, ditto. 772 LM 0.28 215.68

C Ditto for big pipe, ditto. 208 LM 0.32 66.41

D Holes through 200mm walls for small pipe and make good 16 NO 0.24 3.83

E Ditto for 100mm diameter pipe, and make good 111 NO 0.24 26.58

F 100mm UPVC Sleeve 350mm long 16 NO 0.24 3.83

HVAC Installations ( Provisional)

G150mm thick plain concrete plinths for 4m x 3m x 2m Air Handling

Units4 NO 27.94 111.75

H

Cutting of exit points in concrete slab for 400 x 300 HVAC Duct and

later flush up in cement mortar/Water proof 2 NO 31.93 63.86

I Ditto in 800 x 600 HVAC Duct 8 NO 35.92 287.36

JVibrated Reinforced Concrete class 25 in Upstand Beams Around the

Openings2 CM 111.75 223.50

High yield ribbed reinforcement bars to KS ISO 6935-2:2007 to;

K Assorted reinforcement bars 253 KG 1.12 282.73

L Sawn formwork as described to vertical sides of upstand Beams 17 SM 5.59 94.99

MCut exit points in masonry block wall for 200 x 200mm HVAC Duct and

later flush up in cement mortar17 NO 11.97 203.54

Total Carried to Collection Page 1,896.31

MAIN BUILDING BILL3 Page 20

Page 55: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Medical Gas Installations ( Provisional)

ACut chase in concrete block wall for small(Copper) pipe and later flush

up in cement mortar497 LM 0.12 59.51

B

Holes through 200mm walls for small pipe (Gas Terminal Units) and

make good34 NO 0.16 5.43

C Chasing in Wall for bedhead units 7 NO 9.58 67.05

In connection with Electrical Installations (Provisional)

Cut away for and make good and attend in all trades on the

Sub-contractor installing the following points, including

cutting or forming chases, holes and recesses, notching

timber, etc. and making good all finishes

DCut chase in concrete block wall for metal trunking and later flush up in

cement mortar150 LM 2.00 299.33

E Lighting points 304 NO 0.24 72.80

F Fire Alarm points 91 NO 0.24 21.79

G Switch points 57 NO 0.24 13.65

H Socket outlet points 375 NO 0.24 89.80

I Data outlet points 20 NO 0.24 4.79

J Speaker Point outlet 12 NO 0.24 2.87

K Urinal Sensor Point 6 NO 0.24 1.44

L CCTV points 12 NO 0.24 2.87

D Telephone outlets 9 NO 0.24 2.16

E Hand Driers points 8 NO 0.24 1.92

F Consumer units/Distribution boards 5 NO 0.24 1.20

Total Carried to Collection Page 646.59

MAIN BUILDING BILL3 Page 21

Page 56: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

COLLECTION

Total Brought forward from Page 20 1,896.31

Total Brought forward from Page 21 646.59

Total for Builder's Works associated with Specialist Installations

Carried to Main Summary. 2,542.90

MAIN BUILDING BILL3 Page 22

Page 57: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

BILL SUMMARY

1 Substructures Page 4 $ 9,919.89

2 Reinforced Concrete Frame Page 5 $ 6,712.96

3 Structural Steel work Page 6 $ 9,282.73

4 Walling and Partitions Page 8 $ 114,134.74

5 External Finishes Page 9 $ 2,252.55

6 Internal Finishes Page 11 $ 126,621.17

7 Doors Page 12 $ 73,303.00

8 Windows Page 14 $ 18,621.85

9 Roofing Page 19 $ 71,802.90

10 Builder's Works in connection with Specialist Installations Page 22 $ 2,542.90

TOTAL FOR BUILDER'S WORK CARRIED TO MAIN SUMMARY $ 435,194.69

MAIN BUILDING BILL3 Page 23

Page 58: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

BILL NO 4 : EXTERNAL WORKS

Page 59: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO 01: FOUL WATER DRAINAGE

Existing Drain Trenches

Reinstatement of the existing drain trenches

A Allow a provisional sum for repairing the existing foul drainage system SUM 2,394.64

New Drain Trenches

Excavate in any material for drain pipe, fill and ram soil and cart

away surplus excavated material, including supporting sides of

excavations and keeping free from water.

BTrench for 200mm diameter pipe not exceeding 1.50 meters deep and

average 1000mm deep.59 LM 9.58 565.13

C Extra over rock excavation for 200mm diameter pipe not exceeding

1.5 meters deep and average 1000mm deep9 LM 11.97 105.96

Beds and surrounds

DPlain concrete, class 15 in 200mm bed and surround to 300mm

diameter pipe, including formwork.59 LM 15.96 941.89

UPVC Buried Drain System Heavy Gauge pipework Class 41

E 200mm diameter Golden Brown pipe 59 LM 13.57 800.61

Inspection chambers

F

Excavate for and construct standard pattern inspection chambers size

internally 900x850x1750mm deep, including maintaining and

supporting sides of excavations, and keeping free from water and all

necessary backfill and removal of surplus excavated material

comprising 150mm concrete class 20 bed on 50mm class 10 concrete

blinding, 325mm (average) concrete class 15 benching to bottoms,

including forming main branch channels and rendering smooth in

cement and sand (1:3), 200mm solid concrete block walling in cement

mortar (1:3) rendered with a 15mm waterproof cement and sand (1:3),

rendering, 150mm reinforced concrete class 20 cover slab, including all

necessary formwork, and single layer of mesh reinforcement to A142,

heavy duty double seal cast-iron manhole cover and frame size

600x450mm to B.S. 497 and bedding frame in cement mortar and

setting cover in grease include for all holes, etc.

7 NO 119.73 838.12

GAllow for testing and commissioning of the whole of the foul drainage

system to the satisfaction of the Civil / Structural Engineer.1 Item 239.46 239.46

Total for Foul Drainage Carried to Summary 5,885.82

EXTERNAL WORKS BILL 4 Page 1

Page 60: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO 02: STORM WATER DRAINAGE

Refurbishment of the Existing Drain

A Carefully remove the debris in the existing storm drain around the

building and cart away arising debris152 LM 3.19 485.31

B Supply and install 700mm wide 4 mm thick flat bar steel grating to the

refurbished existing storm drain to the Civil Engineer's approval.106 SM 31.93 3,384.42

C Allow a provisional sum for minor demolitions and making good any

damaged part of the existing storm drain.SUM 1,197.32

New Storm Drain

Excavations

D Trench for 200mm diameter pipe not exceeding 1.5 meters deep and

average 1000mm deep55 LM 9.58 526.82

E Extra over rock excavation for 200mm diameter pipe not exceeding

1.5 meters deep and average 1000mm deep8 LM 11.97 98.78

Beds and surrounds

F Plain concrete, class 15 in 200mm bed and surround to 200mm

diameter pipe, including formwork.33 LM 15.96 526.82

UPVC Buried Drain System Heavy Gauge pipework Class 41

G 200mm diameter Golden Brown pipe 55 LM 11.97 658.52

Total Carried to Collection 6,877.99

EXTERNAL WORKS BILL 4 Page 2

Page 61: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

Inspection Chambers

A

Excavate for and construct standard pattern inspection chambers size

internally 900x850x1000mm deep, including maintaining and

supporting sides of excavations, and keeping free from water and all

necessary backfill and removal of surplus excavated material

comprising 150mm concrete class 20 bed on 50mm class 10 concrete

blinding, 325mm (average) concrete class 15 benching to bottoms,

including forming main branch channels and rendering smooth in

cement and sand (1:3), 200mm solid concrete block walling in cement

mortar (1:3) rendered with a 15mm waterproof cement and sand (1:3),

rendering, 150mm reinforced concrete class 20 cover slab, including all

necessary formwork, and single layer of mesh reinforcement to A142,

heavy duty double seal cast-iron manhole cover and frame size

600x450mm to B.S. 497 and bedding frame in cement mortar and

setting cover in grease include for all holes, etc.

6 NO 119.73 718.39

Drainage Collecting Manhole

B Excavate for and construct standard pattern Discharge / Collecting

Manhole From Downpipe internally 400x400x400mm deep with grilled

cover

18 NO 35.92 646.55

Total Carried to Collection 1,364.94

COLLECTION

Total from Page 2 6,877.99

Total from Above 1,364.94

Total for Storm Water Drainage Carried to Summary 8,242.94

EXTERNAL WORKS BILL 4 Page 3

Page 62: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

ELEMENT NO 03: LANDSCAPING AND PAVING.

Landscaping

AProvide red soil mixed with manure, at (1:4), plant grass to approval,

water and maintain until fully established.32 SM 9.58 306.51

B Allow a provisional sum for assorted plants to Architect's approval SUM 925.93

Precast paving slabs

CSupply and fix 600 x 600x50mm concrete paving slabs including 50mm

sand bending and jointing with 1:4 sand cement mortar.127 SM 9.58 1,216.48

Existing Concrete Cable Trenches

Demolitions

D

Carefully remove the existing concrete cover slabs and remove

existing debris in the cable trench form Power Center to towards the

Main Hospital thereafter load and cart away arising debris as directed.

85 LM 3.99 339.24

Precast Concrete Cover Slabs

ESupply and fix 600 x 400x75mm thick waterproofed precast concrete

cover slabs to the existing cable trench to Civil Engineer's approval212 NO 7.98 1,692.21

Total for Landscaping and Paving to Summary 4,480.36

EXTERNAL WORKS BILL 4 Page 4

Page 63: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Quantity Unit Rate Amount ($)

BILL SUMMARY

1 Foul Water Drainage Page 1 $ 5,885.82

2 Storm Water Drainage Page 3 $ 8,242.94

3 Landscaping and Paving Works Page 4 $ 4,480.36

TOTAL FOR EXTERNAL WORKS CARRIED TO MAIN SUMMARY 18,609.12

EXTERNAL WORKS BILL 4 Page 5

Page 64: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

BILL NO. 5: PC & PROVISIONAL SUMS

Page 65: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

Item Description Qty Unit Rate Amount (USD)

PROVISIONAL SUMS

Joinery Works

AAllow a Provisional sum for assorted joinery and cabinetry works at the

staff changing rooms, pharmacy and other areas. Sum 27,937.42

Contingency

BAllow a provisional sum for contingency to be expedited at the express

authority of the client.Sum 79,821.20

Collapsible Partitions

C

Allow a Provisional sum for supply and installation of Acoustic Sliding /

Folding Partitions or any other equal and approved folding partitions

complete with all necessary fittings to Architect's Approval between the

Counselling Room and consultation Room WallsSum 7,183.91

Protective Lead Lining

D

Allow a Provisional sum for supply and installation of fix a 2mm thick

anti-radiation protective lining as 'lead' or any other equal and

approved material with at least 5 years warranty toProject Manager's

approval to the Cath lab ceiling and walls

Sum 135,696.04

Walkway Relocation

E

Allow a provisional sum for relocation of the walkway from Anderson

Center to the Main Hospital through the Western Entrance Sum 15,964.24

Total for Provisional Sums Carried to Main Summary $ 266,602.81

Page 66: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

MAIN SUMMARY

Page 67: BILL OF QUANTITIES - VOLUME 1A (MAIN WORKS)

PROPOSED CONVERSION OF THE OLD KITCHEN INTO A CARDIAC CENTER FOR

THE NAIROBI HOSPITAL.

MAIN SUMMARY

BILL

NO.

DESCRIPTION.PAGE. SUBTOTAL (USD)

ADD 16% VAT (ONLY

WHERE APPLICABLE).TOTAL (USD).

GRAND SUMMARY

1 Preliminaries Bill No 1 Page 19 23,946.36 3,831.42 27,777.78

2 Demolitions Bill No 2 Page 6 13,713.28 2,194.13 15,907.41

3 Main Building Bill No 3 Page 25 519,179.00 83,068.64 602,247.63

4 External Works Bill No 4 Page 5 18,609.12 2,977.46 21,586.57

5 Volume 2A - General Electrical

InstallationsVol 2A - Summary 115,541.11 18,486.58 134,027.69

6 Volume 2B - Security Systems

Installations.Vol 2B - Summary 42,305.04 6,768.81 49,073.84

7 Volume 2C - Nurse Call System

Installations.Vol 2C - Summary 26,930.32 4,308.85 31,239.17

8 Volume 3A - Plumbing, Drainage and

Fire Fighting Installations.Vol 3A - Summary 149,051.68 23,848.27 172,899.95

9 Volume 3B - Medical Gases InstallationsVol 3B - Summary 159,016.18 25,442.59 184,458.77

10 Volume 3C - HVAC Vol 3C - Summary 350,325.51 56,052.08 406,377.59

11 Volume 4 - Medical Equipment Vol 4 - Summary 2,420,888.89 387,342.22 2,808,231.11

12 PC & PROVISIONAL SUMS Bill No 5 Page 1 266,602.81 42,656.45 309,259.26

GRAND SUMMARY

CARRIED TO FORM OF

TENDER

4,106,109.29 656,977.49 4,763,086.78

TENDERER

Signature of Tenderer.........................................................(Company stamp)...................................................

Name of Tenderer.............................................................................................................................................

Address of Tenderer.........................................................................................................................................

Telephone no(office).....................................................Mobile..........................................................................

E-mail Address...................................................................................................................................................