REF :TE/MBA/INVOCE-1076 DATE: 26/06/15 To :-MBA FOUNDATION Name of work :- CONSTRUCTION OF SCHOOL BLDG FOR M/S MBA FOUNDATION, PLOT NO. 23-A SECTOR NO. 17, AT AIROLI 12TH R.A.BILL FOR M/S MBA FOUNDATION, PLOT NO. 23-A SECTOR NO. 17 AT AIROLI NAVI MUMBAI FOR CONSTRUCTION OF SCHOOL BLDG CIVIL WORK Item No. Description Qty. Unit. Rate Amount 1 EXCAVATION UPTO 1.5 M 165.75 CUM 250.00 41437.50 2 EXCAVATION ABOVE 1.5 M 225.68 CUM 300.00 67704.00 3 PCC 10.965 CUM 5000.00 54825.00 4 RCC M30 81.8019 8 CUM 7000.00 572613.86 5 SHUTTERING 503.040 80 SQM 600.00 301824.48 6 SHAHBAD LADI WATERPROOFING FOR TANK 238.706 6 SQM 1550.00 369995.23 7 STEEL REINFORCEMENT 5780 KG 66.00 381480.00 8 BRICK MASONARY 230MM 25.5 SQM 1600.00 40800.00 9 BRICK WORK 115MM THICK 5.08 SQM 770.00 3911.60 10 RUBBLE MASONARY 7.2 CUM 3450.00 24840.00 11 SAND FACED PLASTERING 61.2 SQM 550.00 33660.00 12 MAKING PATTA IN PLASTERING 73 RM 100.00 7300.00 13 INTERNAL PLASTERING 1473.1 62 SQM 315.00 464046.00 14 RCC M30 FOR TERRACE RAMP 13.887 CUM 7000.00 97212.50

Upload: md-rizwan-ahmad

Post on 06-Sep-2015

214 views

Category:

Documents


1 download

DESCRIPTION

mba

TRANSCRIPT

REF :TE/MBA/INVOCE-1076DATE: 26/06/15To :-MBA FOUNDATIONName of work :- CONSTRUCTION OF SCHOOL BLDG FOR M/S MBA FOUNDATION, PLOT NO. 23-A SECTOR NO. 17, AT AIROLI

12TH R.A.BILL FOR M/S MBA FOUNDATION, PLOT NO. 23-A SECTOR NO. 17 AT AIROLI NAVI MUMBAI FOR CONSTRUCTION OF SCHOOL BLDG CIVIL WORK

Item No.DescriptionQty.Unit.RateAmount

1EXCAVATION UPTO 1.5 M165.75CUM250.0041437.50

2EXCAVATION ABOVE 1.5 M225.68CUM300.0067704.00

3PCC10.965CUM5000.0054825.00

4RCC M30 81.80198CUM7000.00572613.86

5SHUTTERING503.04080SQM600.00301824.48

6SHAHBAD LADI WATERPROOFING FOR TANK238.7066SQM1550.00369995.23

7STEEL REINFORCEMENT5780KG66.00381480.00

8BRICK MASONARY 230MM25.5SQM1600.0040800.00

9BRICK WORK 115MM THICK5.08SQM770.003911.60

10RUBBLE MASONARY7.2CUM3450.0024840.00

11SAND FACED PLASTERING 61.2SQM550.0033660.00

12MAKING PATTA IN PLASTERING73RM100.007300.00

13INTERNAL PLASTERING1473.162SQM315.00464046.00

14RCC M30 FOR TERRACE RAMP SLAB13.8875CUM7000.0097212.50

15SHUTTERING FOR TERRACE RAMP SLAB83.2528SQM600.0049951.68

15PLUM CONCRETE FOR LIFT PIT19.6639CUM4000.0078655.60

16CHEMICAL COATING IN TOILET110.8915SQM700.0077624.05

17BRICK BAT WATERPROOFING FOR TOILET76.1955SQM1000.0076195.50

TOTAL27,44,077.03

LESS 3.5% DISCOUNT96,042.696

TOTAL26,48,034.334

19ADD FOR STEEL FE 5005780KG317340.00

20ADD FOR WATER CHARGE FOR FOUR MONTHS FEB-15 TO MAY 1548000.00

TOTAL27,13,374.334

RETENTION 5%1,35,668.716

BALANCE DUE25,77,705.617

THANKING YOUFOR TIMES ENTERPRISES