Page 2: Bill Keenen Project Slideshow R2

Vista Ridge Mall Phase II160,000 SF Addition for Homart Development. Completed on time & within budget.

Page 3: Bill Keenen Project Slideshow R2

Foley’s @ Vista Ridge180,000 SF Anchor Department Store for the Vista Ridge Phase II Mall Expansion Built for the May Company.

Page 4: Bill Keenen Project Slideshow R2

AMI Fab 10Class 1 Ballroom Style Microelectronics Cleanroom with a Clear Span of 181 LF.

Page 5: Bill Keenen Project Slideshow R2

AMI Fab 10Class 10 Clean Interconnect Corridor between Existing Fab 9 & the New Fab 10 that saves time in the movement of people between the Fabs by eliminating unnecessary smock changes.

Page 6: Bill Keenen Project Slideshow R2

AMI Fab 10 Bulk Gas Back Pad for the Generation of High Purity Nitrogen. It also supports the Fab with other necessary Bulk Gases such as Oxygen & Argon.

Page 7: Bill Keenen Project Slideshow R2

AMI Fab 10Pressurized Plenum Utilizing Custom Recirculation Air Handling Units Producing 30,000 CFM of HEPA Filtered Air Directed to the Production Area Below.

Page 8: Bill Keenen Project Slideshow R2

AMI Fab 10A View of the Sub-Fab Piping Racks and Electrical Bus Looking up to the Production Floor from the Sub-Fab below.

Page 9: Bill Keenen Project Slideshow R2

AMI Fab 10 – Beta Tool SetInitial Production Process Tool Set. Installed proximate to an Emergency Eyewash Station. Notice the Amber Lenses in the Photolithography Area.

Page 10: Bill Keenen Project Slideshow R2

HISUS A/O Building45,000 SF 3 Story Structural Steel Frame with Granite Clad GFRC Panels. Included 8000 SF Class 100 Wafer Test Clean Room.

Page 11: Bill Keenen Project Slideshow R2

HISUS A/O BuildingBook Matched Marble on the Reception Desk. Polished Stainless Steel Stair with Radius Glass.

Page 12: Bill Keenen Project Slideshow R2

HISUS Clean Room Remodel – Bay & ChaseClass 100 Process Equipment Chase prior to the Process Tool Installation.

Page 13: Bill Keenen Project Slideshow R2

HISUS Clean Room Remodel – Bay & ChaseClass 10 Production Bay prior to Tool Installation with Integral Ionization System in the HEPA Ceilings.

Page 14: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoBreaking Ground and Excavation Begins.

Page 15: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoPiers Drilling, Vertical Formwork, and Shear Wall Placement in the Crawl Space.

Page 16: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoVertical Formwork coming out of the Ground from the Piers through the Crawl Space up to the Subfab Floor Elevation.

Page 17: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoConcrete Placement and Finishing of the Waffle Slab while Formwork is Progressing in the Service Areas and the Scaffold Shores are being Erected.

Page 18: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoConcrete Shear Wall Construction and Vertical Concrete Placement from the Crawl Space through to the Subfab Elevation.

Page 19: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoConcrete Slab Placement for the Support Services like Chemical Distribution Rooms and Specialty Gas Distribution Rooms.

Page 20: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoClear Span Truss Erection Continues. The Waffle Slab Elevation is Decked in Protective Plywood while the Subfab elevation is Visible Below.

Page 21: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoStructural Steel Erection Continues with the Truss Members Being Staged on the next Waffle Slab. MAHU Ductwork Installation is Installed.

Page 22: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoStructural Steel Installation Secondary Framing Progressing while Roof Decking is being Installed Above and MAHU Ductwork is Being Installed within the Truss.

Page 23: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoView From the Waffle Slab Elevation up to the Clear Span Trusses and MAHU Air Handler Deck.

Page 24: Bill Keenen Project Slideshow R2

HISUS U4 – Construction Progress PhotoConstruction of the Masonry 4 Hour Fire Separation Walls that also Create the Return Air Chase from the Subfab Return Air Grill to the Fan Filter Plenum Deck.

Page 25: Bill Keenen Project Slideshow R2

HISUS U4 - Substation138 KV Dual Feed Substation on Site Dedicated for the support of Hitachi Semiconductor Plant Operations with Architectural Screen Wall and Lightning Protection Systems.

Page 26: Bill Keenen Project Slideshow R2

HISUS U4 – Electrical RoomElectrical Distribution at Medium Voltage 13.8 KV with Redundant Service Feeders & Uninterruptable Power Supply for Critical Systems.

Page 27: Bill Keenen Project Slideshow R2

HISUS U4 – Fab Level BallroomFab Level Ballroom with Fan Filter Unit Plenum Ceiling with Integrated Lights and Ionization Systems. Nickel Chrome Plated 2’ x 2’ Grated Floor Panels.

Page 28: Bill Keenen Project Slideshow R2

HISUS U4 – Support AreaClass 100 Wafer Test Area with 2’ x 2’ Static Dissipative Raised Floor System.

Page 29: Bill Keenen Project Slideshow R2

HISUS U4 – Sub-FabSub-Fab View Looking up at the Gold Guard Unistrut Rack System Supporting the Process Piping Systems and Stainless Exhaust Ductwork. Chemical Resistant Floor Coatings with Containment Curbs at each Column Sealing the Isolation Joints.

Page 30: Bill Keenen Project Slideshow R2

HISUS U4 – Central PlantPlant Chiller Capacity 7000 TonsVibration Isolation on all Rotating EquipmentAdvanced Building Automation System

Page 31: Bill Keenen Project Slideshow R2

HISUS U4 – D.I. Water PlantD.I. Water Plant Producing 18 Mega-Ohm Water with a UDI Water Pretreatment System.

Page 32: Bill Keenen Project Slideshow R2

HISUS U4 – Central PlantCentral Plant Service Aisle to Service and Pull the Chiller Tubes. Notice the Vibration Isolation Inertia Bases on the rotating Equipment.

Page 33: Bill Keenen Project Slideshow R2

HISUS U4 – Fan Filter DeckBill Keenen Fully Gowned and Inspecting the Clean Air Plenum utilizing the Fan Filter Unit Walkable Deck.

Page 34: Bill Keenen Project Slideshow R2

SRX ProjectOffice Warehouse Manufacturing Facility with 2nd Floor Mezzanine. Tilt Wall Panels with full Face Brick Façade Poured Face Down with ¾” Reveals on a 2’x2’ Grid.

Page 35: Bill Keenen Project Slideshow R2

Clarke Checks40,000 SF Build to Suit Office, Warehouse, and Checking Printing Facility. Mezzanine Office Areas with 3 Story Entrance, Brick Paver Accent Band on Exposed Aggregate Panels.

Page 36: Bill Keenen Project Slideshow R2

Northgate Phase II – Building 15Brick and Tilt-Wall Building with Low Clear Height and Dock High Rear Entry. Face Brick Façade Radius Columns over Concrete Columns with Steel Lintels for the Brick and Block Above.

Page 37: Bill Keenen Project Slideshow R2

Summit Business Park – Plano TX – Building 5104,000 SF High Bay Tilt-Wall Warehouse with Face Down Panels and Labrado Ribbed Texture.

Page 38: Bill Keenen Project Slideshow R2

Summit Business Park – Plano TX – Building 2Buildings 1 – 4 were single story low clear height which were opposite hand mirror images of one another. Face Down Panels with Labrado Ribbed Texture.