bihar state power transmission company ltd., patna · 1 sri perwez alam all communication and plcc...

16
- J , Bihar State Power Transmission Company Ltd., Patna A subsidiary company of Bihar State Power (Holding) Company Ltd., Patna CIN-U40102BR2 012SGC018889 [SAVE ENERGY FOR BENE. FIT OF SELF AND NATION] Head Offi ce, Vidyut Bhawan, Bail ey Road, Patna -800021 . 5 7 / BSPTCL, Patna Dated <!:J B - 0 3 - / l g Offi ce Order No. The Committee of following officers is hereby constituted to prepare and finalise the technical specifications for turn key pro jects of 400/132 KV, 400/220/132/33 Kv, 220/33 Kv, 220/132/33 Kv & 132/33 Kv Grid Sub-stations as well as transmission lines of 400 Kv, 220 Kv & 132Kv with OPGW cables and earth wires and 220Kv, 132 Kv & 33Kv Cables. Sr. No Committee No.-1 Details of Works 1 Sri Kumar Prashant 400/132 Kv, ESE, P-II 400/200/132 KV, 2 Sri A.K.Mislu·a 220/33KV, EEE, P-I, (Nodal Of ficer) 220/132/33 KV, 3 Sri Ashwini Kumar GTS & ATS Grid Sub-stations, EEE, P-II 400KV, 220Kv & 132 Kv GTS & ATS Bays. 4 Sri Rakesh Kumar ' EEE, P-I 5 Sri Abhinav Basu AEE, P-II 6 Ms. Khisti ja Ran jan AEE, P-I Sr. No Committee No.-2 Detail s of Works I Sri R.K.Ambastha Line & Pile foundations 400 KV, ESE P-I 220KV, 132KV trans lines with OPGW Cables and earth 2 Sri Varun Vineet wire, EEE, P-II Issues related to river crossing, railway crossing, 3 Sri D.K. Jha Pile Foundations, transmission line towers, EEE, P-I (Nodal Of ficer) 4 Sri A jay 'Kumar use of latest technologies in survey of lines, AEE, P-I optimisation techniques for transmission lines, 5 Sri Prateek Kumar use of narrow base towers, monopoles and other new AEE, P-ll technologies. 6 Sri Vineet Bageria Any other issues related to tenders of Transmission lines. AE,Civil 7 Ms. Sarita Kumari AEE, Planning Sr. No Committee No.-3 Details of Works I Sri S. Katiyar 220 KV, 132 KV & 33 KV Power Cables, ESE, P-II termination equipments, 2 Sri Upendra Kumar Straight through Joints, EE,Civil Cable laying Procedures, '"I Sri Ravishankar Control Cables with glands, J TS/ EEE P-II (Nodal Of ficer) cable tranches, insulators, 4 Mrs. Madhu Priya all type of conductors including HTLS & other new AEE, P-11 generation conductors, I 5 Sri Manish Sharma Hardware fit tings, P-11 Fire fighting equipments portable type as well as HVWS 6 Sri Brij Mohan & Hydrant system, AEE, P-I LED lighting. 7 Ms. Nidhi Vipul Any other issues. AEE, P&E E:Dircctor(P)/07.03.18/Committee constituted for technical specification Page 1

Upload: doananh

Post on 21-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

- J, Bihar State Power Transmission Company Ltd., Patna

A subsidiary company of Bihar State Power (Holding) Company Ltd., Patna CIN-U40102BR2012SGC018889

[SAVE ENERGY FOR BENE.FIT OF SELF AND NATION] Head Office, Vidyut Bhawan, Bailey Road, Patna -800021 .

5 7 / BSPTCL, Patna Dated <!:J B - 0 3 - / l g Office Order No.

The Committee of following officers is hereby constituted to prepare and finalise the technical specifications for turn key projects of 400/132 KV, 400/220/132/33 Kv, 220/33 Kv, 220/132/33 Kv & 132/33 Kv Grid Sub-stations as well as transmission lines of 400 Kv, 220 Kv & 132Kv with OPGW cables and earth wires and 220Kv, 132 Kv & 33Kv Cables.

Sr. No Committee No.-1 Details of Works 1 Sri Kumar Prashant 400/132 Kv,

ESE, P-II 400/200/132 KV, 2 Sri A.K.Mislu·a 220/33KV,

EEE, P-I, (Nodal Officer) 220/132/33 KV, 3 Sri Ashwini Kumar GTS & ATS Grid Sub-stations,

EEE, P-II 400KV, 220Kv & 132 Kv GTS & ATS Bays. 4 Sri Rakesh Kumar '

EEE, P-I 5 Sri Abhinav Basu

AEE, P-II 6 Ms. Khistija Ranjan

AEE, P-I

Sr. No Committee No.-2 Details of Works I Sri R.K.Ambastha Line & Pile foundations 400 KV,

ESE P-I 220KV, 132KV trans lines with OPGW Cables and earth 2 Sri Varun Vineet wire,

EEE, P-II Issues related to river crossing, railway crossing, 3 Sri D.K. Jha Pile Foundations, transmission line towers,

EEE, P-I (Nodal Officer) 4 Sri Ajay 'Kumar use of latest technologies in survey of lines,

AEE, P-I optimisation techniques for transmission lines,

5 Sri Prateek Kumar use of narrow base towers, monopoles and other new

AEE, P-ll technologies. 6 Sri Vineet Bageria Any other issues related to tenders of Transmission lines.

AE,Civil 7 Ms. Sarita Kumari

AEE, Planning

Sr. No Committee No.-3 Details of Works I Sri S. Katiyar 220 KV, 132 KV & 33 KV Power Cables,

ESE, P-II termination equipments, 2 Sri Upendra Kumar Straight through Joints,

EE,Civil Cable laying Procedures, '"I Sri Ravishankar Control Cables with glands, J

TS/ EEE P-II (Nodal Officer) cable tranches, insulators, 4 Mrs. Madhu Priya all type of conductors including HTLS & other new

AEE, P-11 generation conductors,

I 5 Sri Manish Sharma Hardware fittings, P-11 Fire fighting equipments portable type as well as HVWS

6 Sri Brij Mohan & Hydrant system,

AEE, P-I LED lighting.

7 Ms. Nidhi Vipul Any other issues.

AEE, P&E

E:Dircctor(P)/07.03.18/Committee constituted for technical specification Page 1

Sr. No Committee No.-4 Details of Works 1 Sri Perwez Alam All communication and PLCC equipments,

ESE, ULDC & Telecom Reliable communic~tion System for present & 13th Plan, 2 Sri Ravi Shankar integration of OPGW equipments with PLCC equipments,

TS/EEE, P-II Communication protocols, 3 Sri A.K.Mishra

EEE, P- I RTU with LDMS supply installation &commissioning and

4 Sri Khistija Ranjan integration with SLDC.

AEE, P-1 Auxiliary power supply system DCPS analog / digital 5 Sri Pushkar protection scheme.

AEE, ULDC (Node! Officer) 6 Sri Himanshu Kumar Any other issues related to Communication.

AEE, Telecom 7 Sri Rishi Raj

AEE,P&E 8 Ms. Medha

AEE, Telecom

Sr. No Committee No.-5 Details of Works 1 Sri R.P Srivastava All Civil works related to turnkey projects of G/S/Stn &

Chief Engineer, Civil lines, 2 Sri Upendra Kumar standardisation & formation of Specification to be

EE, Civil (Nodal Officer) adopted for all Civil works of BSPTCL for both G/S/Stn 3 Sri Ravi Shankar and lines, TS/EE, P-ll 4 Sri D.K. Jha Pile foundations, different type of foundations of lines,

EEE, P-1 1-IFL issues, 5 Ms. Archana FGL to be adopted,

AEE,P&E PCC/ gravel filling in switchyard etc. 6 Sri Vineet Bageria Any other Civil works. AE,Civil

Sr. No Committee No.-6 Details of Works I Sri K.N.Sahay Review, modification & formulation of QAP, MQP,

CE (PE & QC) FQP & other works related to qua! ity of works/ 2 Sri. R.K.Ambastha equipments.

ESE, P-1 3 Sri S. Katiyar All issues related to quantity of supply of

ESE, P - fl equipments & works being executed. 4 Sri Ram Babu Singh

EEE, CRITL 5 Sri Arvind Kumar

TE, PE & QC (Nodal Officer) 6 Ms. Bharti Kumari

AEE, PE& QC 7 Sri Praveen Kumar

AEE, P-II 8 Ms. Shweta Nirmata

AEE, P&E 9 Rajeev Kumar

JEE, P-1

E:Dircctor(P)/07.03.18/Committee constituted for technical specification Page 2

· 2. All the above committees shall study the technical specifications and practices adopted by other power utilities across the country and recommend the specifications to be adopted by

BSPTCL accordingly. 3. All the committees shall study the existing specifications of the BSPTCL, all such issues

shall be 'taken care of to remove any ambiguities/ confusions. 4. The committees shall prepare BOQ and proposed schedule for the relevant scope of works. 5. Lump Sum items should be avoided and attempts shall be made to quantify each and every

items. 6. The committee no. 1,2,3 ,4 & 5 shall furnish their report in 2 phase as detailed below:

a) Technical specificatioµs for Bays, G/S/Stn - Within one week of issue of the

lines & Civil Works up to 220KV level order. -,

b) Technical specifications for G/S/Stn, lines, - Within two weeks of issue of the

bays & Civil Works upto 400Kv G/S/Stn order.

GIS/AIS c) Hybrid G/S/Stn - Within three weeks of issue of

the order. The status of preparation of the Technical Specifications with price schedule shall be

reviewed during weekly meeting. . ti 7. The works covered under the 13 1 plans for BSPTCL have already been approved. The work

of constructions of three nos. of 400 KV G/S/Stn under TBCB has also been started by PGCIL & BSPTCL has to create the transmission infrastructure for down linking.

As such, it is desirable that the technical specifications with BOQ & price schedule etc. are to be prepared in mission mode within the targeted schedule.

The details of work covered under 13th plan and also additional works proposed to the state Government is enclosed for reference.

Encl: As above Sd/­ (H.R.Panday)

Director (Projects) BSPTCL

Memo No. /BSPTCL, Patna Dated / Copy forwarded to OSD to the MD, BSPTCL for kind perusal and approval.

~ e,__3 Memo No. /BSPTCL, Copy forwarded to:

1) CE, Project- I, BSPTCL, Patna 2) CE, Project - II, BSPTCL, Patna 3) CE, Trans (0 &M), BSPTCL, Patna 4) CE, (PE &QC), BSPTCL, Patna 5) CE, (System Operation), BSPTCL, Patna 6) CE, (P & E), BSPTCL, Patna

Sd/­ (H.R.Panday)

Director (Projects) BSPTCL

Patna Dated <1 g .. -e:J 3 -t8 /

I .. »: y~­ eg{ti~

(H.R.Pa;nday) Director (Projects)

BSPTCL

E:Director[P)/07.03.18/Committee constituted for technical specification Page 3

/2018

, .

modi, of finance for 21-222.jpg

- - ---··----

~ g I'-! ~ -qm ~ 1.-fi f?p~ 1;:, q5.s-q ~'1 ftf o. q c:--11 ~m~(~)~~o~~~

ClN - U40J 02BR2012SGC018889 l ~wix1~f%a·~~~ I

~ cf>11.1~&11.1, fctM '+{qr[, ~ m! ~-aooo21

-~- ~ ?.~.~~ . .? : .

~-. 1q,q,y .-

m:TR~, ~ fcri:rrT. ~ "ffWR .. "CfC'TI I

~ ~ 'WR ~l"'{-1~~1'1 ~ fRo cf> ~ ~ ·cm ~ (2021~~~} cl> · 3Rr"Wl? ~ ·cfi;·.<W,f·~ l;Jf:lJ.cf>T'!ffi; ~-~ ~ -~ -~ ·~ 400 io~ci ~ cfA mi·~- w+rn:- €i-~:i~-~' ~:,~·~ ~ ~

· :Qownlinking ~ ~-:ifi ~ ~- 1,40~.36. ~. ~· ~: ~- ~ ~ ~ ~ ~ ~ xTftf $ 10% ~-~ 28~;.87.~'~·\ul),1Q'\

-~ * -~ R ~- ~ ~ ~ ab% GT~ 11-27.,rn ~ ~d -~­ . ~ ~ ~ <R. ~ ~ ~~'$UT mc<r ~cm~ :, • • , • C.

~-~cfi~~I

~ - . ·, , -3qgc1fl ~ cfi ~ ~ ~ c/'iX'i1 ~ fcp 19cTI q]cR ~ cfi 3l]fITT ~

~ <B):'~ ·fclw1 -i:ni1 6576 TfTITTTc ~ t; I ~ 1'.!T1T cl?1 ~ m ~ ~ixi~~l-i ~ ~ 4j.q:{L£l;s. ~ ~ ™· ii fcRW, ~ ~ cfi ~'Wi.H\4xia 400 cfiO~O ~ 220

· cf>O'BTO ffix' 1lx ~ 2021-22 cf> 3Rl QC() ~ ~ -qM cfi ~ ~ ~ fcRW, ~ ~ mvAT 6ffmf Tf<1T % ~ ~ mT ~ ~ 1'.!T1T cf>T ~ cITT ~ I

~ ~ ci; cIBc'l. fu?) -rn) q)]1TI <R ~ ~ mfwRrrr cffl a ch ,11 J;)

~ ID'Cf t1 ~ ~ ci; -~ ch 11.1\f.i'\a iA cfTill cITTm <ITT ~ fcrcRufr ~ ~ t:

;,>~>!"ITT cfi 3RfT@ Tariff Baseu Competitive Bidding (T.BCB) J, r.nu:f1i ii chli..llf.i'\a xflcil'iCf>'\ fffixfl1 ~ ~cfufr °ti~~ 400/220/132 "$01-110 cfi ffi '34cf>-i:l (.lSTS) "fl~ 220/132/33 -Jiomo ffi ~ ~ ~ 220 ' "' ->-- .......AL. ""' ' ~ ' ...;,.. -~ ...;,.. -AL. fcp ' ~ cl101-il0 CfJ 930 -<-1\CflC 1cr>~'11'11CX -c,rcf 132 Cfl01i10 Cfl 407 x;1cnccvil id

(~) "ffi1xUJ ~"4 cf,1 f.RroT I

~ -Ji chll~\.:q1.H t,c," ~ \.llcfdif2.lci 7<ITTT 1409.36 ~ 3r.:mrf;m- -g I SXi ~ ~ . ~" ~ ~ -J, ~ch~1u+-\-<~11.1~-1 q\- -me; x\mUT -q-lJTRll 400 -Jio·i.j)o ~ 220 cfio1fro «R crx cft'1 2021-22 cB 3Rl ~ ~ ~ 1'!Tff cITT CJYT t!"i"x?. -P ~-Te1"! -g1- \Jllirrfl i ~ TlTvAI cITT 2021-22 cicn 1, ~ cl1[ c,"e=l:1 xNf Tfm f: I

·, ·· - - -• - --~,~~;11, ,1n/flinhnx/162005ce5e12bf5e?projector=1 &messagePertid=0.5 1 /1

7/2018

f .f

· mode of finance for 21-223.jpg

:311::1: -38-Wt '% re)) ~.;R cf. ~ rcl"Ern i:i'M cir q~r cil';--:=i ~ c.r,-<;;'lll i-1~ <f) ..J _-st .:;, ~ ~ ..

~~~ 400 <Bo~.fio ci'; ~ ftrG· ~-;;:: wr.rn: &-~. z-i-~~m -crcj t1--~Mr 'fl zi'Rlf?.t@

Oov,rnlittking ~11:1fOT J:rU[T'fTT ~ i~ ~CJ. 1409 .. 36 ~ cl~ ~ "<:llvFTI c:#1 W1c:i;tf?i t(o '3cffi t~ '!:;fl ·w~T q)T 20% (H~ 28'Ul7 cb·-ll"<5 \'i'il!'~I Tf)f:r@' ITT-~·: c7i 'vr -;:; 'efc)ut! ~-(n~.4 t;cT ~\ct 30% Z!2.Tf<"t 1121.49 Q'lx'1,s ;_i;:;o ~v 'fRq)lx elf! T!1--<ac:'r ~ ~ fmfr:i m-0..ITTt 'fl '5ft.1JT m~ ~ clfl x~~ ~- cm7-t ~ m_:lTh1' ~ ·1:.r'j'vR1 <B <NUJ·-:11.H ~ wJ'nl cf1'\ ·2011-18

If 50.00 ¢-<'i-s 'fi1T[l ~T CP'.'B cb'l q1-qT ml' 'CrlTll I ' <

-mvRT3TI ct Wlq~a me~ c!;'t \Tfu ~ 1xrRrcir, ~ ~ x#.'l~ q)'[ ~ ~ Lf?l' cfi x-IT~ ~ t I

. . 29-~'.2:, ~-~ ._j_

°50/- ( ~ 'cgtITT 3ITT'O ~~c/'le'ii'h~J:'\ )

1J6iu f.J-~ ~ ~- 30\,0.l~D\t__L_

~ ::>A'afef-W-WltT ~. ~ ~ 'QTcR (~) ~ ~o. ~

( #~ ., '.f'\'""'"'""1) . ·w;u~

1/1

·, -- - _·_,_ --~1~.,n1, ,/n/ifinhnx/162005ce5e12bf5e?projector=1 &messagePartid=0.6

L6-" . "" SI. No. Description io4"tl .¢<;>s.t (R~. ~r)

A Total Cost of the Complete Project .. '" .. ""'1· ,225.53

-

Contingency (@3% on A) - 36.Y7 '

B

C !DC(@ 10% on A) 122.55

D Consultancy (@2% an A) 24.51

E Total Cost of the Project i!Jcluding 1,409.36

Contingency, IDC & Consultancy Charges (=A+B+C+D)

108 1,04,09,31, 110.23

2 Construction of Sitamarhi (New) - Runnisaidpur (in place 34 17.28,71,94551

of Sitamarhi) 132KV 0/C Trans. line (Single Moose).

~onstruction of 132 KV D/C by making LILO arrangement

3 of 132 KV DCSS Benipatti - Pupri Transmission Line at

62 31,54,50,051.87

Sitamarhi New GSS

4 Construction of 2 nos. 220 KV Line bays at Motipur GSS 7,91,35,822.63

5 Construction of 2 nos. 132 KV Line bays at Runnisaidpur 5,63,33,537.38

GSS

200 1,67,20,71,945.53

2 160 1, 14,82,87,296.04

Construction of 132 KV D/C by making LILO arrangement

Down liking 3

of 132 KV DCSS Saharsa(OLD)-Banmankhi Transmission 20 17,38,91,702.09

A Lines for Line at Saharsa (New) GSS

400KV S/S Construction of 132 KV 0/C by making LILO arrangement

4 of 132 KV DCSS Saharsa(OLD)-Udakishanganj 15 12, 19,74,455.08

Transmission Line at Saharsa (New) GSS

5 Construction of 2 nos. 220. KV Line bays at Begusarai 7,91,35,822.63

GSS r Construction of 2 nos. 220 KV Line bays at Khagaria 8,34,57,210.99

New GSS 70 27,27,22,747.06

62 31,23,60, 159.17

2 156.42 79,94,56,702.08

3

4 30 45,60,32,700.26

5

1, 15,46,28,804.77

B

220KV New- Sub-Stations 2

with associated 3

lines

4

240 2, 15,61,98,513.21

0/c Trans. line Twin Moose . Construction of Raxaul (New) - Gopalaganj 220KV 0/c Trans. line Twin Moose .

160 1,50,09.14,037 .19

Construction of LILO of both Ckt of Bettiah-Raxaul 132KV 20 22,25,52,069.61

•. ; ~ '

43,69, 10,452.41

5

1,225.53

3/1/2018 --.,-,---~------

, . •.

' '.

'(fl!fr~~ .. ~ fcr;rJ cf> m ii ~ · c1011 t rcn 19~ . -q:j'cR ~ ~ ~ifITT ~ ~Ir~:,~, -~fytf~ ~ 6576 ~ ~~ ~ I ~ -tj'jTr q11 ~ ~ ~ ~~ ~­ ~ .. , i:u4~11i~ 'cf> -~ Y<-Tm Tl ~ ~ ~ cf> 31u1<H1qxi<1 400 cflo'lfro ~ 220 Gfi0'lfro· :fITT tix cT1l 2021-22 cf>~ cfcf ~ -~ 111l'T cf>~~~~~ ~~ ~-rm) t \J11 ~c#r ~~~cm·~ cR ~I

~ ~ 'cfi ~ ft;ri'.r -rr:r ~ tix ~ ~ ~ c#r ,lcfi-11~

~-~ti ~ ~ cf> 0RPm cfillllR<i ~ cJm1 q)TU! cITT n~ fumun ~i i;rcfiH t:

~ ~ rJil 220 / 132/ 33 <f>Q1-]1Q ~ '3-Y-~ cplFff'ffi ~ C;cfi 132 / 33 cf>O'lf!O m ~ ~ cITT 220/132 cf>o'lfro ~ tix fuwr~ qft[ITvFnzm Tl ~ 220 cto'lfTo ct 120 fffctc ~~cf \TU 132 cto·.fro ~ 147 nfk ~c,i'ltncx (~f.ic1}:t·c1\'.Lir ~ cflT ~ 1

r x~ cf1 13 -3~ g-~ n2 cto'lfto ct 473.42 x:r%c .,=);c;!11Z1c.~ fi~;~ui ~-{;~ cf.'1

HTLS Conclucl()r (capncit- - 2=-tO V\V •\. 1050 :\) !;,1-:l Rccc;nduuorin:_! c.Fr-11

r ,lv'li 7.fi 09 ;;,rc.;-<'; 220 / 132 c.so·iflo (ti rh m-R~l"i't ~ s;@epfT-\-{i ,:r,[ ~Ff:'fl

1c1«rr~ 1

... r:n:nr::,,~ r·c ,,'/;c: ;,:. ~··:;,.'"':, .. ,. ,,,_r .. :.q .;·s--· ,_;,- '.!;.;;· .,

11

https://mail.google .com/mail/u/Ol#inbox/162005ce5e12bf5e?projector= 1 &messagePartld=O. 7

! I,.., ..... ..., "'! 111 l":" f ,.., .., IV' O ._ I -. ........ ,,.,:;:,

-go/- , .

( ~ ~. ~P- -~~clic,tcfie/1 ) '~~

. ' .'···' ,, .. trcaT--~ 3'.tt l~2q\~L

•·

hllps ://mail .google. com/maii/u/O/#inbox/16200 5ce5e 12bf5e? projector= 1 &message Pa rtld=O. 8 1 /1

.. '

,p1:No. . Description total Cost (Rs. Cr)

A Total·Cost of the Complete Proj~ct 954.10

B Contingency (@3% on A) 28.62

C .ioC·(@ 16% on A) 95.41

. ' .

D ConsL.Jltaricy .(@2% on A) 19·.08

E Total ·cost- of the Project including 1,097.21

· ·Coi:-itingency, IDC & Consultancy Charges (=A+.B+C+_D) . -

. 8,33,94,483.61

220Kv'.New:. · ·s.ub~S:tati;n~.

A

54,62,93,240.23

14,14,10,531.33

Barauni TPS-Be usarai 132 'r0./ 0/C Trans. line

4 Kishanganj (New)- Kishanganj 132 'r0./ 0/C Trans. Line. 19.4 13,79,64,235.62

Both Circuits i.e (Ckt 1 & Ckt 2) of 132'10./ Biharsharif- 5 Baripahari D1C Transmission Line(RL-7 Km) with HTLS 14 8,83,20,658.99

Conductor RKM Re- Both Circuits i.e (Ckt 1 & Ckt 2) of 132KV DIC Lakhisarai

Conductoring 6 (PGCIL)-Lakhisarai Transmission Line (RL-16 Km) with 32 24,41,27 ,524.82

B of HT°LS Conductor RKM

Transmission I Reconductoring of 132'10./ DIC Dehri-Banjari Transmission Lines with 7 Line with HTLS Conductor (line length (RKM) 80 25, 16,44,245.26

HTLS

8 Reconductoring of 132'10./ S/C Sipara-Mithapur- 7 6, 13,76,653.34 Karbi ahi a Tr Line with HTLS Conductor

9 Re-Conductoring of 132'10./ 0/C Chandauti-Tekari 98 50,50,21,052.13 Transmission Line with HTLS conductor

10 Reconductoring of 132'10./ SIC Kahalgaon (BSPTCL)- 7 4,58,27,441.25 Kahal aon NTPC Trans Line with HTLS Conductor

11 Reconductoring of 132'10./ S/C Kahalgaon -Sabour Trans 27 14,85, 18,035.05 Line with HTLS Conductor Reconductoring of 132'10./ D/C Dehri-Sonenagar

12 Transmission Line with HTLS Conductor (line length - 38 21,55,50,904.51

19.00 RKM D Scheme Modification

Reconductoring of Motihari (ISTS) - Motihari (BSPTCL)

Scheme 132 'r0./ 0/C with HTLS conductor (Capacity - 240 MVA, 77.52 38,90,39,248.49

C Modification 1050A.

2 Construction of 132KV D/C Transmission Line from 80 53,85, 16,465.60 Banka(PG) to Banka(New) GSS with HTLS Conductor

53,63,71,043.09

2 25,00;91,775.79 '

D Up-Gradation

'of ~ul>­ Station-

25;3.0,49,730.43 :_.' ,. ..

16,77;1~,835.41" •. .A

39,63,45,903.23

25,82,84,900.88

Muzzafarpur (PG) - 'Chtiapra ·(New), Arnrrout 22d KV D/C Trans. line. 130 58,00, 75,1f14.4 7

8,0

42,99,30,506.76

2 Vaisbali - Chhapra (Nl3w); Arnnour (in place of Hajipur 220 KV GSS KV 132 'kv DIC Trans. line. . 27,35,41,826.92

E New Lines 3 Lauka.hi- Phulparas-132 KV D/C Trans. line with HTLS

Conductor, 50

4 Construction of"2 Nos. 132KV line bays at Muzaffarpur GSS 5,60,96,892.44

5 Construction of 2 Nos. 132KV line bays at Vashali GSS 3,70,59,593.63

- 6 Construction of 2 Nos. 132KV line bays at Laukahi GSS 4,40,05,7 40.41

7 Construction otzNos, 132.!<V line bays at Phulparas GSS 4,70,04,012.91

_ Tb'QI~ & P amfs.·f~r 1f:aps1Jllss\9_n Uhe · Portable lnflata~I~ b.igntl_ng Tow~r .

' Sel - 10 34,79/93.30

Make AS!<A' Model-Air 45C>O, Geheral or E' uivalent. \

. ~-- ~ . ~ ~00 Ml; portabl~ Hy_dri~~l_ic eomprs·sor machine·with die sets suitable for the foll0Wir.lg Ctind,!'icfcr: . I •

2 (a) For Moose Coridi.JctGr. · 1 Set 10 52,61_,862.90

'. . t, • a !

· (b) for Zebra.Conductor. I

(c) For Panther concuctor. ( d) For Eartti-Wir~-:Coriductor.

3 T.hermo~Visior) Camera {High End), Set 10 2,09,29,708.44 (Minimum - 64.dx480 Pixels

4 Rechargeable Lon!:J Range Search Liqht Set 10 9,84,771.73 Make ASKA (Mbdel-AEL-5W-LED Mode, General) or .Equivalent.

' !~ ' '. : .

5 Tower Footing Resistance and Impedance Meter (Complete Kit), Set 10 32,56,099.21 / ..

Puncture insulator Detector Tester with sled and adjustable skid

6 suitable for Testing of Porcelain Insulator with Laptop, Conductive Set 10 1,21,87,328.56 Gloves, Conductive Socks & Conductive Safety Shoes/Boot etc. Com lete in all res ect

Puncture insulator Detector Tester with sled and adjustable skid

7 suitable for Testing of Composite Insulator/ Long Rod Polymer Set 10 1,21,87,328.56 Insulator with Laptop, Conductive Gloves, Conductive Socks & Conductive Safety Shoes/Boot etc. (Complete in all respect)

(B) Test Equipments for OPGW (i) Main Equipments

Digital Protection Coupler suitable for integration and operation ~1:

1 Set 10 27,80,545.82 ·}

through OPGW System with required Cables, complete in all respect.

(ii) Test Equipments for Terminal Equipments 1 SDH Anal zer u to STM-16 with Jitter and wander option No. 10 1,48,52,3103.22

2 Handheld 2 Mb s BER Tester No. 10 37,87,626.86

3 No. 10 3, 13,504.05

(iii) Test Equipment for Fibre Optic Cable System

OTDR (Optical Time Domain Reflectometer) for 1310/1550 nm with No. 10 77,58,342.32 laser siource. Equivalent to Amritsu MW9076B1 or better.

2 Optical Attenuators (Vaiable 1310/1550 nm). Equivalent to JDSU No. 10 23,22,591.22 MTS6000 or better

3 Optical Power Meter (131011550nm) with Laser Source, Equivalent to No. 10 15,45,886.16 JDSU OLP55 or better

4 Optical Talk Set, E uivalent to JDSU OTS55 or better No. 10 20,88,078.12

5 Optical Fiber Fusion Splicer including Fiber Cleaver Equivalent to No. 10 55,63,138.75 Sumitomo T-39-SE or better.

6 Calibrated Fibre. No. 10 1,44,375.52

7 Connectorization Kit (FIS-Fl-0053-FC-INST or equivalent) No. 10 14,57,608.14

8 Splice Kit (FIS-Fl-0053-FF ore uivalent) No. 10 8,24,013.89

Optical test accessory kit including all necessary connectors, 9 adaptors, cables, terminations and other items required for testing Set 10 7,81,769.27

(FIS-Fl-0053-TS-ST or equivalent) SUB-TOTAL (B) 4,42, 19,783.34 TOTAL(= A+B) 10,25,06,676.05

Page 1 of 1

3/7/2018

•·. ,.

mode of finance for 21-22.jpg

filg1'< ~ trTcR ~1·-·Hf?p~l--1 q5s:q~~ tBo, qc:--1r 1mm m ~ (~) ~ fso c5T ~ c5RRf

C(N - U40l02l3R20JiSGC:0.18889 I ~ ~ x1~f%a l{ ~ ~ J

>f'qR cf>ill\C'lll, ~ tfcf,f, ~ m, '1C"IT-B00021

-~

~ ~ ?.:-.?.::.~.~ ······

-~.

ml"R 'fffucr, ~ fcrrrrr, ~ ~. tfC'=f1 I

\~,:.. '• . '

~ ~ tITTR s;1'i"lf?i~11 ~ ~o 'f ~ ~ cf5)- 12cff· 4ilgtfiii ~~-~om. (201&-=17) ~-~-~ ~ +TI1T''$1' ~'~ mt~ ~ ~: Fclttii,~g;~u1; ~ ~ ·.'(.fi~"/¢{01 ~ ~-- ~- .~,__IV (mn-~ I 2) ~ ~ 400 cfi"O'lfto -qfr0~9~0 ~- ~~ -~~-~ -,,..Ji=,~~!!~-'< w ~ -~~-.%TI ~- xiiO ~64.76··~ $f:·~'·'§l .. ~ 'c(cr .

. ~ %)-~~-~ -~;~, coT 20% ~ 3{mN 1·3~_9i cfj~\,~;-~~~--i~~;,~~~~,-~. w:r ·it ~ ~ ~- ~ so·% ~¢tr 531.Bt ~ 'xile· ~ -~ ~ .. ~ ~- ·~~~~-TI ~ m ctr~- WcIT.-J' ffl r$ +i.4 l;f '# ·1

~ ~ cf;" ~-it ii 'f[fm'r cITT"1T t;· fcr> 12cff 4 -rjq ~ ll 7.TivRT cf)" ¥c1 ii ~x ~ cBT ~ ~ .:/'fTr cB'r ~ ~- ~ ~iflf?i::tH ~ ~ q1<Jxf?l-s cf;" ~-~,.rm ~ ~ ~ ~ 'cf>T 3{'U1 lj ,fj 4 X id ~ i:rrnm * fcl '<-d J{) cJ'i '(Of, ~lfUT '(;ci ~~ ~ ~ ~ 'rrJl' ~I~ cf)" ~-IV ('lWT-2/2) ii~ 'cf>Tm cf)"~ 400_ cfio'lfro ~o3IT{o~o w.r ~- ~ ~ ~ ~ ~ 'cf>T f.'rnuT ~ t I

' ~ ~ ~ ~ fun ,ro cnn:rr ~ ~ ~ ~ r-tr· cf~

~~t, ~ ~ cfi 3Rf1m ~ ·-;,ii 400 / 220 / 132 cfio'lfro cfi m ~­

i<.l fua ii1 x gx ii ~ vfR -g TIW ~ ~ 400 cf;"O-.frO cf;" 10 ~ ~\lex. 220 cfiO'lfrO cf;" 1.31 ~ ~ ~ 132 cfio.fro cfi 53 ~ Rr,C"l11-J1c:~ mRDT ~ (3r:rrrf.m) C{1f ITT'for ~ t,

~ cf)' cl'illlT-cJ[j.--j tg" ~ ~lcfc.f,R;Ja xrfvr xiiO 664.76 q-,x'l'5 3fj1,rf.m 'g I ~ u'r\Jl.-n cB1 2'020-21 c'fcn ~ W 'cf>T ~~ x'm Tf'lIT $ I

3Tff 31...fxlS/ '3' er, 12a· ::r'i'.rmrn:l ZT~ cfi ,3Vi1 c'fcn (2016-17\ fcmx cf, cf>C'T ..j'' I V

fci-qc'T 1TITf cB'r ~ ~ ~TI r-f'muT vurrcfl c.'> Pffi'Jrtq>~o,_ ·,-r:~01 t,rci ~~cf10xu1 ~ 'lf/v!';:ff q'; 1.:tvJ-[V (1-TPT-2 / 2) <fi 3R'J'l'@ 400 <fio1.\To \il'fO~Ot,rflO -:.:Toi ~FT, ~if&P-11'·?~'1' (;d' ~ef;~.@

h tips :{/mail .goog le. com/mail/u/0/#i n box/ 162005ce5e 12bf5e?projector= 1 &messagePartld =O .3 . 1/1

3/7/2018 mode of finance fo~r-;2~1-;22~1~.jP~Q~-----------------

~ BWf tg cg'C'I =o 664.76 cnx~ ct,") ~ ~ ~ ~ ~ T-c~.qzci ~ ~:rm cfiT

20% cP1 31'2llil 132.95 ~ ~- ~ f;rcM· cfi ~ "ti ~ ~o,Cf 'C;c1 1'M' 80% 312ffi'i

531.s1 ~ x'io ~ ~ ct'r T>JT~ 4X fcrr'0=r ~ m~ 'fl ";f[1Jf ~'(l m *1 ~ ~ q'iB ~ W,,@ 1{cT $11 cf> cW-l1-<1lFf ~~ fcra'r<1 ql'.f 2017-18 it 25.00. ~

~ ~&:r ~ cP1 ~ cb'T ~ I . qRa'10HIW cf> T~ P.lcM,drl cm- i;rfu 'C[c.i mft~ 'flfq@ ~ -:r-iit-a- cl'i1 Q1·w-l

~~cf>m~~t1

'2 2.~2-. __ L

io/- ( ~ ~ 3ITTO ~?icf5§1cB~ei )

~tT~ ~ f¥:liq) ,.,.~ o /. l t» L '.).(') < '7

~~ . ( ~ ~ 3ITTO ~~¢<'-!¢~~ )

~'q f;t-~

1/1 htt ns · //mail .oooale .com/mail/u/O/#inboi</162005ce5e 12bf5e?projector= 1 &messagePartld =O .4

" Bakhtiyaq~ur 40012201132 KV GSS (GIS} and associated Works

SI. SCOPE OF WORK Estimated

No. , Cost

A NEW SUBSTATION WORK (In Rs.)

1 2x500 MVA + 2xl60 MVA, 40012201132 KV GIS Sub 283.01

Station at Bakhtiyarpur

B LINE BAY EXTENSION WORK

1 Sheikhpura GIS, BGCL, 220 I~V Ext. 15.60

(2 Nos. Line Bay) 2 Hathidah GIS, BGCL, 220 KV Ext.

15.76

(2 Nos. Line Bay) ,.., Fatuha GIS, BSPTCL, 220 KV Ext.

41.38 .)

(2 Nos. Line Bay) 4 Harnaut AIS, BSPTCL, 132 KV Ext.

3.38

(2 Nos. Line Bay) 5 Baripahari AJS, BSPTCL, 132 KV Ext.

25.63

(2 Nos. Line Bay) C TRANSMISSION LINE WORK

1 LILO of Barh-Patna 400 KV DIC (Quad) Transmission 36.71

Line at Bakhtiyarpur (New) 2 Bakhtiyarpur (New) to Sheikhpura (New) 220 KV 45.05

DIC Transmission Line 3 Bakhtiyarpur (New) to Hathidah (New) 220 KV DIC 45.66

Transmission Line , 4 Bakhtiyarpur (New) to Fatuha (8SPTCL) 220 KV 26.26

DIC Transmission Line 5 Bakhtiyarpur (New) to Harnaut (BSPTCL) 132KV 12.56

DIC Transmission line 6 Bakhtiyarpur (New) to Baripahari (BSPTCL) 132KV 27.06

DIC Transmission line D Transmission System Total (=A+B+C) 578.05

E Contingencies 17.34

(@3°/o ofD) F IDC (D:E=80:20)

57.80

(@10°/o of D) G Consultancy

11.56

(@2°/o of D) H GRAND TOTAL 664.76

,..

Page 1 of 1