big river

1
JUNE 2011 BIG RIVER Sun Mon Tue Wed Thu Fri Sat 1 2 Read through 3 4 5 6 Group songs 7 Group songs 8 9 Solos/duets 10 11 12 13 Solos/duets 14 Act I Blocking 15 16 Act I Blocking 17 18 19 20 Act II Blocking 21 Act II Blocking 22 23 Addt’l Blocking 24 25 26 27 Full run 28 All music 29 30 Run Act I Producon Stage Manager Sara Gonzalez (903) 253-2923 [email protected] Note: All rehearsals are from 7-9 PM unless otherwise noted. Dates, mes, and actors called are subject to change.

Upload: sara-gonzalez

Post on 26-Mar-2016

216 views

Category:

Documents


2 download

DESCRIPTION

June 2011 Calendar

TRANSCRIPT

Page 1: Big River

JUNE 2011

BIG RIVER

Sun Mon Tue Wed Thu Fri Sat

1 2 Read through

3

4

5 6 Group songs

7 Group songs

8 9 Solos/duets

10 11

12 13 Solos/duets

14 Act I Blocking

15 16 Act I Blocking

17 18

19 20 Act II Blocking

21 Act II Blocking

22 23 Addt’l Blocking

24 25

26 27 Full run

28 All music

29 30 Run Act I

Production Stage Manager Sara Gonzalez

(903) 253-2923 [email protected]

Note: All rehearsals are from 7-9 PM unless otherwise noted. Dates, times, and actors called are subject to change.