1978 ORIGINAL BUILDING COLUMN LINES
1982 ADDITION COLUMN LINES
1986 ADDITION COLUMN LINES
LEGEND
SAW MILL
AREA
5'-0"
6'-0"
10'-0"
8'-6"
Cart
42x30
Table 96x36
Wire
R
ack
60
x2
4
Wire
R
ack
60
x2
4
Stamper
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Desk
Fcab
Cabnt
36x30
Cart
42x30
Table 96x36
Cart
42x30
Cart
42x30
Table 96x36
Table 96x36
Cart
42x30
Cart
42x30
Table 96x36
Cart
42x30
Table 96x36
Pallet
40x48
Mallet
Winder
Table
48x30
Pallet
40x48
Pallet
40x48
Pallet
40x48
Cart
42x30
Wire
R
ack
60
x2
4
DLKS
Pallet
40x48
Cart
Jens
Desk
Cart
Wire
R
ack
60
x2
4
Pallet
40x48
Table 96x30
Table 96x30
Hand
Strtn
Table
48x30
Table
60x30
Table
48x30
Table
60x30
Table 72x30
Table 72x30
Table 72x30
Table 72x30
Table 72x30
Table 72x30
Pallet
40x48
Pallet
40x48
Table 72x30
Table
60x30
Table
60x30
Fcab
Table
60x30
Table
60x30
Table
60x30
Table
60x30
Wire Rack
60x24
Wire Rack
60x24
Wire Rack
60x24
Wire Rack
60x24
Wire Rack
60x24
Wire
R
ack
60
x2
4
Desk
Desk
Cabnt
36x30
Table 72x30
Table 72x30
Pallet
40x48
Die
Sh
elf
Pallet
40x48
Pallet
40x48
Clicke
r
Pre
ss
Clicker
Press
Frans
Desk
Elec P
anels
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
CHECKER
Table
CHECKER
Table
Pallet
40x48
Pallet
40x48
Pallet
40x48
Table 72x30
Table 72x30
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Table
2/6 A
rt
Em
pty
Totes
Empty
Totes
Stm
p 2
/6
Qu
e
Stm
p 2
/6
Qu
e
Stm
p 2
/6
Qu
e
Stm
p 2
/6
Qu
e
Stm
p 2
/6
Qu
e
Stm
p 2
/6
Qu
e
Stm
p 2
/6
Qu
e
Stm
p 2
/6
Qu
e
Stm
p 2
/6
Qu
e
Ink
Cbnt
Adj
Table
Pallet
40x48
Pallet
40x48
TBox
Pallet
40x48
Pallet
40x48
We
ig
ht
Qu
e
We
ig
ht
Qu
e
We
ig
ht
Qu
e
We
ig
ht
Qu
e
We
ig
ht
Ta
gs
Strghtn
Strghtn
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Stm
p 7
Que
Stm
p 7
Que
Stm
p 7
Que
Stm
p 7
Que
Stm
p 1
Que
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Stm
p 7
Que
Auto
Straighten
Auto
Straighten
Auto
Straighten
Auto
Straighten
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
HA
ND
ST
R.
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
HA
ND
ST
R.
12'-0"
7'-0"
SMOKING AREA
HAZ. WASTE STORAGE
24'X24' (576 SQFT)
EXISTING
TRANSFORMER PAD
NEW CANOPY OVER RAMP
NEW ADA COMPLIANT WALKWAY
MACHINE SHOP
7843-7010-01-AR001
UNLOADING
OF LONG
MATERIAL
RAMP UP
R
A
M
P
U
P
RAW MATERIAL
HANDLING DOCK
KILN #1
KILN #2
KILN #3
KM SECONDARY
AREA
SANDER JIG
CART WITH
GLASS CASE
SHELVING
SHELVING
COMPUTER
F.C.
VICE
BRIDGEPORT
TOOLBOX
DOWEL CART
DUST COLLECTOR
LATHE
DOWEL CART
DOWEL CART
TABLE
DRILL
PRESS
DOWEL CART
DOWEL CART DOWEL CART
TRIM SAW
TRANSFER PRESS
18'-0"
13'-0"
50'-0"
28'-6"
8'-0"
5'-4"
FUTURE EXPANSION
(1,100 SQFT)
6'-0"
5'-0"
6'-0"
TRIMSAW
SORTER
TABLE
AUTOMATIC
FEED BIN
SORTER
TABLE
AUTOMATIC
FEED BIN
11'-0"
TRIMSAW
TRIMSAW
5'-0"
5'-0"
TABLE TABLE
SORTER
TABLE
AUTOMATIC
FEED BIN
TABLE TABLE
5'-10"
TOTE
TOTE
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
FUTURE DEVELOPMENT
TOTE
AUTO FEED
BUTT WHEEL
TIP WHEEL
TOTE
AUTO FEED
BUTT WHEEL
TIP WHEEL
DRYING RACKS
DRYING RACKS
FAN
FAN
FAN
FAN
TOTE
AUTO FEED
BUTT WHEEL
TIP WHEEL
DRYING RACKS
FAN
FAN
TOTE
AUTO FEED
BUTT WHEEL
TIP WHEEL
DRYING RACKS
FAN
FAN
TOTE
AUTO FEED
BUTT WHEEL
TIP WHEEL
DRYING RACKS
FAN
FAN
TOTE
AUTO FEED
BUTT WHEEL
TIP WHEEL
DRYING RACKS
FAN
FAN
TOTE
AUTO FEED
BUTT WHEEL
TIP WHEEL
DRYING RACKS
FAN
FAN
TOTE
AUTO FEED
BUTT WHEEL
PAN
TIP WHEEL
DRYING RACKS
FAN
FAN
12
3
4
56
78
PALLET
PALLET
PALLET
PALLET
PALLET
PALLET
PALLET
PALLET
GRINDING WHEELS
VERTICAL CAROUSEL STORAGE
HEAD PREP
DRESSING
HEAD PREP
DRESSING
BENCH
DOWEL CART
DESK
TOOL SHELVES
7'-11 7/16"
DOWEL CART
DOWEL CART
DOWEL CART
DOWEL CART
DOWEL CART
BENCH
TOOL CARTTOOL CART
6'-6"
13'-0"
1'-4 7/8"
DESK
EL. PANEL 1 EL. PANEL 2 EL. PANEL 3
EL. PANEL 4
EL. PANEL 8
EL. PANEL 7
EL. PANEL 6EL. PANEL 5
PAN
PAN
PAN
PAN
PAN
PAN
PAN
PAN
PAN
PAN
PAN
PAN
PAN
PAN
PAN
5'-6"
13'-0"
15'-0"
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
Pallet
40x48
5'-0"
4'-0" DEEP SUMP
W/ DUPLEX PUMPS
TRENCH
PLUMBING NEEDED
TABLE
TOOLBOXCABINET
BUTT DRILL
WHIRL WIND
CNC
CABINET
DRILL PRESS
WOOD
DUMPSTER
BIN
BIN
WOOD
DUMPSTER
BIN
TOTE
TOTE
TOTE
DRILL PRESS
DRILL PRESS
WORK TABLE
BENCH
WOOD LATHE
CART
SHELVING
GRINDER
CART
DRUMSTICK
BUTTHOLE
DRILLER
DESK
TABLE JOINTER
F
I
T
S
A
W
NASH GRINDER
SEAVEY BACK KNIFE
DBL END JOINTER
BIN
BIN
BENCH
BENCH
PLASTIC
MOLD
INJECTOR
RESIN
GRINDER
RESIN
GRINDER
PLASTIC
MOLD
INJECTOR
BENCH
FLAP SAND
SIDE SAND
PALLET
PALLET
BENCH
BENCH
TOOLBOX
TOOLBOX
Pallet
40x48
Pallet
40x48
9'-1 5/8"
Pallet
40x48
Pallet
40x48
JOINTER
DREDLOCK SLOTTER
WHIRL WIND
Pallet
40x48
Pallet
40x48
Pallet
40x48
DOWEL CART
TOTE
SIDE SANDER
BENCH
EXISTING POWER POLE
NEW TRANSFORMER
BY CMP.
9'X9' VAULT BY VFC.
NEW POWER POLE
G
NEW ROAD
EXISTING POWER POLE
A
APPROX. PROPANE
TANK LOCATION
3 BAY LUMBER STORAGE
(60X40)
NEW ELECTRICAL ROOM
12'X10'
BOILER HOUSE
22' DIAMETER SILO
APPROXIMATE PROPERTY
LINE LOCATION
(2) 5" U/G CONDUIT BY VFC.
CABLING BY CMP.
CKD.
APP.
CURRENT REVISION
WWW. MSECO.COM
1658 Malvern Ave., Hot Springs, AR 71901
SCALE
DRN.
NO. DATE BY
DRAWING NO.
DESCRIPTION
200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
STATE
- - -
F 10/19/2018 MKL ISSUED FOR BIDS
ZILDJIAN COMPANY
NEWPORT
ME
PLANT
OVERALL AREA
ARCHITECHTURAL, BUILDING
BUILDING LAYOUT
7843 1000 01 AR0011/16"=1'-0"
MKL 08/01/2018
MKL 10/19/2018
MKL 10/19/2018
7843-1000-01-AR005 7843-1000-01-AR004
7843-1000-01-AR003 &
7843-1000-01-AR006 ABOVE
7843-1000-01-AR002
7843-1000-01-AR007
NOT FOR
CONSTRUCTION
ISSUED FOR
BIDS
EF
G
MATCH LINE
7843-1000-01-AR005
9'-4 1/2"
18'-0"
60'-0"
ELECTRICAL
ROOM
MULTICLONE
ID FAN
STACK
BELT CONVEYOR
WATER TREATMENT TANKS
BAG HOUSE
BLOWER
BOILER
22'-0" DIAMETER, 100 TON, SILO
REST ROOM
REVERSING DISCHARGE
SCREW
ASH SCREW BELOW BREECHING
TO FILL DUMPABLE BIN.
METERING BIN
40'-0"
10'-11"
40'-0"
9'-0"
8'-4 1/2"
ALTERNATE POSITION OF THE
BRIQUETTER DISCHARGE
275 GAL FUEL TANK
8X10 ROLL DOOR
8X10 ROLL DOOR
DUMPING HOPPER
RETURN
AIR
FROM BLOWERS
DUMPING HOPPER
22T
23R
UP
10'-0"
CYCLONE
VENT FILTER
9'-4 1/2"
14'-0"
CONTROL
ROOM
MULTICLONE
ID FAN
STACK
BELT CONVEYOR
WATER TREATMENT TANKS
BREECHING
BOILER
22'-0" DIAMETER,
100 TON, SILO
BOILER ACCESS WALKWAY
BRIQUETTER
BAG HOUSE FOR SANDER
(RAISED)
10'-11"9'-0"
12'-4 1/2"
ALTERNATE POSITION W/
DUMPING HOPPER BELOW
PRESS
KILN CONTROL
VALVES
STORAGE
ROOM
SCREW CONVEYOR
UP
22T
23R
CKD.
APP.
CURRENT REVISION
WWW. MSECO.COM
1658 Malvern Ave., Hot Springs, AR 71901
SCALE
DRN.
NO. DATE BY
DRAWING NO.
DESCRIPTION
200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
STATE
- - -
D 10/19/2018 MKL ISSUED FOR BIDS
ZILDJIAN COMPANY
NEWPORT
ME
PLANT
OVERALL AREA
ARCHITECHURAL, BUILDING
PARTIAL BUILDING LAYOUT BOILER HOUSE
7843 1000 01 AR0071/8" = 1'-0"
MKL 09/21/2018
SIM 10/19/2018
SIM 10/19/2018
KEY PLAN
AR003AR002
AR004
AR005
AR007
AR006
SECOND FLOOR PLAN
NOT FOR
CONSTRUCTION
ISSUED FOR
BIDS
MID-SOUTH
SCALE DRAWING NO.DRN.
CKD.
APP.
NO. DATE BY DESCRIPTION
CURRENT REVISION
WWW.MSECO.COM
NOT FORCONSTRUCTION
ISSUED FORBIDS
RESERVED FOR PROFESSIONAL ENGINEER STAMP
STATE
1658 Malvern Ave., Hot Springs, AR 71901
200 Mackenan Drive, Cary, NC 27511
303 Main St., Orono, ME 04473
MID-SOUTH ENGINEERING CO. NH
RWR
RWR
ZILDJIAN COMPANYNEWPORT
10/26/2018
7843-1000-05-ST001
PLANTOVERALL AREASTRUCTURAL, SECTIONS & DETAILSISOMETRIC VIEW
10/30/2018
10/30/2018
ME
ISOMETRIC VIEW
ISOMETRIC VIEW
A 10/30/2018 NH ISSUED FOR BIDS ADDENDUM 2
1 2
A
3
B
C
4
1000-06-ST001
C
20'-0"
20'-0"
20'-0" 20'-0" 20'-0"
61'-4"
41'-0"
FRAME ABOVE (TYP.)
TRIPLE SLIDING DOOR
ON TRIPLE TRACK
TRIPLE SLIDING DOOR
ON TRIPLE TRACK
MID-SOUTH
SCALE DRAWING NO.DRN.
CKD.
APP.
NO. DATE BY DESCRIPTION
CURRENT REVISION
WWW.MSECO.COM
NOT FORCONSTRUCTION
ISSUED FORBIDS
RESERVED FOR PROFESSIONAL ENGINEER STAMP
STATE
1658 Malvern Ave., Hot Springs, AR 71901
200 Mackenan Drive, Cary, NC 27511
303 Main St., Orono, ME 04473
MID-SOUTH ENGINEERING CO.
1/4" = 1'-0"
NH
RWR
RWR
ZILDJIAN COMPANYNEWPORT
10/26/2018
7843-1000-05-ST002
PLANTOVERALL AREASTRUCTURAL, LAYOUTPLAN VIEW
10/30/2018
10/30/2018
ME
1/4" = 1'-0" 1000-05-ST002
1T. O. CONCRETE ELE. 0'-0"
A 10/30/2018 NH ISSUED FOR BIDS ADDENDUM 2
1 2 3 42.1
30'-0" 30'-0"
TOS 20'-0"
TOS 17'-3 3/4"
TOC 0"
2'-8
1/4"
17'-3
3/4"
6"4'-0"
20'-0" WIDE DOOR 20'-0" WIDE DOOR20'-0" WIDE DOOR
23'-4
9/16"
12"1"
NOTE:
TRIPLE TRACK SLIDING DOOR
SUPPORT BY PRE-ENGINEERED
METAL BUILDINGS SUPPLIER.
20'-0"
MID-SOUTH
SCALE DRAWING NO.DRN.
CKD.
APP.
NO. DATE BY DESCRIPTION
CURRENT REVISION
WWW.MSECO.COM
NOT FORCONSTRUCTION
ISSUED FORBIDS
RESERVED FOR PROFESSIONAL ENGINEER STAMP
STATE
1658 Malvern Ave., Hot Springs, AR 71901
200 Mackenan Drive, Cary, NC 27511
303 Main St., Orono, ME 04473
MID-SOUTH ENGINEERING CO.
3/16" = 1'-0"
NH
RWR
RWR
ZILDJIAN COMPANYNEWPORT
10/26/2018
7843-1000-06-ST001
PLANTOVERALL AREASTRUCTURAL, SECTIONS & DETAILSELEVATION VIEWS
10/30/2018
10/30/2018
ME
3/16" = 1'-0" 1000-06-ST001
CFRAMING ELEV. GRD. C
A 10/30/2018 NH ISSUED FOR BIDS ADDENDUM 2
1
G
B
C
D
E
F
KILNS DESIGN BY OTHERS
12X12
ROLL D
OOR
EXISTING
20X
20 R
OLL D
OOR
20X20 OPENING
EXISTING DOOR
EXISTING WALL
NEW WALL
EXISTING WALL
NEW WALL
RAMP UP
RAMP UP
A
2020-01-
AR002
48' - 10"
100' - 2"
24' - 5" 24' - 5"
19' - 5 3/16"
19' - 5 3/16"
19' - 5 3/16"
19' - 5 3/16"
19' - 5 3/16"
1' - 6 1/16"
FLUSH TO KILN ROOF
OPEN BELOW
1"/F
T
1.1
47' - 6 1/32"
30' - 0
"30' - 0
"30' - 0
"30' - 0
"30' - 0
"
FRAME ABOVE
MID-SOUTH
SCALEDRAWING NO.DRN.
CKD.
APP.
NO. DATE BY DESCRIPTION
CURRENT REVISION
WWW.MSECO.COM
NOT FORCONSTRUCTION
ISSUED FORBIDS
STATE
1658 Malvern Ave., Hot Springs, AR 71901200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
1/8" = 1'-0"
MKL
WDG
RWR
ZILDJIAN COMPANYNEWPORT
7843-2020-01-AR001
SAWMILL/ WOOD STORAGEHOUSEARCHITECTURAL, BUILDINGPLAN VIEW
10/01/2018
10/30/2018
10/30/2018
ME 1/8" = 1'-0"
RAW MATERIAL HANDLING DOCK LAYOUT
B 10/30/2018 NH ISSUED FOR BIDS ADDENDUM 2
ISOMETRIC VIEW
Level 1
0' - 0"
Level 1
0' - 0"
ROOF
30' - 0"
ROOF
30' - 0"
GD E F
-4' - 0"
1
12
TO BE DETERMINED
1
12
TO BE DETERMINED
EXISTING ROOFEXISTING WALL
KILNS DESIGN BY OTHERS
SECOND FLOOR
11' - 0"
SECOND FLOOR
11' - 0"
16' - 0 5/32"
MID-SOUTH
SCALEDRAWING NO.DRN.
CKD.
APP.
NO. DATE BY DESCRIPTION
CURRENT REVISION
WWW.MSECO.COM
NOT FORCONSTRUCTION
ISSUED FORBIDS
STATE
1658 Malvern Ave., Hot Springs, AR 71901200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
3/16" = 1'-0"
MKL
WDG
RWR
ZILDJIAN COMPANYNEWPORT
7843-2020-01-AR002
SAWMILL/ WOOD STORAGEHOUSEARCHITECTURAL, BUILDINGSECTION
10/01/2018
10/30/2018
10/30/2018
ME
3/16" = 1'-0" 2020-01-AR001
ARAW MATERIAL HANDLING DOCK SECTION
B 10/30/2018 NH ISSUED FOR BIDS ADDENDUM 2
UP
UP
E
F
8' - 6 1/2" 17' - 10 1/2"
8X8 ROLL DOOR
ELECTRICAL ROOM
OPENING FOR CONVEYOR
3010-01-AR002
2 BOILERBUILDINGNORTHELEVATION
3010-01-AR0021
BO
ILE
RB
UIL
DIN
GE
AS
TE
LEV
AT
ION
8X8 ROLL DOOR
REST ROOM
40' - 0
"
20' - 9
11/
16"
60' - 0"
15' - 0" 17' - 8 1/4" 12' - 11 27/32" 12' - 11 27/32"
15' - 0" 17' - 8 1/4" 12' - 11 27/32" 12' - 11 27/32"
DESIGN BY MID-SOUTH ENGINEERING,
ERECTED BY PRE-ENGINEER BUILDING SUPPLIER
BRACE BAY
BRACE BAY
30' - 0
"
E
3010-01-AR0021
BO
ILE
RB
UIL
DIN
GE
AS
TE
LEV
AT
ION
SECOND FLOOR
SUPPORTED BY
BUILDING
45' - 3 1/2"
18' - 6
"
3' - 10"
10' - 4
1/2"
9' - 4
"
18' - 10 1/2" 26' - 5"
12' - 4"
RAIL
DESIGN BY MID-SOUTH ENGINEERING,
ERECTOR TO SUPPLY MATERIAL
AND LABOR TO ERECT
GRATING ON
STEEL BRASING
FRAMING BY OTHER
4" CONCRETE FLOOR ON
METAL DECK ON STEEL
BEAMS
GRATING
MID-SOUTH
SCALEDRAWING NO.DRN.
CKD.
APP.
NO. DATE BY DESCRIPTION
CURRENT REVISION
WWW.MSECO.COM
NOT FORCONSTRUCTION
ISSUED FORBIDS
STATE
1658 Malvern Ave., Hot Springs, AR 71901200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
3/16" = 1'-0"
MKL
RWR
WDG
ZILDJIAN COMPANYNEWPORT
7843-3010-01-AR001
BOILERHOUSEARCHITECTURAL, BUILDINGBOILER BUILDING PLAN
10/01/2018
10/30/2018
10/30/2018
ME
3/16" = 1'-0"
BOILER HOUSE LAYOUT
NOTES:
1. ALL DOORS TO BE 3'-0"X7'-0" UNLESS NOTED OTHERWISE.
2. INTERIOR WALLS TO BE 5 1/2" STEEL STUDS WITH 5/8" GYPSUM
WALL BOARD BOTH SIDES. ELECTRICAL ROOM HAS TWO LAYERS.
3/16" = 1'-0"
SECOND FLOOR
B 10/30/2018 NH ISSUED FOR BIDS ADDENDUM 2
ISOMETRIC VIEW
4' - 0
"18' - 0
"
4.76°
1
12
SIDING
CONCRETE WALL40' - 0"
4' - 0
"21' - 4 5/16"
4' - 0
"21' - 4 5/16"
60' - 0"
SIDING
CONCRETE WALL
MID-SOUTH
SCALEDRAWING NO.DRN.
CKD.
APP.
NO. DATE BY DESCRIPTION
CURRENT REVISION
WWW.MSECO.COM
NOT FORCONSTRUCTION
ISSUED FORBIDS
STATE
1658 Malvern Ave., Hot Springs, AR 71901200 MacKenan Dr., Cary, NC 27511
303 Main St., Orono, ME 04473
3/16" = 1'-0"
MKL
WDG
RWR
ZILDJIAN COMPANYNEWPORT
7843-3010-01-AR002
BOILERHOUSEARCHITECTURAL, BUILDINGBOILER BUILDING ELEVATIONS
10/01/2018
10/30/2018
10/30/2018
ME
3/16" = 1'-0" 3010-01-AR001
1BOILER BUILDING EAST ELEVATION
3/16" = 1'-0" 3010-01-AR001
2BOILER BUILDING NORTH ELEVATION
B 10/30/2018 NH ISSUED FOR BIDS ADDENDUM 2
PROJECT MANAGER
xc: Neil Brackley (Vic Firth/Newport, ME) w/e
Page 1/1
BID ADDENDUM
Vic Firth M-S Job No.: 7843 Newport, ME Date: 30-Oct-2018 To: All Bidders Re: Quotation Request No. QR7843-006 Addendum No. 2 Pre-Engineered Metal Building
The following are hereby amended:
The attached files have been revised: 7843-006_04_General Building Configuration
7843-006_06_Pre-Engineered Metal Building Spec – I have hi-lighted the areas that have changed in yellow.
7843-006_07_Drawing List
7843-006_Drawing Package – I am sending the entire set. There are no changes to the first 2 drawings.
General Building Configuration Specification 30-Oct-2018; Rev-1
Vic Firth Company Page 1 of 1
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
Reference revised drawings
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 1 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
1.0 SCOPE OF WORK Furnish all materials, accessories, equipment, tools, transportation, and perform all services and labor required to complete the building system, which includes the following: The structural steel system primary and secondary members, metal roof system, wall systems, all trim and building accessories, all doors and windows, wall and roof insulation with vapor barrier, and ventilation, as described in this specification and shown on the drawings. Provide all work in place, complete, for the Vic Firth Company (VFC) project in Newport, ME. The scope of work for the metal building manufacturer and their installation contractor DOES NOT include the following: Site improvements in and around the area of the building; Concrete foundations and grade slabs; Column anchor rods; Fire sprinkler system and feed water; Lighting and Electrical wiring. 2.0 Tentative Schedule Tentative Pre-Engineered Metal Building Schedule
Issue Bids 7843-001 Friday, October 19, 2018
Receive Bids Friday, November 7, 2018
Evaluate Bids/Award PO, on or before Friday, January 4, 2018
Selected Building Supplier/Erector to Provide Building Anchor Bolt Layout and Reactions to VFC/Mid-South Engineering (MSE)
Friday, January 25, 2019 (or sooner)
Detailed Shop Drawings of Metal Buildings to MSE Friday, March 1, 2019
Metal Buildings delivered to Jobsite Friday, May 3, 2019
Buildings Erected by Friday, August 30, 2019
Bidder to provide a detailed schedule including delivery of approval drawings, delivery of building components, and time for building erection on foundations. The building supplier will be required to schedule the building erection in collaboration with other trades to allow for building erection that minimizes the impact to other trades. 3.0 CODES AND STANDARDS A. The buildings shall conform to the International Building Code (2015 edition), to all applicable
local building codes, and to the MBMA "Metal Building Systems Manual", (2012 Edition). B. Manufacturer shall be IAS AC472 accredited.
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 2 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
C. All structural steel sections and welded plate members shall be designed in accordance with the AISC "Steel Construction Manual", latest edition.
D. All light gauge, cold-formed structural members and coverings shall be designed in accordance
with AISI "Specifications for Design of Light Gauge, Cold-Formed Steel Structural Members", (latest edition).
E. AISC "Specifications for Structural Joints Using ASTM A325 or A490 Bolts”, (latest edition). F. AWS D1.1 Structural Welding Code, (latest edition). G. All work shall conform to OSHA standards. 4.0 SUBMITTALS A. General All metal building drawings and data submitted shall be designed by or under the supervision of
the Vendor’s qualified engineer registered in the State of Maine. All drawings and data shall have signature, date, and stamp of the registered engineer responsible.
B. Schedule Refer to section: 2.0 Tentative Schedule C. Building reactions and anchor rod layout drawings shall be submitted as one package. Reactions
shall include all necessary foundation anchorage loads, in combinations specified herein, that are required for the steel building and components and to be used for foundation design by others. Individual load case reactions shall also be tabulated. Reactions shall be appropriately referenced by building component and sign convention used. Anchor rod layout drawing shall include size, spacing, location and projection of all anchor rods required. Drawing shall also include size and location of baseplates or other steel bearing surfaces in contact with foundation.
D. All detailed drawings of the metal building system shall be submitted as one package. Drawings
shall consist of erection drawings, catalog cuts, shop painting and finishing specifications, window and door specifications, instruction manuals, manufacturer's recommended erection methods and procedures, and other data as necessary to clearly describe material, sizes, layouts, construction details, fasteners, and erection. Manufacturer's recommended erection methods and procedures shall describe the basic sequence of assembly, temporary bracing, shoring, and related information necessary for proper erection of the metal building including its structural framework and components.
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 3 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
5.0 DELIVERY OF MATERIALS Materials shall be delivered, stored, and handled so as to prevent any damage by water or breakage. All galvanized or painted materials, i.e., roofing, sheeting, wire bracing etc., shall be stored under roof to prevent corrosion. All insulation and other materials that are subject to rain damage shall also be stored under roof. The Owner will make adequate lay down and staging area available to the erector. Details of access and lay down areas shall be finalized at the pre-award conference. 6.0 MATERIALS A. The buildings shall be designed, fabricated, and erected to be weathertight. B. The buildings shall conform to the following general criteria:
1. All buildings shall be furnished with trim on gables, eaves, and corners. 2. All windows, doors, framed openings, and ventilation units as indicated on the drawings
shall be furnished with this package, unless otherwise noted. Currently, ventilation for the boiler building has not been designed and is not included in this RFQ. The owner will purchase the ventilation louvers and fans and will supply them to the contractor for installation. Mid-South will advise the selected supplier as to size and location of louvers once certified drawings are received from the successful contractor. The contractor will provide a cost to install at that time.
3. The building manufacturer shall provide base plate size, anchor bolt location drawings,
and building reactions. 4. Bolts, Nuts and Washers - High strength bolts, including nuts and washers, shall conform
to ASTM A325 or ASTM A490. Plain washers, other than for high strength bolts, shall conform to ANSI B27.2. Bolts for purlins and girts, and other bolts so designated on the drawings shall conform to ASTM A307, Grade A.
5. Welding Materials – Welding materials shall be the type required for materials being
welded and shall conform to AWS D1.1. Welding electrodes shall be E70XX. C. The following building nomenclature will be used throughout:
1. The "width" and "length" of the building shall be as shown on the drawings. 2. The "eave height" of the building shall be measured from the top of slab at the sidewall
columns to a line approximately to the top of the "eave strut". 3. The "bay spacing" shall be from centerline to centerline of the main support columns.
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 4 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
D. Structural Steel Design
1. All live loads, wind, and seismic loads shall be as required by the International Building Code (2015 edition) and the American Society of Civil Engineers (ASCE).
2. All buildings shall be designed according to the load combinations set forth in the
MBMA “Metal Building Systems Manual”, (2012 edition) and any other combinations specified in the governing building code.
3. Additional loads are as specified herein and on the drawings. Load combinations shall
be as specified in the International Building Code. 4. Loads not accounted for in the codes that shall be included in the design of the building
are as follows: All buildings shall be designed for a Collateral Load of 10PSF. This load is to account for
lighting, sprinklers and piping. 5. Building Risk Category II for Boiler Building and for Raw Material Handling Dock Building 6. Building Risk Category I for Lumber Storage Building 7. Snow and wind load design shall consider exposure Category C. 8. Importance factor for snow, seismic and wind shall be 1.0 for the Category II buildings. 9. Importance factor for snow and seismic shall be 0.8 and wind shall be 1.0 for Category I
buildings. 10. All columns shall be designed as pinned base.
11. The collateral load is not to be used to resist uplift. 12. Tributary area roof live load reduction is not allowed. E. Structural Framing
1. All framing members shall be shop fabricated for field bolted assembly.
2. Primary Framing a. All rigid frame and modular frame members shall be either hot rolled mill
sections or welded, built-up "I" shapes. b. All primary framing shall receive one (1) shop coat of red rust inhibitive primer,
applied at 3.0 – 4.0 mils DFT, Sherwin Williams, Steel Spec Universal B50 AV 8431 or equal.
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 5 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
3. End wall Framing End wall framing shall consist of columns at building corners, interior support columns,
and continuous or simple span rafter sections, unless otherwise specified on drawings. 4. Secondary Framing a. Roof purlins shall be cold-formed "Z" sections of necessary depth and gauge to
support the specified design loads. b. Eave struts shall be cold-formed, unequal leg "C" sections of sufficient depth
and gauge to support both roof and wall loads at the building eave. c. Wall girts shall be "Z" or "C" sections of sufficient depth and gauge to support
the specified design loads. d. The sheeting attachment at the base shall be an angle of unequal legs of
necessary gauge and size to provide a positive bolt connection. e. All secondary framing shall receive one (1) shop coat of red rust inhibitive
primer, applied at 3.0 – 4.0 mils DFT, Sherwin Williams, Steel Spec Universal Primer, B50 AV 8431 or equal, or galvanized finish (preferred) if standard per manufacturer.
5. Wind bracing, where required, shall be threaded rods fabricated of materials of
adequate strength, with capability of being adjusted as necessary. F. Roof and Wall Covering 1. Roof and wall panels shall be precision roll-formed. 2. Wall panel material shall be ribbed panel, (Alliance SBS ‘R’ panel profile or equivalent)
26 gauge minimum or thicker galvalume, per ASTM specification A653, and painted with metal panel coating system per manufacturers standards. Interior and Exterior face color shall be a standard manufacturer color. Color charts for both interior and exterior options shall be supplied with proposal for review and selection by owner.
3. Roof panels shall be 24-gauge minimum or thicker galvalume. Ribbed panel (Alliance
SBS ‘PBR’ profile or equal). All roof systems shall be screw down, ribbed panel, exposed fastener, with galvalume finish.
4. For exposed fastener roof and wall panels, self-tapping panel fasteners shall be No. 14,
Type “A”, hex head, stainless steel screw with bonded neoprene seal washer factory assembled.
5. Sealer for roof sidelaps and endlaps shall be per-formed tape mastic, and/or non-
skinning tube sealants. Tape mastic shall be pre-formed butyl rubber-based compound, which is non-hardening, non-corrosive to metal and shall have excellent adhesion
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 6 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
properties. Tape mastic shall be white or light grey in color. Tube sealant shall be a synthetic elastomer-based material, grey or bronze. The sealer shall be non-asphaltic, non-shrinking, non-drying, and non-toxic. Adhesion to metal, plastic, and painted
surfaces shall be superior from -10F to 140F. Flash point shall be at least 300F and
shall not flow at 200F. G. Flashing Closures and Trim
1. Flashing and/or trim shall be provided at the rake, corners, eaves, framed openings, and wherever necessary to provide a "weathertight" building and a finished appearance.
2. Flashing and/or trim shall be formed from factory painted materials. Rake and eave
trim, or gutters, shall be furnished in Owner selected color. Trim on corners, framed openings or other openings in wall shall be furnished in the same color as the wall material.
3. Solid or closed cell rubber or neoprene closures, pre-formed, and shall be provided at
rake, eave, ridge, and roof to wall flashing when required to ensure weather tightness. 4. Thermal break at purlins shall be provided if noted on drawings.
5. Flashing shall be 24-gauge steel sheet galvanized and painted to match building siding or trim. Ridge caps and corner trim shall be one-piece die formed panels, all comparable with the cladding type.
H. Accessories 1. Insulated Hollow Metal Swing Doors a. Door leaves shall be 3’-0” x 7’-0” x 1-3/4" thick, full flush, fabricated from 20
gauge, 1.25 ounces per square foot hot dip galvanized, mill bonderized steel sheets. Jamb extensions shall be furnished where required to provide secure attachments to the wall framing.
b. Doors shall be furnished with lever handles, satin chrome finish and industrial
hydraulic closer, unless noted on drawings. Provide locksets on all exterior doors. Doors to be keyed alike. Door handles are to be approved by owner.
c. Doors shall have full safety glass light panel on upper half of door. d. Doors shall be insulated. e. Each door leaf shall swing from three (3) 4½" x 4½" galvanized steel, inter-
locking, template butt hinges. f. Door leaf and frames shall be shop painted with one (1) coat primer and one (1)
finish coat. Finish color to be determined by Owner.
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 7 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
g. Fire rated doors shall be provided as indicated on the included drawings and shall be in accordance with NFPA 252 fire protective standards (45 minutes and under ratings) and ASTM E119/NFPA 251 fire resistive standards (over 45 minutes).
2. Overhead Doors Reference drawings for door locations and sizes. 4. Windows Reference drawings for window locations and sizes. Windows shall be metal framed,
double hung and have low-E glass. 5. Gutters and Downspouts None Required 6. Insulation
Metal Building Insulation for the boiler building shall be vinyl backed condensation control blanket of sufficient thickness to provide a minimum “R” value required to provide a vapor barrier to protect metal roofing and siding. The (white) vinyl backing shall provide a permeability of 0.02 perms or less when tested in accordance with ASTM E 96 with a flame spread rating of less than 25 when tested in accordance with ASTM C 84. Insulation shall conform to ASTM C 665, Type II, Class A or Type III, Class A.
7. Ventilators Exhaust fans, gravity ventilators, and louvered vents shall be as specified on the
drawings and shall be of size and type shown on the drawings (Later-Reference 6.0-B-2 Above). Color and final paint coating or finish to match siding color or to be selected by the Owner. Owner to supply components for installation by contractor.
I. Building Anchorage and Foundations The building anchor bolts and related anchorage shall be designed to resist the column reactions
resulting from the specified loads as applied in the specified loading combinations. The sizes and design shall be as specified by the building manufacturer. All required anchor bolts will be supplied by others. Refer to drawings for any unique connection circumstances such as extending or attaching to equipment columns or steel structure supplied by others.
J. Grout Contractor to advise if grout is required under column base plates. If grout is required, a
maximum of 1” grout allowance to be assumed.
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 8 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
7.0 ERECTION A. Contractor responsible for erection all items. B. Exercise care with all items to avoid damaging either materials or finishes. C. Provide all bracing, temporary bracing and accessories required for proper and complete
erection of work. Safety and adequacy of temporary bracing are the responsibility of the Contractor.
D. Set all steel plumb, level, and properly spaced at correct elevations. E. Erection tolerances shall be in accordance with AISC "Code of Standard Practice for Steel
Buildings and Bridges". 8.0 WARRANTY A. Bids shall include a written warranty against defects in workmanship and materials for a
minimum of the following: 1. A one (1) year workmanship warranty against failures caused by faulty erection. 2. A two (2) year materials and workmanship warranty against failures.
3. Provide manufacturer’s written weather tightness warranty for five (5) years against leaks in roof panels arising out of or caused by ordinary wear and tear under normal weather and atmospheric conditions.
4. Provide manufacturer’s paint film warranty for twenty (20) years against cracking,
peeling, chalking, and fading of the coating on painted wall panels, painted roof panels, and soffit panels. Manufacturer warrants that coating shall not peel, crack, or chip for twenty (20) years. For a period of twenty (20) years chalking shall not exceed #8 per ASTM D4214 and fading shall be 5 color difference units or less per ASTM D2244.
B. Any defects, leaks or other deficiencies appearing within this period of warranty shall be
immediately repaired at no additional cost to the Owner. C. Any materials damaged during shipping or erection to render it structurally unsound or unsightly
shall likewise be replaced at no additional cost. 9.0 SPECIAL INSTRUCTIONS A. All bids shall be submitted on the enclosed Bid Form with attachments, if necessary. B. The enclosed drawings are for BIDDING PURPOSES ONLY. C. The successful bidder shall have access to power as necessary for completion of the erection of
the buildings.
Pre-Engineered Metal Building 10/30/2018; Rev-1
Vic Firth Company Page 9 of 9
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
D. Building erection is to be done with appropriate tie-off per OSHA requirements. E. Manlifts and truck cranes required for erection are to be part of the successful bidders’ s supply. F. Building lighting, electrical, etc. will be provided by others. 10.0 BID REMOVAL OPTION The Owner reserves the right to remove any or all of this section from the bid package.
Drawing List 30-Oct-2018; Rev-1
Vic Firth Company Page 1 of 1
Mid-South Quotation Request 7843-006 for Pre-Engineered Metal Building
Drawing Number Rev. Rev. Date Drawing Title
7843-1000-01-AR001 F 10/19/2018 Building Layout
7843-1000-01-AR007 D 10/19/2018 Partial Building Layout Boiler House
7843-1000-05-ST001 A 10/30/2018 Isometric View
7843-1000-05-ST002 A 10/30/2018 Plan View
7843-1000-06-ST001 A 10/30/2018 Elevation Views
7843-2020-01-AR001 B 10/30/2018 Plan View
7843-2020-01-AR002 B 10/30/2018 Section
7843-3010-01-AR001 B 10/30/2018 Boiler Building Plan
7843-3010-01-AR002 B 10/30/2018 Boiler Building Elevators