bide ford

Upload: amiraivanho

Post on 16-Jul-2015

32 views

Category:

Documents


0 download

TRANSCRIPT

PF

PDTy pe Parking Schedule Count Ty pe Comments 482 48

LS LSPF

D

LS

LS

LS

D

LS

LS LS

4800 x 2400mm - 90 deg BD-Parking Space - ADA

F LSPD

D

PD PF

PF

PD

FPD

D

LS

PD

PF

PD

A

F

PF

LS

PB PB

LS

PB

PF

PB

LS

PB

LS

LSPBPlanting Schedule Ty pe Mark Ty pe Populus Nigra Italica 32' Betula Pendula - 3 Met ers Ty pe Comment s Lombardy Poplar European Birch 17 Count Description

H

H

H

H

H

PB

PA

PB

7

PD

PF

Populus Lombardy Nigra Italica Poplar - 3 Met ers Quercus Black Oak Velutina - 3 Met ers

8

8

Site Plan

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 500

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL SITE PLAN DRAWING NO. L.01.01 REV

L.04.99 4.99 NORTH 2 2 L.04.99 4.99 NORTH 1 1 L.04.01 NORTH 1

2 L.03.03

3 L.03.03

1

2

3

4

5

6

7

8

10

11

12

13 14

15

16

17

18

19

20

21 22

23

24 25

26

27

28

29

30

M1 L.03.03

M

91 L.03.02

1SD8 SD9

2 L.03 .04

10

D20

L.03.04

L

1 L.03 .02

L

8K

SD7

SD10

11

D21

K47

7JD8 D7 D9 D6 D12

SD6

SD11

12D2 3 D2 6 D28 D2 9

D22

D24

1 L.27.13D25

J

D10

D11

SD5 D13

SD12 D27

D30

H18

1

2

3

4

6--SD31

16 15

17

18

19

20

21

4

L.04.98 1

5

22

H4.98 EAST 7 L.04.98

1

L.27 .15SD32

G3 L.03 .02 2 L.03 .02

2SD1 SD2 SD3

--SD30 SD29 SD28 D2 SD27 SD23 D4 SD22 SD21 SD20 SD19 SD18 SD17

2 L.03 .02

3 L.03 .02

EAST 1

F E

L.31.50

1

L.31.50

1

D1

SD4

SD13

D3

SD14

SD15

SD16

SD39

G2 L.04.03 3 1

-

L.31. 100

F E

L.04.02

SD26

SD25

SD24

18

1 L.31 .54

23D

D3

35 38 37 36 34 33

1 L.27 .09 ---

1 L.27 .08

39C1 B1 L.04.200

L.0 3.2 02

32

31

30

29

28

27

26

25

24C B1 B

2 L.0 3.2 04

B

A

D50

D49

D4 8

48

D46

D45

D44

D43

D42

D41

D40

D39

D38

D37

A

1

1

99070 L.74.01 990 70 A. 21. 23

1

2

3

4

5

6

7

8

9

10

11

12

13 14

15

16

17

18

19

20

21 22

23

24 25

26

27

28

29

30

2 1 L.03.03 L.03.03 3 L.03.03 1 L.03.04 2 L.03 .04

SOUTH 2 L.04.01

4.99 SOUTH 1 3 L.04.99

4.99 SOUTH 2 4 L.04.99

Main - Floor Plan

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 250

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL G.A. FLOOR PLAN DRAWING NO. L.02.01 REV

L.04.99 4.99 NORTH 2 2 L.04.99 4.99 NORTH 1 1 L.04.01 NORTH 1

2 L.03.03

3 L.03 .03

1

2

3

4

5

6FABRIC CANOPY

7

8

9

10

11

12FABRIC CANOPY

13 14

15

16

17

18

19

20

21 22

23

24 25

26

27

28

29

30

M1 L.03 .03RW O

1 L.03 .04

2 L.03 .04

1 L.03.02FALL . . FALL

1 L.03 .02FABRIC CANOPY FABRIC CANOPY

L

ZONE 2B

RWO

K

O/FLOW CENT RED BETWEEN EAVES BRACKETS

O/FLOW CENT RED BETWEEN EAVES BRACKETS

FALL ARREST SYSTEM TO RUN FULL LENGTH OF RIDGE LINE

FALL ARRE ST S YS T EM T RUN O FUL LENG OF FALL LI NE L TH

FALL ARRE ST SYS T EM T RUN O FULL LE NGT OF RIDGE LI NE H

FALL

FAB RIC CANOPY

FAB RIC CANOPY

FA LL

FA LL

J

4.98 EAST 7 EAST 1

H. FALL ARREST S YS T M T RUN E O FULL LENGT OF RI DGE LINE H

L.04.98

.

FALL GLAZED MALLROOFLIGHTS o

FALL

G2 L.03 .02 3 L.03 .02

.

.

2 L.03.02

3 L.03 .02ZONE 1 ZONE 2A ZONE 3 GLAZED MALL ROOFLIGHTS

F E

L.04.02

FALL ARREST SYSTEM TO BE FIXED THROUGH MEMBRANE INTO STEEL STRUCTURE

.

DNSERVICE WALKWAY ZONE

1 3 L.0 3.202FALL FALL

1 L.27.08

1 L.31.54HANDRAIL TO STEP IN ROOF SINGLE PLY MEMBRANE TO VERTICAL SSURFACE OF STEP NOM. 1200 HIGH FALL ARREST SYSTEM TO RUN FULL LENGTH OF RIDGE LINE FA LL

.

L.27.09 ---

D

2 L.0 3.204

FALL ARREST SYSTEM TO BE FIXED THROUGH MEMBRANE INTO STEEL STRUCTURE

C B1 B

ROOF ACESS/ ESCAPE POINT

A1 99070 A. 21. 23

1

21 L.03 .03

3

4

5

6

7

8

9

10

11

12

13 14

15

16

17

18

19

20

21 22

23

24 25

26

27

28

29

30

2 L.03.03 3 L.03 .03 1 L.03 .04 2 L.03 .04

SOUTH 2 L.04.01

4.99 SOUTH 1 3 L.04.99

4.99 SOUTH 2 4 L.04.99

L02.02 Main Roof PlanREVISION DATE COMMENTS AUTHOR/CHECKED

SCALE 1 : 250

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL ROOF PLAN DRAWING NO. L.02.02 REV

3 L.03.03

2

1

2

3

4

5

6

L.03 .03

7

8

9

10

11

12

13

14

13301

3744

2010

7056

2038

3839

13572

1 99070 A.28.10

M

7198

9

SD8

SD9

10

D20

1 L.03 .02 1 L.03.03

250

L

1 L.03.02

7250

84996 1840 1618 1840 7681 1840 3409 1840 436

SD7

SD10

11

D21

INTERNAL MALL

Elevation 15 - a

250

K

-

-

7

D22 SD11

7250

SD6

12D23 D24

1

2000

250

L.27 .13

D26

D25

2

L.04.202 SD5 SD12

D28

D29

D30

1H

2

3

13 6

D27

7298

250

7250

250

7250

250

2749

250

4

151 L.27.15

SD31

SD32

G.4 GSD12 L.31 .50

SD2 2 L.31.100

SD3

D1

SD4

SD13

D3

F2 L.03 .02

INTERNAL MALL

1 L.27.122 L.03.02

SD30

SD29

SD28

D2

SD27

SD23

D4

E D.7SD26 SD25 SD24

D.6 D.5

39P D

38

37

36

1

35

34

33

L.27 .09

32

31

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

1

1

L.03.03

2

3

4

5

6

2 L.03 .03

7

8

93 L.03.03

10

11

12

13

14SCALE 1 : 100 TITLE CLOVELY ROAD BIDEFORD

1

L.04.200

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL MAIN BUILDING DETAILED FLOOR PLAN SHEET 1 OF 4 DRAWING NO. L.02.10 REV

Q1

1

2

3

4SD31

6

1 L.27 .15

15SD32

G.6 G.5

G.4 G2 L.31 .50

-

SD1

SD2 2 L.31.100

SD3

D1

SD4

1 L.27.122 L.03.02

F2 L.03 .02

SD30

E D.7

SD29

SD28

D2

SD27

SD26

SD25

SD24

D.6 D.51 L.27.09

P D

35 39 38 37 36

34

33

32

31

C

B1

1

L.04.200

N B

D50

D49

D48

A

1

2

3

4

5

6

7

8

9

10

11

12

13

14

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 100

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL MAIN BUILDING DETAILED FLOOR PLAN SHEET 2 OF 4 DRAWING NO. L.02.11 REV

1 L.03 .04

K

J

16

17

18

19

20

21

H Q1 G.6 G.5 G.4 G

F

2

L.04.03 3

E D.7 D.6 D.51 L.27.08

D

30C

29

28

27

26

25

B1

B

3 4 99070 L.74.01 2

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

A1 990 70 A. 21. 23

SCALE 1 : 1001 L.03 .04

TITLE CLOVELY ROAD BIDEFORD

13

14

15

16

17

18

19

20

21

22

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL MAIN BUILDING DETAILED FLOOR PLAN SHEET 3 OF 4 DRAWING NO. L.02.12 REV

2 L.03.04

K

J

4

L.04.98

5

H Q1

22G.4 G

F

23 L.03 .02

L.04.03 3

13 L.03.02

E D.7

1 L.31 .54

D

23

24C

B1

B

REVISION3 99070 L.74.01

DATE

COMMENTS

AUTHOR/CHECKED

ASCALE 1 : 1001 99070 A. 21. 23 2 L.03.04

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL MAIN BUILDING DETAILED FLOOR PLAN SHEET 4 OF 4 DRAWING NO. L.02.13 REV

21

22

23

24

25

26

27

28

29

30

A8033 8106 606 1875 1875 1875 1875

N

L.04.201 21852 1920 1920

WEST11250 7478 1853 1875 1875 1875 1615 2173 4206

P609

Q1845 1875 1875 1875 1875

R1875

L.04.2031875

WEST1875

K1875 1875 1875

S825

2

1875

19

197775 7400

192700 945

401875

826

951

96

933662

1875

1875

32

19

6576

4374

5982

5982

1875

1875

1875

CJ

950

1810

4229

STORE2000CJ CENT ERED OVER DOOR

81810

1875

1875

1875

7

382 910

97 41600

411875 1875 1875RENDER RETURNS AROUND JAMB

1875

1010 300

150910

1

1875

1875

MEETING

CONTROL

CJ ON C/L OF GRID

9 OFFICE (OPEN PLAN) 6

5

31110

21110 1875

41

1875

1875

1875

6672

291875 1875

6672

COPY1900

M EETING2600

19

3200

2400 1875T ANK CJ

2 L.03.202

NOT PART OF KIER CONTRACT

1875

1875

1875

NORTH

SOUTH

27076

4326562

1875

1875

CUSTOM ER INF ORM ATION

4660

SHOWER / W.C.

REST

98

43 NORTH35626

1875

1875

1875

L.04.200

FOODCOURT1875 1875 6562

30

1875

SOUTH

35666

CJ

143.500 F.F.L.

1

L.04.201

1875

1875

CAF E

1875

L.04.202 11875

143.500 F.F.L.

1

L.04.203

1875

1875

1875

1873

1875

17402

4529050

1875

451875CJ

1

1875

1877

L.03.202

7376

1875

1875

36FULL HEIGHT ST UD PART ITION

1875

T .O. WALL 145.515

7376

1875

FULL HEIGHT ST UD PART ITION

1031875 1875PUMP AREA

1875

541

1770

9955

1010

1343

1420

1351

1022

6930

1875

1022

47

136800 2042 3611

3750

1875

211982 2140

47991875CJ ON C/L OF PANEL

1875

1572

181875 5805 3024

2140

1875

TI MBER PANELLIN G 8496

1875

1875

1351

1514 700 700

4910

1351

1489

860

4050

1413 700 700

SWITCH

1875

1875

1875

1874

1893

4790

2380 2152 228

1869

3620

1875

1875

705

2132

1834

2090

1974

1790

862 L.03.204

LOW LEVEL

4417

4717

1002

CJ

CJ

606

1875

1875

1875

1875

1512

1875

1875

1875

1875

1875

1875

3

1875

1045 832 1875 1875 6457 1875 1875 1875 1875 3750 1875 1875 1875 1875 2357 1875 910 1875 5058 1875 810

L.03.202

RENDER 8106

1 1 L.03.204 L.04.200

TI MBER PANELLIN G 15682

2

REVISION22282

DATE

CJ

49

431 948

DIS. WC

2125

4675

4303

1350

REST 105 106

SWTCH950

1875

20

19

FEM ALE TOILETS

1010

L.03.201

1490

1432 228

2151

3981

1413

1

11

17

15

MALE TOILETS

DIS. WC

6635

2045

2258

1600

12

1875

102

450 1200 508

8496

10

CJ

BABY CHANGE

8605

8117

STORE

DRIVER'S ROOM

SHWR / WC

CHARGE ROOM

3015

100

1875

1540

4029

2371

16

14

5365

NOT PART OF KIER CONTRACT

104

49

945

925

COMMENTS

AUTHOR/CHECKED

EAST

L.04.202

EAST

Amenities & Foodcourt Floor Plan

SCALE 1 : 100 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT GROUND FLOOR PLAN DRAWING NO. L.02.203 REV

FALL

FALL

FALL

FALL

ST ANDING SEAM ROOF

ST ANDING SEAM ROOF H31/ 112

FOR ROOF PI TCHES SEE ELEVA TIONS

FALL ARREST SYST EM TO BE SECURED T O ST ANDING SEAM ROOF

ROOF ACCESS ESCAPE POINT

ROOF ACCESS ESCAPE POINT

REVISIONENT RANCE

DATE

COMMENTS

AUTHOR/CHECKED

Amenities & Foodcourt Roof Plan

SCALE 1 : 100 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT ROOF PLAN DRAWING NO. L.02.204 REV

A

N

P

SUSPENSION SYST EM AS PER MANUFACT URERS REQUI REMENT S

METAL PROFILE ROOF ON UNSULATI ON SUPPORT ED BY PROFILED ME TAL DECKING

T.O. Wall 3600.000

LI NE OF CEI LING

2700

FIN. FL.

Level 1 0.000 T.O. Footing -660.000

ALL BLOCK WALLS GO FULL HEIGHT

SECTION A-A

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 100 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL FOODCOURT SECTION DRAWING NO. L.03.201 REV

P D.5 D.6 D.7Atrium Small 8598.311 T.O. Tall ColumnST ANDI NG SEAM ROOFI NG BULLNOSE FASCIA/ SOFFI T /EAVES FLASHING BY SPECIALIST

49

7484.000

ABULLNOSE FASCI A/SOFFIT /EAVES FLASHING BY SPECIALIST

1 A.27.201ST ANDI NG SEAM ROOFI NG ON I NSULATION AND PROFILED MET AL DECKING

NINSULAT ED VALLEY GUT TER

ST ANDI NG SEAM ROOFI NG

1 A.27.202RESOPLAN FASCIA

RESOPLAN FASCI AST EEL WOR K AT 5DEG PI TCH

PRESSED METAL VERGE FLASING

---

PURLI N ZONE

PRESSED MET AL SILL

T.O. Rafters 4150.000

RESOPLAN FASCIA

PRESSED MET AL SILL ST RUCT URAL ST EELWORK TO ENGI NEERS DESIGN4150 TO TOP OF RAFTERS AT VALLE Y

LAT TICE T RUSS TO ENGINEERS REQ.

1200

2FI XED LI GHT

RAKING RAFTERS

A.27.202

SUSPENDED CEILING (WHERE APPLICABLE)

EXTERNAL FINI SH VARIES (REFER T O ELEVAT I ONS)

--2700

EXT ERNAL FACING VARI ES (REFER TO ELEVS)3600

2700

INSULATION CAVI TY WALL CONST RUCT ION

FOLDI NG DOORS CHS COLUMN TO ENGINEERS REQ.

BRI CKWORK PLIN TH

---

BRICK PLIN TH

BRICK PLI NT H

Level 1 0.000 Amenities T.O. Footing -660.000

Amenities T.O. Footing -660.000

Amenities Typical Section

Amenities Typical Wall Section

Section A27.10F

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 50 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT WALL SECTIONS DRAWING NO. L.03.202 REV

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

Section B-B-1

30

29

28

27

26

25

24

23

22

21

20

19

18

17

16

Section B-B-213 12 11 10 9 8 7 6 5

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 100

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002

DETAIL GENERAL SECTION B-B AND C-C - SHEET 2 OF 4 DRAWING NO. L.03.02 REV

Section C-C

AUTHOR \ CHECKED Checker

K

J

H

Q1

G.6 G.5 G.4

G

F

E

D.7 D.6 D.5

D

C

B1

B

A

---

Section 1-1

M

L K J H Q1 G.6 G.5 G.4 G F E D.7 D.6 D.5 D C B1 B A

---

Section 2-2M L K J H Q1 G.6 G.5 G.4 G F E D.7 D.6 D.5 D C B1 B A

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

1 L.27.14

SCALE 1 : 100

TITLE CLOVELY ROAD BIDEFORD

Section 3-3

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL GENERAL SECTIONS 1-1, 2-2, AND 3-3 SHEET 3 OF 4 DRAWING NO. L.03.03 REV

K

J

H

Q1

G.6 G.5 G.4

G

F

E

D.7 D.6 D.5

D

C

B1

B

A

Section 4-4

K

J

H

Q1

G.6 G.5 G.4

G

F

E

D.7 D.6 D.5

D

C

B1

B

A

Section 5-5

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 100

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL GENERAL SECTIONS 4-4 & 4-5 - SHEET 4 OF 4 DRAWING NO. L.03.04 REV

FOODCOURT 1

2 L.03.202

NOT PART OF KI ER CONT RACT

1 L.03.202

FULL HEI GHT ST UD PART IT ION

FULL HEIGHT ST UD PART IT ION

1200 X 1200 ACCESS HAT CH ACCESS HAT CH T O BE COMPLETE WI T H RETRACT ABLE LOFT LADDER WI TH HANDRAI L

---

CJ CENTERED OVER DOOR

REVISIONRESOPLAN SOFFI T T O SOFFIT OE EXTERNAL TOILET ACCESS3 L.03.202

DATE

COMMENTS

AUTHOR/CHECKED

RECESSED DOWN LIGH TS (3NO) 2 TO M&E EI NGINEER'S REQ.L.03.204

SCALE 1 : 100

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT REFLECTED CEILING PLAN DRAWING NO. L.35.01 REV

Amenities & Foodcourt - RCP

DATE MARCH 2002 AUTHOR \ CHECKED Checker

30

29

28

27

26

25 24

23

22 21

20

19

18

17

16

15

14 13

12

11

10

9

8

7

6

5

4

3

2

1

NORTH ELEVATIONMATERIALS LEGEND 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 METAL STAN DI NG S EA M ROOFING STAINED TI MB ER FACING PANELLING STEEL OU TR IG GED CANOPY SUPPORTS PTFE COATE D FA BR IC SAIL CANOPIES TIMBER / G LA ZE D DOOR SETS SILICONE J OI NTED GLAZING STEEL / TI MB ER M AST STRUCTURES TIMBER / G LA ZE D PORTHOLE OPENINGS TIMBER / G LA ZED DISPLAY BOXES TIMBER / P AI NTED STEEL COLUMN SUPPORTS METAL PR OF IL ED VERTICAL WALL CLADDING ---STEEL RO LL ER S HUTTER DOORS FIRE ESCAP E / SE RV ICE DOORS RENDER ---TIMBER / G LA ZED DISPLAY WINDOWS SITE BOUND AR Y PL ANTING TO APPX. 6M HEIGHT ---POSSIBLE L OC AT ION OF FUTURE DOORS

L.04.99

KEY PLAN

4.99 NORTH 2 2

EAST 1 4.99 SOUTH 1 3 L.04.99

L.04.02

1

2

3

4

5

6

7

8

9

10

11

12

13 14

15

16

17

18

19

20

21 22

23

24 25

26

27

28

29

30

SOUTH ELEVATION

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE As indicated

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL NORTH & SOUTH G.A. ELEVATIONS DRAWING NO. L.04.01 REV

2

15

9

17

6

11

10

WEST ELEVATION

1 3 8

4 13 5 14 7

20

EAST ELEVATIONMATER IAL S LE GEN D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 MET AL STAN DIN G SE AM ROOF ING STA INE D TI MBE R FA CIN G PA NEL LING STE EL OUTR IGG ED C ANO PY S UPP ORTS PTF E C OATE D F ABRI C S AIL CAN OPIE S TIM BER / G LAZ ED D OOR SET S SIL ICO NE J OIN TED GLA ZING STE EL / TI MBE R MA ST STRUC TU RES TIM BER / G LAZ ED P ORT HOLE OP ENING S TIM BER / G LAZ ED D ISP LAY BO XES TIM BER / P AIN TED STE EL C OLU MN S UPP ORTS MET AL PROF ILE D VE RTI CAL WAL L CLA DD ING --- STE EL ROLL ER SHUTT ER DOOR S FIR E E SCAP E / SER VIC E DO ORS REN DER --- TIM BER / G LAZ ED D ISP LAY WIN DOWS SIT E B OUND ARY PLA NTI NG T O A PPX. 6M HEI GHT --- POS SIB LE L OCA TION OF FUTU RE DOOR S

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

L.04.99 L.04.99

KEY PLAN

4.99 NORTH 2 2 4.99 NORTH 1 1

SCALE As indicated

TITLE CLOVELY ROAD BIDEFORD

EAST

1 L.04.02

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL EAST & WEST G.A. ELEVATIONS DRAWING NO. L.04.02 REV

4.99 SOUTH 1 3 4.99 SOUTH 2 4 L.04.99

12

16

18

19

UNIT 22 & 23 ENTRANCEEAST ELEVATION

MALL ENTRANCE

WEST ELEVATION

MAT ERIAL S LEGEN D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ME TAL STA NDIN G S EAM ROO FING ST AINE D T IMBE R F ACIN G P ANEL LIN G ST EEL OUT RIGG ED CANO PY SUPP ORT S PT FE C OAT ED F ABR IC S AI L CAN OP IES TI MBER / GLAZ ED DOOR S ETS SI LICO NE JOIN TED GLA ZIN G ST EEL / T IMBE R M AST STR UCTU RES TI MBER / GLAZ ED PORT HOL E OP ENI NGS TI MBER / GLAZ ED DISP LA Y BO XES TI MBER / PAIN TED STE EL COLU MN SUPP ORT S ME TAL PRO FILE D V ERTI CAL WAL L C LADD ING -- -ST EEL ROL LER SHU TTER DO ORS FI RE E SCA PE / SE RVIC E D OORS RE NDER -- -TI MBER / GLAZ ED DISP LAY WIN DOW S SI TE B OUN DARY PL ANTI NG TO A PPX . 6M HE IGHT -- -PO SSIB LE LOCA TIO N OF FU TURE DO ORS

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 100

TITLE CLOVELY ROAD BIDEFORD

UNIT 24 ENTRANCENORTH ELEVATION

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL G.A. PIAZZA ELEVATIONS DRAWING NO. L.04.03 REV

40

41

43

46

47

49T.O. Rafters

1

4150.000

T.O. Wall9 3 9

3600.000 Level 1 0.000 T.O. Footing -660.000

4.200 FOODCOURT - SOUTH

MATERIALS LEGEND 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20T.O. Rafters1

A

N

P

METAL STANDING SEAM ROOFING STAINED TIMBER FACING PANELLING STEEL OUTRIGGED CANOPY SUPPORTS PTFE COATED FABRIC SAIL CANOPIES TIMBER / GLAZED DOOR SETS SILICONE JOINTED GLAZING STEEL / TIMBER MAST STRUCTURES TIMBER / GLAZED PORTHOLE OPENINGS TIMBER / GLAZED DISPLAY BOXES TIMBER / PAINTED STEEL COLUMN SUPPORTS METAL PROFILED VERTICAL WALL CLADDING ---STEEL ROLLER SHUTTER DOORS FIRE ESCAPE / SERVICE DOORS RENDER ---TIMBER / GLAZED DISPLAY WINDOWS SITE BOUNDARY PLANTING TO APPX. 6M HEIGHT ---POSSIBLE LOCATION OF FUTURE DOORS

4150.000

T.O. Wall 3600.0003 2 9 2

REVISIONLevel 1 0.000

DATE

COMMENTS

AUTHOR/CHECKED

4.200 FOODCOURT- EAST

SCALE 1 : 100 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT ELEVATIONS DRAWING NO. L.04.200 REV

49

47

45

44

41

40

1

T.O. Rafters 4150.000

T.O. Wall2

3600.000 Level 1 0.000 T.O. Footing -660.000

4.201 FOODCOURT - NORTH1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

MATERIALS LEGEND METAL STANDING SEAM ROOFING STAINED TIMBER FACING PANELLING STEEL OUTRIGGED CANOPY SUPPORTS PTFE COATED FABRIC SAIL CANOPIES TIMBER / GLAZED DOOR SETS SILICONE JOINTED GLAZING STEEL / TIMBER MAST STRUCTURES TIMBER / GLAZED PORTHOLE OPENINGS TIMBER / GLAZED DISPLAY BOXES TIMBER / PAINTED STEEL COLUMN SUPPORTS METAL PROFILED VERTICAL WALL CLADDING ---STEEL ROLLER SHUTTER DOORS FIRE ESCAPE / SERVICE DOORS RENDER ---TIMBER / GLAZED DISPLAY WINDOWS SITE BOUNDARY PLANTING TO APPX. 6M HEIGHT ---POSSIBLE LOCATION OF FUTURE DOORS

P

N

AT.O. Rafters 4150.000

T.O. Wall 3600.000

Level 1 0.000 T.O. Footing -660.000

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

4.201 FOODCOURT - WESTSCALE 1 : 100 DATE MARCH 2002 AUTHOR \ CHECKED Checker TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT ELEVATIONS DRAWING NO. L.04.201 REV

40

41

43

45

47

49

T.O. Rafters1 7 7

4150.000

4

4

T.O. Wall 3600.000

3 5 6 5 5 5 6 5

Level 1 0.000 T.O. Footing -660.000

MATERIALS LEGEND

4.202 AMENITIES - SOUTH

Q

K

ST.O. Rafters

1

4150.000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

METAL STANDING SEAM ROOFING STAINED TIMBER FACING PANELLING STEEL OUTRIGGED CANOPY SUPPORTS PTFE COATED FABRIC SAIL CANOPIES TIMBER / GLAZED DOOR SETS SILICONE JOINTED GLAZING STEEL / TIMBER MAST STRUCTURES TIMBER / GLAZED PORTHOLE OPENINGS TIMBER / GLAZED DISPLAY BOXES TIMBER / PAINTED STEEL COLUMN SUPPORTS METAL PROFILED VERTICAL WALL CLADDING ---STEEL ROLLER SHUTTER DOORS FIRE ESCAPE / SERVICE DOORS RENDER ---TIMBER / GLAZED DISPLAY WINDOWS SITE BOUNDARY PLANTING TO APPX. 6M HEIGHT ---POSSIBLE LOCATION OF FUTURE DOORS

T.O. Wall3 9 3 9 9 11

3600.000 Level 1 0.000 Amenities T.O. Footing -660.000

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

4.202 AMENITIES - EAST

SCALE 1 : 100 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT ELEVATIONS DRAWING NO. L.04.202 REV

49

47

45

43

41

40

T.O. Rafters1 7 7

4150.000

T.O. Wall9 3 8 3 11 9 3

3600.000 Level 1 0.000 T.O. Footing -660.000

4.203 AMENITIES - NORTH

MATERIALS LEGEND 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 METAL STANDING SEAM ROOFING STAINED TIMBER FACING PANELLING STEEL OUTRIGGED CANOPY SUPPORTS PTFE COATED FABRIC SAIL CANOPIES TIMBER / GLAZED DOOR SETS SILICONE JOINTED GLAZING STEEL / TIMBER MAST STRUCTURES TIMBER / GLAZED PORTHOLE OPENINGS TIMBER / GLAZED DISPLAY BOXES TIMBER / PAINTED STEEL COLUMN SUPPORTS METAL PROFILED VERTICAL WALL CLADDING ---STEEL ROLLER SHUTTER DOORS FIRE ESCAPE / SERVICE DOORS RENDER ---TIMBER / GLAZED DISPLAY WINDOWS SITE BOUNDARY PLANTING TO APPX. 6M HEIGHT ---POSSIBLE LOCATION OF FUTURE DOORS

S

K

Q

T.O. Rafters 4150.000

T.O. Wall3 11 3 11 9

3600.000 Level 1 0.000 T.O. Footing -660.000

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

4.203 AMENITIES - WEST

SCALE 1 : 100 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT ELEVATIONS DRAWING NO. L.04.203 REV

G.4

G

F

E

D.7

1500

7500

1500

MALL GLAZING STYSTEM AS H10/110 PROPRIETARY STANDING SEAM ROOF ON 80MM INSULATION ON PROFILED METAL DECKING TO STEEL FRAME GYPROC PLASTERBOARD FACE ON SW BATTENS TO LINE THROUGH WITH FACE OF ST EEL PRESSED MET AL GUTTER ON SW FASCIA T O SW BATTENS GYPROCK PLAST ERBOARD FACE ON SW FACIA TO SW BATTENS LINE OF MANSARD RIDGE SINGLE PLY ROOFING MEMBRANE AS J42/110

2 HR FIRE RAT ED SLAB ON PROFILED DECK

PROTRUDING SHOP MALL SIGNS 20MM PLYWOOD CONST RUCTION OVER SHOP SIGNABE PANEL UB TO ENGINEERS DET AILS - PAINTED WITH HAMMERITE (GREY) FINISH WITH WESTERN RED CEDAR / SS FACE FIXING FRONT PANELS 3600 12MM TOUGHENED GLASS SHOP FRONT TIMBER CASEMENTS REFER T O DRAWING L.31.100 AND A.32.01 FOR DETAILS BLOCKWORK/ENGINEERING BRICKWORK STALL RISER CONST RUCTION WIT H TIMBER CLADDING TO MALL FACE AS H21/110 AND PLYWOOD INTERNAL LINING

700

2600

5100

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 50

TITLE CLOVELY ROAD BIDEFORD

Section L27.08

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL SMALL ATRIUM DRAWING NO. L.27.08 REV

D.6

E

F

G

G.5

2750

3750

3750

2750

MALL GLAZING SYSTEM AS H10/110 PROPRIET ARY STANDING SEAM ROOF ON 80MM INSULATION ON PROFILED METAL DECKING TO STEEL FRAME GYPROC PLASTERBOARD GABLE END ON STUDS AT 600MM C/ GYPROC MF PLASTERBOARD SOFFIT SYSTEM GYPROC PLASTERBOARD FACE ON SW BATTENS TO LINE THROUGH WITH FACE OF STEEL PRESSED METAL GUTTER ON SW FASCIA TO SW BATT ENS SINGLE PLY ROOFING MEMBRANE AS J42/110

PROTUDING SHOP MALL SIGNS 20MM PLYWOOD CONSTRUCT ION OVER SHOP SIGNAGE PANEL UB TO ENGINEERS DETAILS - PAINTED WITH HAMMERITE (GREY) FINISH WIT H WESTERN RED CEDAR / SS FACE FIXING FRONT PANELS 12 MM T OUGHENED GLASS SHOP FRONT TIMBER CASEMENTS REFER TO DRAWING L.31.100 AND A.32.01 FOR DETAILS 5510 2HR FIRE RAT ED SLAB ON PROFILED METAL DECK

3600

2600

4092

BLOCKWORK/ ENGINEERING BRICKWORK STALL RISER CONST RUCTION AND PLYWOOD INTERNAL LINING

700

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

Section L27.09

SCALE 1 : 50

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL LARGE ATRIUM DRAWING NO. L.27.09 REV

J

H

Q1

G.6

G.5

G.4

G

MALL GLAZING SYSTEM AS H10/110 PROPRIETARY STANDING SEAM ROOF ON 80MM INSULATION ON PROFILED METAL DECKING AND STEEL FRAME GYPROC MF PLASTERBOARD SOFFIT SYSTEM

ENSURE CONTINUITY OF INSULATION AT WALL/ROOF JUNCTION GYPROC PLASTERBOARD INNER LINING TO GABLE END ON BYPROC METAL STUDS AT 600MM C/S PROFILED METAL CLADDING ON PURLINS TO ENGINEERS REQ. INSULATION BETWEEN PURLINS1 L.27.15

GYPROC MF PLASTERBOARD SOFFIT

SINGLE PLY ROOFING MEMBRANE

PLASTERBOARD SOFFIT ON BYPROC M/F SYSTEM

STEELWORK TO ENGINEERS REQUIREMENTS SS CORNER COLUMN CASING

TIMBER BOARDING TO BLOCKWORK ST ALL RISER

Section L 27.14

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 50

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL ATRIUM SECTION (THROUGH DROP BULHEAD) DRAWING NO. L.27.14 REV

G.5

G.4

G

F

E

D.7

D.6 1

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

31.50 ELEVATION

Section L31.50SCALE 1 : 50 TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL MALL ENTRANCE - ELEVATION AND SECTION DRAWING NO. L.31.50 REV

F

C

R J

H Q Q1

G.4 G

E D.7

B1

N B

P D

M

A180x180SHS

K

L S

180x180SHS 40 6 4 0 x1 6 x 78 1 7 x7 8x 4U 74 B U B 180x180SHS180x180SHS 305x165x40UB 305x165x40UB 180x180SHS 180x180SHS 180x180SHS

Main Structure - No Import180x180SHS610x229x113UB

1180x180SHS 610x229x113UB

cranked cranked cranked beam-mansard- north3 beam-mansard- north3 beam-mansard- north3

220 3x 20 3180x180SHS 305x165x40UB 305x165x40UB

20 3x 20 20 3x 20 3 x6 0U C7500

180x180SHS

x6 0U C610x229x113UB 610x229x113UB

3 x7 1U C

320 3x 20 3 20 3x 20180x180SHS7500

305x165x40UB

305x165x40UB

x6 0U C610x229x113UB

20 3x 20 3 x7 1U C 3 x6 0U C

203x133x25UB

305x165x40UB

305x165x40UB

180x180SHS 180x180SHS 180x180SHS

cranked 457x191x98UB beam-mansard- north3

420 3 x6 0U C 3 x6 0U C3000

3x 20

520 3x 207500

20 3x 20 3 610x229x113UB x6 0U 20 3x C 20 3 x6 0U C610x229x113UB 203x133x25UB 305x165x40UB 305x165x40UB

20 35 3x2 6 x 03 1 7 x7 1 1 20 x6 UC 3x 7U B 20 3 x7 1U C

610x229x113UB 2 20 3 50 3 3x 6 xx20 20 17 3 3 x6 1x x 71 610x229x113UB 0U 67 U 20 20 C U C 3x 3x B 20 20 3 3 x7 x6 1U 0U C C

cranked beam-mansard- north2

620 3x 20 3 3x 20 x2 03 x7 1U C x6 0U C7500

20 3 x7 1U C

20 3 20 3x 20 3

20

305x165x40UB

180x180SHS

x6 0U C610x229x113UB

3x 20

20 3 3 x6 0U C

x2 03

x6 0U C

20 3x 20

3 x6 0U C

610x229x113UB

610x229x113UB

610x229x113UB

610x229x113UB cranked beam-mansard- north2

305x165x40UB 305x165x40UB

720 3x 20 3 3x 20 3 x7 1U C305x165x40UB

20

180x180SHS

8610x229x113UB

x6 0U C

305x165x40UB

920 3x 20 3 20 3 x7 1U C 3x 20305x165x40UB 180x180SHS

20 3x 20 3 x7 1U 305x165x40UB 305x165x40UB 2 305x165x40UB C 20 03x 20 3x 20 3x 20 3x 20 7 3 3 x7 1U x7 1U C 1U C C254x146x37UB 305x165x40UB

20 305x165x40UB 20 305x165x40UB 2 0 3x 20 3x 3x 20 3x20 2 0 3x 20 3x 3 71 3 71 x7 U x7 U 1U C 1 UC C C

20 20 3x 3x 20 20 3x 3 71 x7 U 1U C C

305x165x40UB 305x165x40UB

10610x229x113UB

x7 1U C 20 3x 20 3 x7 1U C305x165x40UB

610x229x113UB cranked beam-mansard- north2

610x229x113UB

610x229x113UB

1120 3x 20 3 x7 1U C610x229x113UB 180x180SHS

20 3

20 305x165x40UB 203x2 3x 03 20 x 7 3 1 x7 U 1 UC C x2 03 x7 1U C203x133x25UB

305x165x40UB 20 2 0 3x 3x 20 2 0 3x 3 71 x7 U 1U C C

20 305x165x40UB 203x 3x20 203x 3 71 x7 U 1 UC C

20 203 x 3 x20 203x 3 71 x7 U 1 UC C

cranked beam-mansard- north2

1220 3x 20 3 x7 1U C180x180SHS

20

3x 20

20

3x 20 3 3 x7 x7 1U 1U C C

20 3x 20

20 3

x2 03 3 x7 x7 1U 1U C C

20 3x 20 3457x191x98UB

457x191x98UB

x7 1U C

20 3x 20

3 x7 1U C610x229x113UB

20 3x 20

3 x7 1U C

20 3x 20

3 x7 1U C

cranked cranked cranked cranked cranked cranked cranked beam-mansard- northbeam-mansard- northbeam-mansard- northbeam-mansard- northbeam-mansard- northbeam-mansard- northbeam-mansard- north

13 14180x180SHS

20 3x 20 3

20610x229x113UB

3x 20 x7 1U 20 C 3x 20 3 x7 1U C203x133x25UB

610x229x113UB 20 20 35 3x 3x 6 x 203 20 17 x 3 7 x7 3 5 1x 1U 610x229x113UB 1U 6 x 67 C 20 1 7 UB C 3x 1x 20 67 3 U x7 B 1U C 305x165x40UB 305x165x40UB 610x229x113UB 610x229x113UB

20

203x133x25UB

3x 20

3 x7 1U C

40 6x 17 8x 74180x180SHS

U B 3 x7 1U C

40 6x 4 0 1 78 6 x x7 1 7 4U 8x B 74 U B

40 6 4 0 x1 7 6 x 8x 1 7 74 8x U 74 B U B

15180x180SHS

20 3x 20 3203x133x25UB

20305x165x40UB305x165x40UB

3x 20203x133x25UB

180x180SHS

x7 1U C610x229x113UB

3 x7 1U C

610x229x113UB

16180x180SHS

20 3x 20 3203x133x25UB

20 3 x7 1U C610x229x113UB

305x165x40UB

305x165x40UB

203x133x25UB

x2 03

180x180SHS

x6 0U C

20 3x 20 3

20 x7 1U C610x229x113UB

3x 20

3 x7 1U C

17180x180SHS

20 3x 20 3203x133x25UB

180x180SHS

305x165x40UB

305x165x40UB

203x133x25UB

x7 1U C610x229x113UB

20 3x 20 3

20 x7 1U C610x229x113UB

3x 20

3 x7 1U C

40 6x 17 8x 74 U B

18180x180SHS

20 3 20 3x 20 3203x133x25UB

x2 03305x165x40UB

20 3x 207500

20305x165x40UB

180x180SHS

203x133x25UB

x7 1U C610x229x113UB

x6 0U C

3 x7 1U C610x229x113UB

3x 20

3 x7 1U C

40 6x 17 8x 7

4

U B

19180x180SHS

20 3 20 3x 20 3203x133x25UB

x2 03 x7 1U C610x229x113UB

180x180SHS

203x133x25UB

x6 0U C

20 3x 20 37500

20 x7 1U C

3x 20

3 x7 1U C

40 6x 17 8x 7

4

U B

20 3x 20 37500

20 3 x7 1U C

610x229x113UB

305x165x40UB 305x165x40UB

20180x180SHS

x2 03203x133x25UB

x7 1U C

20 3x 20 34500

20 x7 1U C

3x 20

25 4610x229x113UB

x2 54

20 3x 20 3203x133x25UB 180x180SHS

20 3 x7 1U C

x2 03

x8 9U C

20 3x 20 3

20

3 x7 1U C

21 22 23 24 25 26 27 28 29

x7 1U C x7 1U C8500

3x 20

3 x7 1U C

35 6x 17 1x 267 20 U 3 x 03x B 20 20 3 3 x x7 1U 71U C C

610x229x113UB

20 3 1 20 x1 20 1 20 x1 20 25 4x 25 4 S H S S H S 1 20 x1 20 25 4x 25 x8 9U C 25 4 4 x8 9U C

x2 03 x2 54

x7 1U C x8 9U C

25

4x 25

25 4 x8 9U C

4x 25

4 x8 9U C

25 4x 25

20 x1 20 4 S x8 H 91 S U2 Cx 0 12 0S H S 1 S H S 1 20 x1 20 1 20 x1 20 1 20 x1 20 1 S H S S 20 x1 20 S

1

H S 20 x1 20 S 1 H S S 1 20 x1 20 20 x1 20 S 1 H S 1 S H S 20 x1 20 S

H S H S

H S 20 x1 20 S

H S

SCALE

REVISION

DATE MARCH 2002

Checker S.01.01

1 : 200

1 20 x1 20

S

30

AUTHOR \ CHECKED DRAWING NO. REV

H S 25 4x 25 4

x8 9U C

25 4x 25

25 4x 25 4 x8 9U C

1 20 x1 4 20 x8 S 9U H S C

DATE

D.6 D.5

G.6 G.5

TITLE

DETAIL

COMMENTS

MAIN STRUCTURAL PLAN

CLOVELY ROAD BIDEFORD

AUTHOR/CHECKED

Structure - 3D View

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE

TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL 3D Main Structure DRAWING NO. S.01.03 REV

1

2REVISION DATE SCALE DATE MARCH 2002 AUTHOR \ CHECKED Checker

3COMMENTS AUTHOR/CHECKED TITLE CLOVELY ROAD BIDEFORD DETAIL Unnamed DRAWING NO. S.01.04 REV

A

TOILET EXTRACT TO DISCHARGE THRO' REAR OF MANSARD ROOF

OVERFLOW RWO TO EXTEND 30mm ABOVE ROOF DECK

---

RW OUTLET

TOILET EXTRACT

VERTICAL LADDER FRAME (UNISTRUT OR Si m.) TO SUPPORT PIPEWORK RW DOWNPIPE SOIL/VENT PIPE L ANGLE T O BE CUT TO ALLOW OVERFLOW TO PASS THROUGH DECK OVER WC TO BE CONSTRUCTED OF 225 x 50 SW JOISTS AT max 600 c/s WITH 19mm WBP PLY DECK OVER JOISTS SUPPORT ED ON HANGERS FIXED TO SW PLATE BOLTED TO WALL SOLID NOGGINS AT MID SPAN

HORZ. DISCHARGE PIPE ( Max 3No OUTLET S ) INTUMESCENT FIRE COLLAR WHERE PASSING THRO' COMPARTMENT WALL

OVERFLOW 60 DIA.

300 x 25 SW FASCIA JOISTS FIXED TO 100 X 50 SW PLATE SECURED TO WALL WITH GALV HOLDING DOWN STRAPS AT MAX 1500 C/S FOIL BACKED MOISTURE RESISTANT PLASTERBOARD CEILING. SOUND INSULATING QUILT BETWEEN JOISTS VENT. EXTRACT UNIT TO M/E ENGINEERS SPEC. SOIL/ VENT PIPE TERMINAT ION (AT L/LEVEL AIR ADMITTANCE VALVE OR AT H/LEVEL THRO ROOF) SUBJECT TO LOCATION. SEE DRAINAGE LAYOUT 100MM DENSE CONC BLOCK

DENSE CONC BLOCK INNER LEAF FOR WC DETAILS REFER TO DRWG 99070 L 74.01

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE

TITLE CLOVELY ROAD BIDEFORD

Section A21.23

1 : 20

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL TYPICAL SECTION THRO W.C. DRAWING NO. 99070 A.21.23 REV

GRID LINE

GRID LINE

PROPRIETARY STANDING SEAM ROOF ON 80mm THICK INSULATION ON PROFILED METAL DECKING ON STEEL FRAME TO ENGINEERS DESIGN SW BATTEN TO SUPPORT ROOF EDGE AND PROVIDE BEARING FOR GUTTER

PROPRIETARY STANDING SEAM ROOF ON 80mm THICK INSULATION ON PROFILED METAL DECKING ON STEEL FRAME TO ENGINEERS DESIGN SW BATTEN TO SUPPORT ROOF EDGE AND PROVIDE BEARING FOR GUTTER

GALV STEEL GUTTER PROFILED FIRESTOP TO TROUGHS OF DECKING TWO PIECE MS EAVES BRACKET GALV. FINISH CLOSE CAVITY SHAPED SW PLATE ( min 38mm ) TOP OF EAVES BRACKET

+4075

350 MASTERBOARD CAVITY CLOSER 615 RWP 100 120 140

STEEL EAVES BEAM TO ENGINEERS DETAILS SHS AT OTHER LOCATIONS SHOWN DOTTED HEAD RESTRAINT DETAIL TO ENGINEERS REQUIREMENTS MASTERBOARD CAVITY CLOSER 615 RWP

350 COVER FLASHING

MS EAVES BRACKET GALV. FINISH

PARTIAL FILL CAVITY INSULATION ENSURE CONTINUITY OF INSULATION AT EAVES RENDER FINISH ON BLOCK OUTER LEAF140

STEEL COLUMN

PROFILED METAL CLADDING ON PURLINS TO SPECIALISTS REQUIREMENTS

DETAIL AT RENDERED FINISHREVISION

DETAIL AT PROFILED CLADDINGDATE COMMENTS AUTHOR/CHECKED

EAVE DETAILSSCALE TITLE

1 : 10DATE

CLOVELY ROAD BIDEFORDDETAIL

MARCH 2002AUTHOR \ CHECKED

ROOF DETAILS - EAVESDRAWING NO.

?

A.27.02

REV

2 2STANDING SEAM ROOF AND INSULATION ON PROFILED METAL DECKING

PACK FIRESTOP MATERIAL INTO VOIDS OFDECKING SINGLE PLY ROOFING MEMBRANE TO HORIZONTAL SURFACES ON 65MM THICK INSULATION, ON VAPOUR CONTROL LAYER ON PROFILED METAL DECKING

25 GYPROC S FRAMELESS ENCASEMENT ON SW STUD FRAMING AT MAX 600 C/S TO PROVIDE 2HR FIRE RESISTANCE

25 GYPROC S FRAMELESS ENCASEMENT TO PROVIDE 2 HR FIRE RESIST ANCE 25 GYPROC S FRAMELESS ENCASEMENT TO PROVIDE 2HR FIRE RESISTANCE FILL VOID (NOM 60) WIT H DENSE MINERAL FIBRE FIRESTOP TO PROVIDE 2 HR FIRE RESISTANCE LEAVE NOM 30MM GAP BET WEEN BOARD AND MASONRY T O ALLOW FOR DEFLECTION OF BEAM

DENSE BLOCK PARTY WALL BETWEEN SHOP UNITS30 30

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

Section A27.10A

Section A27.10BSCALE 1 : 10 TITLE CLOVELY ROAD BIDEFORD

DATE MARCH 2002 AUTHOR \ CHECKED Checker

DETAIL ROOF DETAILS - FIRE STOP SEPARATION DRAWING NO. A.27.10 REV

A1500

EAVES CLOSURE AND FOAM FILLER

ST ANDI NG SEAM ROOFI NG ON I NSULAT ION AND PROFILED MET AL DECKI NG

PURLIN ZONE CONT I NUOUS DRI P RAI L AT FASCIA / SOFFIT CHANGE BULLNOSE FASCIA / SOFFI T / EAVES FLASHING BY SPECI ALIST

MS OUTRIGGERS FI XED TO ST RUCT URAL COLUMN / EAVES BEAM OUTRI GERS T O STRUCT URAL ENGI NEERS DESIGN

SHS EAVES BEAM

RESOPLAN FASCIA PANELS ON 38 THI CK SW VERT I CAL BAT T ENS TO FORM VENT ILATION VOID ON BREAT HER MEMBRANE ON 50 T HICK HORIZONT AL BAT T ENS WITH INSULATION BET WEEN ON 19MM SHEAT HI NG PLY ON CLADDING RAILS TO ENGINEERS DESIGN PRESSED MET AL SI LL ON SHAPED SW PLAT E (WEATHERED T O SHED RAIN WAT ER) BREAT HER MEMBRANE WITHI N FASCIA CONST RUCT ION T O BE DRESSED DOWN OVER VERT ICAL UPSTAND OF MET AL SILL

ST RUCT URAL ST EELWORK / PURLINS T O ENGINEERS DESI GN

MASONRY HEAD REST RAINT TO ENGINEERS REQUIREMEN TS

INSULATED CAVI TY WALL CONS TRUC TION (EXTERNAL FI NISH VARIES)

TYPICAL EAVES SECTIONREVISION DATE COMMENTS AUTHOR/CHECKED

SCALE 1 : 10 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT EAVE DETAIL DRAWING NO. A.27.201 REV

ST ANDING SEAM ROOFI NG ON INSULAT I ON AND PROFILED MET AL DECKING

PRESSED MET AL VERGE FLASHI NG BY SPECIALIST

PURLI N ZONE

ST RUCT URAL STEELWORK T O ENGINEER'S REQ.

MET AL SOFFIT BY SPECIALIST ENSURE CONT INUI TY OF INSULATION BET WEEN WALL AND ROOF RESOPLAN FASCI A PANELS FIXED TO 38MM THICK VERT ICAL BAT TENS WI TH 'SIKA-TACK' BONDING SYSTEM

VENT ILAT ED VOI D RESOPLAN FASCI A PANELS ON VERT ICAL BAT TENS ON BREATHER MEMBRANE ON 50,, T HICK SW HORZ. BAT TENS (WIT H INSULAT ION BETWEEN) ON 19MM SHEATHI NG PLY ON CLADDING RAILS TO ENGINEERS REQ. MI NIMUM SOFFIT HEI GHT

ST ANDING SEAM ROOFI NG ON I NSULAT I ON AND PROFILED MET AL DECKING

GALV. ST EEL I NSULATED GUT TER SUPPORTED ON PURLINS

EAVES CLOSURE FLASHI NG PRESSED METAL SILL ON SHAPED SW PLAT E TO ALLOW RAI NWATER RUN OFF

175

450

MASONRY HEAD RETRAIN T TO ENGINEER'S REQ. HORIZONT AL T IMBER CLADDING ON VERTI CAL SW BAT TENS (EXT ERNAL WALL FINI SH VARIES, REFER TO ELEVATIONS) INSULATED CAVI TY WALL CONS TRUCTION PURLI NS AND ST RUT URAL ST EELWORK TO ENGINEERS REQ.

GUTTER CROSS SECTION

VERGE DETAIL

REVISION

DATE

COMMENTS

AUTHOR/CHECKED

SCALE 1 : 10 DATE MARCH 2002 AUTHOR \ CHECKED Checker

TITLE CLOVELY ROAD BIDEFORD DETAIL AMENITIES & FOODCOURT ROOF DETAILS DRAWING NO. A.27.202 REV