BID FORM Arts and Humanities Renovation Project Muskegon Community College CONSTRUCTION MANAGEMENT FEE PROPOSAL DATE: Click here to enter text. 1. Using this fee proposal bid form state your compensation for your Construction Management services (including pre-construction involvement, starting with the beginning of design development in November 2016 through construction, as defined within this RFP). Exclusion, deviation from or alteration of this bid form and information requested as part of this proposal request may result in the rejection of your proposal. No exceptions can be taken to bid items. Should the construction scope of the project change, Muskegon Community College reserves the right to renegotiate the fee proposal with the selected CM/GC. a. Lump sum fee – Based on $7,500,000 construction project. (This fee is to include cost of corporate executives, principal in charge, project executive, general superintendent, project manager, accounting, scheduling, purchasing, system development, estimating, cost engineers, project coordinator, project expediter, safety office, general liability insurance, workers’ compensation insurance, FICA insurance, federal and state unemployment insurance, bid package and construction documents distribution, contractors’ licenses and any other overhead items as required and generally described in AIA document A133- 2009 CMC, Article 6). LUMP SUM FEE TOTAL (1a) $ Click here to enter text. b. Provide cost for performance and material and labor bond for the project based on a $7,500,000 construction cost. Attach documentation as part of your proposal certifying current bonding capability for the project. PLM BOND AMOUNT (1b) $ Click here to enter text. c. Identify the level of construction contingency to be carried for use by the CM/Constructor as part of the established GMP following the receipt of trade bids (non-inclusive of owner generated scope changes). Calculate this based on your proposed percentage level of construction contingency multiplied by $ Click here to enter text. (a common construction cost basis inclusive of fixed fees, all material and labor costs, construction contingency, and general condition items). The quoted percentages are subject to negotiation.

Upload: nguyenkien

Post on 30-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BID FORM Arts and Humanities Renovation Project … · BID FORM . Arts and Humanities Renovation Project . Muskegon Community College . CONSTRUCTION MANAGEMENT FEE PROPOSAL . DATE:

BID FORM Arts and Humanities Renovation Project

Muskegon Community College

CONSTRUCTION MANAGEMENT FEE PROPOSAL DATE: Click here to enter text.

1. Using this fee proposal bid form state your compensation for your

Construction Management services (including pre-construction involvement, starting with the beginning of design development in November 2016 through construction, as defined within this RFP). Exclusion, deviation from or alteration of this bid form and information requested as part of this proposal request may result in the rejection of your proposal. No exceptions can be taken to bid items. Should the construction scope of the project change, Muskegon Community College reserves the right to renegotiate the fee proposal with the selected CM/GC.

a. Lump sum fee – Based on $7,500,000 construction project. (This fee is

to include cost of corporate executives, principal in charge, project executive, general superintendent, project manager, accounting, scheduling, purchasing, system development, estimating, cost engineers, project coordinator, project expediter, safety office, general liability insurance, workers’ compensation insurance, FICA insurance, federal and state unemployment insurance, bid package and construction documents distribution, contractors’ licenses and any other overhead items as required and generally described in AIA document A133- 2009 CMC, Article 6).

LUMP SUM FEE TOTAL (1a) $ Click here to enter text. b. Provide cost for performance and material and labor bond for the project

based on a $7,500,000 construction cost. Attach documentation as part of your proposal certifying current bonding capability for the project.

PLM BOND AMOUNT (1b) $ Click here to enter text. c. Identify the level of construction contingency to be carried for use by the

CM/Constructor as part of the established GMP following the receipt of trade bids (non-inclusive of owner generated scope changes). Calculate this based on your proposed percentage level of construction contingency multiplied by $ Click here to enter text. (a common construction cost basis inclusive of fixed fees, all material and labor costs, construction contingency, and general condition items). The quoted percentages are subject to negotiation.

Page 2: BID FORM Arts and Humanities Renovation Project … · BID FORM . Arts and Humanities Renovation Project . Muskegon Community College . CONSTRUCTION MANAGEMENT FEE PROPOSAL . DATE:

CONSTRUCTION CONTINGENCY AMOUNT (1c) Click here to enter text.% x $Click here to enter text. = $Click here to enter text. 2. Identify percentage of mark-up on labor and materials for owner-generated

project scope changes. No mark-up will be allowed on other change order related items. The quoted percentages are subject to negotiation.

MARK-UP PERCENTAGE SELF PERFORMED WORK: Click here to enter text. % SUBCONTRACTED WORK: Click here to enter text. %

3. Complete a detailed, itemized listing/budget estimate for reimbursable

general condition items as defined in AIA document A121 CMC, Article 6 using the following general conditions chart/worksheet. The quoted estimate amounts are subject to negotiation. All costs related to main office (and branch offices), including management and support staff, insurance, overhead and profit, etc., in support of this project are to be included in your base fee. All other project expenses and costs will be included in the construction contract bid documents.

4. GENERAL CONDITIONS ITEMS ESTIMATE

Secretarial/Clerk Typist $ Temporary Fencing $

Builders Risk Insure $ Covered Walkways $

Postage & Express Costs $ Site Barricades $

All Other Reproductions $ Watchman Service $

Site & Building Testing/Inspection

$ Telephone Expense/Fax

$

Layout Engineer/Surveyor $ Electric Power Expense

$

Safety and First Aid $ Temporary Water $

Construction Trailers $ HVAC Energy Charges

$

Off-Site Storage $ Weekly Clean-Up $

Temporary Toilets $ Final Clean-Up $

Temporary Stairs/Elevator $ Dump Permits and Fees

$

Control Signs $ Debris Hauling/Removal

$

Page 3: BID FORM Arts and Humanities Renovation Project … · BID FORM . Arts and Humanities Renovation Project . Muskegon Community College . CONSTRUCTION MANAGEMENT FEE PROPOSAL . DATE:

Dust Control $ Temporary Road Installation

$

Snow Removal $ Roadway Maintenance

$

Project Signs $ Pick-Up/Fuel $

Schedules $ Final Glass Cleaning

$

Punch List $ As-Built Drawings $

Security Lighting $ Equipment Rental $

General Conditions Estimate Total $

Note:

1. CM is responsible for installing and making provisions for temporary power. Cost to be included in construction cost.

2. CM is responsible for installing and making provisions for temporary heat. Cost to be included in construction cost.

3. Builder risk insurance to be determined

4. Acknowledge receipt and adherence to any addenda issued during proposal process. Addendum No. Click here to enter text.

Date: Click here to enter text. Addendum No. Click here to enter text. Date: Click here to enter text.

Page 4: BID FORM Arts and Humanities Renovation Project … · BID FORM . Arts and Humanities Renovation Project . Muskegon Community College . CONSTRUCTION MANAGEMENT FEE PROPOSAL . DATE:

VI. CERTIFICATION We, the undersigned, understand that the above information, along with any additionally submitted, becomes part of any agreement subsequently made with the Owner, and we attest, to the best of our knowledge, to its accuracy. Signed: _______________________________ Title: Click here to enter text. Print Name: Click here to enter text. Date: Click here to enter text.