bid document provisions as at section ii - bidding data ... corrigendum solar... · bid document...
TRANSCRIPT
Addenda cum Amendment No.1 for tender issued Dt.29.12.2013 to ICZMP Odisha BID document for Procurement of ”60 KWP Solar Power Plant with SOLAR LED Street Lights and Related Services” at Barkul under ICZM Project of ICB No. .ICZMP/G/OTDC/05/2013-14
Amen
dment
Sl.No.
Bid document
Clause Reference
Provisions as at Section II - Bidding Data Sheet of
published bid document
Modification now made
I
Section VI
Schedule of
requirements
sr no.3
1. Technical Specifications:
1.Technical Specifications ,
Solar Panel Specifications(Poly Crystalline):
Solar Panels in this project should be 250Wp at STC.
Solar panels used in this project must comply to IEC 61215, 61730 part
1 & 2(Certificates must be submitted at the time of tender
submission.)
Solar panels used in this project must have efficiency ≥14%.
Solar cell efficiency should be more than ≥16%.
Particular Specificat
ions Solar Panel Wattage at
STC
250Wp
Type of PV Module Poly
Crystalline
Open Circuit Voltage of
each panel
42Vdc
Max mppt Voltage of
each panel
36Vdc
No of cells in each
panel
72 Cells per
panel
Total No of panels 10 No’s
Total Wattage 2500wp
Arrangement 2 Series 5
parallel of
series
1. GRID INTERACTIVE (50 KW) DRAWING NO.-PDC-1/14
SPV MODULE 1. The photovoltaic modules should be Mono / Poly
Crystalline with a total array capacity of 50.0 KW. Capacity of each module is 250 Wp/24 Volt.
Number of modules required: 200.
2. The Photovoltaic modules must be qualified as per IEC 61215 (revised) / IS 14286 standards and in addition, the modules must conform to IEC 61730-1 requirements for construction & Part-2 requirements for testing, for safety qualification. It should also confirm IEC 61701-Salt mist Test.
3. The PV modules must be tested and approved from any of the NABL/MNRE Accredited Testing Calibration laboratories.
4. The supplier shall provide performance Guarantee for the PV
ENERGY METER: The supplier shall provided the Energy meter with the system to know the units consumed from the system (export & import).
Remote access facility via telephone network PCU Specification: (1 + ONE STAND BY) 2 NOS.
PV modules used in solar power plants/ systems must be warranted
for their output peak watt capacity, which should notbe less than 90%
at the end of 10 years and 80% at the end of 20 years.
IDENTIFICATION AND TRACEABILITY
Each PV module used in any solar power project must use a RF
identification tag (RFID), which must contain the following
information. The RFID can be inside laminate, but must be able to
withstand harshenvironmental conditions.
(i)Name of the manufacturer of PV Module.
(ii)Name of the manufacturer of Solar cells.
(iii)Month and year of the manufacture (separately for solar cells and
module).
(iv)Country of origin (separately for solar cells and module).
(v)I-V curve for the module.
(vi)Peak Wattage, Im, Vm and FF for the module.
(vii)Unique serial No and Model No of the module.
(viii)Date and year of obtaining IEC PV module qualification certificate.
(ix)Name of the test lab issuing IEC certificate.
SPV panels must be warranted against any manufacturing/ design for
a minimum period of 5 years.
Specifications of Solar Power Conditioning Unit(PCU):
PCU should be MPPT type and its rating should be 3Kw .
50 KW inverter for 200 modules of 250 Wp to be incorporated
in DC side.
The specifications are as follows:
INPUT PARAMETERS
Input Voltage range 305-600 V Dc
Maximum array Input Voltage 600 V DC
Maximum Operating Input Current 172 ADC
Combiner Bus Bar Inputs 6
No. of inputs and fuses 4X80 A 5X63 A
Efficiency 96.4%
OUTPUT PARAMETERS
Nominal Power 50KW
Nominal Output Voltage 480 V AC
Output Voltage Range 422-526 VAC
Maximum output current per phase
60A
Stand by Consumption 76W
Maximum Harmonics Distortion <3% THD
Power Factor, Full Factor >99%
Dynamic Power Factor Control +/-0.8
Environment
Cooling Forced Air
Noise level <65 db (A)
Relative Humidity Upto 90%
HARMONICS ON AC SIDE:
Total Voltage Harmonics Distortion=5%
Individual Voltage Harmonics=3%
Total Current harmonics Distortion=8%
Data Logging: Computer Port: Isolated RS232 port.
Nominal System voltage should be 48Vdc
Specifications of Solar PCU
3000W
Solar
Solar charge Controller Type MPPT
Vmax range (Vdc) 50-79
Max Open circuit
Voltage(Vdc) 88
System Voltage(Vdc) 48
Max array capacity(Wp) 3000
Solar Charging Type
Boost and
Float, suitable
for Gel battery
System Operating
Modes/Priority
Solar>Grid>B
attery
Inverter
Rated Output power(Max) 3000W
Output Wave Form
Pure Sine
wave
Inverter Efficiency >85%
Output Voltage 230V±5%
Output Frequency 50Hz±3
Inverter Overload Capacity
150% for 4
Min, 125% for
4Min
Power factor >0.8 lag
THD <3%
Grid
Grid input voltage 165-265Vac
Grid frequency range 47-53Hz
Grid Charging Current 41A
Environmental
Operating temperature -5 to 45°C
Altitude <1000m
Relative Humidity
>95% Non
Condensing
Enclosure Body IP 20
Cooling Forced Cool
System Features:
Adjustable logging repetition from 1 sec to 60
second
Storage Capacity of up to 100 days with 5 sec
logs
Time & date stamped log entries
View & change system set point configuration
remotely
Bulk log download for data importation into a
spreadsheet where applicable.
Logging Attributes:
System summations
Site kWh
Inverter input & output kWh
Solar kWh System Parameters
Grid kW, voltage, pf, frequency
Inverter kW, voltage, pf, frequency
Ambient temperature
Solar Charge current
Solar Radiation
Junction Boxes:
The junction boxes shall be dust and water proof and
made of thermoplastic the terminals will be connected
to copper lugs of bus-bar of proper sizes. The junction
boxes will have suitable cable entry points fitted with
the cables. Suitable markings shall be provided on the
lugs or bus-bars for easy identification at cable ferrules
will be fitted at the cable terminations points for
identification. Each main junction box shall be fitted with
appropriate rating reverse blocking diode. The junction
GENERAL TECHNICAL PARTICULARS OF BATTERY BANK.
LOAD : 2 Tuble lights, 1 Fan, 4 Personal Computers, 1 Modem.
Battery is designed to proide 6 hours back up for above mentioned
load.
Charge and discharge of battery should lie in between 100% to 25%
.Remaining 25% should be always be inside battery .
Sl.
No Description Battery Details
1 Battery rating 48 V- 300 Ah at C10 to 1.80 ECV at
2 Type of Battery Tubular Gel Maintenance Free
Valve Regulated Lead Acid Battery
3 Model offered Tubular Gel type 2V 300Ah.
4 Cell capacity
300 Ah at 10 hour rate to 1.80 ECV
5 No of cells 24 cells
6 Applicable standards IEC 60896 – 21 & 22, IEC 61427,DIN
43539 P5
7 AH Efficiency > 95%
8 WH Efficiency > 85%
9 Self discharge < 0.5% per
10 Design float life 20 years design life at 27°C
11 Design cycle life 2100 Cycles at 80% depth of
discharge at 35°C
boxes shall be of reputed make. The junction Box should
confirm IP:65
The junction boxes shall have suitable arrangement for
the following:
a) Combine groups of modules into independent
charging sub-arrays that will be wired into the
controller.
b) Provide arrangement for disconnection for each
of the groups.
c) Provide a test point for each sub group for quick
fault location.
d) To provide group array isolation.
e) The rating of the JBS shall be suitable with adequate safety factory to inter connect the Solar PV array.
Structure for module frame:
Modules shall be mounted in supporting structure made out of
galvanized MS angle of required structural strength. (Hot
dip/galvanized) either on the roof top or at ground as per site
requirement.
Structure:
1. The size of M.S (Galvanized) angle should be 50 x 50 x 6
mm. The structures are to be fitted on the structure
south faced. It should withstand wind speed up to 120
Km/hour.
2. Foundation – The legs of the structure made with hot
dip GI angles will be fixed and grouted in the RCC
foundation columns of size 300mm x 300mm made with
1:2:4 cement concrete. The minimum ground clearance
from the lowest part of any module shall be 500 MM.
While making foundation design due consideration will
6000 Cycles at 20% depth of
discharge at 35°C
12
Charge Controller
setting
Pulse width modulation( CV
CONTROLLER) Type:
Regulation voltage: 2.400±0.005
V/cell at 27°C
Low voltage disconnect:
1.850±0.005 V/cell at 27°C
Load reconnection voltage:
2.080±0.005 V/cell at 27°C
13 Recommended max.
period of storage
14 Operating temperature
range -
15 Grid Alloy Lead Calcium tin alloy
16 Container & Lid
Material Poly propylene co-polymer
17 Sealing Method Heat sealing
18 Safety vent Self resealing, Pressure Regulating
Valve with Flame arrestor
19 Ventilation Normal ventilation is required
20 Positive Plate type Tubular
21 Separator Micro porous synthetic separator
24 Electrolyte Gel type
25 Terminals & ICC Lead plated brass & copper with PP
be given to weight of module assembly, maximum wind
speed of 120 km per hour.
3. The work includes necessary excavation, concreting, back filling, shoring and shuttering etc.
CONNECTING CABLE:
PVC insulated copper cables (ISI marked) for:
Module interconnections
Module parallel interconnection
PCU to load / change over and for further distribution
Points.
- All cables to be supplied should be as per BIS
and should have proper current carrying
capacity and should not be heated.
- All cables shall be adequately supported.
- Outside of terminal/panels/enclosures shall be
protected by conduits.
Cable shall be provided with dry type compression glands
wherever they enter junction boxes, panels, enclosures.
LIGHTING PROTECTION : Suitable nos. of lighting
arrestors shall be provided in the array field.
EARTHING PROTECTION : Each array structure and all metal casings of the plant etc. shall be earthed properly.
TOOL KIT AND SPARES: One necessary tools kit and spares will have to be provided by the supplier.
DISPLAY BOARD : A display board of size 4 ft. x 3 ft.
made of MS 40mm x 40mm square/round pipe on metal
plate is to be erected at each plant site indicating:
Capacity of Solar Power Plant : 50.0 KW
Promoted by : TOURISM & ICZMP / WORLD BANK with Logo &
Moulding.
26 Cell enclosure
Steel Enclosures with Acid Resistant
Epoxy Powder coating.
27 Mounting
Mounting frame with acid resistant
coating
Designed life of battery should be 5 years.
Junction Boxes Array Junction Box Should be IP65 Weather proof provided with
reverse blocking diodes, fuses and Isolators of suitable ratings.
DC Distribution board should be made of MS with powder
coating/polystyrene. It should be equipped with suitable rating of DC
isolators for solar input from array junction box and fuse of suitable
rating between PCU and battery.
AC distribution board should be made of MS with powder coating. It
should be equipped with suitable rating of MCB between PCU and
load.
Module Mounting Structures Module mounting structure should be installed on roof.
Module mounting structure designed to install solar panels should be
made of MS hot dip galvanized.
Thickness of galvanizing should be 80µm(Microns)
Minimum clearance of Solar panels from roof should be 500mm.
All fasteners used to fix solar panels with module mounting structure
should be of SS304.
All exposed metallic parts should be properly grounded.
Cables
Supported by WORLD BANK
Name of the Supplier: M/s. ……………………………………………
Contact numbers : …………………………………….
Service Centre Contact: ……………………………………………
OTHER CODES AND STANDARDS
The BOS items / components of the SPV power plant must
conform to the latest edition of IEC/equivalent BIS Standards as
specified below:
BOS item / component
Standard Description
Standard Number
Power Conditioning Unit Inverter
Efficiency Measurements Environmental Testing
IEC61683 / IS 61683 IEC 61701-Salt mist Test IEC60068 2 (1,2,14,30)/ equivalent BIS standard
Cables General Test Measuring Method PVC insulated cables for working voltages up to and including 1100 V-Do-, UV resistant for outdoor installation.
IEC 60502/IS1554 (Pt. I & II)
Switches/ Circuit Breakers/ Connectors
General Requirements Connectors-safety
IS / IEC 60947 Part – I, II & III EN 50521
Cables running between solar panels and array junction box should be
4 Sqmm copper flexible.
Cables running between AJB and DCDB should be of 25Sqmm copper
flexible cable .
Cable running between PCU and battery should be 25Sqmm coppers
flexible cable.
Cable running between PCU and ACDB should be 6 Sqmm Copper
cables.
All copper flexible cables should comply to IS651 and make should be
Polycab, Havells or equivalent .
Color code should be followed for over all wiring i.e, red for positive,
black for negative , green for earth .
All cable should run in suitable PVC Conduits .No cable should be
directly exposed to sunlight.
System Working Solar Grid Hybrid System is to be designed to operate loads and charge
battery bank through
solar power and grid power as the case may be. Hybrid power pack is
to be designed with energy management system for continue
operation of loads and maintain the battery bank in charged condition
in all feasible circumstance. First preference for both- load and battery
charging is always from solar for maximum utilization of Solar Power.
Solar system working priority should be Solar>Grid>Battery.
As this solar system is also connected to computers, PCU should be
online type where there would be no interruption in power supply to
computers.
Junction Boxes/ Enclosures for inverters/ charge controller/ luminaries
General Requirements
IP 54 (For outdoor) / IP/21 (For indoor) as per IEC 529
2.TECHNICAL SPECIFICATION: (10 KW) STAND ALONE
DRAWING NO. PDC-2/14
ITEM DESCRIPTION
SPV Module
1. The photovoltaic modules should be Mono/Poly Crystalline with a total array capacity of 10.0 KW. Capacity of each module is 250 Wp. Number of modules required: 40 10 no. Are connected in series are 4 are in parallel.
2. The Photovoltaic modules must be qualified as per IEC 61215 (revised) / IS 14286 Standards and in addition, the modules must conform to IEC 61730-1 requirements for construction & Part-2 requirements for testing, for safety qualification. It should also confirm IEC 61701-Salt mist Test.
3. The PV modules must be tested and approved from any of the NABL/MNRE Accredited Testing Calibration Laboratories.
System autono
my
2 days
Energy Meters
The supplier shall provide the Energy meter with the system to know the units consumed from the system.
Warranty
The mechanical structures, electrical works including power
conditioners/inverters/charge controllers/ maximum power point
tracker units/ distribution boards/ switchgear/storage batteries etc.
and overall workmanship of the SPV power plants/system must be
warranted against any manufacturing/ design/ installation defects for
a minimum period of 5 years.
Battery Bank
1. VRLA tubular GEL type 240 volt 350 Ah battery bank conforming to relevant BIS standard, low maintenance, stationery at C/10 rate).
2. The 60 Cells of 2 Volt, 350 Ah will be connected in series / parallel to ultimately form 240 volt 350 Ah battery bank.
3. The cells will be placed in racks duly painted with acid resistant paint to cover less space.
Power Conditio
ning Unit (1+1
Stand by 2 Nos.)
Power conditioner unit of Capacity 10.0 KW should convert DC power in to AC Power must confirm to standards IEC 61683 for efficiency. The inverter will have following features:
MOSFET based Sine Wave.
Capacity: 10 KW, 3 Phase
Normal Voltage & frequency: 230/415 Volts 50 Hz, 4 wires.
Vide input voltage range.
Output voltage: 415 volts + or – 1% three phase, 4 wire output: Nominal voltage can be adjusted by + or – 5% via system set point.
Out frequency: 50 Hz + or – 0.5% during standalone inverter operation. Inverter to follow grid frequency up to + or – 3Hz of the nominal output frequency during parallel operation.
Efficiency: 93%
Low power factor: 0.8 lagging to unity.
Ambient temperature: 0-50 deg. Cent
Relative humidity: 90% Non-condensing
Enclosure: Rated for IP65 – weather proof
2SETS TO BE PROVIDED, 1 FOR STAND BY
MODE
Protections: - Over voltage (automatic shut down)
- Under voltage (automatic shut down) - Overload
- Short circuit (circuit breaker & electronics protection against sustained fault)
Indications: - Overload - Inverter ON - Input & output voltage - Input & output current - Frequency - Power output
Cooling: Air cooled
SPV Charge Controll
er
A suitable SPV charge controller having following features, specifications be provided
MPPT base
Capacity 10 KW peak
Both calibrated scales and test points to allow precise adjustments and setting verification
Electronics protection for - Short circuit - Overload - Over temperature - Reverse polarity
Auto resetting electronic over current protection
LCD Digital display with back lighting and continue display of
- Battery voltage - DC current - Cumulative AH - Separating resettable “trip” AH
measurement
Suitable dusk/dawn controller for street lighting system
- Integrated charge controller and Inverter will be preferred.
Data Logging
Computer Port: Isolated RS232 port. System Features:
Adjustable logging repetition from 1 sec to 60 second
Storage Capacity of up to 100 days with 5 sec logs
Time & date stamped log entries
View & change system set point configuration remotely
Bulk log download for data importation into a spreadsheet where applicable.
Logging Attributes: System summations
Site kWh
Inverter input & output kWh
Grid and Genset kWh
Genset run hours
Battery input & output kWh
Solar kWh System Parameters
Inverter kW, voltage, pf, frequency
Battery current
Battery voltage
Battery temperature
Ambient temperature
Solar Charge current
Solar radiation
Wind speed
Junction Boxes
The junction boxes shall be dust and water proof and made of thermoplastic the terminals will be connected to copper lugs of bus-bar of proper sizes. The junction boxes will have suitable cable entry points fitted with the cables. Suitable markings shall be provided on the lugs or bus-bars for easy identification at cable ferrules will be fitted at the cable terminations points for identification. Each main junction box shall be fitted with appropriate rating reverse blocking diode. The junction boxes shall be of reputed make. The junction Box should confirm IP:65
The junction boxes shall have suitable arrangement for the following:
a) Combine groups of modules into independent charging sub-arrays that will be wired into the controller.
b) Provide arrangement for disconnection for each of the groups.
c) Provide a test point for each sub group for quick fault location.
d) To provide group array isolation. e) The rating of the JBS shall be
suitable with adequate.
Structure for
module frame
Modules shall be mounted in supporting structure made out of galvanized MS angle of required structural strength. (Hot dip/galvanized) either on the roof top or at ground as per site requirement. Structure:
1. The size of M.S (Galvanized) angle should
be 50 x 50 x 6 mm. The structures are to be fitted either on the roof top or at ground properly and south faced. It should withstand wind speed up to 120 Km/hour.
2. Foundation – The legs of the structure made with hot dip GI angles will be fixed and grouted in the RCC foundation columns of size 300mm x 300mm made with 1:2:4 cement concrete. The minimum ground clearance from the lowest part of any module shall be 500 MM. While making foundation design due consideration of 120 km per hour.
3. The work includes necessary excavation, concreting, back filling, shoring and shuttering etc.
Connection Cable
PVC insulated copper cables (ISI marked) for:
Module interconnections (4.0 mm2 copper single core multi strand)
Module parallel interconnection (10mm2 copper single core multi strand)
Array or AJB to charge controller (25 mm2 copper two cores)
Charge controller to battery (25 mm2 copper two core multi strand)
Battery to PCU (25 mm2 copper single core multi strand) might be double cables if required
PCU to load / change over (Single core copper cable 10.0 mm2 multi strand) and for further distribution points (Single core copper cable 4.0 mm2 and 2.5 mm2 multi strand)
- All cables to be supplied should be as per BIS and should have
proper current carrying capacity and should not be heated.
- All cables shall be adequately supported.
- Outside of terminal/panels/enclosures shall be protected by conduits.
- Cable shall be provided with dry type compression glands wherever they enter junction boxes, panels, enclosures.
Lighting Protecti
on
Suitable nos. of lighting arrestors shall be provided in the array field.
Earthing protecti
on
Each array structure and all metal casings of the plant etc. shall be earthed properly.
Tool Kit and
Spares
One necessary tools kit and spares will have to be provided by the supplier.
Display Board
A display board of size 4 ft. x 3 ft. made of MS 40mm x 40mm square/round pipe on metal plate is to be erected at each plant site indicating: Capacity of Solar Power Plant : 10.0 KW Promoted by : TOURISM & ICZMP / WORLD BANK with Logo & Supported by WORLD BANK Name of the Supplier: M/s. …………………………………………………………….. Contact numbers : ……………………………………. Service Centre Contact: ………………………………………………
OTHER CODES AND STANDARDS
The BOS items / components of the SPV power plant must
conform to the latest edition of IEC/equivalent BIS Standards as
specified below:
BOS item / component
Standard Description
Standard Number
Power Conditioning Unit Inverter
Efficiency Measurements Environmental Testing
IEC61683 / IS 61683 IEC 61701-Salt mist Test IEC60068 2 (1,2,14,30)/ equivalent BIS standard
Charge controller/ MPPT units*
Environmental Testing
IEC60068 2 (1,2,14,30)/ equivalent BIS standard
Storage Batteries
General Requirements & Methods of Testing VRLA/GEL
As per relevant BIS standard
Cables General Test Measuring Method PVC insulated cables for working voltages up to and including 1100 V-Do-, UV resistant for outdoor installation.
IEC 60502/IS1554 (Pt. I & II)
Switches/ Circuit Breakers/ Connectors
General Requirements Connectors-safety
IS / IEC 60947 Part – I, II & III EN 50521
Junction Boxes/ Enclosures for inverters/ charge controller/ luminaries
General Requirements
IP 54 (For outdoor) / IP/21 (For indoor) as per IEC 529
3.TECHNICAL SPECIFICATIONS
SOLAR BASED LED STREET LIGHT 30
NOS. Sl.
No. Item
1 Supply, Installation, Testing &
Commissioning of 5 Meter Long
Stainless Steel Pole Solar Street
Light with 25 Watt LED Lamp
Luminaries
Specification of Stainless Steel Pole
:-
The solar lighting system should be supplied
with 5 mtr long 60mm dia Stainless steel pole
(316 Grade) with Single arm bracket including
foundation. The arm length should be at least
1 meter with 40mm dia , Digging the hole
minimum 4feet and laying plain cement
concrete of proportion (1:2:4) in foundation
and floors using Portland slag cement (PSC)
with 4 cm and down size black hard crusher
broken granite stone metal of approved quality
and from approved quarry, washed and
cleaned including hoisting, lowering, laying
concrete, ramming, watering and curing etc.
cost, conveyance, loading and unloading,
royalties and taxes all materials and cost all
labours, sundries, T&P required for the work
complete including dewatering if required as
per instruction of the Engineer in charge.
2 Specification of 25 Watt LED Lamp:-
Supply, Installation, Testing & Commissioning
of 25 Watt LED High Power Street light Lamp
similar to specification following specification
(Philips Catalogue no-Green line smart-BRP020
1X10 LED)
LED TOTAL POWER: 25W
LIGHT SOURCE: WHITE LED
MATTERIAL: ALLUMINIUM PRESSURE DIA-CAST
HOUSING,PROVISION FOR AUTOMATIC
SWITCH 'ON' AT DUSK AND 'OFF'AT DAWN.
LED OPERATING VOLTAGE: 12V D.C.
LUMEN OUT PUT-1650
PROTECTION RATING:IP 65
AVERAGE LIFE SPAN OF LEDS : >50,000 HOURS
NO ULTRAVIOLET LIGHT
CABLE-ISI MARKED
4. TECHNICAL SPECIFICATIONS
SOLAR BASED STAND ALONE LED
STREET LIGHT 30 Nos.
Sl.
No. Item
1 Supply, Installation, Testing &
Commissioning of 5 Meter Long
Stainless Steel Pole Solar Street Light
with 25 Watt LED Lamp Luminaries
Specification of Stainless Steel Pole :-
The solar lighting system should be supplied with 5
mtr long 60mm dia Stainless steel pole (316
Grade) with Single arm bracket including
foundation. The arm length should be at least 1
meter with 40mm dia , Digging the hole minimum
4feet and laying plain cement concrete of
proportion (1:2:4) in foundation and floors using
Portland slag cement (PSC) with 4 cm and down
size black hard crusher broken granite stone metal
of approved quality and from approved quarry,
washed and cleaned including hoisting, lowering,
laying concrete, ramming, watering and curing etc.
cost, conveyance, loading and unloading, royalties
and taxes all materials and cost all labours,
sundries, T&P required for the work complete
including dewatering if required as per instruction
of the Engineer in charge.
Specification of Solar PV Module :-
Supply, Installation, Testing & Commissioning
including earthing as per IS specification of Solar
PV Module(MNRE approved) with Microcontroller
based Charge Controller. The modules must be
manufactured from specified materials and
components and subjected to Manufacturers
quality assurance process. The system module
should have test certificates (As per IEC 61215, IEC
61730 & IEC 61701).
Type-Polycrystalline Silicon type.
PV Module Rating: 100Wp/12V
Specification of Battery:-
Supply, Installation, Testing & Commissioning of
LMLA/TGEL Battery including Battery Box. The
Battery Rating is 12V/100 AH . The battery is to be
installed on Battery box which should be Stainless
Steel Sheet of >1mm thick and secure locking
arrangement for Battery .
Battery should conform to the latest BIS/
International standards.
PROTECTION:
LOW BATTERY PROTECTION
SHORT CIRCUIT PROTECTION
REVERSE FLOW OF CURRENT FROM BATTERY
TO MODULE AT NIGHT TIME.
OVER CHARGING PROTECTION, FUSE
PROTECTION & OVERLOAD PROTECTION
Specification of 25 Watt LED Lamp:-
Supply, Installation, Testing & Commissioning of
25 Watt LED High Power Street light Lamp similar
to specification following specification (Philips
Catalogue no-Green line smart-BRP020 1X10 LED)
LED TOTAL POWER: 25W
LIGHT SOURCE: WHITE LED
MATTERIAL:ALLUMINIUM PRESSURE DIA-CAST
HOUSING,PROVISION FOR AUTOMATIC SWITCH
'ON' AT DUSK AND 'OFF'AT DAWN.
LED OPERATING VOLTAGE: 12V D.C.
LUMEN OUT PUT-1650
PROTECTION RATING:IP 65
AVERAGE LIFE SPAN OF LEDS : >50,000 HOURS
NO ULTRAVIOLET LIGHT
CABLE-ISI MARKED
5. TECHNICAL SPECIFICATION (GENERAL) :
All cables from distribution boards to load centre will
be within the scope of tender.
2.
Section IV
Bidding Forms
sr. no.3
Price Schedule The price schedule is amended as per Annexure A
3.
Section IV
Bidding Forms
sr. no.4
Price and Completion Schedule - Related Services The price and completion schedule-related services is
amended as per Annexure B.
4.
Section VI
Schedule of
requirements
sr. no.1
List of Goods and Delivery Schedule The List of Goods and Delivery Schedule is amended as
per Annexure C.
5.
Section VI
Schedule of
requirements
sr no.2
List of Related Services [ITB Clause 14.6(b)] and Completion
Schedule
The List of Related Services [ITB Clause 14.6(b)] and
Completion Schedule is amended as per Annexure D.
6.
Section VI
Schedule of
requirements
sr no.4
Drawings Drawings is amended as per Annexure E.
7.
Section VI –
Schedule of
Requirements
5.Inspections and Tests
Manufacturer’s test and inspection certificate to be provided along
with the supply
Inspection and tests prior to handing over of the vessels and at final
acceptance are as follows:
5.Inspections and Tests
Manufacturer’s test and inspection certificate to be provided
along with the supply
Inspection and tests prior to handing over of the Solar
power plant and at final acceptance are as follows:
8.
Section III.
Evaluation and
Qualification
Criteria
Sr.no.3
Post Qualification Requirements (ITB 38.2)
(a)Financial Capability:
The Minimum required aggregate turnover in respect of
construction, commissioning and delivery of vessels for the
successful bidder in any two of the last five (5) Financial Years
i.e. 2008-09 to 2012-13 shall be of amount 98.00 Million INR or
an equivalent amount in a freely convertible currency.
b) Experience and Technical Capacity:
Post Qualification Requirements (ITB 38.2)
(a)Financial Capability:
The Minimum required aggregate turnover in respect of
construction, commissioning and delivery of Solar power
plant for the successful bidder in any two of the last five (5)
Financial Years i.e. 2008-09 to 2012-13 shall be of amount
98 lakhs, INR or an equivalent amount in a freely
convertible currency.
b) Experience and Technical Capacity:
The Bidder shall furnish documentary evidence to
demonstrate that it meets the following experience
requirement(s):
(i) The Bidder as a dealer shall furnish documentary evidence to demonstrate that he has successfully supplied, installed and commissioned at least 100% of the quantity included in schedule of requirements (the plant shall be same or similar in nature) during any one of the last five (5) Financial Years i.e. 2008-09 to 2012-13.
The list of supplied vessels shall include:
Name and address of Purchaser with contact details as email address/phone No
Contract no and date.
Vessels ordered/supplied & delivered with their respective quantities.
Scheduled delivery date and actual delivery date.
Details of Complaint, if any, received from the purchaser about the performance of the vessels.
The Bidder shall furnish documentary evidence to
demonstrate that it meets the following experience
requirement(s):
(ii) The Bidder as a dealer shall furnish documentary evidence to demonstrate that he has successfully supplied, installed and commissioned at least 100% of the quantity included in schedule of requirements (the plant shall be same or similar in nature) during any one of the last five (5) Financial Years i.e. 2008-09 to 2012-13.
The list of supplied Solar power plant shall
include:
Name and address of Purchaser with contact details as email address/phone No
Contract no and date.
Solar power plant ordered/supplied & delivered with their respective quantities.
Scheduled delivery date and actual delivery date.
Details of Complaint, if any, received from the purchaser about the performance of the
Solar power plant.
9. ITB 24.1 Deadline for submission of Bid is:
Deadline for submission of Bid is:
The deadline for the submission of bids is:
Date: 31/01/2013
Time:12:00 p.m.
The deadline for the submission of bids is:
Date: 11/02/2013
Time:12:00 p.m.
10. ITB 27.1 The bid opening shall take place The bid opening shall take place
The bid opening shall take place at :
In the office of
Project Director, ICZMP Project, Odisha
108,Surya Nagar,2nd
Floor,Unit-VII,
Bhubaneswar-751003,Odisha.
Date:31/01/2013
Time:12:30 pm
The bid opening shall take place at :
In the office of
Project Director, ICZMP Project, Odisha
108,Surya Nagar,2nd
Floor,Unit-VII,
Bhubaneswar-751003,Odisha.
Date:11/02/2013
Time:12:30 pm
Annexure A
Price Schedule
Date:_________________________
NCB No: _____________________
Alternative No: ________________
Page No.______ of ______
1 2 3 4 5 6 7 8 9
Line
Item
No
Description of Goods Delivery
Date
Quantity
and
physical
unit
Unit price
EXW
[including
excise duty
if any]
Total EXWprice per
line item [including
Excise Duty if any]
(Col. 45)
Price per line item for inland
transportation, insurance and
other services required to
convey the Goods to their
final destination
Sales Tax, vat, and other
taxes payable per item if
Contract is awarded (in
accordance with ITB
14.6(a)(ii)
Total Price per line item
(Col. 6+7)
[insert
number
of the
item]
[insert name of Good] [insert
quoted
Delivery
Date]
[insert
number
of units to
be
supplied
and name
of the
physical
unit]
[insert EXW
unit price] [insert total EXW
price per line item]
[insert the corresponding price
per line item]
[insert tsales and other taxes
payable per line item if
Contract is awarded]
[insert total price per item]
1. Procurement of GRID
INTERACTIVE (50 KW)
Solar Power Plant at Barkul under ICZM Project
1
2 Procurement of (10 KW) STAND ALONE Solar Power Plant at Barkul under ICZM Project
1
3 Solar Based Led Street Light
30
4 Solar Based Stand Alone Led Street Light
30
Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person signing the Bid] Date [insert date]
Note: (a) The bidder shall give list of spares for 2 years operation (or as required for the period specified in the evaluation criteria) separately indicating description, quantity, unit price and total price
in the above format, for those items whose scope of supply includes spare parts as per technical specification.
Annexure B
A. Price and Completion Schedule - Related Services
Date:_________________________
NCB No.: _____________________
Alternative No.: ________________
Page No. ______ of ______
1 2 3 4 5 6 7
Service
No.
Description of Services (excludes inland transportation and
other services required in India to convey the goods to their
final destination)
Country of
Origin
Delivery Date at place of Final
destination
Quantity and physical unit Unit price Total Price per Service
(Col. 5*6)
[insert
number
of the
Service ]
[insert name of Services] [insert
country of
origin of the
Services]
[insert delivery date at place of
final destination per Service] [insert number of units to
be supplied and name of
the physical unit]
[insert unit price per
item] [insert total price per
item]
1. Cost of AMC of GRID INTERACTIVE (50 KW)
Solar Power Plant (Maintenance, repair
including supply of spare parts and software
updates of the supplied goods) for Year 1
after Warranty
The Superintending
Engineer (OTDC)cum
Nodal Officer
/Designated Officer at
Locations detailed in:
Section VI. Schedule of
Requirements in
“List of Goods and
Delivery Schedule”
2. Cost of AMC GRID INTERACTIVE (50 KW)Solar
Power Plant (Maintenance, repair including supply of spare parts and software
updates of the supplied goods) for Year
2afterWarranty
Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person signing the
Bid] Date [insert date]
B. Price and Completion Schedule - Related Services
Date:_________________________
NCB No.: _____________________
Alternative No.: ________________
Page No. ______ of ______
1 2 3 4 5 6 7
Service
No.
Description of Services (excludes inland transportation and
other services required in India to convey the goods to their
final destination)
Country of
Origin
Delivery Date at place of Final
destination
Quantity and physical unit Unit price Total Price per Service
(Col. 5*6)
[insert
number
of the
Service ]
[insert name of Services] [insert
country of
origin of the
Services]
[insert delivery date at place of
final destination per Service] [insert number of units to
be supplied and name of
the physical unit]
[insert unit price per
item] [insert total price per
item]
1. Cost of AMC of 10 KW STAND ALONE Solar
Power Plant (Maintenance, repair including supply of spare parts and software
updates of the supplied goods) forYear1 after
Warranty
The Superintending
Engineer (OTDC)cum
Nodal Officer
/Designated Officer at
Locations detailed in:
Section VI. Schedule of
Requirements in
“List of Goods and
Delivery Schedule”
2. Cost of AMC of 10 KW STAND ALONE Solar
Power Plant (Maintenance, repair including supply of spare parts and software
updates of the supplied goods) for Year
2afterWarranty
Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person signing the
Bid] Date [insert date]
C. Price and Completion Schedule - Related Services
Date:_________________________
NCB No.: _____________________
Alternative No.: ________________
Page No. ______ of ______
1 2 3 4 5 6 7
Service
No.
Description of Services (excludes inland transportation and
other services required in India to convey the goods to their
final destination)
Country of
Origin
Delivery Date at place of Final
destination
Quantity and physical unit Unit price Total Price per Service
(Col. 5*6)
[insert
number
of the
Service ]
[insert name of Services] [insert
country of
origin of the
Services]
[insert delivery date at place of
final destination per Service] [insert number of units to
be supplied and name of
the physical unit]
[insert unit price per
item] [insert total price per
item]
1. Cost of AMC of Solar Based Led Street Light
(Maintenance, repair including supply of spare parts and software
updates of the supplied goods) forYear1 after
Warranty
The Superintending
Engineer (OTDC)cum
Nodal Officer
/Designated Officer at
Locations detailed in:
Section VI. Schedule of
Requirements in
“List of Goods and
Delivery Schedule”
2. Cost of AMC of Solar Based Led Street Light
(Maintenance, repair including supply of spare parts and software
updates of the supplied goods) for Year
2afterWarranty
Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person signing the
Bid] Date [insert date]
D. Price and Completion Schedule - Related Services
Date:_________________________
NCB No.: _____________________
Alternative No.: ________________
Page No. ______ of ______
1 2 3 4 5 6 7
Service
No.
Description of Services (excludes inland transportation and
other services required in India to convey the goods to their
final destination)
Country of
Origin
Delivery Date at place of Final
destination
Quantity and physical unit Unit price Total Price per Service
(Col. 5*6)
[insert
number
of the
Service ]
[insert name of Services] [insert
country of
origin of the
Services]
[insert delivery date at place of
final destination per Service] [insert number of units to
be supplied and name of
the physical unit]
[insert unit price per
item] [insert total price per
item]
1. Cost of AMC of Solar Based Stand Alone Led
Street Light (Maintenance, repair including supply of spare parts and software
updates of the supplied goods) forYear1 after
Warranty
The Superintending
Engineer (OTDC)cum
Nodal Officer
/Designated Officer at
Locations detailed in:
Section VI. Schedule of
Requirements in
“List of Goods and
Delivery Schedule”
2. Cost of AMC of Solar Based Stand Alone Led
Street Light (Maintenance, repair including supply of spare parts and software
updates of the supplied goods) for Year
2afterWarranty
Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person signing the
Bid] Date [insert date]
Annexure C: 1. List of Goods and Delivery Schedule
Package
No.
Description of Goods Quantity Physical
unit
Final (Site) Destination as
specified in BDS
Delivery (as per Incoterms) Date
Earliest
Delivery
Date
Latest Delivery
Date
Bidder’s offered
Delivery date [to
be provided by the
bidder]
Bid
Security in
Indian
Rupees
[insert
item No]
[insert description of Goods] [insert
quantity of
item to be
supplied]
[insert
physical unit
for the
quantity]
[insert place of Delivery] [insert the
number of days
following the
date of
effectiveness the
Contract]
[insert the number of
days following the
date of effectiveness
the Contract]
[insert the number of
days following the date
of effectiveness the
Contract]
01
Procurement of GRID
INTERACTIVE (50 KW)
Solar Power Plant at Barkul under ICZM Project
01 Set Barkul Amusement Park & Pantha Niwas,
OTDC
90 days 120 days
97,160 02
Procurement of (10 KW) STAND ALONE Solar Power Plant at Barkul under ICZM Project
01 Set Barkul Amusement Park & Pantha Niwas, OTDC
90 days 120 days
03 Solar Based Led Street Light
30 Nos. Barkul Amusement Park & Pantha Niwas,
OTDC
90 days 120 days
04 Solar Based Stand Alone Led Street Light
30 Nos. Barkul Amusement Park & Pantha Niwas,
OTDC
90 days 120 days
`
1 The offer price shall cover all costs including installation, tests, trials and commissioning at Final (Project Site) Destination as specified in BDS,
Warranty Cost and Training to (Operational) Staff for Items in the List of Goods and Delivery Schedule as in the Table above.
2 Training i s t o be imparted to the Operational Staff at Barkul in two batches(Four Technical Personnel per Batch)within 15 days of commissioning of the Solar Plant with a repeat training after 15 days of initial training.
Annexure D
2.A. List of Related Services [ITB Clause 14.6(b)] and Completion Schedule
Service Description of Service Quantity¹ Physical Unit Place where Services
shall be performed
Final Completion
Date(s) of Services
[insert
Servic
e No]
[insert description of Related Services] [Insert after modifying as appropriate deleting inapplicable
items from the following:]
[insert quantity
of items to be
supplied]
[insert physical
unit for the
items]
[insert name of the
Place]
[insert required
Completion Date(s)]
1. Cost of AMC for GRID INTERACTIVE (50 KW)
Solar Power Plant (Maintenance, repair including supply of spare parts and software updates of the supplied goods) forYear1afterWarranty
The Superintending
Engineer (OTDC)cum
Nodal Officer
/Designated Officer
at Locations detailed
in:
Section VI. Schedule
of Requirements in
“List of Goods and
Delivery Schedule”
Service required
every quarter
2. Cost of AMC for GRID INTERACTIVE (50 KW)
Solar Power Plant (Maintenance, repair including supply of spare parts and software updates of the supplied goods) forYear2afterWarranty
Service required
every quarter
1. If applicable
2.B. List of Related Services [ITB Clause 14.6(b)] and Completion Schedule
Service Description of Service Quantity¹ Physical Unit Place where Services
shall be performed
Final Completion
Date(s) of Services
[insert
Servic
e No]
[insert description of Related Services] [Insert after modifying as appropriate deleting inapplicable
items from the following:]
[insert quantity
of items to be
supplied]
[insert physical
unit for the
items]
[insert name of the
Place]
[insert required
Completion Date(s)]
1. Cost of AMC for (10 KW) STAND ALONE Solar Power Plant (Maintenance, repair including supply of spare parts and software updates of the supplied goods) forYear1afterWarranty
The Superintending
Engineer (OTDC)cum
Nodal Officer
/Designated Officer
at Locations detailed
in:
Section VI. Schedule
of Requirements in
“List of Goods and
Delivery Schedule”
Service required
every quarter
2. Cost of AMC for (10 KW) STAND ALONE Solar Power Plant (Maintenance, repair including supply of spare parts and software updates of the supplied goods) forYear2afterWarranty
Service required
every quarter
1. If applicable
2. C. List of Related Services [ITB Clause 14.6(b)] and Completion Schedule
Service Description of Service Quantity¹ Physical Unit Place where Services
shall be performed
Final Completion
Date(s) of Services
[insert
Servic
e No]
[insert description of Related Services] [Insert after modifying as appropriate deleting inapplicable
items from the following:]
[insert quantity
of items to be
supplied]
[insert physical
unit for the
items]
[insert name of the
Place]
[insert required
Completion Date(s)]
1. Cost of AMC for Solar Based Led Street Light (Maintenance, repair including supply of spare parts and software updates of the supplied goods) forYear1afterWarranty
The Superintending
Engineer (OTDC)cum
Nodal Officer
/Designated Officer
at Locations detailed
in:
Section VI. Schedule
of Requirements in
“List of Goods and
Delivery Schedule”
Service required
every quarter
2. Cost of AMC for Solar Based Led Street Light (Maintenance, repair including supply of spare parts and software updates of the supplied goods) forYear2afterWarranty
Service required
every quarter
1. If applicable
2. D. List of Related Services [ITB Clause 14.6(b)] and Completion Schedule
Service Description of Service Quantity¹ Physical Unit Place where Services
shall be performed
Final Completion
Date(s) of Services
[insert
Servic
e No]
[insert description of Related Services] [Insert after modifying as appropriate deleting inapplicable
items from the following:]
[insert quantity
of items to be
supplied]
[insert physical
unit for the
items]
[insert name of the
Place]
[insert required
Completion Date(s)]
1. Cost of AMC for Solar Based Stand Alone Led Street Light (Maintenance, repair including supply of spare parts and software updates of the supplied goods) forYear1afterWarranty
The Superintending
Engineer (OTDC)cum
Nodal Officer
/Designated Officer
at Locations detailed
in:
Section VI. Schedule
of Requirements in
“List of Goods and
Delivery Schedule”
Service required
every quarter
2. Cost of AMC for Solar Based Stand Alone Led Street Light (Maintenance, repair including supply of spare parts and software updates of the supplied goods) forYear2afterWarranty
Service required
every quarter
1. If applicable