SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 1 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
Issue Date: March 21, 2016
FROM: ROSSER INTERNATIONAL, INC.
Two Peachtree Pointe
1555 Peachtree Street, N.E., Suite 800
Atlanta, Georgia 30309
TO: BIDDERS
Santa Barbara County Northern Branch Jail Project
Phase 1, Project 8600
BID ADDENDUM NO. 02
THIS ADDENDUM is hereby made a part of the Construction Documents dated September 14, 2015 on the subject
work as though originally included therein. Prospective Bidders shall acknowledge receipt of this Addendum in the
space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. The following
amendments, additions and/or corrections shall govern this work.
NOTE: The bid-opening deadline has been extended.
GENERAL INFORMATION:
The date for Requests for Clarification has been extended to 5:00 P.M. Pacific Time, Thursday, March 24,
2016.
The Bid Date has been extended to on or before 2:00 P.M. Pacific Time, Thursday, April 7, 2016.
NOTE: All references to a bid opening date and time within the Contract Documents are hereby amended to
reflect the new date and time: Thursday, April 7, 2016, at 2:00 P.M.
CHANGES AND/OR CLARIFICATIONS TO THE PROJECT MANUAL / CONTRACT FORMS:
A2-1 Document 00100 – NOTICE TO BIDDERS
a. Re: BID SUBMITTAL INSTRUCTIONS paragraph. In the fourth line,
Delete “on or before 3:00 PM, March 31, 2016 at which time each bid will be opened.”
And Replace with
“on or before 2:00 PM, April 7, 2016 at which time each bid will be opened.”
A2-2 Document 00200 – INSTRUCTIONS TO BIDDERS
a. Re: Article 10, Paragraph 10.04. In the fourth and fifth lines,
Delete “on or before 3:00 P.M. Thursday March 31, 2016, at which time each bid will be opened.”
And Replace with
“on or before 2:00 P.M., April 7, 2016, at which time each bid will be opened.”
A2-3 Document 00410 – BID FORM
a. Re: Bid Date line. In the fourth line below the first page title,
After “Bid Date:” Delete “March 31, 2016” and Replace with: “April 7, 2016” so the line reads:
“Bid Date: April 7, 2016”
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 2 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
APPROVED “AS EQUAL” SUBSTITUTIONS
A2-4 Section 07 26 50 – UNDER SLAB VAPOR RETARDER
a. Re: Article 2.1 VAPOR RETARDER, A: add:
“4. Husky Yellow Guard 15 mil by Poly-America; CFYG1514-140 – 15 mil 14’x140’.”
A2-5 Section 11 19 40 – SECURITY HARDWARE
a. Re: Article 2.5 REMOTELY CONTROLLED SWINGING DOOR LOCKS, A, 1, a: add
manufacturer and model numbers as follows:
“Manufacturer Exit Function
Airteq 9912S-ELHB-K2”
b. Re: Article 2.5 REMOTELY CONTROLLED SWINGING DOOR LOCKS, A, 1, b: add
manufacturer and model numbers as follows:
“Manufacturer Cell Half-Cycle Function Sallyport Half-Cycle
Function
Airteq: (Non-rated) 9912M-RLHB-NRLB-K1 9912M-RLHB-NRLB-K2
(Fire-rated) 9912M-NRLB-K1 9912M-NRLB-K2”
c. Re: Article 2.5 REMOTELY CONTROLLED SWINGING DOOR LOCKS, A, 1, c: add
manufacturer and model numbers as follows:
“Manufacturer Cell Half-Cycle Function w/ Local Electric Key
Airteq: (Non-rated) 9912M-RLHB-NRLB-LEK-K1
(Fire-rated) 9912M-NRLB-LEK-K1”
d. Re: Article 2.7 REMOTELY CONTROLLED ELECTRIC GATE LOCKS, A: add manufacturer
and model numbers as follows:
“Manufacturer Sliding Gate Swinging Gate
Airteq: 9712P-K2 ”
A2-6 Section 11 19 50 – SECURITY ACCESSORIES
a. Re: Security Grab Bars Paragraph 2.3, A, 1, a: to end of list add the following:
“Argyle Precision, Orange, CA”
b. Re: Mirrors Article 2.4 delete in its entirety and substitute the following:
“A. Mirrors-Face Mount (MIRF, MIRF-HC)
1. Acceptable Products; subject to compliance with specified requirements:
Manufacturer MIRF MIRF-HC
Bottom Mirror Top Mirror
Acorn Engineering Co. 1817 1817 1817
Argyle Precision MR1000
modified
MR1000
modified
MR1000
modified
Bobrick Washroom
Equip., Inc.
B-942 B-942 B-942
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 3 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
Bradley Corp. SA05 SA05 SA05
Meek Mfg. Co. M5500 M5500 M5500
Metcraft, Inc. A752 A752 A753
Northwest Specialty
Hardware, Inc.
NW 605-1 NW 605-1 NW 605-1
Portland Hardware Co.,
Inc.
PSH 721 PSH 721 PSH 721
Southern Folger Det.
Equip. Co.
432 432 432
Trussbilt, Inc. WMM-1711 WMM-1711 WMM-1711
2. Type: Vandal-resistant, one-piece formed stainless steel mirror with rounded corners and
integral frame; designed for front exposed fastener mounting.
a. Material and Finish: Minimum 18 gage (0.0500 in.) (1.3 mm) Type 304 or 430
stainless steel with No. 8 bright, mirror polished finish.
b. Size: Outside dimensions as follows:
1) MIRF: One mirror, 11.25-inch (286 mm) min. width by 16-inch (406
mm) min. length.
2) MIRF-HC: Two mirrors; each 11.25-inch (286 mm) min. width by
17.25-inch (438 mm) min. length for equal size mirrors or for unequal
sizes not less than specified for MIRF above for the smallest with sum
of the two mirror lengths not less than 34.5-inch (876 mm).
c. Fabrication: Integral frame formed with minimum 1/4" (6 mm) returns. Predrill
and countersink holes for fasteners.
3. Fasteners: Not less than six, 1/4-20 × 3" (75 mm) minimum stainless steel tamper-resistant
Torx security screws in drop-in anchors or 1/4" × 3" (6 × 75 mm) minimum stainless
steel drive bolt expansion anchors as specified Division 11 Section SECURITY METAL
FABRICATIONS.
4. Mounting Heights:
MIRF: Unless otherwise indicated on drawings, mount single mirror with centerline at
5’-4” (1.6 m) A.F.F. for males and 5’-0” (1.5 m) A.F.F. for females.
MIRF-HC: For locations indicating handicap access, provide two center aligned mirrors,
one mounted with top reflective surface not less than 6’-2” (1880 mm) A.F.F and,
one mounted with bottom reflective surface not more than 3’-4” (1015 mm)
A.F.F. mounted centered above a sink, except not more than 2’-11” (890 mm)
A.F.F where there is no sink. If mirrors are not equal size, place longer mirror on
top.”
c. Re: Non-Rated Package Receiver Paragraph 2.5, A, 1, a: to end of list add the following:
“Argyle Precision Package Pass PP1000”
d. Re: Clothes Hook Units Paragraph 2.7, A: to end of list add the following:
Manufacturer CH1 CH4 CHS
Norix Group, Inc. ITH-110 ITS-410 — — —
e. Re: Folding Shower Seats Paragraph 2.9, A: delete ”PDI Detention SS1000 modified” and
instead substitute the following:
“Argyle Precision SS1000 modified”
f. Re: Pistol Locker Paragraph 2.10, A, 1: to end of list add the following:
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 4 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
“Argyle Precision ”
A2-7 Section 11 19 60 – SECURITY FURNISHINGS
a. Re: Article 2.1 MANUFACTURERS: delete ”PDI Detention, an ISI Security Co., Orange, CA”
and instead substitute the following:
“Argyle Precision, Orange, CA”
b. Re: Article 2.1 MANUFACTURERS: to end of list add the following:
“Viking Products, Inc., Orange, CA”
**********************END OF APPROVED “AS EQUAL” SUBSTITUTIONS**********************
A2-8 Section 11 19 00 – SECURITY GENERAL
a. Re: Acceptable DEC Paragraph 1.6, B, 1: delete empty sub-paragraphs 1 through 4 and substitute
the following list of pre-qualified DECs:
“1. CCC
2. CML Security
3. Cornerstone
4. Sierra Detention
5. Southern-Folger”
A2-9 Section 28 00 00 – INTEGRATED SECURITY SYSTEMS GENERAL
a. (Changes are in BOLD text) Re: Article - 1.2 SUMMARY
“A. The Division 28 series of specifications covers the complete security, communication and
alarm systems as indicated on the drawings and specified herein. The Division 28 work
establishes three separate local area networks not related to the facility administration
network. One network services the Security Control and Monitoring system, a second
services the IP based Video Surveillance (Closed Circuit TV) system and a third services
the Video Visitation system. The systems form the basis of a digital security system
integrated as indicated here and in the rest of the Division 28 specifications.
B. Provide all labor materials, equipment and supervision to install specified systems and
systems indicated on the plans which include, but are not limited to, the following:
1. Security Monitoring and Control System
2. Video Surveillance (Closed Circuit TV) System
3. Passive Duress System
4. Television Signal Distribution Systems
5. Fire Alarm System
6. Telephone / Data Premises Distribution Systems (County/Sheriff)
7. Inmate Kiosk Data Premises Distribution Systems
8. Inmate Telephone control, conduit and wiring system
9. Video Visitation Conduit and Wiring Systems
10. Intercommunications System
11. Public Address and Monitoring System
12. Radio Booster signal distribution conduit System
13. Raceway / Conduit System, refer to Division 26 and 28 for requirements
14. Underground Duct Bank, refer to Division 26 and 28 for requirements
15. System Wiring, refer to Divisions 26 and 28 for requirements
16. UPS Systems
17. Surge Protection Equipment
18. Access Control System
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 5 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
19. Nurse Call System
(This section was revised after Project Manual submission dated 09/03/2015)”
b. (Changes are in BOLD text) Re: Article - 1.4 ACCEPTABLE SYSTEMS INTEGRATORS
(SI)
“(Article 1.4 revised after Project Manual submission dated 09/03/2015.)
A. The intent of these specifications is to ensure the systems described in Division 28
are provided and installed by a technically experienced SI and further that the
Division 28 work is fully coordinated between the various systems by a single
installer who is technically qualified as described herein.
B. The following Systems Integrators are approved Systems Integrators for the
services specified in Division 28:
1. Status Automation, Aldergrove BC
2. Stanley Convergent, Noblesville, IN
3. Argyle Security, San Antonio, TX
4. Sierra Detention Systems, Brighton CO
5. Cornerstone Detention Products, Madison AL
6. Accurate Controls, Ripon, WI
7. Simplex Grinnell Criminal Justice Operations Center, Montgomery AL”
A2-10 Section 28 13 00 - ACCESS CONTROL SYSTEMS
a. (Changes are in BOLD text) Re: Article 1.3 SYSTEM OVERVIEW
“A. The Access Control system shall consist of a computer based networkable system with
proximity technology card/fob readers, access controllers, monitor, mouse, keyboard,
integral time clock, power supplies and all interconnecting cabling. The system shall
have the capability of restricting or allowing access to the doors controlled by time or
location. System shall be microprocessor based to allow independent programming and
voiding of all system keys.
B. The Access Control system will match the existing County adopted access control
system. The system will be the WinDSX line of products and software of DSX Access
Systems Inc. of Dallas Texas. No substitutions. WinDSX data for the North Branch
Jail will be retained in the Access Control System database local to the facility. It
will not be linked to the County’s WinDSX database in any way. is located on the
Administrative Network (County). Share data with the WinDSX database via
VLAN or County secure firewall (CheckPoint 12600) between the security network
and the Administrative Network (County/Sheriff). If elect to share data via the
County firewall, this contractor must coordinate set up with county IT staff. If the
Contractor pursues firewall protection and, for any reason, firewall protection
cannot occur, the contractor must revert to VLAN protection to accomplish this
provision.
(Revised after Project Manual submission dated 9/03/2015)”
b. (Changes are in BOLD text) Re: Article 2.8 ACCEPTABLE MANUFACTURERS
“A. Systems manufactured by Honeywell conforming to this section of the specifications
will be acceptable. Systems by other manufactures may be submitted as long as the
minimum of these specifications is met and is accepted by Addendum no later than
10 days prior to bid. WinDSX of DSX Access Systems Inc. of Dallas Texas is the
only acceptable manufacturer. No substitutions.
(Revised after Project Manual submission dated 9/03/2015)”
A2-11 Section 28 23 00 - INTEGRATED VIDEO SURVEILLANCE SYSTEM (CCTV)
a. (Change are in BOLD text) Re: Article 2.2 INTERIOR/EXTERIOR FIXED POSITION
CAMERAS
“A. VSS cameras shall be UL listed and shall be the standard product of Pelco, Vicon,
Panasonic, Samsung or Bosch complying with not less than the specifications contained
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 6 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
herein. Installation of each camera shall include mounting brackets and/or camera
housings fully compatible with the camera provided.
B. Most interior fixed cameras shall be integral dome assemblies semi-flush ceiling
mounted. Pendent mounting or bracket mounting may be utilized as required where
compatible ceilings do not exist or to provide desired sight lines. Domes shall be similar
to interior Pan/Tilt Zoom domes, camera shall be as follows:
1. Color, solid state charge coupled device 1/3-inch format.
2. Resolution for 4CIF camera: 480 TVL minimum, 704x480, 30 IPS/FPS,16:10
format. If manufacturer’s 4CIF resolution cameras are not available in
widescreen format use the manufacturer’s 1.3MP cameras as minimum
resolution.
3. Resolution – for 1.3MP cameras: 720p, 1280x720, 30 IPS/FPS, 16:9 format
4. Digital PTZ – all fixed IP cameras will be equipped for digital zooming
anywhere in the image at all viewing stations – zooming will not affect full
recording of the entire image. Digital zooming of archived video is also
required. 5. Direct RJ45 network connection
6. Compression at the camera using H.264 compression
7. Individually configurable multi-streaming outputs up to native resolution satisfy
all video viewing and recording requirements
8. Power Over Ethernet (POE), 12 VDC or 24VDC 60 Hz
9. Provides video motion detection at the camera
10. Where required, provide Video Analytics at the camera capable of detecting
a. Idle Object
b. Removed Object
c. Multiple crossings
d. Objects in the field of view
e. Loitering
f. Condition change
g. Route Following
h. Tampering
i. Entering field
j. Leaving field
11. Video Motion Detection and camera operation software license (if required by
manufacturer) shall be included and shall be perpetual.
12. Provide Video Analytics software license where required, License shall be
perpetual.
13. Minimum two user configurable video masking areas
14. Remote focus, Automatic back focus
15. Provides internal character generation
16. Provides alarm input and output. Input is capable of displaying a user defined
message, output can be NO or NC and respond to external input, video motion
or video loss – user selectable.
17. Scene illumination required for full video with f/1.2 lens and 75% reflective
surface 0.08 fc.
18. Signal to noise ratio > 46 dB.
19. Automatic light range with f/1.4 to f/360 auto iris lens 1 million to 1.
20. Video Output 1.0 V p p, 75 ohm composite for service.
21. Sync phase locked loop to synchronize to power line zero crossing.
22. Genlock capable of external sync.
23. Lens – Varifocal lenses sized for the specific location and shot, auto iris control.
24. Operating temperature range – minus 14 to 122 degrees F.
25. Operating humidity range 0 to 90% relative noncondensing.
26. Audio 1 line in, 1 line out, SNR >50dB
27. Concealed wiring
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 7 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
28. Dome – Smoked polycarbonate interior – Clear in low light and exterior areas
(Revised after Project Manual submission dated 9/03/2015)”
b. (Changes are in BOLD text) 2.4 INTERIOR/EXTERIOR 360/180 DEGREE “FISHEYE”
HEMI-SPHERE PANORAMIC IP NETWORK CAMERA
“A. Single and multi-sensor 360/180 degree dome style abuse resistant camera for interior or
exterior mounting
1. Color, solid state charge coupled device 1/3-inch format minimum.
2. Resolution - 5.0 Minimum single or multi sensor resolution 12.0 MP. At
single sensor camera must be optimized for 70% minimal use of imager - must
achieve minimum 25 pixels on 1’0” square target at 50’ 25’ on the view horizon
– this must be demonstrated upon submittal of shop drawings. If manufacturer’s
camera cannot achieve this requirement at 5.0 MP, the manufacturer’s camera
which can achieve this requirement must be provided. At two pole mounted Jail
Outdoor Recreation cameras utilize 12.0 MP Pelco Optera 4 imager IMM
series 360 180 degree or equal 360 degree cameras in exterior rated
housings. At all locations requiring 180 degree cameras use 360 degree
cameras wall mounted in the manufacturer’s 180 degree mode 12.0 MP
Pelco Optera 4 imager IMM series 180 degree or equal.
(Revised after Project Manual submission dated 09/03/2015)”
c. (Changes are in BOLD text) 2.7 VSS MONITORS
“A. VSS monitors shall be the standard products of Pelco, Vicon, Panasonic, Samsung or
Bosch compatible with the total system specified herein and complying with these
specifications.
B. VSS monitors shall be LED type, mounted as specified herein. Monitor controls shall be
on off, brightness, contrast, vertical hold, and horizontal hold. Monitors shall contain
differential input amplifier, voltage regulation and shall be rated for continuous duty. All
monitors shall be UL listed.
C. VSS Monitors shall be color and sized as required in these specifications unless
otherwise indicated on the drawings. These monitors shall conform to the following:
1. 22-inch color monitor (or manufacturers closest size) at all workstations but
Central Control
2. 32-inch color monitor at Central Control:
3. Power Source: 120 VAC, 60 Hz
4. Resolution 1920 x 1080 at 60 Hz
5. Minimum Contrast ratio: 1001:1 at 25" monitors, 3000:1 at 32" monitors
6. Picture in Picture (PIP) capable
7. LED backlit technology
8. Video: Connections compatible with the system components.
9. Front panel control for color, tint, brightness, contrast
10. Geometric distortion less than 3%
11. Monitors will be 1080p resolution in 16:9 or 16:10 format.
(Revised after Project Manual submission dated 09/03/2015)”
d. (Changes are in BOLD text) 2.17 EXTERIOR POLES FOR CAMERA MOUNTING
“A. Concrete taper poles 30 20 feet height above finish grade.
(Revised after Project Manual submission dated 09/03/2015)”
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 8 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
CHANGES AND/OR CLARIFICATIONS TO THE PROJECT DRAWINGS:
Note: Because of the nature of the following revisions and time limitations, the following drawings are not
being altered or issued to show the referenced revisions; these drawings as herein revised are made a part
of the contract requirements.
A2-12 Sheet A1.3.1.4 – Ground Floor Plan Area 4
a. Delete: All references to sheet A2.10
A2-13 Sheet A1.3.1.1 – Ground Floor Plan Area 1
a. Delete: All references to sheet A2.15
A2-14 Sheet A5.06 – Building Details
a. At Detail 28: Change the gutter material to “Sheet Metal”
A2-15 Sheet A1.3.1.3 – Ground Floor Plan Area 3
a. Delete: Note regarding “Contractor to provide 40’ x 10’ shipping container…”
A2-16 Sheet X.0.03 – ISS Site Drawing
a. See attached sketch SKX-01 Yard Cameras Modifications
A2-17 Sheet X0.01 – ISS Legend
a. See attached sketch SKX-02 Modification to the CCTV Legend
b. See attached sketch SKX-03 Add DAS System Legend
A2-18 Sheet X1.3.1.11 – Ground Floor ISS plan Area 1-1
a. See attached sketch SKX-04 CCTV Changes at Deputy Station Z103
A2-19 Sheet X1.3.1.41 – Ground Floor ISS plan Area 4-1
a. See attached sketch SKX-05 CCTV Changes at Kitchen Courtyard
A2-20 Sheet X1.3.1.42 – Ground Floor ISS plan Area 4-2
a. See attached sketch SKX-06 CCTV Changes at Laundry
A2-21 Sheet X1.3.1.33 – Ground Floor ISS plan Area 3-3
a. See attached sketch SKX-07 CCTV Changes at Booking.
A2-22 Sheet X1.3.1.12 – Ground Floor ISS plan Area 1-2
a. The 360 degree Camera in the center of space “Control Z106” marked 840 should be appended to
show the text “12 MP.”
A2-23 Sheet X1.3.1.32 – Ground Floor ISS plan Area 3-3
a. The 360 degree Camera just below and adjacent to space “Control Z106” marked 841 should be
appended to show the text “12 MP.”
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 9 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
A2-24 The following supplementary drawings (sketches) are hereby issued on this work, dated as noted. They
shall be as binding as though included in the original contract documents.
Drawing Title Issue Date
SKA-A01 Architectural Louvers 03/18/16
SKA-A02 Alternate Bid #11 03/18/16
SKX-01 Yard Camera Modifications 03/16/16
SKX-02 Modifications to the CCTV Legend 03/16/16
SKX-03 Adds to the ISS Legend for DAS System 03/16/16
SKX-04 CCTV Modifications for Deputy Station ZZ103 03/16/16
SKX-05 CCTV Changes at Kitchen Courtyard 03/16/16
SKX-06 CCTV Changes at Laundry P186 03/16/16
S|KX-07 CCTV Changes at Booking 03/16/16
PRE-BID QUESTIONS:
A2-25 Question:
There are Louvers tagged L1 thru L4 shown on Elevations but there are no sizes, please verify the
Louver sizes or provide louver schedule.
Response:
See schedule attached to this addendum
A2-26 Question:
Structural Sheet S1.3.1.5 lists the CUP and adjacent Service building as premanufactured metal
buildings. The elevations for these areas on sheet A2.03 list them as EIFS exterior but the details for the
pre-engineered metal building on sheet A5.04 designate them as metal panel exterior. Please confirm
that the exterior wall cladding for the CUP and adjacent service building are Metal Panel.
Response:
In general the CUP walls are EIFS on the East and North and are metal panel elsewhere. Please refer to
the architectural wall sections for a detailed description of the construction of the walls per building
elevation.
A2-27 Question:
Please reference drawing S1.3.1.1, with attention to the spread footing along 1-30 between 1-BB and 1-
DD. After referencing 6/S2.03 and detail H/S0.12, the width of the footing is 6’-6”, however, the scaled
width of the footing is 4’. Please confirm the width as 6’-6”. This similar condition occurs at multiple
free standing CMU wall locations at outdoor recreation areas.
Response:
Contractor shall refer to General Note #9 on Sheet S0.01. Drawings shall not be scaled. Footing widths at
freestanding wall shall be per detail H/S0.12 unless noted otherwise on plan.
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 10 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
A2-28 Question:
Please reference drawing S1.3.1.1, with attention to the spread footing along 1-A between 1-B and 1-DD.
The footing appears to be stepped, presumably down 8” (T.O. Footing -2’-0) to allow storm drain piping
(reference P1.4.0.11) to penetrate the CMU wall in lieu of the footing. Please confirm the typical 8” step
down or provide the top of footing elevation. This similar condition occurs at multiple free standing
CMU wall locations at outdoor recreation areas as well as other locations along the perimeter such as
along 1.2 between 1-B.3 and 1-C.
Response:
Yes, typical 8” step downs should be employed to allow for the passage of utilities. Confirm each
plumbing invert to achieve clearance without conflict. Steps shall not exceed 18”
A2-29 Question:
Please reference drawing S1.3.1.1, with attention to the spread footing along 1-4 between the F9 and F11
footings. As no footing width was provided, the default width of 2’-0” is assumed per C/S5.01, however,
the scaled width of the footing is 3’. Please confirm the footing width as 2’-0” per C/S5.01.
Response:
Contractor shall provide 2’ -0” Minimum footing width per C/S5.01, Unless Noted Otherwise.
A2-30 Question:
Reference drawings S1.3.1.1 & S1.3.1.2, as no wall elevations were provided, please confirm the CMU
wall height (from top of footing) is 20’-8 for the free standing CMU walls at the following locations:
a. Along 1-GG between 1-40 & 1-D
b. Along 3-5 between 1-4 & 1-H
c. Along 1-CC between 1-C.9 & 1-H
d. Along 2-C between 2-2 & 2-3
Response:
Architectural and Structural drawings are complimentary. Typical wall sections and dimensions for these
walls are provided within the Architectural series.
A2-31 Question:
Refer to drawings S1.3.1.1, S1.3.1.2 and section Q/S5.01, please provide the footing depth for the footing
along 1-H west of 3-5 and the similar condition east of 1-CC.
Response:
Detail “Q” S5.01 references details “C” and “D” on the same sheet that give the typical dimensions.
A2-32 Question:
Please reference the Outdoor Recreation areas on drawings S1.3.1.1, S1.3.1.2 & S1.3.1.3, please provide
footing dimensions for the L-shaped beams that appear to surround the outdoor rec toilets.
Response:
Footings below non-structural partitions at recreation yards shall be per detail L/S0.12
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 11 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
A2-33 Question:
Detail 28/A5.06 Tower Eave shows a bird stop under the metal barrel roof edge; sheets with roof edge
details such as A5.02 and A5.03 do not show a bird stop. Please clarify if bird stop is required and
provide a specification for it.
Response:
Refer to specification section 07 31 18, METAL TILE ROOFING, subsection 2.2.C for required end cap
closure.
A2-34 Question:
Drawing A1.3.1.4 references elevations 1/A2.10, 2/A2.10, 3/A2.10, 4/A2.10, 5/A2.10, 6/A2.10 &
7/A2.10, however drawing A2.10 was not provided. Please issue drawing A2.10.
Response:
Sheet A2.10 does not exist. Reference to these details is deleted by this addendum.
A2-35 Question:
Drawing A1.3.1.1 references elevations 1/A2.15, 2/A2.15 & 3/A2.15, however drawing A2.15 was not
provided. Please issue drawing A2.15.
Response:
Sheet A2.15 does not exist. Reference to these details is deleted by this addendum.
A2-36 Question:
Drawing Sheets A3.11, A5.01. Please provide a structural CMU detail for the lintels along 1-B spanning
between 1-DD and 1-3. The typical lintel detail D/S0.12 applies to maximum 7’-0 openings. The lintel
between 1-DD and 1-3.7 is shown on 3/A3.11 and 15/A5.01, and has a span of approximately 32’.
Response:
Contractor shall refer to wall elevations on Sheets S2.01 through S2.19 as referenced on foundation plans
for specific wall reinforcing requirements. Wall elevations shall govern over Detail D/S0.12. Multiple
rows of horizontal reinforcing shall be spaced vertically at 8-inch intervals. Contractor shall provide
additional jamb and lintel hairpin and U-bar reinforcing as indicated on Details D-1 and D-2/S0.12.
A2-37 Question:
Refer to S1.3.3.1, please provide a roof framing detail for the WF beam to CMU lintel connection for the
roof WF beams along 1-B between 1-DD and 1-3
Response:
Contractor shall provide WF Beam to Lintel connections per detail M/S7.03 at lintel along gridline 1-B
between grids 1-DD and 1-3.
A2-38 Question:
Refer to S1.3.3.1, please provide a roof framing detail for the WF beam to CMU lintel connection for the
roof tube steel beams along 1-B between 1-DD and 1-3.
Response:
Contractor shall provide HSS Beam to Lintel connections per detail D/S7.03 at lintel along gridline 1-B
between grids 1-DD and 1-3.
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 12 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
A2-39 Question:
Specification 03 30 00 paragraph 3.7/D requires isolation joints in slab-on-grade “at slab junctions with
vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as
indicated”. The foundation details on S5.01 & S5.02 do not show isolation joints. Please indicate if
isolation joints are required and respond with the effected details.
Response:
Isolation joints shall be omitted where SOG is doweled to structural elements such as columns, walls,
grade beams, etc.
A2-40 Question:
Specification 03 30 00 paragraph 2.10/C does not list the minimum compressive strength for slabs-on-
grade, however the Material Properties section of S0.01 indicates 3,000 psi compressive strength for
slab-on-grade. Please confirm 3,000 psi compressive strength concrete is required for all slabs-on-grade.
Response:
Concrete compressive strengths shall comply with the requirements indicated in “Material Properties”
general Notes Sheet S0.01
A2-41 Question:
Specification Section 313100 requires the Contractor and applicator to provide a five year warranty for
the soil treatment. Please confirm that this warranty is a pass-through from the subcontractor to the
Owner and that the Contractor's warranty remains 1-year from Final Completion.
Response:
The requirements of specification section 01 78 36, Guarantees and Warranties, apply to this
specification section the same as all other sections.
A2-42 Question:
Detail 28/A5.06 Tower Eave calls for a copper gutter but specification section 07 62 00 Sheet Metal
Flashing and Trim calls for sheet metal. Please confirm that the design intent of the gutters and
downspouts are sheet metal.
Response:
The annotation for copper is deleted by this addendum. Use 07 62 00 Sheet Metal.
A2-43 Question:
Note 32 on Drawing A1.1.7 states there are two cargo boxes outside the sallyport that are owner furnish
owner installed. Drawing A1.3.1.3 states "Contractor to provide 40'x10' shipping container" at this same
location. Please advise which note is correct.
Response:
The notes and layout on sheet A1.1.7 are correct. The note on sheet A1.3.1.3 is deleted by this
addendum.
A2-44 Question:
Section 28 46 19 – 2.1 A.15, Re: HMI Software. Is GE Cimplicity HMI acceptable alternative to
Wonderware or Indusoft?
Response:
Yes, when used with the GE Automation platform.
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 13 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
A2-45 Question:
Section 28 05 13-1.3 B.6, Re: Insulate Cable. Is West Penn Wire & Cable an acceptable product
manufacturer?
Response:
Yes.
A2-46 Question:
Section 28 13 00-1.3.B, Re: Access Control System. This specification list the WinDSX line of access
control products as 'no substitutions' because it is the County standard and already in use. Does the
County have a supplier or manufacturers rep who is familiar with the County installation and can provide
knowledgeable pricing and equipment needs?
Response:
Contact Mr. Bruce Clayton at Tel-Tec Security Systems, Bakersfield CA - https://www.tel-
tec.com?contact/contact=Bruce%20Clayton - (661) 397-5511
A2-47 Question:
Section 28 46 19 - 2.13 A, Re: Passive Duress Station. This paragraph describes the button as a
maintained action “PULL TO ACTIVATE”. Because of the maintained action, is this intended to be a
supervised input?
Response:
If you’re asking if the circuit should be supervised, the answer is No. If you’re asking if this should be a
processed input to the PLC, the answer is Yes.
A2-48 Question:
Section 28 00 00 - 1.2 A, Re: Local area network. Is it acceptable to configure the network using
separate VLANS for the 3 systems or is the requirement for 3 physically separate networks?
Response:
The requirement is for 3 physically separated networks.
A2-49 Question:
I respectfully ask that you move the security glass to Division 8.
Response:
Security glass and glazing is purposely specified in Division 11. The specification will stand as written.
A2-50 Question:
Drawing Sheet X1.3.2.20, Re: Cell Intercom. Cell F216 is shown without an intercom station. Is this
intentional or is there is F216 meant to have an intercom
Response:
Yes, F216 is meant to have an intercom.
A2-51 Question:
Drawing Sheet X1.3.2.20, Re: IPTV Locations. There are two IPTV locations shown with double
symbols. They are located near GL 2-A4.5 / 2-4 and 2-3.1 / 2-C. Is this by design?
Response:
No, only one IPTV outlet per location is required.
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 14 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
A2-52 Question:
Drawing Sheet X1.3.2.20, Re: Symbol Query. A symbol, not on the legend appears on the 2nd tier
drawings. It is a hexagon with two black triangles inset. What does this symbol indicate?
Response:
This is the location of Distributed Antenna System antenna and relates to drawing X7-04; also see this
Addendum.
A2-53 Question:
Section 28 13 00, Re: Access Control Manufacturers. Specification Section 281300 – Access Control
1.3 System Overview – Paragraph B States that the Access Control System will be DSX Access Systems
Inc. No Substitutions. Sections 2.8 Acceptable Manufacturers States that Honeywell will be an approved
Manufacturer. – Question: Please confirm that Honeywell is an approved manufacturer for the Access
Control Systems and other manufacturers will be considered by substitution request.
Response:
No, Section 1.3.B is correct; see this Addendum for correction to paragraph 2.8.A.
A2-54 Question:
Section 28 41 33, Re: Internet Protocol IPTV Signal Distribution System. Under the Summary
Paragraph A. 2 – It states that the Systems Integrator will provide a VOD Server at the IPTV headend.
Please provide the required size of the server based upon the Counties Administrative Network or
provide contact information for the County IT Department to coordinate the requirements of the server.
Response:
Use server specs as indicated in 28 41 33 IPTV Signal Distribution System, paragraph 2.5.A. for the
Content on Demand server.
A2-55 Question:
Drawing Sheets C1.2.04, C1.2.05, C5.2.02, Note 58 Hydrant. Please provide acceptable hydrant from
detail M on sheet C5.2.02.
Response:
Detail M on Sheet C5.2.02 shows a standard dry fire hydrant. American AVK, Series 2700, Modern
Style would be one example of an acceptable hydrant. Equivalent products will be considered.
END OF PRE-BID QUESTIONS
THIS ADDENDUM is hereby made a part of the Contract Documents dated September 14, 2015 on the
subject work as though originally included therein. The amendments, additions and/or corrections in this
Addendum shall govern this work and modify the original Project Manual and Drawings.
All other terms and conditions remain unchanged.
Any inquiries concerning this BID should be made to: Senior Project Manager, John Green, General
Services, E-mail: [email protected]. Mail: County of Santa Barbara, Northern Branch Jail Project,
912 West Foster Road, Santa Maria CA 93455, fax (805) 934-6144.
Attachment(s) to this Addendum:
Supplementary Drawings (Sketches)
1. SKA-A01 Architectural Louvers
2. SKA-A02 Alternate Bid #11
3. SKX-01 Yard Camera Modifications
SANTA BARBARA COUNTY - NORTHERN BRANCH JAIL PROJECT 15 of 15
BID ADDENDUM NO. 02
© 2016 PHASE 1, BID PACKAGE 1 – PROJECT NO. 8600 MARCH 21, 2016
4. SKX-02 Modifications to the CCTV Legend
5. SKX-03 Adds to the ISS Legend for DAS System
6. SKX-04 CCTV Modifications for Deputy Station ZZ103
7. SKX-05 CCTV Changes at Kitchen Courtyard
8. SKX-06 CCTV Changes at Laundry P186
9. S|KX-07 CCTV Changes at Booking
END OF THIS ADDENDUM
Two Peachtree Pointe1555 Peachtree Street, NESuite 800Atlanta GA 30309t 404 876 3800www.rosser.com
Rosser International, Inc.
Date Sketch no.
Project
Regarding
Reference
By
no.
Two Peachtree Pointe1555 Peachtree Street, NESuite 800Atlanta GA 30309t 404 876 3800www.rosser.com
Rosser International, Inc.
Date Sketch no.
Project
Regarding
Reference
By
no.
Scale
Project number
Date
Drawn by
Checked by
Rosser International, Inc.Two Peachtree Pointe1555 Peachtree St, NE - Suite 800Atlanta, Ga. 30309t 404 876 3800 - www.rosser.com
Santa Barbara CountyNorthern Branch Jail
Project - Phase I
8600
3/14/2016
LTL
WFR 1" = 60'
SKX-01
ALT 2 - YARD CAMERAS MODIFICATIONSREF DRWG X0.03
POLE MOUNTED 180 DEGREEMULTI-IMAGER DIGITAL CAMERASINTALL CENTER OF YARD ANDUPPER/LOWER 20' OFF FENCE -SEE SPECIFICATIONS
XXX
CCTV SYSTEM LEGEND
CEILING MOUNTED 4CIF DOME CLOSED CIRCUIT TV CAMERA
WALL MOUNTED 4CIF DIGITAL CLOSED CIRCUIT TV CAMERA -UON MOUNT EXT WALL MOUNT CAMERASAT 10'0" AFG
PAN TILT ZOOM CEILING MOUNT 4CIF DIGITAL CLOSED CIRCUIT TV CAMERA
CEILING MOUNTED MICROPHONE
1. PROVIDE ALL CAMERAS WITH LENS, ENCLOSURES, MOUNTS, ACCESSORIESFOR A COMPLETE CAMERA UNIT INSTALLATION
2. "ARROW" SHOWS INTENDED LINE OF VIEW. CONTRACTOR TO SUBMITVARI-FOCAL LENS AND FIELD OF VIEW WITH SHOP DRAWINGS
3. PROVIDE EXTERIOR RATED CAMERAS/HOUSINGS ON EXTERIOR OF THEFACILITY. POLE MOUNTED CAMERAS ARE INDICATED ON THE SITE PLAN.
4. TAGS"XX MP" INDICATES CAMERA TO BE MEGA-PIXEL HD IN RESOLUTION SHOWN"CC" INDICATES CAMERA CONTROLLED AT CENTRAL CONTROL ONLY"WA" INDICATES WIDE ANGLE CAMERA
INDICATES IP 5 MP 12 MP (UNO) DIGITAL FISHEYE 360 DEGREE HEMISPHERIC "PTZ" VS MECHANICAL(see specs)
360
PAN TILT ZOOM WALL OR POLE MOUNT 4CIF DIGITAL CLOSED CIRCUIT TV CAMERA - AT EXTERIOR 1.3 MP
180 - INDICATES 5 MP 12 MP (UNO) IP DIGITAL FISHEYE FOUR IMAGER 180 DEGREE HEMISPHERIC "PTZ"CAMERA (see specs)P - INDICATES POLYCOM 7000 SERIES (or equal) CAMERA/VIDEO CONFERENCING SYSTEM (see specs)
"CL" INDICATES CAMERA CONTROLLED AT CLUSTER CONTROL ONLY
CORNER MOUNT ELEVATOR CAB STYLE WIDE ANGLE 4CIF DIGITAL CCTV CAMERA
M
Scale
Project number
Date
Drawn by
Checked by
Rosser International, Inc.Two Peachtree Pointe1555 Peachtree St, NE - Suite 800Atlanta, Ga. 30309t 404 876 3800 - www.rosser.com
Santa Barbara CountyNorthern Branch Jail
Project - Phase I
8600
ADDENDUM 2 - CHANGES TO CCTV LEGENDREFERENCE X0.01
3/14/2016
LTLWFR NTS
SKX-02
INTERCOM LEGEND
INTERCOM STATION, INTERCOM CONTROLS SHALL BE INTEGRATED INTOASSOCIATED TOUCH SCREEN CONSOLE. MOUNT INTERCOM STATION 48" ABOVEFINISHED FLOOR TO CENTERLINE. WHERE NECESSARY TO MOUNT INTERCOMSTATION INTO HOLLOW METAL FRAMES COORDINATE WITH SECURITY/STANDARDHOLLOW METAL PROVIDER
1. INTERCOM SYSTEM CONDUIT AND CABLING TO ASSOCIATED SECURITY EQUIPMENTCABINET SHALL NOT BE LOOPED OR ROUTED FROM ONE DEVICE TO ANOTHER.EACH DEVICE WILL BE INDIVIDUALLY HOME RUN TO COMMUNICATION CABINET
2. CONTROL LOCATION SHALL ALWAYS BE THE LOCAL LOGICAL TOUCH SCREENOR CONTROL PANEL OR CONSOLE TO WHICH ASSOCIATED HARDWARE IS ROUTED.CENTRAL CONTROL WILL HAVE THE CAPABILITY TO OPERATE AND MONITOR ALLSTATIONS THROUGHOUT THE FACILITY.
VIDEO VISITATION SYSTEM
VIDEO VISITATION SYSTEM OUTLET AND STATION LOCATION. MOUNT BACKBOX 48" ABOVEFINISHED FLOOR OR IN MILLWORK AS PROVIDED. ROUTE CONDUCTORS IN CONDUITAND CABLE TRAY. VIDEO VISITATION OUTLETS SHOWN FOR LOCATION OF OUTLETS.VIDEO VISITATION CONDUIT, WIRING AND TERMINATION AT DATA PORT IS REQUIRED.THE VIDEO VISITATION EQUIPMENT IS NOT IN CONTRACT.
INMATE TELEPHONE RACEWAY SYSTEM
INMATE TELEPHONE OUTLET JUNCTION BOX AND CAT 6 CABLE PULLED TO NEAREST SECURITYEQUIPMENT ROOM EQUIPPED WITH INMATE TELEPHONE BACKBOARDS VIA RACEWAYAND/OR CABLE TRAY. MOUNT AT 48" AFF TO C/L UNLESS AT PEDESTALS MOUNT AT MANUFDESIGNATED HEIGHT
DATA PORT ON VIDEO VISITATION NETWORK ONLY. MOUNT AT 1'6" AFF TO CENTERLINE. TO BE USED FOR PORTABLE VIDEO VISITATION SYSTEMS. PROVIDE POWER.
VV
IT
RF BOOSTER SYSTEM RACEWAY SYSTEM
INDICATE THE ANTENNA LOCATION FOR THE DISTRIBUTED ANTENNA SYSTEM (DAS) FOR THE RFBOOSTER SYSTEM. CABLE AND/OR PATH DROP FROM PULL BOX ABOVE EACH ANTENNALOCATION TO CEILING MOUNT ANTENNA - FOR DETAILS SEE X7.04.
Scale
Project number
Date
Drawn by
Checked by
Rosser International, Inc.Two Peachtree Pointe1555 Peachtree St, NE - Suite 800Atlanta, Ga. 30309t 404 876 3800 - www.rosser.com
Santa Barbara CountyNorthern Branch Jail
Project - Phase I
8600
SKX-033/14/2016
LTL
WFR NTS
ADDENDUM 2 - CHANGES TO LEGEND ADD DASREFERENCE X0.01
EXAMC124
SAFETY VSTBLC125
EXAMB143
SAFETY VSTBLD119
EXAMD120
48" AFF
CC CL CC CL
CC CL CC CL
WAP
360 Degree 5MPCeiling Mount 10'AFFCU
CC CL
DEPUTY STTN
Z103
C1HR
CS
1HR
CC CL CC CL
CC CL CC CL
Scale
Project number
Date
Drawn by
Checked by
Rosser International, Inc.Two Peachtree Pointe1555 Peachtree St, NE - Suite 800Atlanta, Ga. 30309t 404 876 3800 - www.rosser.com
Santa Barbara CountyNorthern Branch Jail
Project - Phase I
8600
DELETE 360DEGREE 5 MPCAMERA
ADD FOUR EAWALL MOUNTFIXED CAMERASAT 10' 0" AFF
3/14/2016
LTLWFR 3/16" = 1'
ADD 2 - CCTV CHANGES AT DEPUTY STTN Z103REFERENCE DRWG X1.3.1.11
SKX-04
H
4-1 4-3
COOKINGK6
KITCHENK100
18010'0" AFG
CC
CC
834
799
DELETE 180DEGREE CAMERA
ADD TWO EACH 1.3 MPFIXED WALL MOUNTCAMERAS - EACH MUSTACHIEVE 90 DEGREEFOV - MOUNT 10' AFG
CC
CC
Scale
Project number
Date
Drawn by
Checked by
Rosser International, Inc.Two Peachtree Pointe1555 Peachtree St, NE - Suite 800Atlanta, Ga. 30309t 404 876 3800 - www.rosser.com
Santa Barbara CountyNorthern Branch Jail
Project - Phase I
8600
WEST WALL OF KITCHEN AT COURTYARD
ADDENDUM 2 - CCTV CHANGES AT KITCHEN CYREFERENCE DRWG X1.3.1.41
3/14/2016
LTL
WFR 3/16" = 1'
SKX-05
LAUNDRYP186
STAFF TLTP185
360
WAP
CC
CO3HR
C1HR
646
DELETE 360 DEGREECAMERA
ADD TWO CEILINGMOUNTED CAMERAS
LAUNDRY
Scale
Project number
Date
Drawn by
Checked by
Rosser International, Inc.Two Peachtree Pointe1555 Peachtree St, NE - Suite 800Atlanta, Ga. 30309t 404 876 3800 - www.rosser.com
Santa Barbara CountyNorthern Branch Jail
Project - Phase I
8600
3/14/2016LTL
WFR 3/16" = 1'
SKX-06
ADDENDUM 2 - CCTV CHANGES - LAUNDRYREFER TO DRWG X1.3.1.42
M M
KKKK
PHOTOX106 RECEIVING STTN
X115
TEMP PROPERTYX116
360
WAP
CU
CIRC-2X138-2
CU
C1HR
630 629 634628
313DELETE 360 DEGREECAMERA
ADD 180 DEGREE CEILINGMOUNT CAMERA -BRING MICROPHONE INPUTSTO THIS CAMERA IN LIEUOF THE DELETED 360DEGREE CAMERA
180
Scale
Project number
Date
Drawn by
Checked by
Rosser International, Inc.Two Peachtree Pointe1555 Peachtree St, NE - Suite 800Atlanta, Ga. 30309t 404 876 3800 - www.rosser.com
Santa Barbara CountyNorthern Branch Jail
Project - Phase I
8600
3/15/2016
LTL
WFR 3/16" = 1'
ADDENDUM 2 - CCTV CHANGE - BOOKINGREFERENCE DRWG X1.3.1.33
SKX-07