bharat heavy electricals limited · 2. applicability of bbr certificate & compliance with...

3
Ref. No. : PE/PG/BIF/E-5982/2018 /CORRIGENDA/01 Date: 07.07.2018 Devendra Singh, Sr. Engineer/PG-I/PEM Power Project Engineering Institute Building HRD & ESI Complex Plot No. 25, Sector -16 A, BHEL-PEM,Noida-201301 (U.P.) Tel No. 0120-4368877, 7503632335 Page 1 of 1 Project Engineering Management Bharat Heavy Electricals Limited (A Govt. Of India Undertaking) CORRIGENDA / ADDENDUM-01 PROJECT : 2X660 MW BIFPCL MAITREE KHULNA STPP-BANGLADESH PACKAGE NAME: CONTROL VALVE (FDVs) Our Ref : ENQUIRY No : PE/PG/BIF/E-5982/2018, Dtd- 28.06.2018 DUE DATE 17-July-2018 BY 02:00 PM (IST) Please find below technical amendment: REASON FOR AMENDMENT: Change in Pipe Size & Applicability of BBR Requirement. SPECIFICATION No: PE-TS-421-145-I801B S No. Sec / Clause No. / Sheet No. Existing Clause Revised Clause after Amendment 1. Section-C Datasheet-A & B: Pipe Size & BBR Requirement 1. Datasheet A & B: Pipe Size: 210x42 2. Bangladesh Boiler Act, 1923 with amendments Compliance & essential Certificate: Not required 1. Datasheet A & B: Pipe Size: 210x45 2. Applicability of BBR Certificate & Compliance with Bangladesh Boiler Act, 1923 with amendments Refer updated Datasheet attached as Annexure I. Accordingly, the bid submission of tender for CONTROL VALVE (FDVs) invited vide above Enquiry is extended up to 17.07.2018 at 02:00 PM (IST). Thanking You. For & on Behalf of BHEL,

Upload: others

Post on 08-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bharat Heavy Electricals Limited · 2. Applicability of BBR Certificate & Compliance with Bangladesh Boiler Act, 1923 with amendments Refer updated Datasheet attached as Annexure

Ref. No. : PE/PG/BIF/E-5982/2018/CORRIGENDA/01 Date: 07.07.2018

Devendra Singh, Sr. Engineer/PG-I/PEM Power Project Engineering Institute Building

HRD & ESI Complex Plot No. 25, Sector -16 A,

BHEL-PEM,Noida-201301 (U.P.)

Tel No. 0120-4368877, 7503632335 Page 1 of 1

Project Engineering

Management Bharat Heavy Electricals Limited (A Govt. Of India Undertaking)

CORRIGENDA / ADDENDUM-01

PROJECT : 2X660 MW BIFPCL MAITREE KHULNA STPP-BANGLADESH

PACKAGE NAME: CONTROL VALVE (FDVs)

Our Ref : ENQUIRY No : PE/PG/BIF/E-5982/2018, Dtd- 28.06.2018

DUE DATE

17-July-2018

BY 02:00 PM (IST)

Please find below technical amendment:

REASON FOR AMENDMENT: Change in Pipe Size & Applicability of BBR Requirement.

SPECIFICATION No: PE-TS-421-145-I801B

S

No.

Sec / Clause

No. / Sheet

No.

Existing Clause

Revised Clause after Amendment

1.

Section-C

Datasheet-A

& B: Pipe

Size & BBR

Requirement

1. Datasheet –A & B:

Pipe Size: 210x42

2. Bangladesh Boiler

Act, 1923 with

amendments

Compliance &

essential Certificate:

Not required

1. Datasheet –A & B: Pipe Size: 210x45

2. Applicability of BBR Certificate &

Compliance with Bangladesh Boiler Act, 1923

with amendments

Refer updated Datasheet attached as Annexure I.

Accordingly, the bid submission of tender for CONTROL VALVE (FDVs) invited vide above Enquiry is

extended up to 17.07.2018 at 02:00 PM (IST).

Thanking You.

For & on Behalf of BHEL,

Page 2: Bharat Heavy Electricals Limited · 2. Applicability of BBR Certificate & Compliance with Bangladesh Boiler Act, 1923 with amendments Refer updated Datasheet attached as Annexure
Page 3: Bharat Heavy Electricals Limited · 2. Applicability of BBR Certificate & Compliance with Bangladesh Boiler Act, 1923 with amendments Refer updated Datasheet attached as Annexure