bge’s smart energy pricing the national town meeting on demand response and smart grid

17
BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid Cheryl Hindes Director -- Load Analysis and Settlement July 14, 2009

Upload: leal

Post on 23-Jan-2016

39 views

Category:

Documents


0 download

DESCRIPTION

BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid. Cheryl Hindes Director -- Load Analysis and Settlement July 14, 2009. BGE’s 2008 Smart Energy Pricing (SEP) Pilot featured Peak Time Rebate and Critical Peak Pricing. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

Cheryl Hindes Director -- Load Analysis and SettlementJuly 14, 2009

Page 2: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

BGE’s 2008 Smart Energy Pricing (SEP) Pilot featured Peak Time Rebate and Critical Peak Pricing

Pilot of 1,375 residential customers in Summer 2008: 1,021 participants, 354 control group

Pilot included Dynamic Peak Pricing (DPP or CPP) and Peak Time Rebate (PTR)

Customers were given day ahead notification of critical peak event by their choice of methods

E-mail, telephone call, text message (up to 5 of each)

Certain had the Ambient Energy Orb, signaling prices by color code and pulsing light

Sample of customers had ‘enabling technology’ (ET = smart A/C switch)

Very favorable customer satisfaction results confirm customers’ interest

Key findings of impact assessment conducted by The Brattle Group:

Price elasticities for DPP and PTR were not statistically different

On average customers save

22 – 37% at peak conditions* (*PJM definition: hour ending 17:00 with WTHI of 83.1)

18 – 33% during 50 critical hours

1

Page 3: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Dynamic Peak Pricing: Weekdays (excluding Holidays)

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Rat

e ($

/kW

h)

Hour of Day

Current Rate

Critical Peak

New Rate

2

Pilot Pricing All – in Rate*

Critical $1.30425Peak $0.14425Off-Peak $0.09425

* Includes generation,

transmission and delivery

$1.30

$0.14

$0.09

Page 4: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Peak Time Rebate: Weekdays (excluding Holidays)

A Mirror Image of the DPP Rate

- Schedule R summer rates are $0.14 / kWh for all summer hours

- Up to 12 critical peak days will be called by 6 p.m. the prior day

- Customers who use less during the critical period (2 – 7 p.m.) on any critical peak day will receive a rebate. Two levels being tested:

– $1.75/kWh

– $1.16/kWh

3

Page 5: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Smart Energy Pricing Pilot Design

Group TotalPTR Low Rebate

PTR High Rebate

Dynamic Peak Pricing

Control Group

Without Enabling Technology 675 125 125 125 300

With Orb Technology 250 125 125 0 0

With Orb and AC Switch Technologies 375 125 125 125 0

Total 1300 375 375 250 300

4

BGE’s SEP Pilot: 1,300 accounts, a statistically significant sample

Page 6: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Summer 2008 PilotSmart Energy Pricing - Peak Demand Reductions *

6

Orb & Switch

OrbOnly

No Tech

Orb & Switch

*Peak demand reductions are defined for HE 17:00 for THI of 83.1 degrees

Low Rebate$1.16 / kWh

High Rebate$1.75 / kWh

DPP TariffNo Tech

Orb &Switch

Orb &Switch

Orb &Switch

No Tech

No Tech

OrbOnly

OrbOnly

Page 7: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Summer 2008 Pilot Average Energy Savings over Critical Events **

7

Low Rebate$1.16 / kWh

** Critical events are the first 10 (of 12) called events during 2008 pilot from HE15:00 to HE19:00

High Rebate$1.75 / kWh

-20.1%

-32.5%

-17.8%

-23.0%

-28.5%

-20.9%

-26.8%

-32.9%

-40%

-35%

-30%

-25%

-20%

-15%

-10%

-5%

0%Impact

% C

han

ge in

Cri

tica

l Pea

k D

eman

d

DPP DPP_ET_ORB PTRL PTRL_ORB

PTRL_ET_ORB PTRH PTRH_ORB PTRH_ET_ORB

DPP TariffNo Tech

Orb &Switch

Orb &Switch

Orb &Switch

No Tech

No Tech

OrbOnly

OrbOnly

Page 8: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Customers Were Satisfied with Smart Energy Pricing!

8

On a scale of 1 to 5, where 1 is "Very Dissatisfied" and 5 is "Very Satisfied", please rate your overall satisfaction with the pilot program. (77% response rate)

Page 9: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company 9

Customers Think Smart Energy Pricing Should be the StandardDuring your pilot participation, you experienced a variable rate program where energy used during critical peak periods cost more than energy use during other times. Customers saved money by using energy during non-critical peak periods. Do you think this pricing format should be standard for all BGE customers? (Select one option)

97% would like to return to the same pricing structure in 2009

Page 10: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

PTR More Favorable than DPP, Overall 93% Satisfied

10

On a scale of 1 to 5, where 1 is "Very Dissatisfied" and 5 is "Very Satisfied", please rate your overall satisfaction with the pilot program. (77% response rate)

Page 11: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Peak Time Rebate Widely Favored

BGE held 6 focus groups in 2007 focused on CPP

Our customers said they need help in understanding their usage and how they could save

Our customers said CPP could not be a default rate

More customers were very satisfied with PTR (66%) than with CPP (48%)

MD PSC and Office of People’s Counsel questioned the appropriateness of CPP as default and favored PTR instead

Most (81%) PTR participants think PTR should be standard (default) pricing

11

DOE’s FOA notes its interest in CPP and RTPBGE’s experience suggests adding PTR to the mix

Page 12: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Appendix

12

Page 13: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Summer 2008 Pilot Summary of The Brattle Group Analysis

13

Control GroupControl Group Average Usage

kW % kW kWh/hour % kWh/hour

PTR Low - $1.16 / kWhNo Technology 126 3.19 22.3% 0.71 2.70 17.8% 0.48Orb Technology 141 3.19 26.9% 0.86 2.70 23.0% 0.62Orb and Switch Technologies 113 3.19 31.9% 1.02 2.70 28.5% 0.77

PTR - $1.75 / kWhNo Technology 127 3.19 26.0% 0.83 2.70 20.9% 0.56Orb Technology 137 3.19 31.2% 1.00 2.70 26.8% 0.72Orb and Switch Technologies 118 3.19 36.8% 1.17 2.70 32.9% 0.89

Dynamic Peak PricingNo Technology 148 3.19 25.4% 0.81 2.70 20.1% 0.54Orb and Switch Technologies 111 3.19 36.5% 1.16 2.70 32.5% 0.88

WTHI = [current day’s THI]*(10/14)+ [previous day’s THI] * (3/14)+ [two day's ago THI] * (1/14)THI t = 17.5 + .55*DryBulb t + .2*WetBulb t

Peak Demand Savings*** Energy Savings for SEP Critical Events**

ProgramNumber of Customers

** 'SEP Critical Events' are defined as the 10 hottest critical events during the 2008 summer from HE 15:00 to HE 19:00 *** 'Peak Demand Savings' are defined as hour ending 17:00, for WTHI of 83.1 degrees

Participant Peak Reduction

Average Participant Reduction

Page 14: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company 1414

Sun

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30

June 2008

Sun

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30

Sun

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

July 2008

September 2008Sun

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24

31

25 26 27 28 29 30

August 2008

High Temp

92

96

92

92

91

89

9290

92 92

73

72

Despite Unseasonably Mild Weather, BGE called 12 Smart Energy Pricing Events in 2008

Page 15: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

Smart Energy Pricing Continues in 2009

Small commercial customers added

Assessing the level of savings as compared to the Summer of 2008 for returning residential customer

Added Smart Thermostats (in addition to Smart Switches)

Added Twitter

Tips, notifications, reminders, “way to go!”

Posted 20 Tweets in June

Simulating “PJM Emergency Events”

Notification 30 – 60 minutes prior to event

15

Page 16: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

BGE Service Territory

Page 17: BGE’s Smart Energy Pricing The National Town Meeting on Demand Response and Smart Grid

BGE®, A Constellation Energy Company

BGE’s Business at a Glance

Residential 1,033.4 Commercial 108.9 Industrial 5.0

Total 1,147.3

Residential 553.7 Commercial 40.1 Industrial 1.4

Total 595.2

Accounts (in thousands)

Electric

Gas

Electric T&D

- delivers through 2,300 square miles of territory

- circuit miles:

– 21,819 of distribution(< 34.5 kV)

– 1,297 of transmission( > 115 kV)

Gas Distribution

- stores and delivers gas

– two peak shaving plants

– nine gate stations

– 5,870 miles of gas main