beyond waste plan and p2 diana olegre, hq tony cooper, swro wa state department of ecology may 25,...
TRANSCRIPT
![Page 1: Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006](https://reader035.vdocuments.us/reader035/viewer/2022071807/56649e0b5503460f94af3dc4/html5/thumbnails/1.jpg)
Beyond Waste Plan and P2
Diana Olegre, HQTony Cooper, SWROWA State Department of Ecology
May 25, 2006
![Page 2: Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006](https://reader035.vdocuments.us/reader035/viewer/2022071807/56649e0b5503460f94af3dc4/html5/thumbnails/2.jpg)
Improve P2 Plan Quality
Renew sector expert system and update sectors website
Make a set of standard estimates for HS constituent contentSome facilities have both difficult
inventories and attribute low value to inventories, e.g. autobody facilities
![Page 3: Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006](https://reader035.vdocuments.us/reader035/viewer/2022071807/56649e0b5503460f94af3dc4/html5/thumbnails/3.jpg)
Improve P2 Plan Quality
Improve guidance on how to conduct an inventory of hazardous substances
Create automated audits for P2 plans so that most errors are caught before review begins
![Page 4: Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006](https://reader035.vdocuments.us/reader035/viewer/2022071807/56649e0b5503460f94af3dc4/html5/thumbnails/4.jpg)
Lean Manufacturing and Environment Pilot project funded by EPA
PPG grant and BW Pilot Projects
Partnership with Washington Manufacturing Services (WMS)
ECY dovetails environment into WMS’ Lean
![Page 5: Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006](https://reader035.vdocuments.us/reader035/viewer/2022071807/56649e0b5503460f94af3dc4/html5/thumbnails/5.jpg)
Lean Manufacturing and Environment Objectives
Explore and document how environmental considerations (e.g., risk & waste) add value to Lean Mfg. efforts
Reduce environmental impacts and costs Promote design of a product / process to
reduce toxics Explore collaboration between Ecology and
WMS
![Page 6: Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006](https://reader035.vdocuments.us/reader035/viewer/2022071807/56649e0b5503460f94af3dc4/html5/thumbnails/6.jpg)
Lean & E Pilot Projects
Located in 3 different regions
Two post-pilot workshops Ross & Assoc. and PPRC are
documenting results
![Page 7: Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006](https://reader035.vdocuments.us/reader035/viewer/2022071807/56649e0b5503460f94af3dc4/html5/thumbnails/7.jpg)
Lean & E Design Pilots
ObjectiveReduce toxics footprint by re-
designing a product or manufacturing process using Lean tools with environmental emphasis
Currently in process At least one pilot
![Page 8: Beyond Waste Plan and P2 Diana Olegre, HQ Tony Cooper, SWRO WA State Department of Ecology May 25, 2006](https://reader035.vdocuments.us/reader035/viewer/2022071807/56649e0b5503460f94af3dc4/html5/thumbnails/8.jpg)
Contacts
Beyond Waste Plan & Initiatives Chris Chapman, Contract Manager, 360.407.7160,
[email protected] www.ecy.wa.gov/beyondwaste
Beyond Waste P2 Contracts Dennis Johnson, 425.649.7040,
[email protected] Lean Manufacturing and Environment
Hugh O’Neill, Project Supervisor, 360.407.6354, [email protected]
Margit Bantowsky, Project Manager, 360.407.6353, [email protected]