ft,~ DeweyBurdNonfubEmn Resource _____________ From: Sent: To: Cc: Subject: Attachments: Burrows, Ro.ald Tuesday, February 08, 2011 8:56 AM Lancaster, Thomas; Mandeville, Douglas; Kurian, Varughese VonTill, Bill; Cohen, Stephen; McConnell, Keith Powertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs review of Powertech's RAI response. Please let me know of any corrections/changes. Thanks again for your work on this. Ron BEST AVAILABLE COPY * . (,"r ' 1

Upload: others

Post on 27-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

ft,~

DeweyBurdNonfubEmn Resource _____________

From:Sent:To:Cc:Subject:Attachments:

Burrows, Ro.aldTuesday, February 08, 2011 8:56 AMLancaster, Thomas; Mandeville, Douglas; Kurian, VarugheseVonTill, Bill; Cohen, Stephen; McConnell, KeithPowertech Accept Rev of all Responses merged 2.8.1 l.xlsxPowertech Accept Rev of all Responses merged 2.8.1 1.xlsx

Team,

Attached is the current status of staffs review of Powertech's RAI response.

Please let me know of any corrections/changes.

Thanks again for your work on this.

Ron

BEST AVAILABLE COPY

* . (,"r '

1

Page 2: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Hearing Identifier:Email Number:

PowertechUraniumDeweyBurdockLANonPublic613

Mail Envelope Properties (44CD2E65B0FF0E499CB32BC30CF781 F04009A92787)

Subject:Sent Date:Received Date:From:

Created By:

Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx2/8/2011 8:55:39 AM2/8/2011 8:56:43 AMBurrows, Ronald

[email protected]

Recipients:"VonTill, Bill" <[email protected]>Tracking Status: None"Cohen, Stephen" <[email protected]>Tracking Status: None"McConnell, Keith" <[email protected]>Tracking Status: None"Lancaster, Thomas" <Thomas. [email protected]>Tracking Status: None"Mandeville, Douglas" <Douglas. [email protected]>Tracking Status: None"Kurian, Varughese" <[email protected]>Tracking Status: None

Post Office: HQCLSTRO1.nrc.gov

Files Size Date & TimeMESSAGE 204 2/8/2011 8:56:43 AMPowertech Accept Rev of all Responses merged 2.8.11.xlsx 68588

OptionsPriority:Return Notification:Reply Requested:Sensitivity:Expiration Date:Recipients Received:

StandardNoNoNormal

Page 3: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

NRC Acceptance Review of Powertech's RAI Responses For the Dewey-Burdock Project (January 2011)

RAI # Hard Copy Dic Copy Acceptable? CommentsSubiect Addressed Present Locaton Present Location

(b)(5)

Administrative- Generic N/A N Y See comment.

y Section 2, SheCharacteristics

y Section 2, SiteCharacteristics

(b)(5)

N/A N

N/A N

N/A N

(b)(5)

(b)(5)

All N All

Page 4: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

WA Y Y

Administrative. Specific TR-RAI-P&R-14d

TR-RAI*P&R-14f

TR-RAI-P&R-14g

No

No

No

could not locate response

could not locate response

could not locate response

TR.RAI-P&R-14j Yes

TR.RAI-2.7-3 Yes

TR-RAI5.2.3 No

(b)(5)

(b)(5)

(b)(5)

TR-RAI-57.73-3(b) N 5,7.3-3 (a) N 5.7.3.3 (a) 5,7,3-3 is not found.

Page 5: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)

TR-RAI-5.7.7.2 N Appendix 2.5-C

TR-RAI-2,5-1 b N 2.5-1 b

N Appendix 2.5-C

N 2.51,2.52

Y 2.8,4 & 2.9.3.2.1

In the hard copy the reference is given as 2.5_Dand in the CD R is given as 2.5.C

(b)(5)

(b)(5)

The response of TRRAI-2,51 (b) given in hardcopy and CD are different

Could not find in hard copy

TR revision index does not include TR RAI.2,5-11.

#4 (a,b,c, d &e) N NA

MeteorologyTR Section 2.5

(b)(5)

Process & Restoration-vertical position of ore bodies P&R*1

in aquifers

no(b)(5) TR Section 2.7.2.2.5yes and Exhibits

Page 6: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Fb)(5) (b(5)

Process & Restoration- cross P&R-8sections with logs

Process & Restoration-plugging and abandonment

Process & Restoration. Number P&R-10& location of wells

Process & Restoration-pumping test details

Process & Restoration- breccia P&R-12apipes

Process & Restoration- high,flat potentiometric surface of P&R-12b

Lakota in N. Dewey

Process & Restoration. control& containment re infrastructure P&R-13

outside of boundary

yes Exhibits

yes P&R 9

5)• P&R 10 includesresponse andP&RIO Well Table

no

yes Exhtbits

N/A

no - Attachment- P&R1O

(b)(5) Well Table onlyprovided

no

no

yes 2.7.2,2.8

n exhibits

Response was satisfactory, but replacement

pages were not found

(b)(5)

no

RAI 2.7-5 containsyes 2.7.2.2.8.

(b)(5)

yes

(b)(5)

(b)(5)

Page 7: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)(b)(5)

Process & Restoration-inventoryof economical sig. mineral &energy-related deposits and

activities

Process & Restoration- seismicevaluation to include event N. of P&R-3

Dewey

Process & Restoration- dataand structure map for top of P&R-4

Morrison

Process & Restoration-hydraulic connection between P&R-5

Fall River & surface

Process & Restoration-confining capacity of Fuson

Process & Restoration- Aquifer P&R-7test

TR Section 2.2.2,yes P&R-2, Exhibit 2.2-1 yes Exhibit 2.2-1

yes P&R-3

no -

yes Env. Report

yes Env, Repor

yes P&R-7

yes 2.6.6,1.1

yes 2.7.2.2.16

no

no

yes Appendix 2.7k

(b)(5)

(b)(5)

(b)(5)

U -

Page 8: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)

~b)(5)

m.

(b)(5) 1(b)(5)

Process and restoration - clarify TR-RAI-P&R-14aliquid waste disposal option

Yes

i(b)(5) 'b )(5)

Process and restoration -identity preferred option for

liquid waste disposal

Process and restoration - waterbalance for liquid waste

generation

TR-RAI-P&R.14b Yes

TR-RAI-P&R-14c Yes

!(b)(5)

Page 9: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Process and restoration - waterquality for deep well disposal

Process and restoration deepdisposal well details

Process and restoration - pondcontingencies for >10 years

Process and restoration -central plant brine pond and

purpose

TA-RAtI-P&IR-14d

TR-RAI-P&R-14e

TR-RAI.P&R-14f

TR-RAI-P&R-14g

MLl10050468, page23 says to see

No response andreplacement pages

for P&R-14(d).

ML102380514 andML102380515

ML110050468, page24 says to see

No response andreplacement pagesfor P&R-14(f) in TR

ML110050468, page24 says to seeresponse and

No replacement pagesfor P&R-14(g), could

not locatereplacement pagesin ADAMS version

(b)(5) could not locate response in ADAMS version.also identified as administrative issue

copy of Class V injection permit to EPAincluded in submittal

identified as administrative issue

identified as administrative issue

(b)(5)(b)(5)

Process and restoration - pond TR.RAI-P&R-14hconstruction design specs Yes

Page 10: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)'b)(5)

Process and restoration,impoundment inspections

Process and restoration,multiple tank failure

Process and restoration,shutdown controls for DDW

TR-RAI-P&R-14i Yes

possible administrate i

ML1`10050468, page25 says to seeresponse and

replacement pagesfor P&R-14(), could

TR-RAI-P&R-14j Yes not find replacementpages,

ML102380516 (b)(5)(b)(5)

ML1 02380514 andTR-RAI-P&R-14k Yes MU102380514ML102380515

(b)(5)

,opy of Class V injection permit to EPAncluded in submittal

Page 11: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

U-(b)(5) lDX)/•

Process and restoration -112.(2) waste disposal

agreement

Process and restoralion, landclean-up program

Process and restoration, landclean-up program

Process and restoration, landclean-up program

TR-RAt-P&R-15 Yes ML110050468,page25

TR-RAI.P&R.16(1)

TR-RAI.P&R-16(2)

TR.RAI-P&R-16(3)

N

N

Y

Reviewer could not locate replacement pagesas indicated in the response,

Reviewer could not locate replacement pagesas indicated in the response.

TR-RAI-P&R-17 N

May 19 Teleconference,RadlologIcal Issues

#1

#2

#3

Y 5.1.5

Y 5.22 & 5.4

y 5.22&5.4

Y 5,1.5

y 5,22 & 5.4

Y 5.22 & 5.4

Y 2,8,4 & 2.9.3.2.1

ýb)(5)

Reviewer could not locate replacement pagesas indicated in the response,

(b)(5)

(b)(5)

(b)(5)

(b)(5)

#4 (a,b,c, d &e) N NA

Page 12: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) ~b)(5)(b)(5) (b)(5)

#5 y TR -RAI-RI-5 N N

Miscellaneous

Miscellaneous- chemicals with TR-RAI-MI-1a y Response for TR- yespotential to impact rad safety RAI-MI-1a

(b)(5)

(b)(5)

Miscellaneous- storage TR-RAI-MI-lb yeslocations of chemicals

Response for TR-RAI-MI-la yes

Miscellaneous- acid storage and TR-RAI-MI-ic yesventilation

Response for TR-RAI-MI-la yes

W-

Page 13: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

U-(b)(5) Response not found in hard copy. F :(5(b)(5)

Miscellaneous. Yellowcakedryer operation, Criterion 8.

Miscellaneous- backup in eventof power failure

Miscellaneous- commitment tosurety mechanism

Miscellaneous- update suretyprior to licensing

TR-RAI-MI-2 No Yes Revised text in 4,1,2,2

'b )(5)

TR-RAI-MI-3

TR-RAI-MI-4a

TR-RAI-Mt-4b

Response for TR-yes RAI-MI-3

TRRAI-6.4 seriesyes of responses

yes(b)(5)

yes

yesTRWRAI-6,4 series of

responses

.(b)(5)

(b)(5)

yes (b)(5)

Page 14: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Miscellaneous- discussion oftables

TR-RAI-MI-4c yes yes

Miscellaneous- pore volumesand flare factor

TR-RAI.MI-4d yes Appendix 6.6 B yes

Miscellaneous- surety-relatedcommitments

TR-RAI-MI-4eTRRAI-6.4 series

yes of responsesTRRAI-6.4 series of

responses

Miscellaneous - floodplainanalysis

ML10050468, page147-238;

TR-RAI-MI-5 Yes 147-28;Mpg1 10130328,

pages 141 to 187

Page 15: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

~b)(5)(b)(5)

Miscellaneous - peak flows,ero5ion proectron

2.5 Meteorology

ML10050468, page

TR-RAI-MI-6 Yes 147-238;MLl10130328,

pages 141 to 187

ýIb)(5)

TR-RAI-2.5-1 a2,5.2, Appendix 2,5 Y 25.2, Appendi 2.5 D

D

TR-RAI-2,5-1 b N 2.5-1 b

TR-RAI-2.5-1 c y 2.53.2

2.5.3.2,1 & tableTR-RAI-2,5-2 yI 2.58

IN 2.51,2.52

Y 2.5.3.2

(b)(5)

(b)(5)

y 2.5.3.2.1 & table 2.58

Page 16: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) Quarterly wind speed is not provided. Winddirection and wind speed ioint, ioint relativefrequency is not found.l(b)(5)

TR-RAI-2.5-3 y 2.5.3.2.2 Y 2,5.3.2.2 (b)(5)

(b)(5)

TR-RAI.2,5-4 y Appendix 2.50 page Y Appendix 2.5D pageC3 C3

TR .RAI.2,5 a & b Y App, 2,5D P C12.C13 and C26-27

Y App, 2.50 P C12.C13and C26-27

TR-RAI.2.5-6 Y App, 2,5D P 30 Y App. 2.50 P 30

(b)(5)

TR-RI-2.-7 Y 2.5.3,2.1 and Table2.5-9

TR-RAI-2.5-8 Y 2.5.3.2.3

Y 2.5.3.2.1 andTble2.5.9

y 2.5,3.2.3

TR-RAI-2.5-9 Y 2.5D P 24 Table 4.1 Y 2.5D P 24 Table 4-1

Page 17: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) #(5)

TR-RAI-2.5-10 Y 2.5.1 Para 3 Y 2.5,1 Para 3

TR-RAI-2.5-11 Y 2.51 P 2-59 Y 2,51 P 2-59

(b)(5)

Geology/Seismology.Newcastle Sandstone

TR RAI-2.6-1 yes Response 1to RA 2.6- yes 2.6.1,2 and 2.7.2.2.6

Geo/Seismo-MinnewasteLimestone

TR RAI-2.6-2 yesResponse to RAI 2.6.

2 yes 2.6.1.2

Page 18: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Geo/Seismo-mineralogy TR RAI-2,6-3 yes Responseto RAI 2,6- yes 2.6.3

Geo/Seismo-well abandonmentrecords

TR RAI-2,6-4Response to RAI 2.6-yes 4yes 2,2.3.2.3 and 2,6.4

Hydrology- Figure 2.7-1 SiteDrainage Systems (obsolete

figure)

Hydrology - Drainage at Dewey

Hydrology - Peak flows/waterlevels. Figures 2.7-10 and 2.7-

11 replaced

TR-RAI-2.7-1

TR-RAI-2.7-2

TR-RAI-2.7-3

Yes ML1110130328,page 141

Yes MLl110130328,page 142-146

ML10050468, pageYes 147.238;Ys ML110130328,

pages 141 to 187

Page 19: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Hydrology - Erosion Risks TR-RAI-2,7-4 Yes MLIOO130328,pages 153-186

Hydrology- Figure 2.7-1 "SiteDrainage Systems"

(obsolete figure)TR RAI-2.7-1 yes TR RAI-2.7-1 yes

Hydrology-Drainage at Dewey TR RAI-2.7-2 yes

Hydrology-Peak flows/aterlevels. Figures 2.7-10 and TR.RAI-2.7-3 no

2.7-11 Replaced

TR RAI-2.7-2 yes

no

Hydrology-Erosion risks

Hydro -potentiometric Surfaceof the Fall River and

Lakota Aquifers

TR RAI-2.7-4 no

TR RAI-2.7.5 yes

yes

yes

Hydrology-potentiometric head TR Rl-2.7-6 ymethod/artesian

yes

Page 20: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

Hydrology-structure maps TR RAI-27-7 yes TR RAI-2.7-7 NIA

(b)(5)

(b)(5)

Hydrology-potentiometric maps TR RAI-2.7-8

Hydrology-discharge to alluvial TR RAI-27-9aquifers

Response for TRRAI2.7-5 no

Applicant does not provide completeinformation.

(b)(5)

Applicant does not provide completeinfnrmation

Hydrology-springs fromproduction zone TR RAI-27-10 no

................ i

Hydrology-use of "water TR RAI-2.7.11 no

Hydrology-detect and inform of TR Rl-2.7-12 yeswater impact

Hydrology-procedures to TR RAI-2.7-13a yesprotect public health

no

N/A

N/A

(b)(5)

I

Page 21: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) Iconfirmatory item

Hydrology-wells 618, 628 TR RAI-2.7-13b yes

Hydrology-condition of MWs TR RAI-2.7-13c yes605,609,637,& 668

Hydrology-well 16

Hydrology-domestic wells 13,42,2,7,8,18,20 96,115,

135 & 4002 In or out

Hydrology-Stock wells 17, 49,38,61

Hydrology-Stock wells 12, 51,510, 619,620 & 650

Hydrology-type of use of Lakotawells 51 and 14

Hydrology-data table, well-by-well, etc.

TR RAI-2.7-13d yes

TR RAI-2.7-13e yes

TR RAI-2.7-13f yes

TR RAI-2.7-13g yes

N/A

N/A

N/A

N/A

N/A

N/A

N/A

confirmatory item

confirmatory item

confirmatory item

confirmatory item

confirmatory item

confirmatory item

TR RAI.2.7-14 yes

RH 15 and well datano in Vol 1

Ib)(5)

TR RAI-2.7-15 no

Page 22: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Hydrology-samplingSundance/Unkpapa

Hydrology.MCLs

TR RAI-2.7-16 yes

TR RAI-2.7-17 yes

yes

yes

yesHydrology-representative TR RAI-2.7-1 8 yessubimpoundments

Hydrology-suspended,dissolved & total fractions

TR RAI-2.7-19 yes

Hydrology-impoundment Sub05sampling results

Hydrology-p,2-195, additional TR RAI-2.7-21 yeswell data

Hydrology-Well 2, well 7 TR RAI-2,7-22 yes

yes

yes

yes

yes

Hydrology-Well 18 mean value TR RAI-2.7-23 yes yes

Page 23: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)i(b)5

TR RAI-2.9-1Addiocnal data

Background Radiological collection may berequired.

Y VoL. It, Section 2.9

TR RAI-2.9-2 Y Vol. II, Section 2,9

TR RAI-2.9-3 Y Vol. II, Section 2.9

TR RAI-2.94 Y Vol. II, Section 2.9

TR RAI-2,9-5 Y Vol. II, Section 2,9

(b)(5)

(b)(5)

TR RAI-2.9-6 Vol, I, Section 2.9Need total flow data,

TR RAI.2.9-7 Y Vol. 11, Section 2.9

(b)(5)

TR RAI-2.9-8 Vol. II, Section 2,9

Page 24: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

TR RAI-2,9-9 Y Vol. II, Section 2.9

TR RAI.2,9.10

TR RAI-2.9-11

TR RAI-2,9-12

Vol. II, Section 2.9

Vol. H, Secticn 2.9

Vol. II, Section 2.9

(b)(5)

TR RAI.2,9-13 Y Vol. II, Section 2.9

TR RAI.2.9-14 Y Vol. II, Section 2.9 N

l(b)(5)

(b)(5)

1) Replacement pages not found in hard CODVas irdicated in RAI response.I(b)(5)(b)(5)

TR RAI.2.9-15 N Vol. II, Section 2,9 Y P. 7-2,3

Page 25: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

TR RAI.2,9-16Additional data

collection may be Vol, I, Section 2.9required.

TR RAI-2.9.17.a Y Vol, II, Section 2,9

TR RAI-2.9-17.b Y Vol. II, Section 2.9

(b)(5)

(b)(5)

TR RAI-2.9-17,cTR RAI-2.9-18

TR RAI2.9-19

TR RAI-2,9*20

TR RAI-2,9-21TR RAI-2,9-22TR RAI-2,9-23

Y Vol, 11, Section 2,9Vol. II, Section 2.9

Vol, II, Section 2.9

NYY

Vol. II, Section 2.9

Vol. I, Section 2.9Vol. II, Section 2.9Vol. II, Section 2.9

N

(b)(5)

Reviewer could not locate revised text asindicated in applicants response,Response not located.

Same reason as TR RAI-2.9-1 above,

Y Vol. II, Section 2.9

li raNO

Page 26: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)5)

TR RAI-2,9-25 Y Vol. II, Section 2,9

TR RAI-2.9-26 Y Vol, 11, Section 2,9

TR RAI-2.9-27a Vol. II, Section 2.9

TR RAI-2.9.27b Y Vol. I, Section 2.9

(b)(5)

(b)(5)

|(b)(5)

The reviewer could not locate the revised textfor Section 2.9.5.2.1 of the TR as indicated inthe TR RAI.2.9-27(b) response,

(b)(5)

TR RAI2.9°27c(i, ii, iii)

TR RAI-2,9-28

TR RAI-2.9-29

TR RAI-2,9-30aTR RAI-2,9-30bTR RAFl2,9-31aTR RAI*2.9.31b

Vol. II, Section 2,9

Vol. II, Section 2.9

Vol. II, Section 2,9

Vol, 11, Section 2,9Vol, 11, Section 2.9Vol. I, Section 2.9Vol. II, Section 2,9

As previousl indicated in TR RAI-2.9.26, thereviewer could not locate the revised text forSection 2.9.5.2.1 of the TR as indicated in theTR RAI-2.9-28 & TR RAI-2,9.29 combinedresponse.As previously indicated in TR RAI-2,9-26, thereviewer could not locate the revised text forSection 2.9.5.2.1 of the TR as indicated in theTR RAI-2.9.28 & TR RAI-2,9-29 combinedresponse.

YYYY

TR RAI-2.9-32 Y Vol. II, Section 2.9

(b)(5)

Page 27: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

TR RAI-2.9-32a Y Vol. II, Section 2.9

TR RAI-2.9-32b Y Vol. II, Section 2.9

TR RAI-2.9-32cT, RAI-2.9-33Additional data

collection may berequired.

Y Vol. II, Section 2.9

Y Vol. II, Section 2.9

TR RAI-2.9-34(b)(5) Y Vol. II, Section 2.9

TR RAI-2.9.35a Y Vol, II, Section 2,9TR RAI-2,9-35b Y Vol. 11, Section 2.9

TR RAI.2.9.35c Y Vol. II, Section 2.9

TR RAI.2.9-36 Vol. II, Section 2.9

TR RAI-2.9-37a Y Vol. II, Section 2.9

Page 28: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

CD:TRRALResponseA

TR RAI-2.9.37b N Vol. II, Section 2.9 ppendices_Attachments

TR RAI-2.9-37c , Vol. 11, Section 2.9

TR RAI-2.9-37d N Vol. II, Section 2.9

TR RAI-2,9-38a Y Vol. II, Section 2.9

Laboratory documentation requested in the RAIcould not be located.Not reviewed by staff

(b)(5)

TR RAI-2.9-38b Vol. II, Section 2.9

TR RAI-2.9-39a Y Vol. II, Section 2,9

TR RAI-2,9-39b Y Vol, II, Section 2.9

Need additional information. 1)Input and output files,

See TR RAI.2.9-32b above.(b)(5)

TR RAI-2.9-39c Y Vol. II, Section 2.9

Page 29: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

TR RAI-2.9.4Oa,b

(b)(5)I

TR RAI-2.9.40c

TR RAI-2.9-41

TR RAI-2.9.42

Vc!, I I, cL , : 2.9

Vol. II, Section 2.9

Vol. II, Section 2.9

Vol. II, Section 2.9

TR RAI-2.9-43a Y Vol. II, Section 2.9

TR RAI-2.9-43b Y Vol, 11, Section 2.9

TR RAI2.29-44 Vol, 11, Section 2,9

Page 30: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)TR RAI-2,9-45 Vol, II, Section 2.9

TR RA1-2.9-46 Y Vol. II, Section 2.9

TR RAI.2,9-47 Y Vol. II, Section 2.9

(b)(5)

(b)(5)

(b)(5)

(b)(5)

(b)(5)

TR RAI-2.9-48

TR RAI-2.9-49

TR RAI-2,9-50Process & Equip.

Instrumentation, alarms & TR RAI-31-1controls

Process & Equip-unconfinedconditions & limited TR RAI.3.1-2

potentiometric head on easlernPAA

Vol. II, Section 2.9

Vol. II, Section 2.9

Vol. II, Section 2,9

yes yes

yes yes

Page 31: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Process & Equip-restorationtimetable

Process & Equip-maintaininghydraulic control

Process & Equip."eachate"Process & Equip-Dewey fault

and stream linesProcess & Equip-land app and

pcnd areas

Process and equipment - landapp and pond areas

Process & Equip-land app arealocations

Process & Equip-water balancediagram

TR RAI-3,1.3

TR RAI-3.1-4

TR RAI-3,1-5

TR RAI-3.1-6

TR RAI-3,1-7

yes

yes

yes

yes

yes

yes

yes

yes

vp•no

TR-RAI-3.1-7

TR RAI-3.1-8

TR RAI-3.1-9

Yes ML110050472 page280 and page 321

no

yes

yes

yes

4.1 Gaseous & AirborneParticulates

Y RAI responses Y RAI responses

4.1.1 b.

TR.RAI-4.1.2

Y 4.1.1

Y 4,12.2

Y 4.1.1

N 4.1.2.2

TR-RAI-4.1.3 Y 4,1.2 Y 4.1.2

Page 32: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)5) (b)(5)

5.2 Management Control

Management control - land usesurvey

M.:1.nR2ýment contrl - cu!' ralresources

Management control - tailings

TR-RAI*5,2-l Y

TR-RAI-5.2-2 Yes

TR*BAI-5,2-3 No

TR-RAI-5.2-4 Yet

5.2

ML110050473,page8

N ,L 110 0 SO"7 a c c,

s ML110050473, page7

(b)(5)

(b)(5)

(b)(5)

(b)(5)

5.3 Management and Audit TR-RAI-5.3-1 aProgram

TR-RAI-5,3_lb

TR-RAI-5.5,1 (RAI5.5 Radiation Safety Training responses)

Y 5,3 Y 5,3

(b)(5)

5, 5.5, 5.3, 5.0,5.15,Y 5.5.4, 5.13, 4.2,3,

5.3.4

5, 5.5, 5.3, 5.0, 5.15,5.5.4, 5.13, 4.2.3,

5.3.4

Y

(b)(5)

NA

(b)(5)

TR section 5.5.1 is not provided in the hardcopy with section 5.5 responses.

Page 33: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

TR-RA[-5.5.1

TR-RAI-5.5.2

TR-RAI-5.5-3

5.5.1,5.7.2.2 and5.7.4,3.

Y 5,7.2.2 and 5.7.4.3,

Y 5,5.1, 5.5.3 Y 5.5.1, 5.5.3

Y Appendix 5.5-A Y APPendix 5.5-A

5,72 External RadiationExposure MonitoringProgram

TR-RAI-5.7.2,1 Y 5.7.2.3 Y 5.7.2.3

TR-RAI-5.7.2.2

TR-RAI-5,7.2.3TR.RAI-5.7.2.4

TR-RAI-5.7.2.5

Y Response TR RAI Y Response TR RAI

YY

TR section 5,7.2,3,Y and Figures 5.7-2

through 5.7-5.

5.7.3 In-Plant AirborneRadiation

TR-RAI-5,7.3,la y 5.7.3-1 (a)

TR-RAI-5.7.3.1b Y 5.7,3.1(b)

N 5,7,3-1 (a)

N 5.7,3.1(b)

.TR-RAI-5.7.3.1c Y 5,7.3,1 c N5.7.3.1 c

Page 34: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)

TR-RAI15.7.3.2

TIR.PAL.7.3.3 (n)

TR-RAI-5.7.3-3(b)

TR-RAI.5.7.3-3(c)

TR-RAI-5.,73-3(d)

TR-RAI.5.7.3*3(e)

TR-RAI-5,.73-4

Y 5.7.3.2 & 4.11 Y 5.7.3.2 & 4.11

No drawings for monthly/weekly samples fornonairt-me areas.

N 5.7,3-3 (a)

5.7.3.2

Y 5.7.3,2 & fig 5.7-10

Y 5.7.3.2

y Response TR RAI.5,7.3-4

y Response TR RAI-5.7.3-5

y 5.7,3,2

N 5.7.3-3 (a)

y 5.7.3.2

Y 57.3.2 & fig 5.7-10

Y 5.7.3.2

y Response TR RAI-5,7.3-4

y Response TR RAI-5.7.3-5

(b)(5)

(b)(5)

b)(5)

TR-RAI-5.7,3-5

- I

Page 35: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

FX5)(5)(b)(5)

TR RAI-5,7.3-6a Y Vol. I1, Sect. 5,7.3

TR RA-5.7.3-6b Y Vol. I1, Sect. 5,7.3

(b)(5)

Reviewer could not find replacement pages asindicated in applicant's response.

(b)(5)

TR-RAI-5.7.3-7

TR-RAI-5.7,3-8

Response TR RAI-5.7.3-7

Response TR RAI-5.7,3-8

Response TR RAI-5,7,3-7

Response TR RAI-5.7.3-8

(5)(5)

5.7.4 Exposure Calculations TR-RAI-5.7,4-4 Y 5.5.1 Y 5.5.1

Page 36: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

TR-RAI.5.7.4-5 y 5.2.6 R 56Y 5.2.6 (b)(5)

TR-RAI-5.7.4-6 N RAI response & RAI response &4.1.2.1 4.1.2.1

5,7.5 Bioassay Program

5.7.6 Contamination control TR-RAl-5.7.6-1Program

5.7.7 Airborne Effluent andEnvironmental Monitoring TR-RAI-5.7,7-la

Program

TR-RAI-5.7.7.2

Response TR RAI- y Response TR RAI-5.7.6-1 5.7.6-1

(b)(5)4.1.2.1 is missing from the hard copy,.(b)(5)

(b)(5)

4,1.1 Y 4.1.1

N Appendix 2,5-D N Appendix 2.5-C

Responses to TR- Response TR 5.7.7-3TR-RAI-5.7.7.3 Y RAI-2.9-2 and RAI- Y and Responses to TR-

5.7.7.3 RAI-2,9-2

-- £

Page 37: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

TR-RA[2.9-1

and

-- K

(b)(5) (b)(5)

TR-RAI-5.7.7-4

TR-RAI-5.7.7-5

y TFR.RAI-2.9-1 andTR-Section 5.77.1

y 5.7.7.1

TR-RAI-2.9-1 and TR-Section 5.77,1

y 5.7.7.1

NA

(b)(5)

TR-RAI-5.7.7-6 N NA N

I 5 . (b)

Coldntb)( dfi.5.6)

P 5TR-RAI-5.7,7-7 y Fig. 5.7-10 & fig 2.9-

8 N Fig, 5.6-10 & fig 2.9-8

RAI 2.9-11 throughY 2.9-14 & TR-RAI 2,9-

21TR-RAI-5,7,7.10 a

TA-RA1-5.7.7.10 b

RAI 2.9 .11 throughY 2.9-14 & TR-RAI 2.9-

21

(b)(5)

(b)(5)

N TR-RAI-2.9.14 N TR-RAI-2.9-14 CCould not find the pages referred.

Page 38: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (I)V)•

TR- RAIk5.7.7.10 c y, TR-RAI-2.9-12 which N TR-RAk2.9-12is 2.9.10

TR-RAI-5.7.7.11 RAI response to TR- RAI response to TR-RAI-5.7,7.11 RAI.5.7.7.11

TR-RAI-5.7.7-12 y, RAI response to TR-RAI-5.7.7-12

TR section 4,0, TRsection 5.7, TR-RAI

TR-RAI5.7.7-13 Y response .2.9 andTR*RAI-response.

5.7,7

TR-RAI-5,7.7-15 Y 5.7.7.1

(b)(5)

(b)(5)

r(b)(5)

TR section 4.0, TRy section 5.7, TR.RAI

response -2,9 and TR-RAI-response.5,7.7

Y 5.7.7.1

UM

Page 39: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

TR-RAI-5,7.7-16 ,, Section 7.3, fig, 5.7-6, lig- 5.7-9

Water Monitoring- surfacewater features

Water Monitoring- constituentsin Table 2.7.3-1 of NUREG

1569Water Monitoring- statistical

methodsWater Monitoring- monitoring

mine pit areasWater Monitoring- MW

sampling densitiesWater Monitoring- baseline

sampling frequencyWater Monitoring. excursion

indicatorsWater Monitoring- sulfate as

indicatorWater Monitoring- TDS orconductivity as indicator

Water Monitoring- uranium asindicator

Water Monitoring- method to beused for establishing UCLs

Water Monitoring-process fordetermining screened horizon

Water Monitoring- site-speciichydrogeological bases for well

spacingWater Monitoring- variation in

well spacing

TR RAI-5,7,8-2 yes

TR RAI-5.7,8-3a yes

TR RAI-5.7.8-3b yes

y Section 7.3, fig, 5.7-6,fig- 5.7-9

yes

yes

yes

yes

yes

yes

yes

yes

yes

yes

b(b)(5)I(b)(5)

TR RAI-5,7.8-4 yes

TR RAI-5.7,8.5 yes

TR RAI-5.7.8-6 yes

TR RAI-5.7.8-7a yes

TR RAI-5,7.8-7b yes

TR RAI-5.7.8-7c yes

TR RAI-5.7.8-7d

TR RAI-5.7,8-8

TR RAI-5.7.8-9

TR RAI-5.7.8-10

TR RAI-5,7.8-11

yes

yes

yes

no

yes

yes

no(b)(5)

confirmatory itemyes yes

Page 40: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Water Monitoring- overlying TR RAI-5.7.8-12aquifer

Water Montoring- underlying TR RAI-5.7.8-13aquifer

Water Monitoring- well field test TR RAI-5.7.8-14procedures

Water Monitoring-excursion TR RAI-5.7,8-15monitoring program

Water Monitoring-excursioncorrective action and notification TR RAI-5.7.8-16

plan

(b)(5)yes

yes

yes

yes

yes

yes

N/A

yes

yes

yes

confirmatory item

confirmatory item

Water Monitoring- water wellsampling locations

Water Monitoring- surfacewater sampling locationsWater Monitoring- watersampling methods and

parameters

517.9 Quality Assurance

Groundwater Restoration.restoration goal

Groundwater Restoration.statistical analysis

Groundwater Restoration-method establishing TRGsGroundwater Restoration-

restoration methodsGroundwater Restoration- Crow

Butte analog re expectedconcentrations

Groundwater Restoration-effectieness of groundwater

treatment

TR RAI-5,7.8-17

TR RAI-5,7.8-18a&b

no yeso)(b)

I

yes yes

yes

(b)(5)

TR RAI-5.7.8-19 yes

TR RAt 5.7.9 Y

Replacement a es found with TRRAI P&R1613.( b)(5)(b)(5)

TR RAI-6.1-1 yes

TR RAI-6.1.2 yes

TR RAI-6.1.3 yes

TR RAI-6.1-4 yes

TR RAI-6,1-5 yes

yes

yes

yes

yes

yes

yes

(b)(5)

TR FAI-6,1-6 yes

Page 41: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

((b)(5)Groundwater Restoration- pore

volume, porosity & Flare factor

Groundwater Restoration-excursion during restoration

Groundwater Restoration.documenting effectiveness of

restorationGroundwater Restoration-

stability monitoringGroundwater Restoration-

restoration schedule

6.2 Plans for ReclaimingDisturbed Land

TR RAI-6.1-7 yes

TR RAI-6.1-8 yes

TR RAI-6t1-9 yes

TR RAI-6.1-10 yes

TR RAI-6.1-11 yes

yes

yes

yes

yes

yes

TR-RAI-6,21c

Response TR RAI6,2-1C

N TR RAIP&R-l'6-3& Fig TRRAlP7R-

16

Response TR RAI 6.2-10 TRRAtP&R-16-3 & Fig TRRAlIP7R-

16

!(b)(5)

Page 42: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

b)(5) b5)(5)

Administrative. Generic N/A N Y See comment.

Section 2, SiteCharacteristics

y Section 2, SiteCharacteristics

N/A N

N/A N

N/A N

(b)(5)

(b)(5)

(b)(5)

(b)(5)

could not locate responsecould not locate response

All N All

N/A

Administrative -Specific TR-RAI-P&R.14dTR.RAI-P&R-14t

y y

NoNo

Page 43: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

TR-RAI-P&R-14g No

TR.RAI-P&R-14j Yes I(b)(5) could not locate response

response found in ER RAI, TR RAI responsecould not be located where text indicated.

!(b)(5)

TR-RAI-5.2-3 No

TR-RAI-5.7,3-3(b)

TR-RAI-5.7.7.2

N

N

5,7.3-3(a)

Appendix 2.5-C

TR-RAI-2,5-1 b N 2.5-1 b

N 5,7.3-3 (a)

N Appendix 2.5-C

N 2.51,2.52

Y 2.8.4 & 2.9.3.2.1

TR Section 2.7.2,2.5yes and Exhibits

(b)(5)

(b)(5)

There is no such page as 2-58 as mentioned inTR RAI-2.5-1(b) response given in hard copy

The response of TRRAI-2.51 (b) given in hardcopy and CD are differentCould not find in hard copyTR revision index does not include TR RAI.2,5-11,

5.7.3-3 is not found.

#4 (a,b,c, d &e)Meteorology

TR Section 2.5

Process & Restoration-vertical position of ore bodies P&R-1

in aquifers

N NA

no(b)(5)

(b(5)

mm

Page 44: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

Process & Restoration,inventoryol economical sig. mineral &energy-related deposits and

activities

Process & Restoration- dataand structure map for top of P&R-4

Morrison

Process & Restoration- cross P&R-8sections with logs

TR Section 2.2,2,yes P&R-2, Exhibit 2.2-1 yes Exhibit 2.2-1

b)(5)

no

yes Exhibits

yes 2.7,2.2.16

yes Exhibits

(b)(5)

mn

Page 45: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5-)- (b)(5)

4 .... on., to ion. N -,.

location ol wells

Process & Restoration-pumping test details

Process & Restoration- breccia P&R.12apipes

no

no

no

no

Process and restoration - water TR-Rl-P&R-14d Noquality for deep well disposal

Process and restoration- pond TRRA[IP&R-141 Nocontingencies for >10 years

Process and restoration -central plant brine pond and TR-RAI-P&R-14g No

purpose

could not locate response in ADAMS version -

also identified as administrative issue

identified as administrative issue

identified as administrative issue(b)(5)

Page 46: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

ML110050468,page(b)(5) (b)(5)

lor P&R-14(j), couldYes not find replacement

Process and restoration, TR-RAI-P&R -14Jmultiple tank failure

Process and restoration, landclean-up program

Process and restoration, landclean-up program

TR-RAI-P&R-16(l)

TR-RAI-P&R-16(2)

TR-RAI*P&R-17

#3

N

N

N

Reviewer could not locate replacement pagesas indicated in the response.Reviewer could not locate replacement pagesas indicated in the response,Reviewer could not locate replacement pagesn indiritard in tho rA~nnncA

Miscellaneous

y 5.22 & 5.4

Response for TR.yes RAI-MI-la

Y 5.22 & 5.4

yes

(b)(5)

(b)(5)

Miscellaneous- chemicals withpotential to impact rad safety

TR-RAItMI-la

Page 47: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Icc•:cr• c c:i••mcals

Miscellaneous- backup in eventof power failure

Miscellaneous- update suretyprior to licensing

Miscellaneous- discussion oftables

TR-RAI-MI-3 yes Response for TR-RAI.MI-3

(b)(5)

TR-RAI-MI-4b yes

yes

yes

TR-RAI-MI.4c yes yes

Page 48: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

r(b) ý(5)(b)(5)

TR-RAI-2.5-11 Y 2.51 P 2-59 y 2.51 P 2-59

(b)(5)

Hydrology - Peak flows/waterlevels. Figures 2.7-10 and 27- TR.RAI-2.7-3

11 replaced

ML10050468, pageYes 147-238;

ML110130328,pages 141 to 187

I-

Page 49: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Hydrology-Peak flowslwaterlevels. Figures 2.7-10 and

2,7-11 Replaced

Hydrology-Erosion risks

TR-RAI-2.7-3 no

TR RAI-2.7-4 no

no

yes

(b)(5)

Hydrology-potentiometric maps TR RAI-2.7-8 Response for TRRAI-2.7-5

no

Page 50: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

Hydrology-discharge to alluvial TR RAI-2.7-9aquifers

no

Hydrology-springs from TR RAI-2.7-10production zone

no (b)(5)

Page 51: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) ()5

Hydrology-use of "water

Hydrology-data table, well-by-well, etc.

TR RAI-2.7-11 no no

RI-15 and well data noTR RAI-2.7-15 no Vol 1

ib)(5)

Page 52: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

- IIFb)(-5) -- ] A P)

1 ý IAI-2.9-1

Background Radiological Y Vol. II, Section 2.9

TR RAI-2,9-5 Y Vol. II, Section 2.9

TR RAI-2.9.11

TR RAI-2.9-12

Vol. II, Section 2.9

Vol. II, Section 2.9

(b)(5)

(b)(5)

TR RAI-2.9-13 Y Vol, II, Section 2.9

Page 53: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)Fb)(5)

TR RAI-2.9-15 N Vol. II, Section 2.9 Y P. 7-2,3

TR RAI.2.9-16

(b)(5)

Y Vol, II, Section 2.9

(b)(5)

TR RAI-2.9-17.a Y Vol. II, Section 2.9

Page 54: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

TR RAI-2,9-19

TR RAI-2,9-20

TR RAI-2.9-21TR RAI-2,9-24

(b)(5)

TR RAI-2.9-25

Vol. II, Section 2.9

Vol, II, Section 2,9

Vol. II, Section 2.9 N

Vol. II, Section 2,9

N

y

Y Vol, II, Section 2.9

TR RAI-2.9-26 Y Vol, I, Section 2.9

Page 55: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)

TR RAI-2.9-29

TR RAI-2,9-32

TR RAI-2.9-32cTR RAI-2.9-33

Vol. 11, Section 2.9

(b)(5)

(,b)(5)

(b)(5)

(b)(5)

(b)(5)

Y

Y

Vol, II, Section 2,9

Vol, II, Section 2.9

Y Vol. II, Section 2.9

Y Vol, II, Section 2.9

TR RAI.2,9-34(b)(5)

(b)(5)

TR RAI-2,9-35c Y Vol. II, Section 2.9

m_

Page 56: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(5)(5 (b)(5)

I ri HAI. 9-ý,J / D Vol, 11, 6 ection 2.9 y-... ... _ppendicesAtachmer

ts

TR RAI-2.9.37d N Vol, II, Section 2.9Laboratory documentation requested in the RAIcould not be located,(b)(5)

TR RAI-2.9.38b Vol. II, Section 2.9

(b)(5)

TR RAI-2.9.39c Y Vol. II, Section 2.9

Page 57: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Vol. Il, Section 2.9

Vol. II, Section 2.9TR RAI-2.9.40c

TR RAI-2.9-43a Y Vol. II, Section 2.9

TR RAI-2.9-44 Vol. II, Section 2.9

Page 58: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5)(b)(5)

(b)(5)

TR RAI-2,9-47 Y Vol, II, Section 2,9

(b)(5)

TR RAI.2.9-48

Process & Equip-land app and TR RAI*31-7pond areas

Process & Equip-land app area TR RAI-3.1-8locations

Vol. II, Section 2.9

no

no

yes

yes

4.1.1 b. Y 4.1.1 Y 4,1.1

Page 59: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

7b) 5) (b)(5)

Management control - culturalresources

I h-hAI'.-I

TR-RAI-5.2-3

TR-RAI-5.5.1 (RAI5.5 Radiation Safety Training responses)

TR-RAI-5,5,1

TR-RAI-5.5-3

No MLl10050473, page1

Y NA r5.5.1 5.7.2.2 and

5,7.4.3.

Y Appendix 5,5-A

Y 5.7,23

'b)(5)

Y 57,2,2 and 5.7.4.3.

Y Appendix 5.5-A

Y 5.7,2,3

(b)(5)

(b)(5)

(b)(5)5,72 External RadiationExposure MonitoringProgram

TR-RAI-5,7.2,1

Page 60: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

(b)(5)

TR-RAI-5.7.3.1c

TR-RAI-5.7,3.3 (a)

TR-RAI-5,7.3-3(e)

Y

y

y

5.7.3,1 c

5.7.3.2

5.7,3.2

N

y

y

5.7.3.1 c

5.7.3.2

5.7.3.2

No drawings for monthly/weekly samples fornonairbome areas,(b)(5)

(b)(5)

TR RAI.5.7.3-6a Y Vol. II, Sect. 5.7.3

TR RAI.5,7.3-6b Y Vol, 11, Sect, 5.7.3

I(b)(5)

Page 61: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

Tb-)5)

5,,4,•

(b)(5)

(b)(5)

(b)(5TR-RAI-5.7.4-5

5.7.6 Contamination control TR-RAI-5.7.6-1Program

5.7.7 Airborne Effluent andEnvironmental Monitoring TR-RAI-5.7.7-la

Program

TR-RAI-5.7.7,2

Y 5.2.6

Response TR RAI-5.7.6-1

Y 5.2.6

y Response TR RAI-5,7.6-1

y 4.1.1 Y 4.1.1

N Appendix 2.5-D N Appendix 2.5-C

(b)(5)

(b)(5)

(b)(5)

TR-RAI-5.7.7-4 TR-RAI-2.9-1 andTR-Section 5.7,7,1

TR-RAI-2.9-1 and TR.Section 5.7.7.1

Page 62: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

(b)(5) (b)(5)

TR.RAI*5.7.7-C

TR-RAI*5.7.7.10 b

N NA NA

N TR-RAI-2.9*14 N TRRAI-29.914

RAI response to TR-TR-RAI-5.7.7,11 Y A*.771RAI.5.7.7.11

TR-RAI-5.77*12 y RAI response to TR-RAIT5.7.7712

TR section 4.0, TRsection 5,7, TR-RAI

TR-RAI-5.7.7-13 Y response -2.9 andTR-RAI-response-

5.7.7

y RA I response to TR-RAI-5.7.7.11

Could not find the page$ npfprrpd

See response to 2.9-1. (b)(5)(b)(5)

ISee staff review of response to RAI 5.7.7.4.(b)(5)

TR section 4.0, TRsection 5.7, TR-RAI

response -2.9 and TR-RAI-response-5.7.7

Page 63: BEST AVAILABLE COPYPowertech Accept Rev of all Responses merged 2.8.1 l.xlsx Powertech Accept Rev of all Responses merged 2.8.1 1.xlsx Team, Attached is the current status of staffs

5)(b)(5 (b)(5)

TR-RAI-5.7.7-16 y Section 7.3, fig, 5.7-6, fig- 5.7-9

Section 7.3, fig, 5.7-6fig- 5.7.9

Water Monitoring- site-specifichydrogeological bases for well

spacing

Water Monitoring- water wellsampling locations

TR RAI-57,8-10 no no

(b)(5)

b)(5)

TR RAI-5,7,8-17 no yes