Bernardo Avenue Undercrossing
Joint BPAC MeetingDec. 2, 20205 to 6:30 p.m.
2Joint BPAC Meeting – December 2020
City of SunnyvaleNabilah Deen, Transportation Engineer
Ralph Garcia, Senior Transportation EngineerAngela Obeso, Principal Transportation Engineer
City of Mountain ViewRia Hutabarat Lo, Transportation ManagerRey Rodriguez, Senior Project Manager
Introductions
3Joint BPAC Meeting – December 2020
Project Team ConsultantsDave Dickinson, WMH – Project ManagerSteve Loupe, WMH – Civil Design Lead
Introductions
4Joint BPAC Meeting – December 2020
• Presentation (~10 minutes)
• BPAC Clarifying Questions (~15 minutes)
• Public Comments (~15 minutes)
• BPAC Comments (~40 minutes)
Agenda
5Joint BPAC Meeting – December 2020
• 2004 – Bernardo Avenue Bicycle Undercrossing Feasibility Study Report
• 2016 – One Bay Area Grant funding award
• 2017 – WMH Corporation hired for preliminary design and environmental analysis
• 2018 – Cost Sharing Agreement with Mountain View
• 2020 – Measure B funding award (for design and construction phase)
• Current – Development of preliminary designs
Project Background
6Joint BPAC Meeting – December 2020
Project Limits
7Joint BPAC Meeting – December 2020
Existing Conditions
Partner Logo Placeholder in Slide Layout: Align with Left Edge of This Box
Max. H
eight
Eastern Alignment
9Joint BPAC Meeting – December 2020
Eastern Option 1(Utilize Portion of Central Expressway)
Partner Logo Placeholder in Slide Layout: Align with Left Edge of This Box
Max. H
eight
Western Alignments
11Joint BPAC Meeting – December 2020
Western Option 1(With Bike Ramp Access to Central Expressway)
No Tunnel Opening
Bicycle ramp
12Joint BPAC Meeting – December 2020
Western Option 1(Without Bike Ramp Access to Central Expressway)
Tunnel Opening
No bicycle ramp
13Joint BPAC Meeting – December 2020
Western Option 2(With Stair access to 280 N. Bernardo)
Stairway connection to 280 N. Bernardo
Ramp landing connection to 280 N. Bernardo
280 N. Bernardo
14Joint BPAC Meeting – December 2020
Western Option 2(Without Stair access to 280 N. Bernardo)
No stairway connection to 280 N. Bernardo
Ramp landing connection to 280 N. Bernardo
280 N. Bernardo
15Joint BPAC Meeting – December 2020
Western Option 3(With Stair access to Evelyn Avenue)
Stair access to undercrossing
Dual crosswalk access points to undercrossing
16Joint BPAC Meeting – December 2020
Western Option 3(Without Stair access to Evelyn Avenue)
Single crosswalk access to undercrossing (no stair access).
Less impact to Evelyn Avenue
17Joint BPAC Meeting – December 2020
Upcoming Project Milestones
Select Project
AlternativeSummer 2021
Community Meetingand BPAC Meeting
Spring 2021
Environmental Phase
Summer 2021 to
Summer 2022
Final DesignSummer 2022 To
Fall 2024
Begin ConstructionLate 2024
18Joint BPAC Meeting – December 2020
How to Participate Today
19Joint BPAC Meeting – December 2020
1. What are the most important existing safety issues that concern you?
2. What features should be prioritized in the selected project alternative?
3. What additional features would you like to see included in the project alternatives and what features would you recommend for removal?
Discussion Questions
20Joint BPAC Meeting – December 2020
Thank You!
Questions or Comments?
Contact Nabilah Deen
Email: [email protected]