bergstrom spur platinum planning study central …...powerpoint presentation author stephanie silver...
TRANSCRIPT
![Page 1: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM](https://reader034.vdocuments.us/reader034/viewer/2022050504/5f9634c2a853796db664e2f0/html5/thumbnails/1.jpg)
Bergstrom Spur Platinum Planning Study
Central Segment:Congress Avenue to Todd Lane
Central Segment
![Page 2: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM](https://reader034.vdocuments.us/reader034/viewer/2022050504/5f9634c2a853796db664e2f0/html5/thumbnails/2.jpg)
✓Create access to nearby destinations
✓Improve safety along the I-35 underpass crossing
✓Provide safe crossings at major intersections
✓Make it easy to access nearby trails
✓Collaborate with local businesses to create a sense of place
✓Include benches and art to make corridor more attractive and useable
What We Heard: Central SegmentCongress Avenue to Todd Lane
![Page 3: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM](https://reader034.vdocuments.us/reader034/viewer/2022050504/5f9634c2a853796db664e2f0/html5/thumbnails/3.jpg)
Central Segment Concepts: Congress Avenue to Todd Lane
A
Mabel Davis Park
Country Club Creek
Trail
Co
ng
ress
Ave
nu
e
Sprin
gs
Terr
y-O
San
tia
go
Industrial Drive
![Page 4: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM](https://reader034.vdocuments.us/reader034/viewer/2022050504/5f9634c2a853796db664e2f0/html5/thumbnails/4.jpg)
Central Segment Concepts: Congress Avenue to Todd Lane
A
![Page 5: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM](https://reader034.vdocuments.us/reader034/viewer/2022050504/5f9634c2a853796db664e2f0/html5/thumbnails/5.jpg)
Central Segment Concepts: Congress Avenue to Todd Lane
AA
![Page 6: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM](https://reader034.vdocuments.us/reader034/viewer/2022050504/5f9634c2a853796db664e2f0/html5/thumbnails/6.jpg)
Future Transit Concepts: West of I-35 and I-35 Crossing
OPTIONS:
1. Produce a level crossing for both the trail and transit.
2. Underground crossing for transit with a street-level hike and bike path.
![Page 7: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM](https://reader034.vdocuments.us/reader034/viewer/2022050504/5f9634c2a853796db664e2f0/html5/thumbnails/7.jpg)
Take the survey atcampotexas.org/get-involved
Submit comments or request printed materials at 512-761-2224 or email [email protected]
Share Your Input