bera syul hydro power project presentation
TRANSCRIPT
BERA-SYUL HYDRO ELECTRICAL
POWER PLANT PROJECT
60x3 MW
NHPC
Guided by: - Mr. GAURAV KUMAR Mr. DEEPAK NAYAK Mr. FRANKLIN KULLU ENGINEERS AT POWER PLANT
Presented by :- TANUJ KUMAR PANDEY B. Tech (4th –year)
REFRENCES
INDIA’S 1HYDRO POWER PROJECT
Of NHPC
st
INTRODUCTION•180 MW (60X3)•Upgraded to 198 MW (66x3)capacity•Voltage – 11 Kv•Current – 3,150 Amp
StatorRatings
•Voltage – 175 V•Current – 875 Amprotor• Medium head - Medium discharge• Rated head – 260m Max. head -284m• Speed – 375rpm
Francis Turbine
BERARESERVOIR
TUNNEL VALVE HOUSE
to Unit 2
to Unit 1
to Unit 3
pen strokes
SYULRESERVOIR
Pen stroke 1
FRANCIS turbineSpherical valve
Water outlet
Shaft
Oil pressurized piston
TURBINE converts the kinetic energy of flowing water to mechanical energy(to the rotor).
Turbine
Francis turbine is used
ROTOR
Carbon brushes
Cooling of rotor is by the pressurized oil
STATOR
Cooling of stator is by the water from the outlet of turbine, after filtration
OutputOUTPUT from the stator DEPENDS upon some FACTORS like :-
FREQUECY- depends upon the number of poles and speed of the rotor
ROTOR’S SPEED –depends upon the head of the DAM and flow rate of water
POWER FACTOR – It is the angle between current and voltage ,as P=VI COS
Hydroelectric dam
Generator
Step-up transformer
Grid high voltage transmission lines
Terminal Station
Sub transmission lines
Distribution substation
How it is used by the customer