bera syul hydro power project presentation

12
BERA-SYUL HYDRO ELECTRICAL POWER PLANT PROJECT 60x3 MW NHPC

Upload: tanuj-kumar-pandey

Post on 10-Jan-2017

32 views

Category:

Engineering


6 download

TRANSCRIPT

Page 1: Bera Syul Hydro power project Presentation

BERA-SYUL HYDRO ELECTRICAL

POWER PLANT PROJECT

60x3 MW

NHPC

Page 2: Bera Syul Hydro power project Presentation

Guided by: - Mr. GAURAV KUMAR Mr. DEEPAK NAYAK Mr. FRANKLIN KULLU ENGINEERS AT POWER PLANT

Presented by :- TANUJ KUMAR PANDEY B. Tech (4th –year)

REFRENCES

Page 3: Bera Syul Hydro power project Presentation

INDIA’S 1HYDRO POWER PROJECT

Of NHPC

st

Page 4: Bera Syul Hydro power project Presentation

INTRODUCTION•180 MW (60X3)•Upgraded to 198 MW (66x3)capacity•Voltage – 11 Kv•Current – 3,150 Amp

StatorRatings

•Voltage – 175 V•Current – 875 Amprotor• Medium head - Medium discharge• Rated head – 260m Max. head -284m• Speed – 375rpm

Francis Turbine

Page 5: Bera Syul Hydro power project Presentation

BERARESERVOIR

TUNNEL VALVE HOUSE

to Unit 2

to Unit 1

to Unit 3

pen strokes

SYULRESERVOIR

Page 6: Bera Syul Hydro power project Presentation

Pen stroke 1

FRANCIS turbineSpherical valve

Water outlet

Shaft

Oil pressurized piston

Page 7: Bera Syul Hydro power project Presentation

TURBINE converts the kinetic energy of flowing water to mechanical energy(to the rotor).

Turbine

Francis turbine is used

Page 8: Bera Syul Hydro power project Presentation

ROTOR

Carbon brushes

Cooling of rotor is by the pressurized oil

Page 9: Bera Syul Hydro power project Presentation

STATOR

Cooling of stator is by the water from the outlet of turbine, after filtration

Page 10: Bera Syul Hydro power project Presentation

OutputOUTPUT from the stator DEPENDS upon some FACTORS like :-

FREQUECY- depends upon the number of poles and speed of the rotor

ROTOR’S SPEED –depends upon the head of the DAM and flow rate of water

POWER FACTOR – It is the angle between current and voltage ,as P=VI COS

Page 11: Bera Syul Hydro power project Presentation

Hydroelectric dam

Generator

Step-up transformer

Grid high voltage transmission lines

Terminal Station

Sub transmission lines

Distribution substation

How it is used by the customer

Page 12: Bera Syul Hydro power project Presentation

THANKSQUERY?