  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    RevINDIA GLYCOLS LIMITED Date

    TECHNICAL SERVICES DEPARTMENT Appd ByPrep By

    Equipment List

    Sr. No. Equipment Tag No.

    1 Flash Drum D-100 2 Level Gauge LG-1003 Pressure Safety Valve PSV-1004 Heat Exchanger E-100

  • 02.2.15SSMF

    Tag No.

    D-100 LG-100

    PSV-100E-100

  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    RevINDIA GLYCOLS LIMITED Date

    TECHNICAL SERVICES DEPARTMENT Appd ByPrepd By

    Instrument List

    Sr. No. Instrument Tag No.

    1 Control Valve PCV-1002 Control Valve LCV-1003 Pressure Transmitter PT-1004 Pressure Gauge PI-100 A/B/C5 Level transmitter LT-1006 Temperature Gauge TI-100 A/B/C/D

  • 021/03/2013SSMF

    Tag No.

    PCV-100LCV-100PT-100

    PI-100 A/B/CLT-100

    TI-100 A/B/C/D

  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    INDIA GLYCOLS LIMITEDTECHNICAL SERVICES DEPARTMENT

    PRESSURE GAUGES

    Tag No.Location

    Service Qty. TypeRange Operating Design

    Temp Press. Temp (0C) C kg/cm2 g 0 C

    PI-100 A Flash vessel D-100 LP Steam 1 Bourdon 0-6 120 1 160PI-100 B LS-100-4''-C1SO LP Steam 1 Bourdon 0-6 120 1 160PI-100 C LS-101-4''-C1SO LP Steam 1 Bourdon 0-6 120 1 160

    PI-101 DM-105-1.5''-C1SO Condensate 1 Bourdon 0-6 45 2 160PI-102 DM-104-1.5''-C1SO Condensate 1 Bourdon 0-6 95 2 160PI-103 LC-103-2''-C1SO Condensate 1 Bourdon 0-6 47 0.5 160

  • Rev 0Date 2/2/2015Appd By SSPrepd By MF

    INDIA GLYCOLS LIMITEDTECHNICAL SERVICES DEPARTMENT

    PRESSURE GAUGESDesign MOC

    RemarksPress. Wetted Parts

    kg/cm2 g6 SS3046 SS3046 SS3046 SS3046 SS3046 SS304

  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    INDIA GLYCOLS LTD.TECHNICAL SERVICES DEPARTMENT

    Pressure TransmitterTag Location Service Range Op. Press Des. Press Opert.No. Temp.

    kg/cm2 g kg/cm2 g kg/cm2 g CPT-100 Flash vessel D-100 LP Steam 0-6 1 6 120

  • Rev 0Date 21/03/2013Appd By SSPrepd By MF

    Design Connection MOC RemarksTemp. Type wetted

    C parts160 Flanged SS304

  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    INDIA GLYCOLS LIMITED TECHNICAL SERVICES DEPARTMENT

    LEVEL GAUGES.No Tag No Location Service Type Pressure kg/cm2g Temperature C

    Operating Design Operating

    1 LG-100 D-100 Steam Condensate Reflex 1 6 120

  • Rev 0Date 2/2/2015Appd By SSPrepd By MF

    INDIA GLYCOLS LIMITED TECHNICAL SERVICES DEPARTMENT

    Temperature C Density MOC NozzleDesign KG/M3 size C-C

    MM

    160 943 SS304 1.5" 900

  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    INDIA GLYCOLS LIMITED TECHNICAL SERVICES DEPARTMENT

    LEVEL TRANSMITTER S.No Tag No Location Service Type Range Op.Press. Des.Press.

    mm Kg/Cm2g Kg/Cm2g

    1 LT-980 D-980 Steam Condensate DP 900 1.0 6

  • Rev 0Date 2/2/2015Appd By SSPrepd By MF

    INDIA GLYCOLS LIMITED TECHNICAL SERVICES DEPARTMENT

    Op.Temp Des. Temp Density MOC Nozzle RemarksKG/M3 size

    (Max.) (Max.) inches

    120 160 943 SS304 1.5

    oC oC

  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    INDIA GLYCOLS LTDTECHNICAL SERVICES DEPARTMENT

    CONTROL VALVE DATASHEETTag No. Location Fluid Flow KG/H Press

    min nor max inlet Outletkg/cm2 g kg/cm2 g

    PCV-100 D-100 LP Steam 115 300 600 1.5 AtmLCV-100 LC-103-2"-C1S0 Steam Conds. 335 720 1440 0.5 Atm

  • Rev 0Date 2/2/2015Appd By SSPrepd By MF

    CONTROL VALVE DATASHEETTemp (C) Max MOC Density Lekage Air Fail Remarks

    inlet Shut off Body Trim kg/m3 classkg/cm2

    127 6 CS SS304 1.39 IV Open50 6 CS SS304 989 IV Open

  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    INDIA GLYCOLS LIMITED TECHNICAL SERVICES DEPARTMENT

    PRESSURE SAFETY VALVES.No Tag No. Location Case Service Required Relieving Conditions

    Capacity Pressure kg/cm2 g Kg/hr set Over Pr. Back1 PSV100 Flash vessel D-100 Block LP Steam 500 4.5 10% Atm

  • Rev 0Date 2/2/2015Appd By SSPrepd By MF

    TECHNICAL SERVICES DEPARTMENT

    Relieving Conditions Material Mol. RemarksTemp. Body / Spring Wt.

    C 155 CS/SS304 18

  • INDIA GLYCOLS LTD.

    01 Plant GORAKHPUR BOILER02 Service of Unit STEAM CONDENSATE03 Size Type PLATE04 Surface of Unit Sq.M.05 No. Of Units Shell Arrangement06 Ref. Dwg.07 P E R F O R M A N C E O F O N E U N I T

    0809 Fluid Circulated10 Total fluid entering11 Vapor Kg/Hr12 Liquid Kg/Hr17 Density Kg/M318 Viscosity - CST Liq..19 Therm. Cond @ oC Kcal/hr.MoC Liq.20 Mol. Weight 21 Sp.HeatKcal/Kg/Liq.Oc22 Temperature In |Crit. Temp. oC23 Temperature Out oC24 Operating Kg/cm2 (G.)25 Number of Passes Per Shell26 Velocity M/Sec.27 Pressure Drop Kg/cm228 Fouling Resistance Hr. M2 oC/Kcal29 Heat Exchanged - Kcal/Hr.30 Transfer Rate - Service Kcal/hr.M2 oC31 % Excess Surface - Required32 C O N S T R U C T I O N - E A C H S H E L L33 Design Pressure Kg/cm2 G.34 Test Pressure Kg/cm2 G.35 Design Temperature oC36 Tubes na No. O.D. BWG37 plate MOC SS304 I.D. na38 Shell Cover na39 Channel I.D. mm 40 Tube Sheets 42 Baffle Type Tube Supports43 Tube To Tube Sheet Joint 44 Gaskets - MOC - Compressed Asbestos Fibre45 Connections - Shell In- " Out " Drain "47 Corrosion Allowance - Hot Side mm cold Side mm

  • 48 Code Requirements 49 Weights - Each Shell and Bundle Kg. Bundle Only Kg. Full of Water Kg.50 REMARKS:

  • EXCHANGER SPECIFICATION SHEETItem no. E-100Rev. No 0 Date - 29.01.15Position horizontalSurface Per Shell Prep. By MFApp. By SS

    P E R F O R M A N C E O F O N E U N I T

    HOT SIDE COLD SIDEFLASH STEAM CONDENSATE TURBINE CONDENSATE

    1450 2100 943 990

    18 18 1 1

    120 45 47 95 1 2

    NA NA Cross: Long: In Avg Allowed 0.2 Calc: Allowed: 0.2

    174000 L.M.T.D. Calc.Actual

    C O N S T R U C T I O N - E A C H S H E L L6 6

    160 110 Wall mm Length mm Pitch mmO.D. na Thickness mm

    Channel Cover

    Connections - Shell In- " Out " Drain "Corrosion Allowance - Hot Side mm cold Side mm

  • Weights - Each Shell and Bundle Kg. Bundle Only Kg. Full of Water Kg.

  • E-100 Date - 29.01.15

    Sq.M.

    COLD SIDETURBINE CONDENSATE

    2100 990

    1 45 95 2

    Out Calc:

    9.2

    Pitch mm

  • Scheme: GKP Boilers Continuous Blowdown Heat Recovery

    Rev 0TECHNICAL SERVICES DEPTT. Date 29/1/2015

    INDIA GLYCOLS LIMITED Appd By SSPrep By MF

    TEMPERATURE GAUGES.No Tag No Location Service Qty. Type Range Normal Operating Design MOC Nozzle Remarks

    C Temp Pressure Temp Pressure SizeC Kg/cm2 C Kg/cm2 inches

    1 TI-100 A LC-102-2''-C1S0 Flash Cond. Hot 1 Bimetallic 0-150 120 1 150 6 SS304 1.52 TI-100 B LC-103-2''-C1S0 Flash Cond. Cold 1 Bimetallic 0-150 50 0.5 150 6 SS304 1.53 TI-100 C LC-105-1''-C1S0 Turbine Cond Cold 1 Bimetallic 0-60 45 2 60 6 SS304 1.54 TI-100 D LC-104-1''-C1S0 Turbine Cond Hot 1 Bimetallic 0-120 95 1.5 120 6 SS304 1.5

    Equip listInstm ListPIPTLGLTPVPSVPHETI