Roadstone Ltd. IPPC Licence 521, AER 2016

1

Bennettsbridge Quarries

Annual Environmental Report 2016

Page 2: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

2

Contents;

1. Introduction

2. Summary Information;

2.1 Dust Deposition Results

2.2 Water Quality Results

2.3 Quarry Pump Flow Results

2.4 Noise Summary.

2.5 Blast Results.

2.6 Waste Management.

2.7 Summary of Complaints.

2.8 Energy Consumption.

3 Management of Activity.

3.1 Objectives and Targets 2016

3.2 Current Year Objectives and Targets 2017

4 Other Reports

4.1 Site Audit.

Page 3: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

3

Introduction;

Licence Register No: 521

Name and Location of Site:

Roadstone Ltd.

Maddoxtown,

Co. Kilkenny

Description of Activities:

Roadstone Ltd is one of the largest suppliers of construction materials such as aggregates, concrete and bituminous products

in Ireland. Rock is quarried in the above location to service the needs of the construction and fertilizer industry. Blasted rock

is hauled from the quarry face to the crushers where the rock is reduced in size and screened into appropriate sizes. Product

sizes range from armour rock to milled lime, used for agricultural purposes. From the stockpiling yard the products are

dispatched to the customer using trucks.

The products produced at the plant in Maddoxtown consist of the following:

Crushing and processing of high grade dolomitic limestone for agricultural limestone.

Crushing and processing of high grade dolomitic limestone for aggregate and stone fill.

Responsibility for Environmental Management:

People with responsibility for the Environmental Management of this site are:

The Location Manager.

The Environmental Officer.

The Operations Director.

The Managing Director.

Page 4: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

4

2.1 Dust Deposition Results

Dust Deposition Monitoring Results - Bennettsbridge Quarry 2016

Month D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13

January 87.7 25.3 17.5

Jar Knocked Over Jar Broken 11.5 49.6 62.9 43.2 11.5 334.4 117.1 47.3

February 35.1 76.2 8.9 163.7 64.9 47.0 60.7 91.1 176.3 130.4 144.7 40.5 91.1

March 112.0 112.6 76.9 203.7 50.5 47.4 72.0 46.8 116.3 100.2 52.3 28.9 55.4

April 266.0 156.2 168.1 97.9 108.3 281.7 85.2 68.0 77.7 53.0 107.6 93.4 58.3

May 399.6 67.2 66.6 68.9 73.5 119.4 75.8 Contaminated* 99.3 62.0 35.6 152.2 66.6

June 172.3 118.8 111.4 109.5 59.7 84.9 377.2 90.5 104.0 176.6 1095.9 206.1 166.7

July 102.1 743.3 115.7 143.4 35.7 88.0 68.8 42.5 19.1 56.0 495.9 156.9 80.0

August 121.7 284.8 133.8 221.6 79.2 242.3 135.5 73.5 73.5 93.0 87.9 66.0 90.7

September 61.6 130.8 141.5 327.4 94.9 50.9 274.9 56.8 68.1 100.2 107.7 347.8 69.1

October 44.0 79.0 56.0 37.0 53.0 41.0 55.0 28.0 36.0 26.0 65.0 86.0 60.0

November 45.0 44.0 77.0 421.0 41.0 92.0 63.0 58.0 152.0 48.0 79.0 9.0 81.0

December 27.0 468.0 39.0 127.0 23.0 25.0 34.0 64.0 34.0 33.0 43.0 666.0 52.0

All results in mg/m2/day Comments: * Sample Jar at location D8 was rejected due to containing high levels of dirt and was brown in colour.

Page 5: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

5

Page 6: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

6

2.2 Water Quality Results

S2: Weekly discharge water samples from the discharge pipe from settlement ponds

Sampling

Pt. TSS pH

Limits

25mg/l 6 to 9

15/01/2016 <10 7.90

22/01/2016 <5 8.29

29/01/2016 <5 8.29

04/02/2016 <5 8.20

12/02/2016 <10 8.12

19/02/2016 <10 8.25

26/02/2016 <5 7.88

04/03/2016 <5 8.27

11/03/2016 <5 8.21

17/03/2016 <5 7.84

22/03/2016 <5 8.28

01/04/2016 <5 7.95

11/04/2016 <5 8.00

15/04/2016 <5 7.95

16/04/2016 <5 8.29

20/04/2016 <5 8.30

29/04/2016 <5 7.61

06/05/2016 <5 7.49

13/05/2016 <5 8.08

18/05/2016 <5 8.06

03/06/2016 <10 8.26

Page 7: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

7

10/06/2016 <5 7.76

15/06/2016 <5 8.20

24/06/2016 <5 8.09

01/07/2016 <5 7.96

15/07/2016 <5 7.99

19/07/2016 <5 8.17

29/07/2016 <5 8.30

05/08/2016 <5 8.17

12/08/2016 <5 7.40

22/08/2016 <5 8.08

26/08/2016 <10 7.90

02/09/2016 <5 8.18

09/09/2016 <5 7.97

16/09/2016 <5 8.03

19/09/2016 <5 7.89

30/09/2016 <10 7.89

07/10/2016 14 7.93

19/10/2016 <5 8.13

21/10/2016 <5 7.83

28/10/2016 <5 7.80

11/11/2016 <5 7.82

16/11/2016 <5 8.12

25/11/2016 <5 7.66

02/12/2016 <5 7.95

09/12/2016 <5 8.04

16/12/2016 <5 7.51

22/12/2016 <5 8.04

29/12/2016 <5 8.06

Page 8: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

8

Borehole Data Bennettsbridge 2016

Location January February March April May June July August September October November December

P. Fitzpatrick 28.2 28 28.1 28.1 28.2 28 27.5 27.1 27 26.9 26.5 26

R. Hogan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a

N. Neary 8.5 8.3 8.7 8.6 8.4 8.4 8.3 8 8 8 7.5 7.9

B. Bryan 0 0 0 0 0 0 0 0 0 0 0 0

E. Mulrooney 0 0 0 0 0 0 0 0 0 0 0 0

Maddoxtown No.1 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a

Maddoxtown No.2 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a

D. Molloy 24.6 24.7 24.8 24.8 24.9 24.7 24.5 24.3 24.3 24.2 24 24.1

Observation Well 1 37.9 38 38.4 37.9 38.1 31 30.6 30.4 30.3 30 29.8 29.9

Observation Well 2 16 16 16.3 16.2 16.3 16.1 16 16 16 15.8 15,9 16

Observation Well 3 17.7 17.5 17.5 17.4 17.4 17.2 17 16.9 16.8 16.7 16.7 17.1

Observation Well 4 14.1 14.3 14.3 14.3 14.1 14 13.9 13.7 13.7 13.5 13.1 13.1

Observation Well 5 13.8 13.8 13.7 13.6 13.6 13.4 13.1 13 13 12.8 12.6 12.3

Observation Well 6 11.9 12 11.8 11.8 11.8 11.6 11.4 11.2 11.1 11 11.3 11

Page 9: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

9

2.3 Quarry Pump Flow Records

Page 10: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

10

Date: Pump Reading Daily Volume EPA limit Hourly Volume EPA limit Visual Check

Pumped (m3) 2200m3/day Pumped 92m3/hour E.g. c lear, c loudy, darker colour etc…

01/01/2016

02/01/2016

03/01/2016

04/01/2016

05/01/2016 78945 10645 6600 88 92 C/W

06/01/2016 81070 2125 2200 89 92 C/W

07/01/2016 83199 2129 2200 87 92 C/W

08/01/2016 85319 2120 2200 89 92 C/W

09/01/2016

10/01/2016

11/01/2016 91719 6400 6600 88 92 C/W

12/01/2016 93838 2119 2200 89 92 C/W

13/01/2016 95968 2130 2200 87 92 C/W

14/01/2016 98092 2124 2200 86 92 C/W

15/01/2016 100221 2129 2200 85 92 C/W

16/01/2016

17/01/2016

18/01/2016 106626 6405 6600 88 92 C/W

19/01/2016 108759 2133 2200 87 92 C/W

20/01/2016 110888 2129 2200 90 92 C/W

21/01/2016 113010 2122 2200 88 92 C/W

22/01/2016 115141 2131 2200 86 92 C/W

23/01/2016

24/01/2016

25/01/2016 121535 6394 6600 88 92 C/W

26/01/2016 123655 2120 2200 89 92 C/W

27/01/2016 125785 2130 2200 87 92 C/W

28/01/2016 127916 2131 2200 88 92 C/W

29/01/2016 130041 2125 2200 90 92 C/W

30/01/2016

31/01/2016

Page 11: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

11

Date: Pump Reading Daily Volume EPA limit Hourly Volume EPA limit Visual Check

Pumped (m3) 2200m3/day Pumped 92m3/hour E.g. c lear, c loudy, darker colour etc…

01/02/2016 140674 6381 6600 88 92 C/W

02/02/2016 142794 2120 2200 88 92 C/W

03/02/2016 144913 2119 2200 89 92 C/W

04/02/2016 147048 2135 2200 89 92 C/W

05/02/2016 149187 2139 2200 90 92 C/W

06/02/2016

07/02/2016

08/02/2016 155526 6339 6600 89 92 C/W

09/02/2016 157646 2120 2200 90 92 C/W

10/02/2016 159770 2124 2200 89 92 C/W

11/02/2016 161905 2135 2200 91 92 C/W

12/02/2016 164034 2129 2200 91 92 C/W

13/02/2016

14/02/2016

15/02/2016 170412 6378 6600 88 92 C/W

16/02/2016 172547 2135 2200 89 92 C/W

17/02/2016 174675 2128 2200 86 92 C/W

18/02/2016 176799 2124 2200 88 92 C/W

19/02/2016 178918 2119 2200 90 92 C/W

20/02/2016

21/02/2016

22/02/2016 185277 6359 6600 88 92 C/W

23/02/2016 187406 2129 2200 89 92 C/W

24/02/2016 189539 2133 2200 89 92 C/W

25/02/2016 191677 2138 2200 90 92 C/W

26/02/2016 193811 2134 2200 88 92 C/W

27/02/2016

28/02/2016

29/02/2016 200171 6360 6600 88 92 C/W

Page 12: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

12

Date: Pump Reading Daily Volume EPA limit Hourly Volume EPA limit Visual Check

Pumped (m3) 2200m3/day Pumped 92m3/hour E.g. c lear, c loudy, darker colour etc…

01/03/2016 202299 2128 2200 89 92 C/W

02/03/2016 204429 2130 2200 90 92 CLEAR/WATER

03/03/2016 206558 2129 2200 90 92 C/W

04/03/2016 208689 2131 2200 90 92 C/W

05/03/2016 Pumps turned off

06/03/2016

07/03/2016

08/03/2016

09/03/2016

10/03/2016

11/03/2016

12/03/2016

13/03/2016

14/03/2016

15/03/2016

16/03/2016

17/03/2016

18/03/2016

19/03/2016

20/03/2016

21/03/2016

22/03/2016

23/03/2016

24/03/2016

25/03/2016

26/03/2016

27/03/2016

28/03/2016 BH

29/03/2016 210864 2175 2200 89 92 C/W

30/03/2016 213044 2180 2200 90 92 C/W

31/03/2016 215220 2176 2200 89 92 C/W

Page 13: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

13

Date: Pump Reading Daily Volume EPA limit Hourly Volume EPA limit Visual Check

Pumped (m3) 2200m3/day Pumped 92m3/hour E.g. c lear, c loudy, darker colour etc…

01/04/2016 217400 2,180 2200 88 92 CLEAR/WATER

02/04/2016

03/04/2016

04/04/2016 223853 6,453 6600 88 92 C/W

05/04/2016 226033 2,180 2200 87 92 C/W

06/04/2016 228208 2,175 2200 86 92 C/W

07/04/2016 230377 2,169 2200 88 92 C/W

08/04/2016 232545 2,168 2200 88 92 C/W

09/04/2016

10/04/2016

11/04/2016 238979 6,434 6600 86 92 C/W

12/04/2016 241155 2,176 2200 89 92 C/W

13/04/2016 243343 2,188 2200 89 92 C/W

14/04/2016 245523 2,180 2200 88 92 C/W

15/04/2016 247699 2,176 2200 88 92 C/W

16/04/2016

17/04/2016

18/04/2016 254138 6,439 6600 88 92 C/W

19/04/2016 256314 2,176 2200 89 92 C/W

20/04/2016 258499 2,185 2200 89 92 C/W

21/04/2016 260679 2,180 2200 87 92 C/W

22/04/2016 262848 2,169 2200 87 92 C/W

23/04/2016

24/04/2016

25/04/2016 269337 6,489 6600 88 92 C/W

26/04/2016 271507 2,170 2200 89 92 C/W

27/04/2016 273686 2,179 2200 90 92 C/W

28/04/2016 275872 2,186 2200 88 92 C/W

29/04/2016 278065 2,193 2200 86 92 C/W

30/04/2016

Page 14: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

14

DATE PUMP READING DAILY VOLUME

PUMPED (M3)

EPA LIMIT

(M3)

HOURLY VOLUME

PUMPED (M3)

EPA LIMIT

(M3)VISUAL CHECK

01/05/2016 280215 2,150 2200 90 92

02/05/2016 282365 2,175 2200 91 92

03/05/2016 284540 2,189 2200 91 92 C/W

04/05/2016 286729 2,183 2200 91 92 C/W

05/05/2016 288912 2,183 2200 91 92 C/W

06/05/2016 291095 2,100 2200 88 92 C/W

07/05/2016 293195 2,188 2200 91 92

08/05/2016 295383 2,198 2200 92 92

09/05/2016 297581 2,194 2200 91 92 C/W

10/05/2016 299775 2,149 2200 90 92 C/W

11/05/2016 301924 2,193 2200 91 92 C/W

12/05/2016 304117 2,156 2200 90 92 C/W

13/05/2016 306273 2,199 2200 92 92 C/W

14/05/2016 308472 2,105 2200 88 92

15/05/2016 310577 2,198 2200 92 92

16/05/2016 312775 2,186 2200 91 92 C/W

17/05/2016 314961 2,197 2200 92 92 C/W

18/05/2016 317158 2,183 2200 91 92 C/W

19/05/2016 319341 2,174 2200 91 92 C/W

20/05/2016 321515 2,174 2200 91 92 C/W

21/05/2016 323689 2,184 2200 91 92

22/05/2016 325873 2,196 2200 92 92

23/05/2016 328069 2,174 2200 91 92 C/W

24/05/2016 330243 2,184 2200 91 92 C/W

25/05/2016 332427 2,142 2200 89 92 C/W

26/05/2016 334569 2,189 2200 91 92 C/W

27/05/2016 336758 2,163 2200 90 92 C/W

28/05/2016 338921 1,500 2200 63 92

29/05/2016 340421 - 2200 - 92

30/05/2016 340421 - 2200 - 92

31/05/2016 340421 - 2200 - 92

Page 15: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

15

Date: Pump Reading Daily Volume EPA limit Hourly Volume EPA limit Visual Check

Pumped (m3) 2200m3/day Pumped 92m3/hourE.g. c lear, c loudy, darker colour etc…

02/06/2016 0 - 2200 - 92

03/06/2016 0 - 2200 - 92

04/06/2016 0 - 2200 - 92

05/06/2016 0 - 2200 - 92

06/06/2016 0 - 2200 - 92

07/06/2016 1475 1,475 2200 61 92 C/W

08/06/2016 2937 1,462 2200 61 92 C/W

09/06/2016 4387 1,450 2200 60 92 C/W

10/06/2016 5820 1,433 2200 60 92 C/W

11/06/2016 7307 1,487 2200 62 92 C/W

12/06/2016 8740 1,433 2200 60 92 C/W

13/06/2016 10211 1,471 2200 61 92 C/W

14/06/2016 11649 1,438 2200 60 92 C/W

15/06/2016 13132 1,483 2200 62 92 C/W

16/06/2016 14620 1,488 2200 62 92 C/W

17/06/2016 16099 1,479 2200 62 92 C/W

18/06/2016 17579 1,480 2200 62 92

19/06/2016 19042 1,463 2200 61 92

20/06/2016 20501 1,459 2200 61 92 C/W

21/06/2016 21960 1,459 2200 61 92 C/W

22/06/2016 23417 1,457 2200 61 92 C/W

23/06/2016 24856 1,439 2200 60 92 C/W

24/06/2016 26338 1,482 2200 62 92 C/W

25/06/2016 27811 1,473 2200 61 92

26/06/2016 29276 1,465 2200 61 92

27/06/2016 30737 1,461 2200 61 92 C/W

28/06/2016 32163 1,426 2200 59 92 C/W

29/06/2016 33636 1,473 2200 61 92

30/06/2016 35101 1,465 2200 61 92

Page 16: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

16

Date: Pump Reading Daily Volume EPA limit Hourly Volume EPA limit Visual Check

Pumped (m3) 2200m3/day Pumped 92m3/hour E.g. c lear, c loudy, darker colour etc…

02/07/2016 1482 1,482 2200 62 92

03/07/2016 2947 1,465 2200 61 92

04/07/2016 4402 1,455 2200 61 92 C/W

05/07/2016 5957 1,555 2200 65 92 C/W

06/07/2016 7412 1,455 2200 61 92 C/W

07/07/2016 8892 1,480 2200 62 92 C/W

08/07/2016 10363 1,471 2200 61 92 C/W

09/07/2016 11815 1,452 2200 61 92

10/07/2016 13260 1,445 2200 60 92

11/07/2016 14748 1,488 2200 62 92 C/W

12/07/2016 16238 1,490 2200 62 92 C/W

13/07/2016 17720 1,482 2200 62 92 C/W

14/07/2016 19187 1,467 2200 61 92 C/W

15/07/2016 20610 1,423 2200 59 92 C/W

16/07/2016 22805 2,195 2200 91 92

17/07/2016 24994 2,189 2200 91 92

18/07/2016 27168 2,174 2200 91 92 C/W

19/07/2016 29324 2,156 2200 90 92 C/W

20/07/2016 31461 2,137 2200 89 92 C/W

21/07/2016 33626 2,165 2200 90 92 C/W

22/07/2016 35782 2,156 2200 90 92 C/W

23/07/2016 37965 2,183 2200 91 92

24/07/2016 40122 2,157 2200 90 92

25/07/2016 42308 2,186 2200 91 92 C/W

26/07/2016 44472 2,164 2200 90 92 C/W

27/07/2016 46627 2,155 2200 90 92 C/W

28/07/2016 48790 2,163 2200 90 92 C/W

29/07/2016 50962 2,172 2200 91 92 C/W

30/07/2016 53157 2,195 2200 91 92

31/07/2016 55327 2,170 2200 90 93

Page 17: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

17

Date: Pump Reading Daily Volume EPA limit Hourly Volume EPA limit Visual Check

Pumped (m3) 2200m3/day Pumped 92m3/hour E.g. c lear, c loudy, darker colour etc…

02/08/2016 2176 2,176 2200 91 92

03/08/2016 4310 2,134 2200 89 92

04/08/2016 6480 2,170 2200 90 92 C/W

05/08/2016 8648 2,168 2200 90 92 C/W

06/08/2016 10798 2,150 2200 90 92 C/W

07/08/2016 12978 2,180 2200 91 92 C/W

08/08/2016 15143 2,165 2200 90 92 C/W

09/08/2016 17311 2,168 2200 90 92

10/08/2016 19486 2,175 2200 91 92

11/08/2016 21599 2,113 2200 88 92 C/W

12/08/2016 23719 2,120 2200 88 92 C/W

13/08/2016 25846 2,127 2200 89 92 C/W

14/08/2016 27250 1,404 2200 59 92 C/W

15/08/2016 27250 - 2200 - 92 C/W

16/08/2016 27250 - 2200 - 92

17/08/2016 27250 - 2200 - 92

18/08/2016 27250 - 2200 - 92 C/W

19/08/2016 27250 - 2200 - 92 C/W

20/08/2016 27250 - 2200 - 92 C/W

21/08/2016 27250 - 2200 - 92 C/W

22/08/2016 28150 900 2200 38 92 C/W

23/08/2016 30315 2,165 2200 90 92

24/08/2016 32480 2,165 2200 90 92

25/08/2016 34647 2,167 2200 90 92 C/W

26/08/2016 36836 2,189 2200 91 92 C/W

27/08/2016 39016 2,180 2200 91 92 C/W

28/08/2016 41199 2,183 2200 91 92 C/W

29/08/2016 43377 2,178 2200 91 92 C/W

30/08/2016 45553 2,176 2200 91 92

31/08/2016 47731 2,178 2200 91 93

Page 18: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

18

Date: Pump Reading Daily Volume

Pumped (m3) EPA limit

Hourly Volume

Pumped (M3)EPA limit Visual Check

01/09/2016 484395 2,183 2200 91 92 C/W

02/09/2016 486553 2,158 2200 90 92

03/09/2016 488718 2,165 2200 90 92

04/09/2016 490823 2,105 2200 88 92 C/W

05/09/2016 493012 2,189 2200 91 92 C/W

06/09/2016 495153 2,141 2200 89 92 C/W

07/09/2016 497351 2,198 2200 92 92 C/W

08/09/2016 499526 2,175 2200 91 92 C/W

09/09/2016 501661 2,135 2200 89 92

10/09/2016 503859 2,198 2200 92 92

11/09/2016 506026 2,167 2200 90 92 C/W

12/09/2016 508169 2,143 2200 89 92 C/W

13/09/2016 510279 2,110 2200 88 92 C/W

14/09/2016 512406 2,127 2200 89 92 C/W

15/09/2016 514584 2,178 2200 91 92 C/W

16/09/2016 516751 2,167 2200 90 92

17/09/2016 518914 2,163 2200 90 92

18/09/2016 521101 2,187 2200 91 92 C/W

19/09/2016 523257 2,156 2200 90 92 C/W

20/09/2016 525446 2,189 2200 91 92 C/W

21/09/2016 527593 2,147 2200 89 92 C/W

22/09/2016 529782 2,189 2200 91 92 C/W

23/09/2016 531967 2,185 2200 91 92

24/09/2016 534075 2,108 2200 88 92

25/09/2016 536178 2,103 2200 88 92 C/W

26/09/2016 538282 2,104 2200 88 92 C/W

27/09/2016 538282 - 2200 - 92 C/W

28/09/2016 538282 - 2200 - 92 C/W

29/09/2016 538282 - 2200 - 92 C/W

30/09/2016 538282 - 2200 - 92

Page 19: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

19

DATE PUMP READING DAILY VOLUME

PUMPED (M3)

EPA LIMIT

(M3)

HOURLY VOLUME

PUMPED (M3)

EPA LIMIT

(M3)

VISUAL

CHECK

01/09/2016 538282 - 2200 - 92 C/W

02/09/2016 538282 - 2200 - 92 C/W

03/09/2016 538282 - 2200 - 92

04/09/2016 538282 - 2200 - 92

05/09/2016 538282 - 2200 - 92 C/W

06/09/2016 538282 - 2200 - 92 C/W

07/09/2016 538282 - 2200 - 92 C/W

08/09/2016 538282 - 2200 - 92 C/W

09/09/2016 540477 2,195 2200 91 92 C/W

10/09/2016 542637 2,160 2200 90 92

11/09/2016 544804 2,167 2200 90 92

12/09/2016 546947 2,143 2200 89 92 C/W

13/09/2016 549057 2,110 2200 88 92 C/W

14/09/2016 551184 2,127 2200 89 92 C/W

15/09/2016 553362 2,178 2200 91 92 C/W

16/09/2016 555529 2,167 2200 90 92 C/W

17/09/2016 557692 2,163 2200 90 92

18/09/2016 559879 2,187 2200 91 92

19/10/2016 559879 - 2200 0 92 C/W

20/10/2016 559879 - 2200 92 C/W

21/10/2016 559879 - 2200 92 C/W

22/10/2016 559879 - 2200 92 C/W

23/10/2016 559879 - 2200 92 C/W

24/10/2016 562040 2,161 2200 89 92

25/10/2016 564210 2,170 2200 90 92

26/10/2016 566329 2,119 2200 88 92

27/10/2016 568452 2,123 2200 89 92 c/w

28/10/2016 570636 2,184 2200 91 92 c/w

29/10/2016 572824 2,188 2200 91 92 c/w

30/10/2016 574990 2,166 2200 90 92 c/w

31/10/2016 577146 2,156 2200 89 92

Page 20: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

20

DATE PUMP READING DAILY VOLUME

PUMPED (M3)

EPA LIMIT

(M3)

HOURLY VOLUME

PUMPED (M3)

EPA LIMIT

(M3)

VISUAL

CHECK

2200m3/day 92m3/hour E.g. c lear, c loudy, darker colour etc…

01/11/2016 579,307 2,161 2200 90 92

02/11/2016 581484 2,177 2200 91 92

03/11/2016 583630 2,146 2200 89 92

04/11/2016 585796 2,166 2200 90 92

05/11/2016 587961 2,165 2200 90 92

06/11/2016 590135 2,174 2200 91 92

07/11/2016 590135 - 2200 - 92

08/11/2016 590135 - 2200 - 92

09/11/2016 590135 - 2200 - 92

10/11/2016 590135 - 2200 - 92

11/11/2016 590135 - 2200 - 92

12/11/2016 592297 2,162 2200 90 92

13/11/2016 594463 2,166 2200 90 92

14/11/2016 596640 2,177 2200 91 92

15/11/2016 598779 2,139 2200 89 92

16/11/2016 600945 2,166 2200 90 92

17/11/2016 603112 2,167 2200 90 92

18/11/2016 603112 2200 - 92

19/11/2016 603112 2200 - 92

20/11/2016 603112 2200 - 92

21/11/2016 603112 2200 - 92

22/11/2016 603112 2200 - 92

23/11/2016 603112 2200 - 92

24/11/2016 603112 2200 - 92

25/11/2016 603112 2200 - 92

26/11/2016 603112 2200 - 92

27/11/2016 603112 - 2200 - 92

28/11/2016 603112 - 2200 - 92

29/11/2016 603112 - 2200 - 92

30/11/2016 603112 - 2200 - 92

603112 - 2200 - 93

Page 21: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

21

DATE PUMP READING DAILY VOLUME

PUMPED (M3)

EPA LIMIT

(M3)

HOURLY VOLUME

PUMPED (M3)

EPA LIMIT

(M3)

VISUAL

CHECK

2200m3/day 92m3/hour E.g. c lear, c loudy, darker colour etc…

01/12/2016 605227 2,165 2200 90 92

02/12/2016 607397 2,170 2200 90 92

03/12/2016 609558 2,161 2200 90 92

04/12/2016 611712 2,154 2200 90 92

05/12/2016 613885 2,173 2200 91 92

06/12/2016 616051 2,166 2200 90 92

07/12/2016 618211 2,160 2200 90 92

08/12/2016 620400 2,189 2200 91 92

09/12/2016 622567 2,167 2200 90 92

10/12/2016 624726 2,159 2200 90 92

11/12/2016 626909 2,183 2200 91 92

12/12/2016 629086 2,177 2200 91 92

13/12/2016 631244 2,158 2200 90 92

14/12/2016 633413 2,169 2200 90 92

15/12/2016 635589 2,176 2200 91 92

16/12/2016 637747 2,158 2200 90 92

17/12/2016 639935 2,188 2200 91 92

18/12/2016 642109 2,174 2200 91 92

19/12/2016 644299 2,190 2200 91 92

20/12/2016 646454 2,155 2200 90 92

21/12/2016 648622 2,168 2200 90 92

22/12/2016 650790 2,168 2200 90 92

23/12/2016 650790 - 2200 - 92

24/12/2016 650790 - 2200 - 92

25/12/2016 650790 - 2200 - 92

26/12/2016 650790 - 2200 - 92

27/12/2016 650790 - 2200 - 92

28/12/2016 650790 - 2200 - 92

29/12/2016 650790 - 2200 - 92

30/12/2016 650790 - 2200 - 92

31/12/2016 650790 - 2200 - 93

Page 22: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

22

2.4 Noise Survey Report

See noise survey report attached in Appendix A

2.5 Blast Monitoring Records

Date Air Peak Particle Velocity (mm/sec)

Overpressure

dB(L) Tran Vert Long

25/01/2016 122.5 2.397 1.626 2.270

20/06/2016 88.0 1.742 1.474 4.587

29/07/2016 92.28 4.430 2.120 4.769

31/08/2016 107.6 4.083 1.119 3.704

05/12/2016 105.4 2.380 1.088 3.665

15/12/2016 112.2 1.568 2.814 2.633

Page 23: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

23

2.6 Waste Management

5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : P0521 | Facility Name : Roadstone Limited (Maddoxtown) | Filename : P0521_2016.xls | Return Year : 2016 | 04/04/2017 16:09

5 8 Please enter all quantities on this sheet in Tonnes 6

Quantity

(Tonnes per

Year)

Haz Waste : Name and

Licence/Permit No of Next

Destination Facility

Non Haz Waste: Name and

Licence/Permit No of

Recover/Disposer

Haz Waste : Address of Next

Destination Facility

Non Haz Waste: Address of

Recover/Disposer

Name and License / Permit No. and

Address of Final Recoverer /

Disposer (HAZARDOUS WASTE

ONLY)

Actual Address of Final Destination

i.e. Final Recovery / Disposal Site

(HAZARDOUS WASTE ONLY)

Transfer Destination

European Waste

Code Hazardous Description of Waste

Waste

Treatment

Operation M/C/E Method Used

Location of

Treatment

To Other Countries 13 02 08 Yes 0.6 other engine, gear and lubricating oils R1 M Volume Calculation Abroad Enva Waste ,184-1

Clonminam Industrial

Estate,Portlaoise,Co

Laois,.,Ireland

Lindenschmidt

,E97095037,Lindenschmidt

,42-46 Krombacher

St,Kreuztal/Krombach,.,Ger

many

Lindenschmidt ,42-46

Krombacher

St,Kreuztal/Krombach,.,Ger

many

Within the Country 16 01 07 Yes 0.12 oil filters R8 M Weighed Offsite in Ireland Enva Waste ,184-1

Clonminam Industrial

Estate,Portlaoise,Co

Laois,.,Ireland

Lindenschmidt

,E97095037,Lindenschmidt

,42-46 Krombacher

St,Kreuztal/Krombach,.,Ger

many

Lindenschmidt ,42-46

Krombacher

St,Kreuztal/Krombach,.,Ger

many

Within the Country 15 02 02 Yes 0.045

absorbents, filter materials (including oil

filters not otherwise specified), wiping

cloths, protective clothing contaminated by

dangerous substances R1 M Weighed Offsite in Ireland Enva Waste ,184-1

Clonminam Industrial

Estate,Portlaoise,Co

Laois,.,Ireland

Lindenschmidt

,E97095037,Lindenschmidt

,42-46 Krombacher

St,Kreuztal/Krombach,.,Ger

many

Lindenschmidt ,42-46

Krombacher

St,Kreuztal/Krombach,.,Ger

many

Method Used

ADD NEW ROW DELETE ROW *

Page 24: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

24

2.7 Summary of Complaints

There were two complaints during 2016.

02/08/2016 A neighbour complained that the lorries were using the Sion Rd., hauliers were instructed not to use the Sion Rd.

02/02//2016 A neighbour phoned to complain about blast. Review carried out on monitoring results.

2.8 Energy Consumption

Summary of Bennettsbridge Energy Usage January 2016 to December 2016

Electricity Consumption: 1412842Kwh

Fuel Consumption: 223782Litres

Summary of Water Usage per annum

a) Wheel wash 1.7 million litres

b) On site dust suppression 1.7 million litres

c) Office usage 220,000 litres

This water usage is not metred, the figures above are estimated.

Page 25: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

25

3.1 Objectives and Targets 2016

Bennettsbridge - Environmental Improvement Program 2016

3.2 Objectives and Targets 2017

Ref.

no.

Aspect Area Improvement Responsibility Completion

Date

1 Pollution Control Interceptors To be inspected biannually by CKH

Environmental.

Location Manager Complete

2 Site maps Entire

Location

Site maps to include, site drainage, storage of

fuel/oils, spill kits, septic tanks, interceptors, flow

meters, environmental monitoring points etc… to

be devised. To use new drone photographs.

Environmental

Officer

Complete

3 Housekeeping Entire

Location

Continue with upkeep of garage area Location Manager Ongoing

4 Environmental

Monitoring

About the

Boundary

Review the labelling of monitoring points and

revise the location monitoring map

Environmental

Officer

Complete

Page 26: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

26

Bennettsbridge - Environmental Improvement Program 2017

Ref.

no.

Aspect Area Improvement Responsibility Completion

Date

1 Pollution Control Silt trap Area Extend settling pond area to manage run off

from roadway.

Location Manager September

2017

2 Waste Management Garage Effort made to reduce amount of tyres, metal

and waste on the site.

Location Manager Ongoing

3 Water Flow Meter Connect to energy management system Location Manager September

2017

4 Electricity High Tension & Low Tension electricity supply

to be upgraded

Location Manager August 2017

5 Haul Roads Quarry Road Installation of new ramp to reduce haul routes

reducing fuel consumption

Location Manager July 2017

6 Training Quarterly Training for all employees and

contractors.

Location Manager Ongoing

7 Reinstatement Reinstatement of land that was used for

stockpiling material

Location Manager October 2017

8 Landscaping Sam Kelly

Residence

Planting of trees near residential house Location Manager March 2017

Page 27: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

27

4.1 Site Audit

ENVIRONMENTAL AUDIT cc Michael Buckley, John Glynn & Denis O’Callaghan

Location – Bennettsbridge Dates of Inspection – September 2016

Manager – Allen Geraghty Completed by – Cillian Casey

Those items marked in red are to be dealt with as a priority.

fig. 1 fig. 2

Aspect Finding Responsibility Completion

Date

Waste Chemical

Storage Drums Plastic containers of any sort should not be discarded around the

yard Proper segregation of waste to correct waste disposal

company to take place. See fig 1

A. Geraghty Sept 2016

Visual

Amenity &

Housekeeping

The garage requires some attention, the oil filters bin requires

servicing and oil drums to be removed from site, see fig. 2.

A. Geraghty

Sept 2016

Housekeeping Plant rooms must be kept clear of used material in case of spills

or causing a hazard for operatives during operation or

maintenance of equipment. See fig 3.

A. Geraghty Sept 2016

Spill Kits Spill kits to be placed on quarry floor of sufficient size to cater

for the diesel in machinery

A. Geraghty Sept 2016

Page 28: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

28

Page 29: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

29

fig. 3

Page 30: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

30

Appendix A

Page 31: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

31

Page 32: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

32

Page 33: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

33

Page 34: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

34

Page 35: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

35

Page 36: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

36

Page 37: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

37

Page 38: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

38

Page 39: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

39

Page 40: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

40

Appendix B

PRTR Submission

Page 41: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

41

| PRTR# : P0521 | Facility Name : Roadstone Limited (Maddoxtown) | Filename :

P0521_2016.xls | Return Year : 2016 |

Guidance to completing the PRTR workbook

Version 1.1.19

REFERENCE YEAR 2016

1. FACILITY IDENTIFICATION

Parent Company Name Roadstone Limited

Facility Name Roadstone Limited (Maddoxtown)

PRTR Identification Number P0521

Licence Number P0521-01

Classes of Activity

No. class_name

- Refer to PRTR class activities below

Address 1 Maddoxtown

Address 2

Address 3

Address 4

Kilkenny

Country Ireland

Coordinates of Location -7.17771 52.6150

River Basin District IESE

NACE Code 0811

Main Economic Activity

Quarrying of ornamental and building stone, limestone, gypsum,

chalk and slate

AER Returns Contact Name Marie Kelleher

AER Returns Contact Email Address [email protected]

AER Returns Contact Position HSE Officer

AER Returns Contact Telephone Number 0217336336

AER Returns Contact Mobile Phone Number

AER Returns Contact Fax Number

Production Volume 138000.0

Production Volume Units Tonnes

Number of Installations 1

Number of Operating Hours in Year 1976

Number of Employees 3

User Feedback/Comments

Web Address

2. PRTR CLASS ACTIVITIES

Activity Number Activity Name

3(b) Opencast mining and quarrying

3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)

Is it applicable?

Have you been granted an exemption ?

If applicable which activity class applies (as per

Schedule 2 of the regulations) ?

Is the reduction scheme compliance route being

used ?

4. WASTE IMPORTED/ACCEPTED ONTO SITE Guidance on waste imported/accepted onto site

Do you import/accept waste onto your site for on-

site treatment (either recovery or disposal

activities) ? No

This question is only applicable if you are an IPPC or Quarry site

PRTR Returns Workbook

Page 42: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

42

4.1 RELEASES TO AIR Link to previous years emissions data | PRTR# : P0521 | Facility Name : Roadstone Limited (Maddoxtown) | Filename : P0521_2016.xls | Return Year : 2016 | 04/04/2017 16:16

8 13 21 23 31 31 6 6 6

SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

01 Methane (CH4) C OTH EPA Calculation Toolset 0.0 9.8 0.0 9.8

02 Carbon monoxide (CO) C OTH EPA Calculation Toolset 0.0 1919.0 0.0 1919.0

03 Carbon dioxide (CO2) C OTH EPA Calculation Toolset 0.0 565640.0 0.0 565640.0

08 Nitrogen oxides (NOx/NO2) C OTH EPA Calculation Toolset 0.0 5869.8 0.0 5869.8

11 Sulphur oxides (SOx/SO2) C OTH EPA Calculation Toolset 0.0 572.8 0.0 572.8

86 Particulate matter (PM10) C OTH EPA Calculation Toolset 0.0 550.0 0.0 550.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTS

Please enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

05 Nitrous oxide (N2O) C OTH EPA Calculation Toolset 0.0 24.2 0.0 24.2

06 Ammonia (NH3) C OTH EPA Calculation Toolset 0.0 1.4 0.0 1.4

07 Non-methane volatile organic compounds (NMVOC) C OTH EPA Calculation Toolset 0.0 605.9 0.0 605.9

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)

Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

Additional Data Requested from Landfill operators

Landfill: Roadstone Limited (Maddoxtown)

Please enter summary data on the

quantities of methane flared and / or

utilised

additional_pollutant_no T (Total) kg/Year M/C/E Method Code

Designation or

Description

Facility Total Capacity m3

per hour

Total estimated methane generation (as per

site model) 0.0 N/A

Methane flared 0.0 0.0 (Total Flaring Capacity)

Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)

Net methane emission (as reported in Section

A above) 0.0 N/A

RELEASES TO AIR

METHOD

POLLUTANT METHOD

Method Used

For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas (Methane)

flared or utilised on their facilities to accompany the figures for total methane generated.  Operators should only report their Net methane (CH4)

emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above.  Please complete the table below:

Method Used

Method Used

RELEASES TO AIR

POLLUTANT METHOD

Method Used

POLLUTANT

RELEASES TO AIR

ADD NEW ROW DELETE ROW *

ADD NEW ROW DELETE ROW *

ADD NEW ROW DELETE ROW *

ADD EMISSION POINT

ADD EMISSION POINT

ADD EMISSION POINT

Page 43: Bennettsbridge Quarries · Introduction 2. Summary Information; 2.1 Dust Deposition Results 2.2 Water Quality Results 2.3 Quarry Pump Flow Results 2.4 Noise Summary. 2.5 Blast Results

Roadstone Ltd. IPPC Licence 521, AER 2016

43

5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : P0521 | Facility Name : Roadstone Limited (Maddoxtown) | Filename : P0521_2016.xls | Return Year : 2016 |

5 8 Please enter all quantities on this sheet in Tonnes

Quantity

(Tonnes per

Year)

Haz Waste : Name and

Licence/Permit No of Next

Destination Facility

Non Haz Waste: Name and

Licence/Permit No of

Recover/Disposer

Haz Waste : Address of Next

Destination Facility

Non Haz Waste: Address of

Recover/Disposer

Transfer Destination

European Waste

Code Hazardous Description of Waste

Waste

Treatment

Operation M/C/E Method Used

Location of

Treatment

To Other Countries 13 02 08 Yes 0.6 other engine, gear and lubricating oils R1 M Volume Calculation Abroad Enva Waste ,184-1

Clonminam Industrial

Estate,Portlaoise,Co

Laois,.,Ireland

Within the Country 16 01 07 Yes 0.12 oil filters R8 M Weighed Offsite in Ireland Enva Waste ,184-1

Clonminam Industrial

Estate,Portlaoise,Co

Laois,.,Ireland

Within the Country 15 02 02 Yes 0.045

absorbents, filter materials (including oil

filters not otherwise specified), wiping

cloths, protective clothing contaminated by

dangerous substances R1 M Weighed Offsite in Ireland Enva Waste ,184-1

Clonminam Industrial

Estate,Portlaoise,Co

Laois,.,Ireland

Method Used

ADD NEW ROW DELETE ROW *