benchmark parameters of andhra pradesh. eluru circle
TRANSCRIPT
![Page 1: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/1.jpg)
BENCHMARK PARAMETERS
OF ANDHRA PRADESH
![Page 2: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/2.jpg)
ELURU CIRCLEELURU CIRCLE
![Page 3: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/3.jpg)
BENCHMARK PARAMETERS - ELURU
PARTICULARSApr02 - Mar03
Apr03 - Mar04
Apr04 - Mar05
Apr05 - Mar06
Input Energy (MU) 2183.05 2237.85 2210.29 2179.63
Metered Energy (MU) 1028.67 1114.19 943.56 1075.45
Billed Energy (MU) 1028.67 1564.95 1787.97 1850.44
Revenue Billed (Crs) 303.29 312.16 233.99 352.02
Revenue Collected (Crs) 301.86 298.59 183.34 354.50
ARR on Input Energy (Rs./unit) 1.38 1.33 0.84 1.67
ARR on Billed Energy (Rs./unit) 2.93 1.91 1.03 1.97
Collection Efficiency (%) 99.53% 95.65% 78.71% 100.70%
Billing Efficiency (%) 47.12% 69.93% 80.91% 85.03%
Metering Efficiency (%) 47.12% 49.79% 43.02% 50.29%
Energy Realised (MU) 1023.82 1496.95 1411.36 1863.79
AT& C Loss (%) 53.10% 33.11% 36.31% 14.38%
DT failure rate (%) 9.79% 7.02%
Feeder Tripping (Nos.) 989 2283 10269 7522
Reliability Index(%) 99.99% 99.99%
![Page 4: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/4.jpg)
I nput, Metered & Billed Energy
0.00
500.00
1000.00
1500.00
2000.00
2500.00
In
MU
Input Energy (MU) 2183.05 2237.85 2210.29 2179.63
Metered Energy (MU) 1028.67 1114.19 943.56 1075.45
Billed Energy (MU) 1028.67 1564.95 1787.97 1850.44
Apr 02 - Mar 03 Apr 03 - Mar 04 Apr 04 - Mar 05 Apr 05 - Mar 06
![Page 5: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/5.jpg)
Revenue Billed & Collected
0.00
50.00
100.00
150.00
200.00
250.00
300.00
350.00
400.00
In R
s. (
Crs
)
Revenue Billed (Crs) 303.29 312.16 233.99 352.02
Revenue Collected (Crs) 301.86 298.59 183.34 354.50
Apr 02 - Mar 03 Apr 03 - Mar 04 Apr 04 - Mar 05 Apr 05 - Mar 06
![Page 6: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/6.jpg)
ARR on Input Energy & Billed Energy
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
Rs
./U
nit
ARR on Input Energy(Rs./unit)
1.38 1.33 0.84 1.67
ARR on Billed Energy(Rs./unit)
2.93 1.91 1.03 1.97
Apr 02 - Mar 03 Apr 03 - Mar 04 Apr 04 - Mar 05 Apr 05 - Mar 06
![Page 7: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/7.jpg)
Collection, Billing & Metering Efficiencies
0%
20%
40%
60%
80%
100%
120%
In %
Collection Efficiency (%) 99.53% 95.65% 78.71% 100.70%
Billing Efficiency (%) 47.12% 69.93% 80.91% 85.03%
Metering Efficiency (%) 47.12% 49.79% 43.02% 50.29%
Apr 02 - Mar 03 Apr 03 - Mar 04 Apr 04 - Mar 05 Apr 05 - Mar 06
![Page 8: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/8.jpg)
AT& C Loss (%)
0%
10%
20%
30%
40%
50%
60%
In %
AT& C Loss (%) 53.10% 33.11% 36.31% 14.38%
Apr 02 - Mar 03 Apr 03 - Mar 04 Apr 04 - Mar 05 Apr 05 - Mar 06
![Page 9: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/9.jpg)
DT failure rate (%)
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%In
%
DT failure rate (%) 9.79% 7.02%
Apr 02 - Mar 03 Apr 03 - Mar 04 Apr 04 - Mar 05 Apr 05 - Mar 06
![Page 10: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/10.jpg)
Feeder Trippings (Nos.)
0
2000
4000
6000
8000
10000
12000
In N
os
Feeder Trippings (Nos.) 989 2283 10269.00 7522.00
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06
![Page 11: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/11.jpg)
TIRUPATI CIRCLETIRUPATI CIRCLE
![Page 12: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/12.jpg)
BENCHMARK PARAMETERS - TIRUPATI
PARTICULARSApr02 - Mar03
Apr03 - Mar04
Apr04 - Mar05
Apr05 - Mar06
Apr06 - JUL06
Input Energy (MU) 2258.96 2215.32 2441.54 2339.36 1004.04
Metered Energy (MU) 843.20 840.04 1004.61 1037.05 407.68
Billed Energy (MU) 1732.94 1750.28 1977.52 1712.16 886.54
Revenue Billed (Crs) 327.56 345.50 355.53 346.54 124.71
Revenue Collected (Crs) 260.74 285.65 325.27 342.30 120.15
ARR on Input Energy (Rs./unit) 1.15 1.29 1.33 1.51 1.21
ARR on Billed Energy (Rs./unit) 1.50 1.63 1.64 2.18 1.37
Collection Efficiency (%) 79.60% 82.68% 91.49% 98.67% 96.26%
Billing Efficiency (%) 76.71% 79.01% 80.99% 73.43% 88.07%
Metering Efficiency (%) 37.33% 37.92% 41.15% 45.67% 41.01%
Energy Realised (MU) 1379.43 1447.12 1809.22 1692.41 857.11
AT& C Loss (%) 38.94% 34.68% 25.90% 27.57% 15.09%
DT failure rate (%) 13.21% 7.64% 9.78% 0.71%
Feeder Trippings (Nos.) 3411 32392 154493 46972 12001.00
![Page 13: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/13.jpg)
Input, Metering & Billed Energy
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00In
MU
Input Energy (MU) 2258.96 2215.32 2441.54 2339.36 1004.04
Metered Energy (MU) 843.20 840.04 1004.61 1037.05 407.68
Billed Energy (MU) 1732.94 1750.28 1977.52 1712.16 886.54
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06
![Page 14: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/14.jpg)
Revenue Billed & Collected
0.00
50.00
100.00
150.00
200.00
250.00
300.00
350.00
400.00In
Rs
. (C
rs)
Revenue Billed (Crs) 327.56 345.50 355.53 346.54 124.71
Revenue Collected (Crs) 260.74 285.65 325.27 342.30 120.15
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06
![Page 15: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/15.jpg)
ARR on Input Energy & Billed Energy
0.00
0.50
1.00
1.50
2.00
2.50R
s./U
nit
ARR on Input Energy (Rs./unit) 1.15 1.29 1.33 1.51 1.21
ARR on Billed Energy (Rs./unit) 1.50 1.63 1.64 2.18 1.37
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06
![Page 16: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/16.jpg)
Collection, Billing & Metering Efficiencies
0%
20%
40%
60%
80%
100%
120%In
%
Collection Efficiency (%) 79.60% 82.68% 91.49% 98.67% 96.26%
Billing Efficiency (%) 76.71% 79.01% 80.99% 73.43% 88.07%
Metering Efficiency (%) 37.33% 37.92% 41.15% 45.67% 41.01%
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06
![Page 17: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/17.jpg)
AT& C Loss (%)
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
In %
AT& C Loss (%) 38.94% 34.68% 25.90% 27.57% 15.09%
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06
![Page 18: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/18.jpg)
DT failure rate (%)
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
In %
DT failure rate (%) 13.21% 7.64% 9.78% 0.71%
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06
![Page 19: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/19.jpg)
Feeder Trippings (Nos.)
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
In N
os
Feeder Trippings (Nos.) 3411 32392 154493 46972 12001.00
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06
![Page 20: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/20.jpg)
WARANGAL CIRCLEWARANGAL CIRCLE
![Page 21: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/21.jpg)
BENCHMARK PARAMETERS - WARANGAL
PARTICULARSApr 02 - Mar
03Apr 03 - Mar
04Apr 04 - Mar
05Apr 05 - Mar
06
Input Energy (MU) 1741.07 1774.26 1820.73 1872.40
Metered Energy (MU) 498.15 533.28 571.86 610.16
Billed Energy (MU) 1296.77 1372.00 1445.66 1509.71
Revenue Billed (Crs) 224.07 263.89 274.31 243.38
Revenue Collected (Crs) 217.98 218.43 254.85 229.87
ARR on Input Energy (Rs./unit) 1.25 1.23 1.40 1.26
ARR on Billed Energy (Rs./unit) 1.68 1.59 1.76 1.57
Collection Efficiency (%) 97.28% 82.77% 92.91% 95.48%
Billing Efficiency (%) 74.48% 77.33% 79.40% 80.65%
Metering Efficiency (%) 28.61% 30.06% 31.41% 34.32%
Energy Realised (MU) 1261.52 1135.65 1343.10 1480.71
AT& C Loss (%) 27.54% 35.99% 26.23% 22.91%
DT failure rate (%) 12.55% 13.29%
Feeder Trippings (Nos.) 12393 33892 16469 16964
Reliability Index(%) 99.98% 99.99%
![Page 22: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/22.jpg)
Input, Metered & Billed Energy
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
1400.00
1600.00
1800.00
2000.00In
MU
Input Energy (MU) 1741.07 1774.26 1820.73 1872.40
Metered Energy (MU) 498.15 533.28 571.86 610.16
Billed Energy (MU) 1296.77 1372.00 1445.66 1509.71
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06
![Page 23: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/23.jpg)
Revenue Billed & Collected
0.00
50.00
100.00
150.00
200.00
250.00
300.00In
Rs
. (C
rs)
Revenue Billed (Crs) 224.07 263.89 274.31 243.38
Revenue Collected (Crs) 217.98 218.43 254.85 229.87
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06
![Page 24: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/24.jpg)
ARR on Input Energy & Billed Energy
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00R
s./U
nit
ARR on Input Energy (Rs./unit) 1.25 1.23 1.40 1.26
ARR on Billed Energy (Rs./unit) 1.68 1.59 1.76 1.57
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06
![Page 25: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/25.jpg)
Collection, Billing & Metering Efficiencies
0%
20%
40%
60%
80%
100%
120%
In %
Collection Efficiency (%) 97.28% 82.77% 92.91% 95.48%
Billing Efficiency (%) 74.48% 77.33% 79.40% 80.65%
Metering Efficiency (%) 28.61% 30.06% 31.41% 34.32%
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06
![Page 26: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/26.jpg)
AT& C Loss (%)
0%
5%
10%
15%
20%
25%
30%
35%
40%
In %
AT& C Loss (%) 27.54% 35.99% 26.23% 22.91%
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06
![Page 27: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/27.jpg)
DT failure rate (%)
12.00%
12.20%
12.40%
12.60%
12.80%
13.00%
13.20%
13.40%In
%
DT failure rate (%) 12.55% 13.29%
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06
![Page 28: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/28.jpg)
Feeder Trippings (Nos.)
0.00
5000.00
10000.00
15000.00
20000.00
25000.00
30000.00
35000.00
40000.00In
No
s
Feeder Trippings (Nos.) 12393.00 33892.00 16469.00 16964.00
Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06
![Page 29: BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649dd25503460f94ac978c/html5/thumbnails/29.jpg)
ENDEND