bemco brochure

Upload: shaikhbwc

Post on 18-Oct-2015

32 views

Category:

Documents


2 download

DESCRIPTION

COMPANY PROFILE

TRANSCRIPT

  • 5/28/2018 Bemco Brochure

    1/19

  • 5/28/2018 Bemco Brochure

    2/19

    BEMCO Commitment to Quality

    Quality is an obsession in BEMCOS culture.

    Strict Quality Control Procedures related to

    Management, Engineering, Procurement,

    Selection of Vendors/Subcontractors and at

    the construction site are designed to ensure

    the highest grade of excellence. Such

    meticulous procedures for quality produceclient satisfaction, repeated business, and

    avoidance of risk.

    BEMCO scrutinizes down to the minor details

    its work to enhance not only the performance

    of the complete system it installs, but also to

    ensure that its finished work is aesthetically

    pleasant.

    BEMCO is a pioneer in obtaining and

    implementing the ISO 9001 Certification for

    Engineering. Design, Management,

    Procurement and Construction since 1994.

    The continuous implementation of such

    quality work contributes to BEMCOs

    reputation and credentials with all its clients

    and partners.

    BEMCO was formed in 1965 as a Mechanical& Electrical Contracting Company. Thereafter,

    BEMCO expanded its experience to become a

    world-class Contractor in Industrial and Power

    Projects. Under this expansion, BEMCO has

    undertaken the largest and most challenging

    turnkey projects in Saudi Arabia and the Region

    using various state of the art technologies.

    Today BEMCO is a leading EPC Turnkey

    Contractor, comprising full-scale and integratedcapabilities in Engineering, Procurement,

    Construction, Fabrication, and Start-up &

    Commissioning.

    BEMCO s Entrepreneurial Leadership restructured

    the company into three highly organized Business

    Units (Power, Industrial, Electromechanical and

    Large Civil Projects) enabling efficient

    management, providing sufficient flexibility to

    expand regionally by focusing on clientsatisfaction, quality and timely completion of

    projects.

    BEMCO is also diversifying its operation in project

    development and project financing under IPP &

    IWPP scheme to benefit from the Governments

    privatization initiatives.

    BEMCO is expanding regionally in the Middle East,

    Gulf and North Africa to become the leader in

    Power and Water projects as Developer and

    Contractor, working in conjunction with

    renowned international Engineering, Construction

    and Manufacturing Firms.

    BEMCO continues to enhance its capabilities to

    meet the challenges of the 21st century.

    Henry M. Sarkissian

    CEO

  • 5/28/2018 Bemco Brochure

    3/19

    Arabian BEMCO has

    three distinct business

    units operating as

    profit centers. A

    dedicated Executive

    Director is responsible

    for running the day to

    day activities of each of

    the units and managing

    its engineering,

    procurement and

    construction activities.

    These business units

    coordinate and

    cooperate with each

    other in the execution

    of projects providing

    scope of their

    specialties, giving

    Arabian BEMCO a

    wealth of professional

    and specialized

    resources to integrate

    large projects and

    ensure their success.

    1-Power Projects Page 6-11

    Power Generation

    Transmission & Distribution

    2-Industrial Projects Page 12-17

    Oil & Gas

    Refrigeration

    Water

    3-Civil & Electromechanical Projects Page 18-21

    Commercial Projects

    Industrial Projects

  • 5/28/2018 Bemco Brochure

    4/19

    Power Generation ProjectsPower Generation Projects

    BEMCOs experience and know-how in the power sector isunrivaled for its efficient and timely delivery of Projects.

    BEMCO has participated in the implementation ofnumerous, large and prestigious Power Projects, rangingfrom Simple Cycle to Combined Cycle Technology. BEMCOhas undertaken on an EPC basis more than 16,000 MW ofPower Generation Projects in the Kingdom of Saudi Arabiaand in the Gulf Region.

    The Riyadh (KSA) Power Plant No.9 Combined Cycle (PP9)project is a typical example of Bemco prowess in thePower Generation sector; the project with a generationcapacity of 5,980MW, was built on an area of 3.2 square

    kilometers.

    > 16,000 MWCombined Cycle Power Plants

    Simple Cycle CombustionTurbine Power Plants

    Conventional Steam Power Plants

    PP9 Combined Cycle 5,980 MW Power Plant - Riyadh

  • 5/28/2018 Bemco Brochure

    5/19

    An Achievement to the RecordAn Achievement to the Record

    680 MW Power plant170 MW Delivered in 5-1/2 monthsTotal Capacity delivered in 7-1/2 months

    In early 2004, Saudi Electricity Company (SEC) awardedArabian Bemco Contracting Company a super rush project for

    680MW extension to Power Plant No.9 in Riyadh with an

    unimaginable and unprecedented schedule of 7-1/2 months.

    The contract was signed on 1st February 2004 with first power

    delivered (170MW) by July 15th to meet the high power

    demand during the summer season. All other power delivery

    milestones were met culminating with the delivery of full

    power (680 MW) by mid September 2004.

    Letter of Appreciation

    Attn. Arabian Bemco Contracting Co.

    I received your letter dated 2/6/1425H

    Reference to the completion of thesecond extension of phase I of theRiyadh Power Plant No. 9 Rush

    Project as well as its handing over inrecord time.

    I thank you and all those whocontributed to this accomplishment andI appreciate your efforts which resultedin such distinguished achievement.

    Minister of Power & WaterAbdullah Bin Abdullrahman Al-Hussain

    680 MW PP9 Extension Fast Track

  • 5/28/2018 Bemco Brochure

    6/19

    Transmission & DistributionTransmission & Distribution

    Bemco has executed over 30 High voltage substations on EPC

    Basis up to 400 KV with 10,000 MVA Transformer capacity using

    Gas insulated switchgear (GIS) and Air insulated switchgear

    (AIS) technologies. The scope of such projects has covered

    turnkey Engineering, Procurement, Erection, Testing and

    Commissioning including civil works.

    Among its many projects, Bemco has executed the 400 KV

    Substation in Aqaba, Jordan, which forms the first part of the

    station link interconnecting Egypt, Jordan, Syria, Iraq and

    Turkey. In addition, Bemco successfully completed two 380 KV

    substations in Hail & Taif, Saudi Arabia.

    >10,000MVAGIS & AIS High Voltage

    Substations

    High Tension Transmission

    Lines

    380 kV Gas Insulated Bus Duct (GIB)380 kV GIS

  • 5/28/2018 Bemco Brochure

    7/19

    Oil & GasOil & Gas

    BEMCO executed on EPC basis a large number of Oil & Gas

    projects related to pumping, transferring, metering and

    storage of hydrocarbon products totaling

    >100 Million Gallons

    Of Hydrocarbon

    Storage Facilities

    BEMCO is a General Contractor for

    construction works in Hydrocarbon

    Process Plants undertaking

    responsibility for civil, electrical,

    mechanical, erection, instrumentation,

    controls, piping, insulation and

    painting.

    Among the Oil & Gas projects

    executed for ARAMCO is the 519,000

    Barrels Medinah bulk storage facility,

    the PP9 2,000,000 BPDD crude oil

    pipeline that ties into the east-west

    Saudi ARAMCO 48 inch pipeline and a

    Flare Tank Project for Luberef.

    Oil & Gas

    Bulk Oil Storage Facilities

    Refinery & Petrochemical

    Pipelines

    Compressor Stations

    Off site Works

    Utilities

    2,000,000 BPD Crude Oil Metering Station Riyadh

  • 5/28/2018 Bemco Brochure

    8/19

    RefrigerationRefrigerationBEMCO executed on EPC basis a large number of central refrigeration and district

    cooling plants using technologies from centrifugal reciprocating and screw

    compression technologies to absorption technologies for applications in HVAC,

    district cooling and Gas Turbines Inlet air Cooling (TIAC) facilities for Power

    Plants.

    Among the refrigeration technology projects executed by Bemco is KAAU CUP#2

    (Over 18,000 TR), KAAU CUP#2 Extension (Over 4,400 TR), Makkah and Madinah

    Haram (Over 35,000 TR), the Qatar District Cooling Plant #1 & 2 (Over 65,000

    TR) and Gas Turbines Inlet air Cooling (TIAC) Plants in Jouba Hail Power Plants

    (Over 10,000 TR) and PP9 (over 50,000 TR)

    >400,000 Tones ofRefrigerationCentral Refrigeration Large Chiller Plants

    District Cooling

    Turbine Inlet Air Cooling

    Cooling Water Pumps

    CentralReciprocatingChillerPlant

  • 5/28/2018 Bemco Brochure

    9/19

    WaterWaterBEMCO executed on EPC basis numerous water treatment plants using

    Reverse Osmosis technologies for seawater and brackish water desalination

    as well as industrial and domestic waste water treatment plants. In addition,

    BEMCO has undertaken large water pumping and transfer stations.

    Among BEMCOs list of projects are ARAMCOs Waste Water & Spent Caustic

    Systems & Juaymah Gas Plant (6,000 m3/day), New Doha Intl Airport

    Domestic Waste Water Treatment Plant (17,000 m3/day), Boweib Water

    Treatment Plant (60,000 m3/day), Salboukh Water Treatment Plant (60,000

    m3/day), Royal Commission sea water intake pumping stations (180,000

    m3/day), King Khaled International Airport Waste Water Sewage Treatment

    Plant (9,600 m3day)

    Water & Sewage Treatment

    Industrial / Domestic Water Treatment

    Desalination Sea Water / Brackish (R.O)

    Pumping Stations

    Pipelines

    Boweib Water Treatment Plant 60,000 m3

    /daySewage Water Treatment KKIA Riyadh 10,000 m3/day

  • 5/28/2018 Bemco Brochure

    10/19

    ElectromechanicalElectromechanicalBEMCO has more than 30 years of experience in the Design, Supply, Installation, Testing

    and Commissioning of Mechanical, Electrical, and low current systems. BEMCO has

    undertaken a large number of complex projects on design and build basis and

    executed on a rush schedule to the full satisfaction of the Clients.

    Among these projects executed are Makkah and Madinah Holly Haram, the Four Seasons

    Hotel in Amman-Jordan, the Conference Center Palace in Riyadh and 300 villas in Hafr

    Al-Baten.

    Building Services Works Large Commercial & Residential Complexes

    Royal Palaces, Luxury Hotels and High Rise Buildings

    Holly Haram of Makkah and Madinah

    Industrial Electromechanical Works

    Power Plants

    Industrial Plants

    Refrigeration CompressorsCooling Water Pumps

    Medium Voltage Switchgear

  • 5/28/2018 Bemco Brochure

    11/19

    Civil ProjectsCivil ProjectsBEMCOs Civil Business Unit executes Civil Works for BEMCOs turnkey

    projects in the Power & Industrial Sector related to large Power

    Plants, Oil & Gas Facilities, Refrigeration and Water Projects.

    BEMCO also Executes the construction of large complexes as a general

    contractor for projects such as Housing and Commercial Buildings in

    PP9 and Shoaiba Power Plants.

    Commercial / Residential

    High rise Buildings

    Industrial Buildings

    Industrial

    Power Plants

    Industrial Plants

    Community Housing Projects

  • 5/28/2018 Bemco Brochure

    12/19

    Project Structured Financingand Projects Development

    Project Structured Financingand Projects Development

    BEMCO has offered and implemented in some of its projects long-

    term Project Structured Financing as well as deferred payment

    options with tenures between 5-10 years. As the power sector

    evolves, BEMCO continues to pioneer this concept at the forefront

    of the movement.

    BEMCO has initiated several concepts for the implementation of

    Independent Power Projects (IPP) in the Kingdom of Saudi Arabia.

    In this process, BEMCO has worked with International Developers

    in the Integration of the project development.

    Typical BOT Project Development Structure

    ConcessionaireConcessionaire

    Equity-

    25-30%

    Pension Funds

    Private Investors

    Off-taker

    (Fuel orFeedstock

    Agreement)

    Off-takerAgreement

    EPC Contract

    O&MContract

    Debt-70-75%

    Financial Institutions

    Multilateral,

    Bilateral Agencies

    Financial& Technical

    Advisors

    Project

    DeveloperBEMCO

    PROJECTCOMPANY

    PartialListofProjectDevelopmentStudiesandProposals 1,200 MW Shoaiba CC Power Plant 1991 Study and

    presentation conducted by GE, BECHTEL and BEMCO for SCECO West.

    1,750 MW Shoaiba Steam Power Plant 1997, Official tender forBOO concept for SCECO West, Joint Venture BEMCO-ENRON.

    1,050 MW Shoaiba Steam Power Plant 1998, Official Tender forStructured Project Financing for SCECO West, Joint VentureBEMCO-ENRON.

    25,000m3/day STP -2000/2001, Official tender for BOT Conceptfor Jeddah Industrial City (JIC), Upgrading and Expansion of

    existing STP.

    150MW CC Power Plant 2001, Tender for BOO Concept forHadeed Iron and Steel Company.

    480MW PP-9 Power Plant -2004, Implementation of DeferredPayment Project Financing.

    350MW Marib-2 Power Plant 2005, Proposal for Long-termfinancing for the Ministry of Electricity in Yemen.

    36,000 m3/day Desalination Plant 2006, Official tender for BOTconcept for the General Authority of Civil Aviation (GACA) Joint

    Venture BEMCO - GE

  • 5/28/2018 Bemco Brochure

    13/19

    BEMCO has evolved to

    become a world class

    Power, Industrial and

    Civil Contractor with

    capabilities to Develop,

    Engineer, Procure,

    Construct, Test, Start-

    up and Commission

    Projects on a turnkey

    basis.

    BEMCOs vast

    resources permit the

    implementation of

    large and complex

    projects in record time.

    BEMCO utilizes a modern and systematic approach

    in the implementation of projects from its pre-

    award phase of development, conceptual design,

    pricing, proposal preparation, bid submittal and

    negotiation; through the engineering,

    procurement and construction phase. BEMCOs

    vast resources of Manpower, Plant & Equipment,

    and Fabrication facilities in construction, coupled

    with its single point responsibility Project

    Management approach ensures customer

    satisfaction and success in the execution of its

    projects.

    BEMCOs IT infrastructure is a key ingredient to

    manage and track the progress of our projects.

    BEMCO has a centralized database with

    information being shared between its head office,

    branches and sites. We take pride in using state

    of the art ERP software such as J.D. Edwards and

    Primavera.

    Large resources with over 18,000 directemployees, extensive fleet of constructionequipment, vehicles and facilities, quick and swiftmobilization.

    Over 2,200 Engineers in all disciplines includingCivil, Electrical, mechanical, Instrumentation andControl.

    Highly qualified Engineering and Design groupcomprising over 400 Engineers, Designers and CADOperators.

    Highly qualified technicians for specialized work;such as welding, high voltage cabling, others.

    Global procurement capabilities

    Large fabrication workshop with state of the artEquipments.

    Competitive pricing with international biddingstandards

    Testing & Commissioning Services and O&M

    ProjectManagement

    Planning and Scheduling

    Quality Control

    Cost Control

    ReportingProcurement

    Sourcing

    Purchasing

    & Logistics

    Engineering

    Basic & DetailedEngineering

    Erection

    Mechanical Erection,Electrical &

    InstrumentationWorks

    FabricationSteel Structure

    Pipe pre-fabricationSkids Ducting

    Start-up &

    CommissioningOperation & Maintenance

    Power plants &

    Substation, Protection

    & Control, Firefighting

    systems, HVAC

    Award

    ProjectEvolution

  • 5/28/2018 Bemco Brochure

    14/19

    Project ManagementProject ManagementBEMCOs Project Management objective is to identify, monitor and correct any deviations from the originalproject scope of work quality, cost and schedule. To achieve the above objective, the following functionsare monitored during project execution:

    Planning and Scheduling:

    Planning is performed to address as a minimum the following: Scope of work, assumptions and risks,

    execution strategy, specific contract requirements, engineering design, procurement, tasks and work break

    down, resources, construction requirements, inspection and test requirements, tooling and equipments

    supplies.

    Quality & Safety Control:

    Designed to ensure that all quality and safety requirements are implemented through all the stages of aproject.

    Cash Flow Control:

    Designed to know the status of Billing and Collection during any stage of a project execution.

    Budget/Cost Control:

    Designed to check expenses on a project as they are incurred. It is intended to keep track of each cost

    element or cost center, to identify reasons for cost variance against budget of the item throughout the

    various stages of project.

    Contract Administration:

    Designed to secure legal and contractual rights for the company in an efficient and timely manner. This

    function is to be carried out jointly by the Project Manager and Contract Administration Section .

    Management PhilosophyManagement Philosophy

    Each business line is led by a senior vice-president who is

    responsible for the projects in a vertical structure and

    responsible for business development, proposals

    preparation, project execution and hand over.

  • 5/28/2018 Bemco Brochure

    15/19

    EngineeringEngineering ProcurementProcurement

    Engineering and Procurement Groups work closely with each

    other to ensure early sourcing of major and long-lead

    equipment and to ensure compliance with the technical

    requirements and customer specifications.

    Quality Engineering in Turnkey EPC Industrial and Power projects is

    the essence of success. BEMCOs Professional group of engineers,

    designers and draftsmen provide conceptual designs from the

    proposal stage of a project all the way to detailed construction

    drawings and as-built drawings at the construction stage. The group

    utilizes computer aided design (CAD) systems for all its two and

    three dimensional designs, as well as state of the art engineering

    software for piping, electrical and structural designs and

    calculations. The Group is supported by its offices in Lebanon,

    Egypt, India, and USA.

    Procurement for all projects is carried out in compliance with strictcompany policies and ISO certified procedures.

    The Procurement Business Process is stream-lined into the followingbasic phases, to ensure quality and timely delivery of materials to site.

    Vendor selection

    Ensuring specification compliance

    Expediting material production and delivery

    Achieving quality requirement, by arranging the quality tests

    Tracking shipments and site delivery

    To achieve a successful procurement performance, BEMCO utilizes J.D.

    Edwards and ERP system, to map and to allow recording of procurement

    data at all phases of the Business Process yielding detailed reports on

    each phase and for greater procurement control.

    GasTurbineElevationDesign 500MVATransformer,weight400tonsincludingtrailer,transportedtositeviaspecialtrailerequippedwith320wheels

  • 5/28/2018 Bemco Brochure

    16/19

    FabricationFabrication

    Todays demanding construction

    market requires from qualified

    and successful contractors

    extensive in house fabrication of

    various mechanical, structural

    and electrical components for its

    turnkey projects.

    BEMCO owns a large,

    modern and automated

    fabrication workshop to

    deliver and erect high

    quality products on an

    expedited and continuous

    basis. This workshop facility

    consists of 80,000 sq.m. offabrication floor space with

    resources, equipment and

    over 2,600 highly qualified

    technicians, engineers and

    management personnel. It

    has basic and detailed

    engineering capabilities and

    is ASME certified for

    pressure vessels.

    Partial list of Fabrication:

    Pressure tanks and vessels

    Pipe and electrical steel supports

    Pipe fabrication and welding 2

    diameter and above

    Platforms, Ladders and Stairs

    Pumps and compressor skids

    complete with piping, tubing and

    electrical

    Steel Structures

    Pipe Spool

    CNC Plasma and Gas Cutting Machine CNC Beam Drilling and Saw Cutting Machine

  • 5/28/2018 Bemco Brochure

    17/19

    BEMCO has its own Start-up & Commissioning, Operation & Maintenanceservice group (BEMCO Services Co.) This Group is a formidable team of

    professional engineers and technicians specialized in Maintaining,

    Operating, Testing and Commissioning of Electrical and Mechanical systems

    for Industrial, Power and Commercial Projects. To support this well trained

    team, BMECO has assembled a large inventory of precision instruments and

    tools for the testing, commissioning and start-up of the projects.

    Partial list of System Testing Capabilities:Partial list of System Testing Capabilities: Hi-pot Testing of Cables MV Circuit Breakers

    LV, MV and HV Switchgears Chilled Water Plants

    Protection and Intertip Relays AHUs and FCUs

    Pilots Differential Protection CCMS

    Distance Relays Variable Frequencies Drivers

    Power Transformers PLC & DDC Controlled Systems

    Highest Quality Erection & Construction

    constitutes an essential part of a successful

    turnkey project.

    BEMCOs competences are demonstrated by

    the successful completion of major

    industrial, power, electromechanical & civil

    projects.

    The significant resources and years of

    experience in Engineering, Procurement,

    Construction, Mechanical Erection, Electrical

    and Instrumentation activities, along with a

    fully owned large modern and highly

    efficient fabrication workshop and

    construction equipment enables BEMCO to

    erect and construct the highest quality

    projects.

    SteamTurbine ShoaibaStage2,PhaseI

  • 5/28/2018 Bemco Brochure

    18/19

    ARABIAN BEMCOPROJECT & CONSTRUCTION

    MANAGEMENT

    BEMCO INTERNATIONALPROJECT & CONSTRUCTION

    MANAGEMENT (Lebanon)

    Projects

    BEMCO STEELFABRICATIONS

    TRUBA ARABIA CO.ERECTION TEAM

    TECHMASTER INC.ILLINOIS, USA

    BEMCO SERVICESSTART-UP & COMMI.

    OPERATION & MAINTENANCE

    TECHMASTER ENGGEGYPT & INDIA

    GEDAC ELECTRICMANUFACTURING OF POWER,

    LIGHT. & ELEC. SYSTEMS

    REGIONAL OFFICES

    Bemco has formed strategic affiliated companies working asProfit Centers providing highly competitive and quality services.

    BEMCO International (Offshore) in Lebanon takes responsibility onassigned projects, proposals, engineering, procurement and projectmanagement.

    TRUBA ARABIA is specialized in heavy Mechanical Erection works forUtility Boilers, large Steam & Gas Turbines, Petrochemical, Cementand Refinery Complexes.

    GEDAC has been at the forefront in the Middle East since 1978manufacturing and assembling electrical switchgears and controlpanels in the medium and low voltage range.

    BEMCO Steel Industries (BSI) is specialized in manufacturing ofstructural and sheet steel, pre-fab pipes, skids ducts, vessels andtanks.

    BEMCO Services is specialized in Operation, Maintenance, Testing &Commissioning systems for Power, Industrial and Building Services.

    Impregilo Arabia is specialized in Engineering and Construction ofinfrastructure, high rise buildings, and marine works.

    Partial list of international companieswith whom BEMCO has worked in the

    past and present:Siemens GermanyGeneral Electric USAABB SwitzerlandAlstom FranceAREVA - FranceMitsui JapanMarubeni - JapanMitsubishi Heavy Industries Japan

    Doosan Heavy Industries KoreaHitachi JapanToshiba JapanNuovo Pignone ItalyYIT FinlandSpie-Batignolles FranceBechtel USALurgi GermanyPB Power - UKBelleli Italy

    Foster Wheeler - ItalyShaw Group Inc. USACBI USAMot MacDonald - UKBlack & Veatch USATermoMeccanica ItalyKorea Power Engineering Company (KOPEC) KoreaHyundai Heavy Industries KoreaIshikawajima-Harima Heavy Industries Co. (IHI) JapanHitachi Zosen Japan

    International Power UKWATERLEAU BelgiumAPINA SpainCADAGUA SpainIBERINCO SpainWeir UKEnpropie FranceEFACEC PortugalDURO Felgueraca - Spain

  • 5/28/2018 Bemco Brochure

    19/19