BEMCO Commitment to Quality
Quality is an obsession in BEMCOS culture.
Strict Quality Control Procedures related to
Management, Engineering, Procurement,
Selection of Vendors/Subcontractors and at
the construction site are designed to ensure
the highest grade of excellence. Such
meticulous procedures for quality produceclient satisfaction, repeated business, and
avoidance of risk.
BEMCO scrutinizes down to the minor details
its work to enhance not only the performance
of the complete system it installs, but also to
ensure that its finished work is aesthetically
pleasant.
BEMCO is a pioneer in obtaining and
implementing the ISO 9001 Certification for
Engineering. Design, Management,
Procurement and Construction since 1994.
The continuous implementation of such
quality work contributes to BEMCOs
reputation and credentials with all its clients
and partners.
BEMCO was formed in 1965 as a Mechanical& Electrical Contracting Company. Thereafter,
BEMCO expanded its experience to become a
world-class Contractor in Industrial and Power
Projects. Under this expansion, BEMCO has
undertaken the largest and most challenging
turnkey projects in Saudi Arabia and the Region
using various state of the art technologies.
Today BEMCO is a leading EPC Turnkey
Contractor, comprising full-scale and integratedcapabilities in Engineering, Procurement,
Construction, Fabrication, and Start-up &
Commissioning.
BEMCO s Entrepreneurial Leadership restructured
the company into three highly organized Business
Units (Power, Industrial, Electromechanical and
Large Civil Projects) enabling efficient
management, providing sufficient flexibility to
expand regionally by focusing on clientsatisfaction, quality and timely completion of
projects.
BEMCO is also diversifying its operation in project
development and project financing under IPP &
IWPP scheme to benefit from the Governments
privatization initiatives.
BEMCO is expanding regionally in the Middle East,
Gulf and North Africa to become the leader in
Power and Water projects as Developer and
Contractor, working in conjunction with
renowned international Engineering, Construction
and Manufacturing Firms.
BEMCO continues to enhance its capabilities to
meet the challenges of the 21st century.
Henry M. Sarkissian
CEO
-
5/28/2018 Bemco Brochure
3/19
Arabian BEMCO has
three distinct business
units operating as
profit centers. A
dedicated Executive
Director is responsible
for running the day to
day activities of each of
the units and managing
its engineering,
procurement and
construction activities.
These business units
coordinate and
cooperate with each
other in the execution
of projects providing
scope of their
specialties, giving
Arabian BEMCO a
wealth of professional
and specialized
resources to integrate
large projects and
ensure their success.
1-Power Projects Page 6-11
Power Generation
Transmission & Distribution
2-Industrial Projects Page 12-17
Oil & Gas
Refrigeration
Water
3-Civil & Electromechanical Projects Page 18-21
Commercial Projects
Industrial Projects
-
5/28/2018 Bemco Brochure
4/19
Power Generation ProjectsPower Generation Projects
BEMCOs experience and know-how in the power sector isunrivaled for its efficient and timely delivery of Projects.
BEMCO has participated in the implementation ofnumerous, large and prestigious Power Projects, rangingfrom Simple Cycle to Combined Cycle Technology. BEMCOhas undertaken on an EPC basis more than 16,000 MW ofPower Generation Projects in the Kingdom of Saudi Arabiaand in the Gulf Region.
The Riyadh (KSA) Power Plant No.9 Combined Cycle (PP9)project is a typical example of Bemco prowess in thePower Generation sector; the project with a generationcapacity of 5,980MW, was built on an area of 3.2 square
kilometers.
> 16,000 MWCombined Cycle Power Plants
Simple Cycle CombustionTurbine Power Plants
Conventional Steam Power Plants
PP9 Combined Cycle 5,980 MW Power Plant - Riyadh
-
5/28/2018 Bemco Brochure
5/19
An Achievement to the RecordAn Achievement to the Record
680 MW Power plant170 MW Delivered in 5-1/2 monthsTotal Capacity delivered in 7-1/2 months
In early 2004, Saudi Electricity Company (SEC) awardedArabian Bemco Contracting Company a super rush project for
680MW extension to Power Plant No.9 in Riyadh with an
unimaginable and unprecedented schedule of 7-1/2 months.
The contract was signed on 1st February 2004 with first power
delivered (170MW) by July 15th to meet the high power
demand during the summer season. All other power delivery
milestones were met culminating with the delivery of full
power (680 MW) by mid September 2004.
Letter of Appreciation
Attn. Arabian Bemco Contracting Co.
I received your letter dated 2/6/1425H
Reference to the completion of thesecond extension of phase I of theRiyadh Power Plant No. 9 Rush
Project as well as its handing over inrecord time.
I thank you and all those whocontributed to this accomplishment andI appreciate your efforts which resultedin such distinguished achievement.
Minister of Power & WaterAbdullah Bin Abdullrahman Al-Hussain
680 MW PP9 Extension Fast Track
-
5/28/2018 Bemco Brochure
6/19
Transmission & DistributionTransmission & Distribution
Bemco has executed over 30 High voltage substations on EPC
Basis up to 400 KV with 10,000 MVA Transformer capacity using
Gas insulated switchgear (GIS) and Air insulated switchgear
(AIS) technologies. The scope of such projects has covered
turnkey Engineering, Procurement, Erection, Testing and
Commissioning including civil works.
Among its many projects, Bemco has executed the 400 KV
Substation in Aqaba, Jordan, which forms the first part of the
station link interconnecting Egypt, Jordan, Syria, Iraq and
Turkey. In addition, Bemco successfully completed two 380 KV
substations in Hail & Taif, Saudi Arabia.
>10,000MVAGIS & AIS High Voltage
Substations
High Tension Transmission
Lines
380 kV Gas Insulated Bus Duct (GIB)380 kV GIS
-
5/28/2018 Bemco Brochure
7/19
Oil & GasOil & Gas
BEMCO executed on EPC basis a large number of Oil & Gas
projects related to pumping, transferring, metering and
storage of hydrocarbon products totaling
>100 Million Gallons
Of Hydrocarbon
Storage Facilities
BEMCO is a General Contractor for
construction works in Hydrocarbon
Process Plants undertaking
responsibility for civil, electrical,
mechanical, erection, instrumentation,
controls, piping, insulation and
painting.
Among the Oil & Gas projects
executed for ARAMCO is the 519,000
Barrels Medinah bulk storage facility,
the PP9 2,000,000 BPDD crude oil
pipeline that ties into the east-west
Saudi ARAMCO 48 inch pipeline and a
Flare Tank Project for Luberef.
Oil & Gas
Bulk Oil Storage Facilities
Refinery & Petrochemical
Pipelines
Compressor Stations
Off site Works
Utilities
2,000,000 BPD Crude Oil Metering Station Riyadh
-
5/28/2018 Bemco Brochure
8/19
RefrigerationRefrigerationBEMCO executed on EPC basis a large number of central refrigeration and district
cooling plants using technologies from centrifugal reciprocating and screw
compression technologies to absorption technologies for applications in HVAC,
district cooling and Gas Turbines Inlet air Cooling (TIAC) facilities for Power
Plants.
Among the refrigeration technology projects executed by Bemco is KAAU CUP#2
(Over 18,000 TR), KAAU CUP#2 Extension (Over 4,400 TR), Makkah and Madinah
Haram (Over 35,000 TR), the Qatar District Cooling Plant #1 & 2 (Over 65,000
TR) and Gas Turbines Inlet air Cooling (TIAC) Plants in Jouba Hail Power Plants
(Over 10,000 TR) and PP9 (over 50,000 TR)
>400,000 Tones ofRefrigerationCentral Refrigeration Large Chiller Plants
District Cooling
Turbine Inlet Air Cooling
Cooling Water Pumps
CentralReciprocatingChillerPlant
-
5/28/2018 Bemco Brochure
9/19
WaterWaterBEMCO executed on EPC basis numerous water treatment plants using
Reverse Osmosis technologies for seawater and brackish water desalination
as well as industrial and domestic waste water treatment plants. In addition,
BEMCO has undertaken large water pumping and transfer stations.
Among BEMCOs list of projects are ARAMCOs Waste Water & Spent Caustic
Systems & Juaymah Gas Plant (6,000 m3/day), New Doha Intl Airport
Domestic Waste Water Treatment Plant (17,000 m3/day), Boweib Water
Treatment Plant (60,000 m3/day), Salboukh Water Treatment Plant (60,000
m3/day), Royal Commission sea water intake pumping stations (180,000
m3/day), King Khaled International Airport Waste Water Sewage Treatment
Plant (9,600 m3day)
Water & Sewage Treatment
Industrial / Domestic Water Treatment
Desalination Sea Water / Brackish (R.O)
Pumping Stations
Pipelines
Boweib Water Treatment Plant 60,000 m3
/daySewage Water Treatment KKIA Riyadh 10,000 m3/day
-
5/28/2018 Bemco Brochure
10/19
ElectromechanicalElectromechanicalBEMCO has more than 30 years of experience in the Design, Supply, Installation, Testing
and Commissioning of Mechanical, Electrical, and low current systems. BEMCO has
undertaken a large number of complex projects on design and build basis and
executed on a rush schedule to the full satisfaction of the Clients.
Among these projects executed are Makkah and Madinah Holly Haram, the Four Seasons
Hotel in Amman-Jordan, the Conference Center Palace in Riyadh and 300 villas in Hafr
Al-Baten.
Building Services Works Large Commercial & Residential Complexes
Royal Palaces, Luxury Hotels and High Rise Buildings
Holly Haram of Makkah and Madinah
Industrial Electromechanical Works
Power Plants
Industrial Plants
Refrigeration CompressorsCooling Water Pumps
Medium Voltage Switchgear
-
5/28/2018 Bemco Brochure
11/19
Civil ProjectsCivil ProjectsBEMCOs Civil Business Unit executes Civil Works for BEMCOs turnkey
projects in the Power & Industrial Sector related to large Power
Plants, Oil & Gas Facilities, Refrigeration and Water Projects.
BEMCO also Executes the construction of large complexes as a general
contractor for projects such as Housing and Commercial Buildings in
PP9 and Shoaiba Power Plants.
Commercial / Residential
High rise Buildings
Industrial Buildings
Industrial
Power Plants
Industrial Plants
Community Housing Projects
-
5/28/2018 Bemco Brochure
12/19
Project Structured Financingand Projects Development
Project Structured Financingand Projects Development
BEMCO has offered and implemented in some of its projects long-
term Project Structured Financing as well as deferred payment
options with tenures between 5-10 years. As the power sector
evolves, BEMCO continues to pioneer this concept at the forefront
of the movement.
BEMCO has initiated several concepts for the implementation of
Independent Power Projects (IPP) in the Kingdom of Saudi Arabia.
In this process, BEMCO has worked with International Developers
in the Integration of the project development.
Typical BOT Project Development Structure
ConcessionaireConcessionaire
Equity-
25-30%
Pension Funds
Private Investors
Off-taker
(Fuel orFeedstock
Agreement)
Off-takerAgreement
EPC Contract
O&MContract
Debt-70-75%
Financial Institutions
Multilateral,
Bilateral Agencies
Financial& Technical
Advisors
Project
DeveloperBEMCO
PROJECTCOMPANY
PartialListofProjectDevelopmentStudiesandProposals 1,200 MW Shoaiba CC Power Plant 1991 Study and
presentation conducted by GE, BECHTEL and BEMCO for SCECO West.
1,750 MW Shoaiba Steam Power Plant 1997, Official tender forBOO concept for SCECO West, Joint Venture BEMCO-ENRON.
1,050 MW Shoaiba Steam Power Plant 1998, Official Tender forStructured Project Financing for SCECO West, Joint VentureBEMCO-ENRON.
25,000m3/day STP -2000/2001, Official tender for BOT Conceptfor Jeddah Industrial City (JIC), Upgrading and Expansion of
existing STP.
150MW CC Power Plant 2001, Tender for BOO Concept forHadeed Iron and Steel Company.
480MW PP-9 Power Plant -2004, Implementation of DeferredPayment Project Financing.
350MW Marib-2 Power Plant 2005, Proposal for Long-termfinancing for the Ministry of Electricity in Yemen.
36,000 m3/day Desalination Plant 2006, Official tender for BOTconcept for the General Authority of Civil Aviation (GACA) Joint
Venture BEMCO - GE
-
5/28/2018 Bemco Brochure
13/19
BEMCO has evolved to
become a world class
Power, Industrial and
Civil Contractor with
capabilities to Develop,
Engineer, Procure,
Construct, Test, Start-
up and Commission
Projects on a turnkey
basis.
BEMCOs vast
resources permit the
implementation of
large and complex
projects in record time.
BEMCO utilizes a modern and systematic approach
in the implementation of projects from its pre-
award phase of development, conceptual design,
pricing, proposal preparation, bid submittal and
negotiation; through the engineering,
procurement and construction phase. BEMCOs
vast resources of Manpower, Plant & Equipment,
and Fabrication facilities in construction, coupled
with its single point responsibility Project
Management approach ensures customer
satisfaction and success in the execution of its
projects.
BEMCOs IT infrastructure is a key ingredient to
manage and track the progress of our projects.
BEMCO has a centralized database with
information being shared between its head office,
branches and sites. We take pride in using state
of the art ERP software such as J.D. Edwards and
Primavera.
Large resources with over 18,000 directemployees, extensive fleet of constructionequipment, vehicles and facilities, quick and swiftmobilization.
Over 2,200 Engineers in all disciplines includingCivil, Electrical, mechanical, Instrumentation andControl.
Highly qualified Engineering and Design groupcomprising over 400 Engineers, Designers and CADOperators.
Highly qualified technicians for specialized work;such as welding, high voltage cabling, others.
Global procurement capabilities
Large fabrication workshop with state of the artEquipments.
Competitive pricing with international biddingstandards
Testing & Commissioning Services and O&M
ProjectManagement
Planning and Scheduling
Quality Control
Cost Control
ReportingProcurement
Sourcing
Purchasing
& Logistics
Engineering
Basic & DetailedEngineering
Erection
Mechanical Erection,Electrical &
InstrumentationWorks
FabricationSteel Structure
Pipe pre-fabricationSkids Ducting
Start-up &
CommissioningOperation & Maintenance
Power plants &
Substation, Protection
& Control, Firefighting
systems, HVAC
Award
ProjectEvolution
-
5/28/2018 Bemco Brochure
14/19
Project ManagementProject ManagementBEMCOs Project Management objective is to identify, monitor and correct any deviations from the originalproject scope of work quality, cost and schedule. To achieve the above objective, the following functionsare monitored during project execution:
Planning and Scheduling:
Planning is performed to address as a minimum the following: Scope of work, assumptions and risks,
execution strategy, specific contract requirements, engineering design, procurement, tasks and work break
down, resources, construction requirements, inspection and test requirements, tooling and equipments
supplies.
Quality & Safety Control:
Designed to ensure that all quality and safety requirements are implemented through all the stages of aproject.
Cash Flow Control:
Designed to know the status of Billing and Collection during any stage of a project execution.
Budget/Cost Control:
Designed to check expenses on a project as they are incurred. It is intended to keep track of each cost
element or cost center, to identify reasons for cost variance against budget of the item throughout the
various stages of project.
Contract Administration:
Designed to secure legal and contractual rights for the company in an efficient and timely manner. This
function is to be carried out jointly by the Project Manager and Contract Administration Section .
Management PhilosophyManagement Philosophy
Each business line is led by a senior vice-president who is
responsible for the projects in a vertical structure and
responsible for business development, proposals
preparation, project execution and hand over.
-
5/28/2018 Bemco Brochure
15/19
EngineeringEngineering ProcurementProcurement
Engineering and Procurement Groups work closely with each
other to ensure early sourcing of major and long-lead
equipment and to ensure compliance with the technical
requirements and customer specifications.
Quality Engineering in Turnkey EPC Industrial and Power projects is
the essence of success. BEMCOs Professional group of engineers,
designers and draftsmen provide conceptual designs from the
proposal stage of a project all the way to detailed construction
drawings and as-built drawings at the construction stage. The group
utilizes computer aided design (CAD) systems for all its two and
three dimensional designs, as well as state of the art engineering
software for piping, electrical and structural designs and
calculations. The Group is supported by its offices in Lebanon,
Egypt, India, and USA.
Procurement for all projects is carried out in compliance with strictcompany policies and ISO certified procedures.
The Procurement Business Process is stream-lined into the followingbasic phases, to ensure quality and timely delivery of materials to site.
Vendor selection
Ensuring specification compliance
Expediting material production and delivery
Achieving quality requirement, by arranging the quality tests
Tracking shipments and site delivery
To achieve a successful procurement performance, BEMCO utilizes J.D.
Edwards and ERP system, to map and to allow recording of procurement
data at all phases of the Business Process yielding detailed reports on
each phase and for greater procurement control.
GasTurbineElevationDesign 500MVATransformer,weight400tonsincludingtrailer,transportedtositeviaspecialtrailerequippedwith320wheels
-
5/28/2018 Bemco Brochure
16/19
FabricationFabrication
Todays demanding construction
market requires from qualified
and successful contractors
extensive in house fabrication of
various mechanical, structural
and electrical components for its
turnkey projects.
BEMCO owns a large,
modern and automated
fabrication workshop to
deliver and erect high
quality products on an
expedited and continuous
basis. This workshop facility
consists of 80,000 sq.m. offabrication floor space with
resources, equipment and
over 2,600 highly qualified
technicians, engineers and
management personnel. It
has basic and detailed
engineering capabilities and
is ASME certified for
pressure vessels.
Partial list of Fabrication:
Pressure tanks and vessels
Pipe and electrical steel supports
Pipe fabrication and welding 2
diameter and above
Platforms, Ladders and Stairs
Pumps and compressor skids
complete with piping, tubing and
electrical
Steel Structures
Pipe Spool
CNC Plasma and Gas Cutting Machine CNC Beam Drilling and Saw Cutting Machine
-
5/28/2018 Bemco Brochure
17/19
BEMCO has its own Start-up & Commissioning, Operation & Maintenanceservice group (BEMCO Services Co.) This Group is a formidable team of
professional engineers and technicians specialized in Maintaining,
Operating, Testing and Commissioning of Electrical and Mechanical systems
for Industrial, Power and Commercial Projects. To support this well trained
team, BMECO has assembled a large inventory of precision instruments and
tools for the testing, commissioning and start-up of the projects.
Partial list of System Testing Capabilities:Partial list of System Testing Capabilities: Hi-pot Testing of Cables MV Circuit Breakers
LV, MV and HV Switchgears Chilled Water Plants
Protection and Intertip Relays AHUs and FCUs
Pilots Differential Protection CCMS
Distance Relays Variable Frequencies Drivers
Power Transformers PLC & DDC Controlled Systems
Highest Quality Erection & Construction
constitutes an essential part of a successful
turnkey project.
BEMCOs competences are demonstrated by
the successful completion of major
industrial, power, electromechanical & civil
projects.
The significant resources and years of
experience in Engineering, Procurement,
Construction, Mechanical Erection, Electrical
and Instrumentation activities, along with a
fully owned large modern and highly
efficient fabrication workshop and
construction equipment enables BEMCO to
erect and construct the highest quality
projects.
SteamTurbine ShoaibaStage2,PhaseI
-
5/28/2018 Bemco Brochure
18/19
ARABIAN BEMCOPROJECT & CONSTRUCTION
MANAGEMENT
BEMCO INTERNATIONALPROJECT & CONSTRUCTION
MANAGEMENT (Lebanon)
Projects
BEMCO STEELFABRICATIONS
TRUBA ARABIA CO.ERECTION TEAM
TECHMASTER INC.ILLINOIS, USA
BEMCO SERVICESSTART-UP & COMMI.
OPERATION & MAINTENANCE
TECHMASTER ENGGEGYPT & INDIA
GEDAC ELECTRICMANUFACTURING OF POWER,
LIGHT. & ELEC. SYSTEMS
REGIONAL OFFICES
Bemco has formed strategic affiliated companies working asProfit Centers providing highly competitive and quality services.
BEMCO International (Offshore) in Lebanon takes responsibility onassigned projects, proposals, engineering, procurement and projectmanagement.
TRUBA ARABIA is specialized in heavy Mechanical Erection works forUtility Boilers, large Steam & Gas Turbines, Petrochemical, Cementand Refinery Complexes.
GEDAC has been at the forefront in the Middle East since 1978manufacturing and assembling electrical switchgears and controlpanels in the medium and low voltage range.
BEMCO Steel Industries (BSI) is specialized in manufacturing ofstructural and sheet steel, pre-fab pipes, skids ducts, vessels andtanks.
BEMCO Services is specialized in Operation, Maintenance, Testing &Commissioning systems for Power, Industrial and Building Services.
Impregilo Arabia is specialized in Engineering and Construction ofinfrastructure, high rise buildings, and marine works.
Partial list of international companieswith whom BEMCO has worked in the
past and present:Siemens GermanyGeneral Electric USAABB SwitzerlandAlstom FranceAREVA - FranceMitsui JapanMarubeni - JapanMitsubishi Heavy Industries Japan
Doosan Heavy Industries KoreaHitachi JapanToshiba JapanNuovo Pignone ItalyYIT FinlandSpie-Batignolles FranceBechtel USALurgi GermanyPB Power - UKBelleli Italy
Foster Wheeler - ItalyShaw Group Inc. USACBI USAMot MacDonald - UKBlack & Veatch USATermoMeccanica ItalyKorea Power Engineering Company (KOPEC) KoreaHyundai Heavy Industries KoreaIshikawajima-Harima Heavy Industries Co. (IHI) JapanHitachi Zosen Japan
International Power UKWATERLEAU BelgiumAPINA SpainCADAGUA SpainIBERINCO SpainWeir UKEnpropie FranceEFACEC PortugalDURO Felgueraca - Spain
-
5/28/2018 Bemco Brochure
19/19