bell road loop 101 to grand avenue its design
DESCRIPTION
Bell Road Loop 101 to Grand Avenue ITS Design. Project Overview. Multi-Agency Project for the design of: 6.5 miles of Fiber Optic Cable Interconnection of 14 traffic signals 6 CCTV camera installations 4 arterial DMS installations. Traffic Signal Interconnect. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/1.jpg)
Bell RoadBell RoadLoop 101 to Grand AvenueLoop 101 to Grand Avenue
ITS DesignITS Design
![Page 2: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/2.jpg)
Project Overview
• Multi-Agency Project for the design of:– 6.5 miles of Fiber Optic Cable– Interconnection of 14 traffic signals– 6 CCTV camera installations– 4 arterial DMS installations
![Page 3: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/3.jpg)
Traffic Signal Interconnect
• 6 City of Surprise traffic signals• 5 MCDOT traffic signals• 3 City of Peoria traffic signals • Benefit:
– Remote monitoring and control of traffic signal timing
– Improved progression across jurisdictions and along the corridor
![Page 4: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/4.jpg)
Traffic Signal Coordination
![Page 5: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/5.jpg)
Traffic Signal Coordination
![Page 6: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/6.jpg)
Traffic Signal Coordination
![Page 7: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/7.jpg)
Traffic Signal Coordination
![Page 8: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/8.jpg)
Traffic Signal Coordination Considerations
• Distance between intersections• Progression speed• Peak hour balancing• Trade-offs between side street delay
and arterial bandwidth
![Page 9: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/9.jpg)
CCTV Cameras• 3 City of Surprise locations
Grand Avenue, R.H. Johnson Blvd, El Mirage Road • 2 MCDOT locations
East of Avenue of the Arts, 99th Avenue
• 1 City of Peoria location91st Avenue
• Benefit: – Remote monitoring of traffic conditions– Incident verification and management
![Page 10: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/10.jpg)
Dynamic Message Signs
• 2 City of Surprise locationsEast of Dysart Road and East of R.H. Johnson Boulevard
• 2 City of Peoria locationsEast of 91st Avenue and East of 84th Avenue
• Benefit: – Inform motorists of incidents, closures and
special events
![Page 11: Bell Road Loop 101 to Grand Avenue ITS Design](https://reader035.vdocuments.us/reader035/viewer/2022070421/56816029550346895dcf31cc/html5/thumbnails/11.jpg)
Future Considerations
• Spare fiber for additional CCTV installations
• Phase 2 ITS Design: Bell Road, Grand Avenue to Loop 303