bejmuk bo
TRANSCRIPT
![Page 1: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/1.jpg)
Design for OperationsSpace Shuttle vs. Sea Launch
Bo Bejmuk
![Page 2: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/2.jpg)
2
Shuttle Sea Launch
Space Shuttle designed for ascent performance, multi functionality and minimum development cost
Result:
Costly ground operationsCostly mission planningCostly flight operations
Zenit Rocket designed to strict operational requirements
Result:
Automation and robust designSimple and cost effective operationsGreat benefit to cost of ownership
Courtesy of the Sea Launch Company
![Page 3: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/3.jpg)
3
Space Shuttle – Magnificent flying system but difficult and costly to operate
![Page 4: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/4.jpg)
4
Initial Naive Concept of Ground Operations
![Page 5: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/5.jpg)
5
Operational Reality
NASA, KSC Photo, dated September 25, 1979, index number “KSC-79PC-500”
![Page 6: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/6.jpg)
6
Lack of Robustness and Design Margins Complicated flight Planning and Increased Cost
Problem• The launch probability predictions for early Shuttle flights was less than
50%– More than half of the measured winds aloft violated the vehicle’s certified
boundariesCorrective Actions• System Integration led the evolution from a single ascent I-load, through
seasonal I-loads, alternate I-loads, and finally arriving at DOLILU• This process extended over a 10+ year period• Concurrently the Program executed 3 load cycles (Integrated Vehicle
Baseline Characterization - IVBC) combined with hardware modifications to expand vehicle certified envelopes
• Current launch probability is well in excess of 95%Lesson• Commit to a DOLILU approach during early development
– Significantly improves margins• Use additional margins on not well understood environments• Will enhance robustness and simplify operations
![Page 7: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/7.jpg)
7
Ascent Design Operations Evolution
1975 1985 1995 2005
50
0
100
Med
High
Low
Ope
ratio
ns O
verh
ead
Perc
ent o
f Win
ds V
iola
ting
Cer
tific
atio
n (%
)
AnnualSeasonal
MonthlyAlternate
Day-of-Launch
Lesson Learned: Reliance on Operations Process to Maintain Margin is Expensive
Certification Violations
Ascent OperationsOverhead
![Page 8: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/8.jpg)
8
Early FlightsSingle I-Loads
Present FlightsDOLILU
Qb
3-Hour Wind Variation
DOLILU drives toward center of Qa – Qbenvelope and reduces winds violation to < 5%
Certified Envelope
Expanded Certified Envelope
Over 50% of winds violated certified envelope
Annual Wind Variation
Qa
Qb
Qa
Day-of-Launch I-Loads Evolution(10 years +)
![Page 9: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/9.jpg)
9
Where did We go Wrong?Problem• Insufficient definition of operational requirements during
development phase– Concentration on performance requirements but not on operational
considerations– Shuttle design organizations were not responsible for operational cost– Very few incentives for development contractors
Result• Very labor intensive (high operational cost) vehicle was developed
and put into operationsLesson• Must have the Concept of Operations defined• Define and levy the operational requirements on contractors to
support the Concept of Operations• Must have continuity and integration between designers, ground
operations, and flight operations requirements during the developmental phase
![Page 10: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/10.jpg)
10
Sea Launch Zenit Rocket Very Efficient and Easy to Operate
Courtesy of the Sea Launch Company
![Page 11: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/11.jpg)
11
Launch Platform
Courtesy of the Sea Launch Company
![Page 12: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/12.jpg)
12
Assembly and Command Ship
Courtesy of the Sea Launch Company
![Page 13: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/13.jpg)
13
Launch
Courtesy of the Sea Launch Company
![Page 14: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/14.jpg)
14
Sea Launch – Zenit Derived Launch System • Major integration of existing and new
elements– Two stage Ukrainian Zenit
– 3rd stage Russian Block DM
– New payload accommodation & composite fairing
– Modified semi-submersible oil drilling platform into a launch pad
– New command and control and rocket assembly ship
• System was built and brought to operational state in less than 3.5 years – 24 flights to date
Courtesy of the Sea Launch Company
![Page 15: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/15.jpg)
15
Sea Launch Operations • Integration of rocket stages
and payload at home port in Long Beach, CA
• Launches performed from the Equator, 154 degrees west (south of Hawaii)
300405Totals
401405070
802005075
AmericansRussiansUkrainiansNorwegians
Launch Team*
Ground ProcessingTeam
* Launch Team is a subset of the Ground Processing Team; GroundProcessing team members that are not required to participate in launch at sea are sent back to their companies and are off the Sea Launch payroll
Small Team performs ground checkout and launchCourtesy of the Sea Launch Company
![Page 16: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/16.jpg)
16
Lessons Learned from Sea Launch
• Zenit extremely automated launch vehicle – Very little interaction with crew during checkout, pre-launch, and
flight
• Single string accountability, no duplications of effort (to some extent driven by export compliance restrictions)
• Low operational cost benefited from original design criteria of Zenit– Rollout to pad, fuel and launch in 90 minutes
– Allows very little time for ground or flight crew involvement
– Imposes requirements for automatic processes
![Page 17: Bejmuk bo](https://reader030.vdocuments.us/reader030/viewer/2022020306/556282d7d8b42ad1688b4ed2/html5/thumbnails/17.jpg)
17
The Big Lesson
• If we want simple and cost effective operations we must design for operations– Shuttle designed for performance and minimum
development cost– Sea Launch Zenit Rocket designed to strict
operational requirements
• NASA is in control of operations destiny of new programs– Narrow window of opportunity