beginner level bmx track design - uci...beginner level bmx track design building layouts c ut a a c...
TRANSCRIPT
Beginner Level BMX Track Design
Building Layouts
Cut AA
Cut AA
Cut A-A
straight 1 straight 2 straight 3 straight 4
63,40 m
7,40 m7,40 m7,40 m10,00 m
7,30 m 7,00 m 7,00 m 5,30 m4,60 m
63,4
0 m
140,60 m
68,4
0 m
Cut BB
Cut BB
Cut B-B3
2 14
1: Natural ground
2: intermediate layer made of gravel limestone (fraction 0/20 or 0/30 max) on 20cm
3: Top soil made of gravel limestone (fraction 0/4 max) on 10cm
4: sides made of organic dirt
The track has to be 30cm above the natural ground
race staging
cabin
Wind direction
1 Flat shape
Footprint
Sectional view of track
Track length 370 m
Electricity
Water system
Drainage
race staging
cabin
2 Ground plan
35,00 m 7,40
m
7,40
m
7,40
m
7,00
m
10,0
0 m
7,00
m
7,30 m
80,00 m
80,00 m
2,20
m
15,00 m
20,0
0 m
2,20 m
2,20
m 5,00
m
8,00 m
3,10
m
60,00 m
80,00 m10
,00m
17,00 m
4,15 m
12,80 m
19,4
0 m
128,60 m
63,4
0 m
124,00 m16
,50
m
4,65 m
race staging
cabin
star
t
3 QuotationsScale : 1/400 unit : meters
Scale : 1/400 unit : meters
race staging
cabin
Evacuation
4 Drainage
the track needs:- 3 water points between straight 1 and 2 - 3 water points between straight 3 and 4- water in cabin and exterior tap on the wall of the cabin- water with exterior tap in race staging
race staging
Cabin
Hose PEHD O 32mm - PN 12.5
5 Water systemScale : 1/400 unit : meters
Scale : 1/400 unit : meters
The Track needs:- Electricity in cabin- Start (compressor, lighting system)- On the track (sound system)- Race staging (sound system)
220v
Sound SystemRace Staging
cabin
Optional:
- Lighting system 380v
6 Electricity
8,00 m
10,00 m
0,80 m
7 Jumps
0,9 1,2 0,7
1,2
1,3 1,8
1,11,61,61,3
0,3 0,9 0,5 0,9 1,1 1,61,1
1,30,8
1,1
0,5 0,5 1 1 0,5 0,8 0,5 1 1 1 0,5 1 1,251,5
0,8 0,8 0,9 1,10,30,30,30,80,3
0,50,90,90,50,91,251,60,90,50,510,70,3 0,3 0,6
Height
6,00 m
7,40 m
0,50 m
WarningTotal width is not the riding width.Rules say the riding width has to be inside the white lanes.We prevent the stability of jump by enlarging the total width as explained in the drawing below
10,70 m
1,20 m
10,00 m 1,60 m 4,50 m 4,50 m 4,50 m5,00 m 5,00 m 5,00 m 5,00 m
11,60 m 4,50 m 5,00 m 4,50 m 4,50 m 4,50 m 11,40 m4,00 m 5,00 m5,00 m
5,20 m 6,00 m 4,00 m 4,00 m 5,50 m5,00 m
4,50 m 4,00 m 3,90 m 2,50 m 11,30 m 6,00 m 6,50 m 2,75 m 6,40 m 3,20 m 4,50 m 4,50 m 4,50 m 2,40 m 10,60 m
2,25 m 5,00 m 3,30 m 15,60 m 3,20 m 3,65 m 12,80 m 3,20 m 8,00 m 4,90 m 1,60 m6,00 mSTRAIGHT 1
STRAIGHT 2
STRAIGHT 4
STRAIGHT 3
FIN
ISH
LIN
E
STOPPING AREA : 25 METERS MINIMUM
8 Jumps Angles
0,9 1,2 0,7
1,2
1,3 1,8
1,11,61,61,3
0,3 0,9 0,5 0,9 1,1 1,61,1
1,30,8
1,1
0,5 0,5 1 1 0,5 0,8 0,5 1 1 1 0,5 1 1,251,5
0,8 0,8 0,9 1,10,30,30,30,80,3
0,50,90,90,50,91,251,60,90,50,510,70,3 0,3 0,6
10,70 m
1,20 m
10,00 m 1,60 m 4,50 m 4,50 m 4,50 m5,00 m 5,00 m 5,00 m 5,00 m
11,60 m 4,50 m 5,00 m 4,50 m 4,50 m 4,50 m 11,40 m4,00 m 5,00 m5,00 m
5,20 m 6,00 m 4,00 m 4,00 m 5,50 m5,00 m
4,50 m 4,00 m 3,90 m 2,50 m 11,30 m 6,00 m 6,50 m 2,75 m 6,40 m 3,20 m 4,50 m 4,50 m 4,50 m 2,40 m 10,60 m
2,25 m 5,00 m 3,30 m 15,60 m 3,20 m 3,65 m 12,80 m 3,20 m 8,00 m 4,90 m 1,60 m6,00 mSTRAIGHT 1
STRAIGHT 2
STRAIGHT 4
STRAIGHT 3
20° 20°15° 15°
20°15°15°15°15°
15°
20°
15°15°
20° 10° 10°
25°15° 15°
15°15°15°15°15°15°15°15°
15° 15°15° 15°15° 15°15° 15°15° 15°15° 15°15° 15°15° 15°15° 15° 15°10°
10°10°10°10°
10°15°
15°15°
15°15°
15° 10°10° 10°
180° 180°
180°
180°
180°
15°
15° 15°15° 15°15° 15°
15°10°10°10°10°
FIN
ISH
LIN
E
Scale : 1/200unit : meters
7
35° - 45°
Layer of compaction
Corner
Sectional view scale 1/100
Corner 1
7,30
m
6,00
m
8,00
m
24,7
0 m
1,50 m
15,20 m
3,50
m
0,40
m
Preferably the corners have to be made with asphalt, but exceptionally to reduce construction costs, a compressed top soil can be used. A turn is curved.
9
Scale : 1/200unit : meters
30°-40°
Corner 2Preferably the corners have to be made with asphalt, but exceptionally to reduce construction costs, a compressed top soil can be used.A turn is curved.
7,00
m
21,8
0 m
6,00
m
6,00
m
1,50 m
3,20
m
13,70 m
Layer of compaction
0,40
m
Sectional view scale 1/100
Scale : 1/200unit : meters
Preferably the corners have to be made with asphalt, but exceptionally to reduce construction costs, a compressed top soil can be used. A turn is curved
7,00
m6,
00 m
6,00
m
21,8
0 m
1,50 m
3,00
m
13,30 m
Layer of compaction
0,41
m
Sectional view scale 1/100
Corner 3
30° - 40°
10 Volume & materials
Start*:
Corner 1:Corner 2:corner 3:
Jumps:
Tracks:
Base Intermediate layer 20cm thick
Surface10cm thick
450 m3
900 m3800 m3700 m3
1200 m3
4050 m3
45 m3
130 m3120 m3105 m3
1100 m3 300 m3
20 m3
90 m380 m375 m3
265 m3
Organic dirt30cm thick
80 m370 m360 m3
350 m3
350 m3
150 m3
150 m3
Asphalt10cm thick
770 m3
180m3
380 m3
TOTAL:
* In this exemple the starting hill is made with concrete walls. To make a starting hill consistent only of dirt you need 300m3 dirt more.
Acces pathway and race staging are 1710m2 and can be made with an intermediate layer and small rocks
Asphalt choice is 0/10 mm fraction and 10 cm thick
Intermediate layer: Gravel limestone 0/20 or 0/30 mm fraction max and 20cm thick
Top layer: Gravel limestone 0/4 mm fraction thick max and 10cm thick
Asphalt 0/10 Intermediate Layer 0/20 Top Layer 0/4
page 14/19
Face view
Left view
Right viewBack view
Top view
11 Starting hill
2,15 m
6,80
m3,
15 m
4,30 m
2,15 m
4,70
m
4,15 m 12,80 m
10,0
0 m
0,65 m
4,00
m1,
65 m
1,05
m
3,15 m
4,00
m
21,25 m
Option : Start hill can be in soil only.