BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U 338-E) for Approval of Its Clean Energy Optimization Pilot A.18-05-015 SOUTHERN CALIFORNIA EDISON COMPANY’S (U338-E) NOTICE OF EX PARTE COMMUNICATION ANNA VALDBERG ROBIN Z. MEIDHOF Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Rosemead, California 91770 Telephone: (626) 302-6054 Facsimile: (626) 302-6693 E-mail: [email protected] Dated: April 11, 2019

Upload: others

Post on 30-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE

STATE OF CALIFORNIA

Application of Southern California Edison Company (U 338-E) for Approval of Its Clean Energy Optimization Pilot

A.18-05-015

SOUTHERN CALIFORNIA EDISON COMPANY’S (U338-E) NOTICE OF EX PARTE COMMUNICATION

ANNA VALDBERG ROBIN Z. MEIDHOF

Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue Rosemead, California 91770 Telephone: (626) 302-6054 Facsimile: (626) 302-6693 E-mail: [email protected]

Dated: April 11, 2019

Page 2: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

1

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE

STATE OF CALIFORNIA

Application of Southern California Edison Company (U 338-E) for Approval of Its Clean Energy Optimization Pilot

A.18-05-015

SOUTHERN CALIFORNIA EDISON COMPANY’S (U338-E) NOTICE OF EX PARTE COMMUNICATION

Southern California Edison Company (SCE) hereby gives notice pursuant to Rule 8.4(a)

of the Rules of Practice and Procedure of the California Public Utilities Commission

(Commission or CPUC) of the following communication.

DATE and TIME OF COMMUNICATION: April 8, 2019, from 9:30 a.m. to 3 p.m.

LOCATION: Los Angeles Clean Tech Incubator – La Kretz Innovation Campus

Amphitheatre, 505 South Hewitt Street, Los Angeles, CA 90013.

WHO INITIATED COMMUNICATION: The CPUC’s Rory Cox requested that Southern

California Edison Company (SCE) present on a panel for the joint CPUC and Energy

Commission workshop on building decarbonization.

NAME AND TITLE OF SCE SPEAKER: Ms. Kevin G Wood, Principal Manager,

Engineering Services.

NAMES AND TITLES OF CPUC DECISION MAKERS PRESENT: Michael Picker,

President; Genevieve Shiroma, Commissioner; and possibly others.

BRIEF DESCRIPTION OF COMMUNICATION: Kevin Wood, spoke on a panel titled

“Proposed Approaches to Implementing SB 1477” at this workshop on Building

Page 3: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

2

Decarbonization. She described research on greenhouse gas emission reductions, customer bill

impacts of building electrification, and consumer awareness of electric equipment. She also

described possible elements of a building decarbonization program, referencing pilots and

possible measures and approaches.

WRITTEN MATERIALS PROVIDED: Yes. SCE’s presentation is attached.

In addition, the following website also includes information about the workshop and links

to all presentations. http://www.cpuc.ca.gov/General.aspx?id=6442460851.

Respectfully submitted, ANNA VALDBERG ROBIN Z. MEIDHOF

/s/ Robin Z. Meidhof By: Robin Z. Meidhof

Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue Rosemead, California 91770 Telephone: (626) 302-6054 Facsimile: (626) 302-6693 E-mail: [email protected]

April 11, 2019

Page 4: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

Attachment A

Building Decarbonization Workshop

Proposed Approaches to Implementing SB 1477

Page 5: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

Building Decarbonization WorkshopProposed Approaches to Implementing SB 1477

Southern California EdisonApril 8, 2019

Southern California Edison1

Page 6: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

Building electrification is a cost-effective approach to building decarbonization; SCE has a recommended path forward

• SCE’s Clean Power Pathway (November 2017) identifies electrification of space and water heating as a cost-effective component of the economy-wide approach to meet California’s goals.

• E3’s “Deep Decarbonization in a High Renewables Future” (May 2018) identifies heat pumps in the loading order of cost effective GHG abatement measures.

• BUILD and TECH pilots are a start but likely not enough.

Southern California Edison2

Page 7: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

Home electrification measures will provide cost savings for most homeowners and developers, while reducing greenhouse gas emissions

Southern California Edison3

Electrification reduces greenhouse gas emissions in homes by up to 60% in 2020 and by up to 90% in 2050 as the grid decarbonizes.

Single Family Low-rise Multifamily

All-electric New Construction

Large majority see lifecycle savings

Large majority see lifecycle savings

Retrofit package – Heat Pump HVAC + Heat Pump Water Heater

Vast majority see lifecycle savings

Approximately half see lifecycle savings or modest

increases

Page 8: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

Market & customer education is key for market transformation

4 Southern California Edison

“With education, customers appear to be willing to adopt building electrification technologies. However shifting the discussion toward ‘how to live in a zero-carbon home’ appears to be imperative. “ Consumer Awareness Study

EMI Consulting

Page 9: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

Builders can pass upfront cost savings on to customers through use of high efficiency appliances

Southern California Edison5

Installation CostsFor all climate zones with air conditioning needs, all electric construction is less expensive than mixed fuel (electric AC + gas water heating, clothes drying and cooking)

Bill Savings Best-in-class HVAC and water heating electric appliances generate bill savings or reduce bill impacts for SF households

Page 10: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

All-electric adoption by builders is lower than economic potential: incentives are needed

6 Southern California Edison

Understand barriers and learn from successful all-electric

developments/missed opportunities

Implement incentive program(s) to reduce upfront

costs & pair with market education

Now Early Stage Market Later Stage Market

• Market assessment; customer survey

• Technical support for builders considering all-electric

• Support development of Title 24 carbon metric

• Manufacturer engagement• Induction cooktops in lending

library• Local reach code support• Review distribution design

standards (“right-size” transformers)

• Robust marketing/outreach (BDC marketing campaign)

• Train/support workforce• Incentive structure (high

efficiency appliances)• Significant manufacturer

engagement (negotiate warranties, etc.)

• Technical support for builders considering all-electric

• Continued local reach code support

• Rate design for bill impacts

• Continued marketing and outreach

• Grid interactive opportunities for additional grid and customer value

• Batteries included in new construction to smooth load curve and help customer take advantage of TOU rates

Support market growth and modify programs as needed

to achieve goals

Page 11: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

For retrofits of existing buildings, households can save on energy bills

Southern California Edison7

• All or nearly all single family and low-rise multifamily homes will see bill savings.

• Heat pumps are typically less expensive than a gas furnace + A/C combination.

• Heat pump water heaters are typically more expensive than gas tank water heaters but less expensive than gas tankless.

Page 12: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

Existing buildings strategy will focus on space and water heating to optimize costs and benefits

8 Southern California Edison

Understand existing state of market & technology and

conduct pilots; educate market

Implement incentive program(s) to reduce upfront costs & pair

with market education

Now

l t i ti

Early Stage Market Later Stage Market

• Market assessment; customer survey; customer journey mapping, customer segmentation

• San Joaquin Valley Pilot; Clean Energy Optimization Pilot

• Manufacturer engagement• Leverage existing energy

efficiency programs to support heat pump market (e.g. SCAQMD’s MF Affordable Housing Electrification Program; CSD’s Low Income Weatherization Program)

• Robust marketing and outreach (leverage local govs and NGOs)

• Train/support workforce• Stepped technology incentive

structure for upstream/midstream• Direct install model for low income

and multifamily• Significant manufacturer

engagement (specs for water heater replacements)

• Prioritize low hanging fruit (e.g. PV over-generators, non-emergency replacements)

• Rate design for bill impacts

• Continued marketing and outreach

• Evaluate financing options to potentially phase out incentives

• Grid interactive opportunities for additional grid and customer value

Support market growth and modify programs as needed

to achieve goals

Page 13: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

Thank You!Kevin G. WoodPrincipal Manager, Southern California [email protected]

Southern California Edison9

Page 14: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE

STATE OF CALIFORNIA

Application of Southern California Edison Company (U 338-E) for Approval of Its Clean Energy Optimization Pilot

A.18-05-015

CERTIFICATE OF SERVICE

I hereby certify that, pursuant to the Commission’s Rules of Practice and Procedure, I have this day served a true copy of SOUTHERN CALIFORNIA EDISON COMPANY’S (U338-E) NOTICE OF EX PARTE COMMUNICATION on all parties identified on the attached service list(s) for A.18-05-015. Service was effected by one or more means indicated below:

Transmitting the copies via e-mail to all parties who have provided an e-mail address.

A true copy was also sent via e-mail to:

Rory Cox, CPUC Energy Division [email protected] Michael Picker [email protected] Commissioner Genevieve Shiroma [email protected]

Placing the copies in sealed envelopes and causing such envelopes to be delivered by US Mail to the offices of the Commissioners(s) or other addresses(s).

ALJ Zita Kline CPUC 505 Van Ness Avenue San Francisco, CA 94102

Executed April 11, 2019, at Rosemead, California.

/s/ Sandra Sedano Sandra Sedano Legal Administrative Assistant SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

Page 15: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

CPUC Home

CALIFORNIA PUBLIC UTILITIES COMMISSIONService Lists

PROCEEDING: A1805015 - EDISON - FOR APPROVA FILER: SOUTHERN CALIFORNIA EDISON COMPANY LIST NAME: LIST LAST CHANGED: FEBRUARY 26, 2019

Download the Comma-delimited File About Comma-delimited Files

Back to Service Lists Index

Parties

GREGORY KLATT ROBIN Z. MEIDHOF DOUGLASS & LIDDELL SR. ATTORNEY 411 E. HUNTINGTON DRIVE, NO. 107-356 SOUTHERN CALIFORNIA EDISON COMPANY ARCADIA, CA 91006 2244 WALNUT GROVE AVENUE / BOX 800 FOR: CALIFORNIA STATE UNIVERSITY ROSEMEAD, CA 91770 FOR: SOUTHERN CALIFORNIA EDISON COMPANY (SCE)

JON GRIESSER MATT MILEY CHAIR, RHTR CALIF PUBLIC UTILITIES COMMISSION RURAL HARD TO REACH LOCAL GOVT LEGAL DIVISION COUNTY OF SAN LUIS OBISPO ROOM 5135 976 OSOS STREET, SUITE 300 505 VAN NESS AVENUE SAN LUIS OBISPO, CA 93401 SAN FRANCISCO, CA 94102-3214 FOR: RURAL HARD TO REACH LOCAL FOR: OFFICE OF RATEPAYER ADVOCATES GOVERNMENT PARTNERSHIPS’ WORKING GROUP (RHTR)

MOHIT CHHABRA MARK WILSON SR. SCIENTIST THE REGENTS OF THE UNIVERSITY OF CA NATURAL RESOURCES DEFENSE COUNCIL 1111 FRANKLIN STREET 111 SUTTER STREET, 21ST FL. OAKLAND, CA 94607 SAN FRANCISCO, CA 94104 FOR: THE REGENTS OF THE UNIVERSITY OF FOR: NATURAL RESOURCES DEFENSE COUNCIL CALIFORNIA

Information Only

Page 1 of 4CPUC - Service Lists - A1805015

4/11/2019https://ia.cpuc.ca.gov/servicelists/A1805015_85537.htm

Page 16: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

CASE COORDINATION MEGHAN DEWEY PACIFIC GAS AND ELECTRIC COMPANY MGR - EE POLICY / STRATEGY EMAIL ONLY PACIFIC GAS AND ELECTRIC COMPANY EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

MICHAEL CADE MRW & ASSOCIATES, LLC BUCHALTER EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

CORINNE SIERZANT ERIN BROOKS REGULATORY AFFAIRS REGULATORY POLICY & REPORTING MANAGER SOUTHERN CALIFORNIA GAS COMPANY SOCALGAS 555 W. 5TH STREET, GT14D6 555 W 5TH ST LOS ANGELES, CA 90013 LOS ANGELES, CA 90013

JOSEPH MOCK RAFAELA DIAZ REGULATORY CASE MGR. CASE MGR. - REGULATORY SOUTHERN CALIFORNIA GAS COMPANY SOUTHERN CALIFORNIA GAS COMPANY 555 WEST 5TH ST., STE 1400, GT14D6 555 W. 5TH STREET, GT14D6 LOS ANGELES, CA 90013 LOS ANGELES, CA 90013

AARON KLEMM CASE ADMINISTRATION CHIEF - ENERGY SOUTHERN CALIFORNIA EDISON COMPANY CSU OFFICE OF THE CHANCELLOR 8631 RUSH STREET 401 GOLDEN SHORE 2/F ROSEMEAD, CA 91770 LONG BEACH, CA 90802-4210

JAKE HUTTNER DONALD C. LIDDELL CASE MGR ATTORNEY SOUTHERN CALIFORNIA EDISON COMPANY DOUGLASS & LIDDELL 2244 WALNUT GROVE AVE. 2928 2ND AVENUE ROSEMEAD, CA 91770 SAN DIEGO, CA 92103

JOHN W. LESLIE, ESQ COURTNEY KALASHIAN ATTORNEY CP-CHAIR, RHTR DENTONS US LLP SAN JOAQUIN VALLEY CLEAN ENERGY ORG. EMAIL ONLY 4747 NORTH FIRST STREET, SUITE 140 EMAIL ONLY, CA 92121 FRESNO, CA 93726 FOR: RURAL HARD TO REACH LOCAL GOVERNMENT PARTNERSHIPS WORKING GROUP (RHTR)

DIANA S. GENASCI LUCY MORGANS REGULATORY AFFAIRS CALIF PUBLIC UTILITIES COMMISSION SOUTHERN CALIFORNIA EDISON COMPANY ELECTRICITY PRICING AND CUSTOMER PROGRAM 601 VAN NESS AVENUE, SUITE 2030 AREA SAN FRANCISCO, CA 94102 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214

MALLORY ALBRIGHT NORA HAWKINS CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION PROCUREMENT STRATEGY AND OVERSIGHT BRANC DEMAND RESPONSE, CUSTOMER GENERATION, AN

Page 2 of 4CPUC - Service Lists - A1805015

4/11/2019https://ia.cpuc.ca.gov/servicelists/A1805015_85537.htm

Page 17: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

AREA AREA 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

STANLEY KUAN MERRIAN BORGESON CALIF PUBLIC UTILITIES COMMISSION SR. SCIENTIST, ENERGY PROGRAM ELECTRICITY PRICING AND CUSTOMER PROGRAM NATURAL RESOURCES DEFENSE COUNCIL AREA 111 SUTTER ST., 21ST FL. 505 VAN NESS AVENUE SAN FRANCISCO, CA 94104 SAN FRANCISCO, CA 94102-3214

ANDREW MEIMAN, PE MATTHEW LEWIS PRINCIPAL CASE MGR - ENERGY PROCEEDINGS ARC ALTERNATIVES PACIFIC GAS AND ELECTRIC COMPANY 222 SUTTER STREET, STE. 600 PO BOX 7442, MC B9A SAN FRANCISCO, CA 94108 SAN FRANCISCO, CA 94120

MEGAN M. MYERS MICHELLE VIGEN RALSTON ATTORNEY COMMON SPARK CONSULTING LAW OFFICES OF SARA STECK MYERS 1929 PARKER ST APT A 122 - 28TH AVENUE BERKELEY, CA 94704 SAN FRANCISCO, CA 94121

PHILLIP MULLER CAROLYN M. KEHREIN SCD ENERGY SOLUTIONS PRINCIPAL 436 NOVA ALBION WAY ENERGY MANAGEMENT SERVICES SAN RAFAEL, CA 94903 2602 CELEBRATION WAY WOODLAND, CA 95776

I ANTHONY PH.D DIRECTOR CENTER FOR ENERGY EFFICIENCY 1100 11TH STREET, STE. 311 SACRAMENTO, CA 95814

State Service

DANIEL BUCH FOREST KASER CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PRICING AND CUSTOMER PROGRAM PRESIDENT PICKER AREA 4-A AREA 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

HENRY BURTON ZITA KLINE CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PRICING AND CUSTOMER PROGRAM ADMINISTRATIVE LAW JUDGE DIVISION AREA ROOM 5115 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: ORA

Page 3 of 4CPUC - Service Lists - A1805015

4/11/2019https://ia.cpuc.ca.gov/servicelists/A1805015_85537.htm

Page 18: BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF … · 2019. 4. 12. · Water Heater Vast majority see lifecycle savings Approximately half see ... Best-in-class HVAC and water

TOP OF PAGE BACK TO INDEX OF SERVICE LISTS

Page 4 of 4CPUC - Service Lists - A1805015

4/11/2019https://ia.cpuc.ca.gov/servicelists/A1805015_85537.htm