before new delhi - power grid corporation of indiaapps.powergridindia.com/cerc/docs/western...
TRANSCRIPT
BEFORE
NEW DELHI
IN THE MATTER OF: Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from DOCO to 31.03.2019 for Asset-l:765kV SIC Solapur-Pune TL and LILO of 400kV DIC Pune-Parli at Pune GIS SS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 765kV, 240 MVAr Switchable Line Reactor at Pune (GiSj S/S with associated bays Asset=!!: L!LO of 400kV D!C Aurangabad- Pune TL at Pune GIS SS with associated bays and 400kV, 50 MVAr Line Reactor under "Transmission System Associated with Krishnapatnam LIMPP- Part B" in Western Region.
PET!T!ONE!? Power Grid Corporation of lndia Ltd. (Govt. of lndia undertaking) Registered office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi 110 01 6 Corporate office: "Saudamini" ,Plot no.2, Sector-29, Gurgaon -122 001. ( Haryana) Power Grid Corporation of lndia Ltd., the petitioner in the matter, is filing petition under Regulation-86 for approval of transmission tariff for the above said assets under "Transmission System Associated with Krishnapatnam UMPP- Part B" in Western Region for tariff block 2014-19 period.
In terms of Regulation 3(2) of the Central Electricity Regulatory Commission (Procedure for making of application for determination of tariff, publication of the application and other related matters) Regulations, 2004, copy of complete tariff application is hereby served to the respondents (beneficiaries of Western Region), for information and necessary action in the matter.
The tariff application is hereby served through the nodal officers of the respondents for CERC matters, on the addresses as mentioned below:
ADDRESSES OF NODAL OFFICERS
1. MADHYA PRADESH POWER MANAGEMENT CONIPANY LTD.
SHAKTI BHAWAN, RAMPUR JABALPUR - 482 008 REPRESENTED BY ITS MD
2. MADHYAPRADESH AUDYOGIK KENDRA VlKAS NlGAM (INDORE) LTD. 3/54, PRESS COMPLEX, AGRA-BOMBAY ROAD, INDORE-452 008
@
3. MAHARASHTRA STATE ELECTRICITY DISTRIBUTIOIV CO. LTD. n n m n ATH FI n n R A ~ R I (FAST) MUMRA~
1, 1 1 1 1 1 ---. , . .. \ 52
REPRESENTED BY ITS MD
4. GUJARAT URJA VlKAS NlGAM LTD. SARDAR PATEL VIDYUT BHAWAN, RACE COURSE ROAD, VADODARA - 390 007 REPRESENTED BY ITS CHAIRMAN
5. ELECTRICITY DEPARTMENT GO\!?. OF G0.4, \!!D?'UT BHAWAN, PANAJI, NEAR MANDVI HOTEL, GOA - 403 001
REPRESENTED BY ITS CHIEF ENGINEER (ELECTRICAL)
6. ELECTRICITY DEPARTMENT ADMINISTRATION OF DAMAN & DIU DAMAN - 396 210 REPRESEIVTED BY ITS SECRETARY (FIN.)
7 ELECTRICITY DEPARTMENT ADMINISTRATION OF DADRA NAGAR HAVELI U.T., SILVASSA - 396 230 REPRESENTED BY ITS SECRETARY (FIN.)
8. CHHATTISGARH STATE ELECTRICITY BOARD P.O.SUNDER NAGAR, DAIVGANIA, RAIPUR CHHATISGAARH-492013 REPRESENTED BY ITS CHAIRMAN
Kindly acknowledge the receipt.
PETITIONER POWER GRID CORPORATION OF INDIA LTD.
REPRESENTEDBY
GURGAON DATED: 16.10.2014
Mohd. Mohsin Sr. CHIEF MANAGER (COMMERCIAL)
BEFORE -
THE CENTRAL ELECTRICITY REGULATORY COMMISSION
NEW DELHI
PETITION FOR
APPROVAL OF TRANSMISSION TARIFF E- - Iur
Asset-l:765kV SIC Solapur-Pune l-L and LILO of 400kV DIC Pune-Parli at Pune GIS SS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 765kV, 240
?J\dA: Switchable Line P,eact=: at P ine (G!S) S/S ~ ~ i i t h ass=ciaterJ bays Asset-
II: I-ILO of 400kV DIC Aurangabad-Pune -rL at Pune GIS SS with associated bays and 400kV1 50 MVAr Line Reactor under "Krishnapatnam UMPP- Part B"
in Western Region
PETITION NO. : ... ... ... ... ... ... ...
TARIFF BLOCK: 2014 - 2019
POWER GRID CORPORA'TION OF INDIA LTD.
REGISTERED OFFICE B-9, QUTAB INSTITU'I'IONAL AREA, KATWARIA SARAI,
NEW DELHI - 110 016
CORPORATE CENTRE "SAUDAMINI", PLOT NO-2, SECTOR-29,
GURGAON-l22 001 (HARYANA) EPABX: 01 24-2571 700 TO 71 9, FAX: 01 24-2571989
BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION
NEW DELHI PETI'I'ION NO.: ..........
IN 'THE MATTER 0F:Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transrrlission Tariff from DOCO to 31.03.201 9 for Asset-l:765kV SIC Solapur-Pune -1-L and LlLO of 400kV DIC Pune-Parli at P1.1ne GIS SS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 765kV, 240 MVAr Switchable Line Reactor at Pune (GIS) SIS with associated bays Asset-ll: LlLO of 400kV DIC Aurangabad-Pune TL at Pune GIS SS with associated bays and 400kV1 50 MVAr Line Reactor under ' 1 1 1 ~r ishnapainam UEPP- Pari B"" in Viestern Region.
Power Grid Corporation of India Ltd. Registered office: B-9, Qutab Institutional Area, --- PETITIONER KatwariaSarai, New Delhi. 110 016. Corporate Ce~it ie : 'SAUEAFV:! P=!!', Plot P40-2, Sector-29, Gurgaon-122 001 (Haryana).
Madhya Pradesh Power Management Corr~pany Ltd. Shakti Bhawan, Rampur RESPONDENTS Jabalpur - 482 008 Represented By Its MD And Others
1 SI. No. I Description 1 1
REPRESENTEDBY * Mohd. Mohsin
1
2 3
GURGAON DATED: 16.10.2014
4 Affidavit
1 8 Schematic Diagram 9 MOM of 24th SCM 10 MOM of 33rd SCM 11 Copy of documents justifying the delay 12 Copy of Cost Certificates (Management) 13 Tariff Filing Formats 14 Checklist ~nc\. - S !m
POWER GRID CORPORATION OF I ~ D I A LTD.
Index
Letter for registration Memo of Parties
- 2 - -
3 C1 -S
BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION
NEW DELHI
PETITION NO.: ........ .. IN THE MATTER 0F:Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from DOCO to 31.03.201 9 for Asset-l:765kV SIC Solapur-Pune l-L and LlLO of 400kV D/C Pune-Parli at Pune GIS SS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 765kV, 240 MVAr Switcliable Line Reactor at Pune (GIS) S/S with associated bays Asset-ll: LlLO of 400kV D/C AI-rangabad-Pune TL at
A A A I \ 1 Piiiie GiS SS a ~ ~ ~ c j ~ t ~ d baSis and + u u ~ v , 56 MbVIAr iiiie Reactor under
"Krishnapatnam UMPP- Part B"" in Western Region.
Power Grid Corporation of India Ltd. Registered office: B-9, Qutab Institutional Area, --- PETITIONER Ka$~;a:iaSa:ai, New Delhi. 1 ? g 016.
Corporate Centre : 'SAUDAMINI', Plot No-2, Sector-29, Gurgaon-122 001 (Haryana).
Madhya Pradesh Power Management Company Ltd. ----m RESPONDENTS Shakti Bhawan, Rampur Jabalpur - 482 008 Represented By Its MD And Others
The Secretary Central Electricity Regulatory Commission New Delhi 1 10001 Sir,
The application filed under Regulation 86 of CERC (Conduct of Business) Regulation, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission tariff from DOCO to 31.03.201 9 may please be registered.
POWER GRID CORPORATION OF INDIA LTD. REPRESENTEDBY
@ Mohd. Mohsin
Sr. Chief Manager (Commercial) GURGAON DATED:16.10.2014
BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION
NEW DELHI PETITION NO.: ..........
IN THE MATTER 0F:Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from DOCO to 31.03.201 9 for Asset-l:765kV SIC Solapur-Pune TL and LlLO of 400kV DIC Pune-Parli at Pune GIS SS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT l &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 765kV, 240 MVAr Switchable Line Reactor at Pune (GIS) SIS with associated bays Asset-ll: LlLO of 400kV DIC Aurangabad-Pune TL at - rune GiS SS wiin associated bays and 400i<'v', 50 MVAr i i i ie Reactor iinder "Krishnapatnam UMPP- Part B"" in Western Region.
Power Grid Corporation of India Ltd. --- PETITIONER Registered off ice: B-9, Qutab lnstitutio~ial Area, i(atw-ariaSarail New Delhi. 11 G 016.
Corporate Centre : 'SAUDAMINI', Plot No-2, Sector-29, Gurgaon-122 001 (Haryana).
Madhya Pradesh Power Management Company Ltd. RESPONDENTS Shakti Bhawan, Rampur Jabalpur - 482 008 Represented By Its NID And Others
MEMO OF PARTIES
POWER GRID CORPORATION OF INDIA LTD. ---PETI'I'IONER
VERSUS
01 MADHYA PRADESH POWER MANAGEMENT COMPANY LTD. SHAK-rI BHAWAN, RAMPUR JABALPUR - 482 008 REPRESENTED BY ITS MD
2. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. PRAKASHGAD, 4TH FLOOR ANDHERI (EAST), MLlMBAl - 400 052 REPRESENTED BY ITS MD
3. GUJARAT URJA VlKAS NlGAM LTD. SARDAR PATEL VIDYUT BHAWAN,
RACECOURSE ROAD VADODARA - 390 007 REPRESENTED BY ITS CHAIRMAN
4
4. ELECTRICITY DEPARTMENT GOVT. OF GOA VIDYUT BHAWAN, PANAJI, NEAR MANDVI HOTEL, GOA - 403 001 REPRESENTED BY ITS CHIEF ENGINEER (ELECTRICAL)
5. ELECTRICITY DEPARTMENT ADMINISTRATION OF DAMAN & DIU DAMAN - 396 21 0 REPRESENTED BY ITS SECRETARY (FIN.)
6. ELECTRICITY DEPARTMENT ADMlhllSTRATlON OF DADRA NAGAR HAVELI U.T., SILVASSA - 396 230 REPRESENTED BY ITS SECRETARY (FIN.)
7. CHHATTISGARH STATE ELECTRICITY BOARD P.O.SUNDER NAGAR, DANGANIA, RAIPUR CHHATISGAARH-492013 REPRESENTED BY ITS CHAIRMAN
8. MADHYAPRADESH AUDYOGIK KENDRA VlKAS NlGAM (INDORE) LTD. 3154, PRESS COMPLEX, AGRA-BOMBAY ROAD, INDORE-452 008
PETITIONER
POWER GRID CORPORATION OF INDIA LTD. REPRESENTEDBY
=$m- Moh . Mohsin
Sr. Chief Manager (Commercial)
GURGAON DATED:16.10.2014
BEFORE 6 THE CENTRAL ELECTRICITY REGULATORY COMMISSION
NEW DELHI
4 PETITION NO.: ..........
IN HE MATTER 0F:Approval under regulation-86 of CERC (Conduct of Business) lations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for t-I:765kV SIC Solapur-Pune T/L and LlLO of 400kV D/C Pune-Parli at Pune GIS
w~th associated bays and equrpments, 2x1500 MVA, 7651400kV ICT 1 & 2 at Pune ( G I ~ ) and 240 MVAR, 765kV Bus Reactor and 240 MVAR, 765kV Switchable Line Re tor at Pune (GIS) with associated bays & Asset-11: LlLO of 400kV D/C ZtF Aurangabad-Pune T/L at Pune (GIS) with associated bays and 400kV, 50 MVAR Line Re tor under "Krishnapatnam UMPP- Part B"" in Western Region. "Yi
ower Grid Corporation of India Ltd. ---PETITIONER eqistered office: B-9, Qutab Institutional Area, atwaria Sarai, New Delhi. 11 0 01 6. orporate Centre : 'SAUDAMINI', Plot No-2,
D ector-29, Gurgaon-122 001
adhya Pradesh Power RESPONDENTS Bhawan, Rampur
Jabalpur - 482 008 Fepresented By Its MD @Tu. c&,-
And Others &/'L,-
@ !l =-Er
.mfax
ri? k3>
I, ~ & d Mohsin, S10 Shri Akhtar Hasan, working as Sr. Chief Manager (Commercial)
-
in the Power Grid Corporation of lndia Ltd., having its registered Office at B-9, Institutional Area, Katwaria Sarai, New Delhi-l10 016, do hereby solemnly affirm and state as under:-
1. I am the Sr. Chief Manager of Power Grid Corporation of lndia Ltd., the representative of the Petitioner in the above matter, and am duly authorized to make this affidavit.
2. 1 submit that the enclosed tariff Petition is being filed for Asset-l:765kV SIC Solapur-Pune TIL and LlLO of 400kV DIC Pune-Parli at Pune GIS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 & 2 at Pune (GIS) and 240 M\!A!?, 765kV Bus Reactor and 240 MVA!?, 765kV Switchah!e Line Reactor at Pune (GIS) with associated bays & Asset-ll: LlLO of 400kV DIC Aurangabad-Pune TIL at Pune (GIS) with associated bays and 400kV, 50 IMVAR Line Reactor under "Krishnapatnam UMPP- Part B"" in Western Region.
1 submit that no other tariff Petition except this Petiticn has been fi!ed directly or V.
indirectly for approval of Transmission Tariff for Asset-l:765kV SIC Solapur- Pune TIL and LlLO of 400kV DIC Pune-Parli at Pune GIS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 240 MVAR, 765kV Switchable Line Reactor at Pune (GIS) with associated bays & Asset-ll: I-ILO of 400kV DIC Aurangabad- Pune TIL at Pune (GIS) with associated bays and 400kV, 50 MVAR Line Reactor under "Krishnapatnam LIMPP- Part B"" in Western Region.
4. The statements made in the tariff Petition herein are based on petitioner company's official records maintained in the ordinary course of business and I believe them to be true and correct.
5. The documents attached with and duly attested by me.
, =hi&- (DEPONENT)
VERIFICATION
.tk 1 Solemnly affirmed at Gurgaon on this .....\b. ... ... ... day of .h@.. ..., 2014 that the contents of the above affidavit are true to my knowledge and belief and no part of it is false and nothirlg material has been concealed there from.
ATT@TE%
P . I
/ C,.
BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION
NEW DELHI Pt~lTllON N W . ' . . . . . . . . . . .
IN THE MATTER 0F:Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for Asset-l:765kV SIC Solapur-Pune TL and LlLO of 400kV DIC Pune-Parli at Pune GIS SS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 765kV, 240 MVAr Switchable Line Reactor at Pune (GIS) SIS with associated bays Asset-ll: I-ILO of 400kV DIC Aurangabad-Pune TL at Pune GIS SS with associated bays and 400kV, 50 MVAr Line Reacioi urider "Krishiiapatfiaiii UMPP- Pag B"" in \J?'este:n Regien.
Power Grid Corporation of lndia Ltd. Reqistered office: B-9, Qutab Institutional Area, --- PETITIONER KatwariaSarai, New Delhi. 11 0 01 6. Corporate Centre : 'SAL'EP,?J!b!!', P!ot No-2, Sector-29, Gurgaon-122 001 (Haryana).
Madhya Pradesh Power Management Company Ltd. --m-- RESPONDENTS Shakti Bhawan, Rampur Jabalpur - 482 008 Represented By Its MD And Others
To The Hon'ble Chairman and his Companion Members of The Hon'ble CERC The humble application filed by the Petitioner
MOST RESPECTFULLY SHOWETH
1.0 That, Hon'ble Commission have made CERC (Terms and Conditions of Tariff) Regulations, 2014 and issued vide notification dated 21.02.2014. These regulations shall remain in force for a period of 5 years w.e.f. 01.04.2014, unless reviewed earlier or extended by the Hon'ble Commission.
2.0 The Petitioner herein, Power Grid Corporation of lndia Ltd. Is a Government Company within the meaning of Companies Act, 1956. In exercise of powers under sub-section (1) of section 38(1) the Electricity Act 2003, the Government of lndia has declared the Petitioner herein as the Central Transmission Utility (CTU). The petitioner being CTU is deemed to be a transmission licensee under section 14 of the Electricity Act' 2003.
3.0 That the instant petition covers approval of SIC Solapur-Pune TL and LlLO of 400kV
8
associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 765kV, 240 MVAr Switchable Line Reactor at Pune (GIS) SIS with associated bays Asset-ll: LlLO of 400kV DIC Aurangabad-Pune TL at Pune GIS SS with associated bays and 4.00kV, 50 MVAr Line Reactor under "Krishnapatnam UMPP- Part" in Western Region which are anticipated to be put under commercial operation w.e.f. 01 .01.2015 & 01.04.201 5 respectively.
4.0 Approval of the Scheme
4.1-That the petitioner has been entrusted with the implementation of "Transmission System associated with Krishnapatnam LIMPP-Part-B". The i~vestment approval of the nroiect P J iA!ar accorded by Board of Directors ~f POWERGRID vide the Memorandum Ref.: CICPIKUNIPP-B dated 09.02.2012, at an estimated cost of Rs. 1927.16 Crores including IDC of Rs 88.13 Crores, price level -4th Qtr, 201 1, a copy whereof is attached hereto as Encl.-l, page.(.%to&\.k that the scope of the scheme was discussed and agreed in the 24th and 3Yd SCM of Southern Region Constituents. Extract of the MOM is Enclosed herewith as ~ n c l - 3 ~ a ~ e ~ 3 t o . % . . 4 Enrt-h P- dh-&C
4.2The scope of work covered under "Transmission System associated with Krishnapatnam UMPP-Part-B" in is as follows:
Transmission Line
(i) Raichur-Sholapur 765 kV SIC line.
(ii) Sholapur-Pune 765 kV SIC line
(iii) LlLO of Parli-Pune 400 kV DIC and Pune-Aurangabad 400 kV DIC line at Pune (GIS) SIS (including MIC)
(iv) I-ILO of existing Raichur-Gooty 400 kV Quad DIC line at Raichur (New) SIS.
Sub Station
(i) Establishment of new 7651400 kV SIS at Raichur with 2x1500 MVA ICTs.
(ii) Establishment of new 7651400 kV SIS at Sholapl~r with 2x1500 MVA I CTs .
(iii) Establishment of new 7651400 kV substation at Pune (GIS) with 2x1 500 MVA ICTs.
Line Reactors (i) 1x240 MVAR switchable line reactors at each end of Raichur -
Sholapur 765 kV SIC and Sholapur-Pune 765 kV SIC lines.
(ii) 4x50 MVAR line reactors at Pune(GIS) substation for LlLO of Parli- Pune and Pune Aurangabad 400 kV DIC line at Pune (GIS) substation.
Bus Reactor
(i) 1x240 MVAR bus reactor each at Raichur, Sholapur & Pune substations.
The Schematic diagram of the scheme is attached hereto as Encl. - & (page K). The details of assets filed and being filed for determination of tariff covered are as follows:
Scope as approved in lnvestment ant. Approval 1 DOCO ~ I DOCO
1 765 kV Raichur-Sholapur line 1 l alongwith bay extensions at Raichur S/S iCTs & Reactors arid Ba)is for Raichur Sholapur 765 kV SIS T L at 7651400 kV Sholapur SIS alongwith 240 MVAR Switchable Line Reactor - Asset I LILG of existiiig Raizhi;;-Goob 400 k\"I Asset3 DIC Quad line at Raichur(New) Sls - ( commissi
bays at Solapur SIS- Asset IV l x1500 MVA ICT-2 and its a s 4
1 Asset II 240 MVAR Bus Reactor and associated bays at Solapur SIS - Asset II I
bays at Solapur SIS- Asset V Asset-l:765kV SIC Solapur-Pune -1-L and LI L 0 of 400kV DIC Pune-Parli at Pune GIS SS with associated bays and equipments, 2x1 500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 IVIVAR, 765kV Bus Reactor and 765kV, 240 MVAr Switchable Line Reactor at Pune (GIS) SIS with associated bays Asset-ll: LILO of 400kV DIC Aurangabad-Pune TL at Pune GIS SS with associated bays and 400kV, 50 MVAr Line Reactor
oned
1 XI 500 MVA ICT-1 and its associated
be commiss ioned
01.01.15 Yet to
Petition for these asset is being filed under the instant
application
299??/20? 3 (30.10.201 3)
The entire scope of the project shall complete on filing the instant Petition.
Heari~r; is yet to be held
5.0 Implementation Schedule As per the approval, the transmission scheme was scheduled to be commissioned in 32 months from the date of investment approval. The date of lnvestment Approval is 09.02.2012. Hence the
10
to 09.10.2014 against which the subject asset is anticipated to be commissioned and put under commercial operation w.e.f. 01.01.2015. Hence there is marginal delay of 03 and 06 months respectively in commissioning of the subject assets. Balance Assets under the project has been commissioned within schedule
Reasons for delay
GIS PUNE SLIBSTATION
a) Delay land - There is delay in land acquisition of Pune (GIS) S/S due to ROW problems encountered at site.
TIL : Construction of the following transmission lines . . delayed:
i > 765kV SIC Solapur- Pune Transmission Line
ii) 400kV D/C Pune- Parli Transmission Line
iii) 400kV ~ u r a n ~ a b a d - Pune Transmission Line
There are severe ROW problems in the construction of 765kV SIC Solapur- Pune line and LlLO of 400kV D/C Pune- Parli and LlLO of 400kV Aurangabad - Pune at Pune (GIS) S/s which were beyond the control of the petitioner, therefore Hon'ble Commission may kindly condone the delay in commissioning of these lines and allow full cost and tariff as being claimed under the instant application.
A detailed write up along with documentary evidences for delay are enclosed as Encl -5 ( ~ a ~ e ~ ~ . . t o ~ ) .
6.0 Completion Cost:
6.1 That the application for determination of tariff is filed in line with provision 7 (2) of Tariff Regulation' 2014 applicable for 2014- 19 period. Further, that the present petition covers approval of tariff based on estimated expenditure to be incurred up to anticipated DOCO and additional capitalization projected to be incurred from anticipated DOCO to 31.03.2017 in respect of the subject asset as per detail given below. That the capital cost incurred upto anticipated DOCO and projected to be incurred during 2014-15 and 2015-16 and 2016-2017 is duly certified by auditors in auditor certificate; copy whereof in respect of the assets covered in this petition is enclosed herewith as Encl.- 6 (page% tto73).
(Rs in lakh)
I I 1 I I l
Total 114491.95 79925.91 1 26172.7 1 10J30~--1,0.97% , ,-b.A . a t , 1 2.44%
11 C\ & \ C 4 4
APP. Exp. Up Asset
Cost I
Asset- l Asset- 2
Proj. Exp. for Est. FY 14-1 5, 16- Comp.
17 Cost
Initial spares (%)
TIL
109652.28 4839.67
SIS
80954.46 4456.20
20378.1 1 pp-----
31 1.92 1,01,330.57 4768.1 2
0.97% 1 %
2.44% 0
Against the total apportioned approved cost of Rs 114491.95 lakhs, the estimated completion cost is Rs 106098.61 lakhs, hence, there is no cost overrun in comparison to FR cost.
The reasons for item wise cost variation between approved cost (FR) and actual cost are explained in detail in Form- 5. Therefore, the Hon'ble Commission may kindly approve the capital cost of the elements covered under instant petition & allow tariff as claimed.
Initial spares: The Initial spares for the sub-station and Transmission Line are within the specified limit under Regulation 13, Chapter: 4, of the CERC Regulations, 2014. Therefore, Hon'ble Commission may kindly allow 'the spares as zlaiiiied iii the Petitioii.
6.2 The details of underlying assumptions for additional capitalization for these assets is summarized below:
The admissibility of additional capital expenditure (Add. Cap.) incurred after DOCO and up to cut off date is to be dealt in accordance with the provisions of Regulation: 14, the extract of Regulation: 14 of the Regulations, 2014 is reproduced as follows:
"Additional Capitalization"
(1) The capital expenditure incurred or projected to be incurred, on the following counts within the original scope of work, after the date of commercial operation and upto the cut-off date may be admitted by the Cornrr~issio~i, subject to prudence check:
(i) Undischargedliabilitiesrecognizedtobepayableatafuturedate; (ii) Works deferred for execution; (iii) Procurement of initial capital spares within the original scope of work,
in accordance with the provisions of Regulation: 13; (iv) Liabilities to meet award of arbitration or for compliance of the order
or decree of a court of law; and
(v) Change in law or compliance of any existing law: Provided that the details of works asset wise/ work wise included in the original scope of work along with estimates of expenditure, liabilities recognized to be payable at a future date and the works deferred for execution shall be submitted along with the application for determination of tariff.
6.3 The Additional Capitalization projected to be incurred in the contextual asset is mainly on account of Balance1 Retention payments and hence the same may be allowed by Hon'ble Commission. The details of capitalization for Asset-l:765kV SIC Solapur-Pune TL
12
Pune-Parli at Pune GIS SS with associated bays and equipments, 2x1500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor at Pune (GIS) S/S with associated bays and Asset-ll: LILO of 400kV D/C Aurangabad-Pune TL at Pune GIS SS with associated bays and equipments. Under "Krishnapatnam UNIPP- Part B in Western Region are given in Form-
That the petition for determination of tariff is being filed in line with Regulation-7 under Chapter: 3 of Tariff Regulation, 2014 applicable for 2014-19 period.
7.0 Additional ROE @a 0.5%: Asset-l as per Investment Approval dated 09.02.2012 and CERC time line of 36 months the asset is anticipated to be commissioiied on 0!.0:.20:5 ivhich is within CERC time line specified for claiming additional ROE of 0.5 %, the provision of 24 (i) of CERC (Terms and Conditions of Tariff) Regulations, 2014 may be invoked. Hon'ble Commission may kindly allow the additional ROE as claimed in the Petition.
8.0 TRANSMISSION TARIFF for 2014 - 19 BLOCK: 8.1 The tariff for block 2014 - 2019 has been worked out as per CERC (Terms and
Conditions of Tariff) Regulations, 2014. In the present petition the transmission tariff has been calculated taking estimated Expenditure up to anticipated DOCO and estimated additional expenditure from anticipated DOCO to 31.03.2017. Calculations for working out the tariff supporting documentation are attached hereto as Encl.-7 (Page 7q.. to
8.2 The annual transmission tariff for the tariff period 2014- 2019 is summarized as
# - While calculating Annual fixed charges, rates as specified in the Tariff Regulation, 2014 have been considered. However, the petitioner is approaching the Hon'ble Commission through review petition for revision. Thus the Annual
below: (Rupees in lakhs')
Fixed Cost is subject to the outcome of the said review petition.
8.3 That, it is submitted that the petitioner being liable to pay income tax at MAT rate, the ROE has been calculated @ 20.243 % after grossing up the ROE with MAT rate of 20.961% based on the rate prescribed by the Hon'ble Commission as per illustration under Regulation: 25 (2) (i) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014. That as per clause: 25 (3) of the above regulation, the grossed up rate of ROE at the end of every financial year shall be trued up based on actual tax paid together with any additional tax demand including inte for any refund of tax including interest received from th
13
Nameoftheasset Asset- l
2017-18 16463.48 719.13
2018-19 16217.99 709.46
2014-15 3651 .OO
Asset- 2 0.00 714.29 728.53
2015-16 16056.46
2016-17 16682.58
to ,the tariff period 2014- 15 to 2018- 19 on actual gross income of any financial year. Any under-recovery or over-recovery of grossed up rate on ROE after truing up shall be recovered or refunded to beneficiaries on year to year basis. It is further submitted that adjustment due to any additional tax demand including interest duly adjusted for any refund of tax including interest received from IT authorities shall be recoverable1 adjustable during1 after completion of income tax assessment of the financial year.
8.4 That as provided in clause: 49 of the Tariff Regulations 2014, the deferred tax liability before 01.04.2009 shall be recovered from the beneficiaries or the long term customers/ DlCs as and when the same gets materialized.
S A 4 A A C I A 4 C I 8.5 Sei-vice tax on traiismissioii iias been piit in the negative list w.e.1. U I .U+.LU I L
and accordingly the Transmission Charges indicated at Para: 8.2 above, is exclusive of Service Tax and the same shall be borne and additionally paid by the respondent(s) to the petitioner and the same shall be charged, billed separately by the petitioner if at any time the transmission charges is withdrawn fin- l lV l l l +hn n n m q t i ~ r n I lG3aL lVG list. Furthe:, m y additional taxes are t~ be paid by the petitioner on account of demand from Govt./ Statutory authorities, the same may be allowed to be recovered from the beneficiaries.
8.6 In the tariff calculation for 2014-1 9 period lnterest on Loan has been calculated on the basis of rate prevailing as on 01.04.2014. The change in lnterest rate due to floating rate of interest applicable, if any, during 201-4-19 period-for-the project needs to be claimed / adjusted over the tariff block of 05 years directly from the beneficiaries.
8.7 The transmission charges at para-8.2 above is inclusive of O&M expenses for the project derived based on the norms for O&M expenditure for Tra~isrrlission System as specified under regulation 29 (3) (a) of the tariff regulations for block 2014-19. It is the understanding of the petitioner that these norms for O&M expenditure been arrived by the Hon'ble Corrlmission after considering (i) normalized actual O&M expenses of the petitioner on its various projects in various regions during the year 2008-09, 2009-10, 2010-1 1, 201 1-12 and 2012- 13. It is submitted that the wage revision of the employees of the petitioner company is due during 2014-19 and actual impact of wage hike which will be effective from a future date has also not been factored in fixation of the normative O&M rates prescribed for the tariff block 2014-19. The scheme of wage revision applicable to CPSUs being binding on the petitioner, the petitioner reserves the right to approach the Hon'ble Commission for suitable revision in the norms for O&M expenditure for claiming the impact of wage hike, if any,during 2014-1 9.
8.8 The application filing fee, expenses incurred on publication of Notices in News papers and License fee may be allowed to be respondents in terms of Regulation 52
14
Commission (Terms and Conditions of Tariff) Regulations, 2014. The fees and charges to be paid by the petitioner as ISTS licensee (deemed ISTS licensee) under CERC (Fees and Charges of RLDC and other matters) Regulations as amended from time to time shall also be recoverable from the DICs as provided under clause 52(2) (a).
8.9 The Transmission Charges and other related Charges indicated at para 8.2 above, is exclusive of incentive, late payment surcharge, FERV, any statutory taxes, levies, duties, cess, filing fees, license fee, RLDC fees and charges or any other kind of imposition (S) and/ or other surcharges etc. whatsoever imposed 1 charged by any Government (CentralIState) and / or any other local bodies/authorities/regulatory authorities in relation to transmission of electricity, environmentai protection, an&'"r iii "f of its iiistaiiatiori associated
with the Transmission System and the same shall be borne and additionally paid by the respondent(s) to the petitioner and the same shall be charged, billed separately by the petitioner on the respondents.
9.0 Sharing of Transmission Charges The Tariff for Transmission of Electricity (Annual Fixed Cost) as per para 8.2 of petition shall be shared as per Regulation-43 of CERC (Terms and Conditions of Tariff) Regulations, 2014. These charges shall be recovered on monthly basis and the billing collection and disbursement of Transmission Charges shall be governed by provision of CERC (sharing of interstate Transmission Charges and Losses) Regulations, 201 0.
In the circumstances mentioned above it will be just and proper that the transmission tariff for the assets covered under this petition be allowed to be charged from the Respondents on the basis set out above. The Petitioner submits that Encl.-l to Encl.-7 may please be treated as integral part of this petition.
PRAYER
It is respectfully prayed that the Hon'ble Comrrrission may be pleased to
1) Approve the Transmission Tariff for the tariff block 2014-19 block for the assets covered under this petition, as per para -8 above.
2) Admit the capital cost as claimed in the Petition and approve the Additional Capitalisation projected to be incurred.
3) Tariff may be allowed on the estimated completion cost.
4) Approve the Additional ROE as claimed in the Petition.
5) Allow the Petitioner to approach Hon'ble Commission for 15
norms for O&M expenditure for claiming the impact of wage hike, if any, during period 201 4-1 9.
6) Allow the petitioner to recover the shortfall or refund the excess Annual Fixed Charges, on account of Return on Equity due to change in applicable Minimum AlternateICorporate Income Tax rate as per the Income Tax Act, 1961 (as amended from time to time) of the respective financial year directly without making any application before the Commission as provided under clause 25 of the Tariff regulations 2014.
7j Approve the reimbursement of expenaiiure by the beneficiaries towarcis petition filing fee, and expenditure on publishing of notices in newspapers in terms of Regulation 52 Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014, and other expenditure ( if any) in relation to the filing of petition.
8) Allow the petitioner to bill and recover Licensee fee and RLDC fees and charges, separately from the respondents in terms of Regulation 52 Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
9) Allow the petitioner to bill and adjust impact on lnterest on Loan due to change in lnterest rate on account of floating rate of interest applicable during 2014-19 period, if any, from the respondents.
10) Allow the petitioner to recover FERV on the foreign loans deployed as provided under clause 50 of the Tariff Regulations, 2014.
11) Allow the Petitioner to bill and recover Service tax on Transmission Charges separately from the respondents, if at any time service tax on transmission is withdrawn from negative list at any time in future. Further, any taxes and duties including cess etc. imposed by any statutory1Govt~municipal authorities shall be allowed to be recovered from the beneficiaries.
12) Allow 90% of the Annual Fixed Chargesas tariff in accordance with clause 7 (i) of Regulation 7 Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for purpose of inclusion in the PoC charges.
allowed to submit revised Certificate and tariff Forms (as per the Relevant Regulation) based on actual DOCO.
and pass such other relief as Hon'ble Comrnission deems fit and appropriate under the circumstances of the case and in the interest of justice
FILED BY POWER GRID CORPORATION OF INDIA LTD.
GuRGAGbi DATED: 16.1 0.201 4
REPRESENTEDBY
en r r ~ llrr nu L I A ~ ~ D I =%d=-
an. bnlcr I ~ I A ~ ~ H ~ L ~ \ C G M M E R C ! A L )
E UCL- 1 % -
GWL! /l /
+F;;th -WTk?I : ''4kTFfl'' Fk ??. 2. 4??3-29, : p l h - 1 2 2 001. $?wll 2) 'h7 -0124-2571730-719, 'h ; 0124-2571760. 01Zc4-2571701 TTR '=kfh'
Gorporale Office 'Seudaixlni" Plot 140.2, Sector-29, Gu~paon-122 001. liaryana Tcl. C121-?5717'0i"-71~, I'ax. C124-2571700,0!24-2571761 Crcln. 'k4ATCRID' . . . -- . - ..- . . .- .- - . . .. . - - - . - - . -- - - -
(-4:;;j 2jzq1 /
CICPlKUNlPP-B February 9, 201 2
MEMORANDUM
SUE: !!i'!F,ST?(IEt'!T ,GPPP\C:'AL FOR "TRA::Si'V"IISSiGi\; S'fSiEivi ASSaCiATED WITH KRISHNAPATNAM UMPP - PART-B"
I-. A n : . I n n ! ~ r . r n r n ~ n ' J t - - . . + - ~ 4- ;+ h,, JL,. I I IC U V ~ I I U LII L J I ! C L ( ~ ~ ~ 01 r w v v ~ n u n , u . iii C A G I L ; ~ ~ p u v v c g a (ZZICYCIIZU I t uy i t
Cepai!ment of P ~ . i b l i ~ Enterprises (DF'E), Ministq of Heavy lndusiries and Public
Eri?e~.prises, Go\:ernment of lndia !hl-ougti its Office Mer~~orandurn No. 26(3)/2005-GM-
GL-92 daied 1'' May, 2008 and Office M ~ m o r a n d ~ ~ r n No. DPE11?(2)!97-Fin. dated 22"d July, 1997 (:riodif~eu subsuque::lly itirougll Gffice Memorandum No. 18(24)!2803-GM-
2L.64 dated 5'"ugust, 2305) ; have accorded investment approval for "Transmission
System associatedwith-ICrish~wpatnam UMPP-- Par3-B" in its 267Ih n;eetil?g-hekl on
February i?? 201 2 as per the details given bclow:
-! 1. Z o a d Scope of the Project . -
c-x.1 l <I I ;< Transmission lines
. . p 1 \. i i) Raichur - Sliolapur 765 kV SIC line;
/' "i
\/ '
Sholapur - Pune 765 kV SIC line; 2
iii) LILO of Parli - Pune 400 kV DIC and Pune-Aurangabad 400 kV DIC line at \. Pune (GIS) substation (including multi circuit);
iv) 1-11-0 of existing Raichur - Gooiy 400 kV Quad D/c line at Raichur (New) substation.
Substations
i) Establishment of new 765!40C) !tV substation at Raichur with
r-.- 2x1500 MVA ICTs;
/ i i ) Establishment of new 7651400 kV substation at Sholapur with 2x1500 MVA ICTs;
i i) Establishment of nsw 765/400 kV substation at Pune (GIS) with I 2x1500 MVA ICTs. b'
-----P -- - . . . - A i 8-9. F W i ~ < j p m ~ ~ P U T , ~ T G Y ~ I = l ~ . ;if f&ii'~.;loc;s cpnq : 011.:~5601?, &m . 011.265600:s 319 .;mv' ep,slcrcU (?Hica 8-9. Q U ~ D lnslm!ul~cjnal Area, K a l w a ~ i a Sa:ai New C ~ ! : ~ I - I I S ~ I G ~ e ! . c11 . ? 6 5 6 ~ ~ 2 1 F S X 21 1-2~360039 G : J ~ 'r<ATGK!I)'
- - ?4f& 4 \hurl a'+ , a '=--.~:rvc P I I ~ I . ~ ~ h, B ~ ~ ) ? l i l of SCII i ~ n t l N ~ + i o r l
. ,. , , L ' I . '
.-.. .-; .. . , .:
Reactive Co~i ipensat ion
4 3 Line Reactors -. . .
( i ) W MVAR ~ ~ w i t & a h k _ L i o ~ m s at each end of Raichur - Sholapur 765 kV SIC and Sholapur -j3une 7 w SIC lines;
F
(ii) 4x50 MVAR line reactors at Pune ((31s) substation for I-ILO of Parli - Pune and Pune-Auranyabad - 400 kV DIG line at Pune (GIS) substation.
1 X 240 MVAR bus reactor each at Ra!ct~ur, Sholapur & Pune substations
2. Project Cost-& Funding
The estlmaied cost of the project based on 4"' Quarter, 2011 price level is 2s. ?927,?6 crorn l:?ciudir;s !DC af P,s. 88.13 c;o;e, -j-ks ;fj~:iztt ~ ~ s i esijii-iais
is atlsched as Annexure-l.
reject !S pr-oposed to be irl?plernanted through loaf! fro111 The \/?lorld Bank/
domes'iic b~rrowings and POi,j!ERGRiD:s internai resources with a debt: equiiy
ratio ~f 70.30.
3. - Commissioning Scheuuie
The pioject IS scheduled to be commissioned with~n 32 months from the date of
investment approval.
This is issued In pursuance of 267Lh meeting of Board of ~ i rec to rs held or1
February 8, 201 2
(Seema Gupta) General Manager (CP)
m fi, : , P , ! , F ~ t ~ j be True COPY m m M hwer G'I( yrpora11 of lndia Ltd.
AT,""--
Distribution:
'I. PS to Secretary (Power), MOP, SI- ram Shakti Bhawa~i, New Delhi-1 10001
2 Chairman. CERC, Core-3, floor, SCOPE complex, NEW DELHI- 110 003
3. Chairman, CEA , Sewa Bhawan, R.K.Puran7, New Delhi -66
4 . CI.~airrnaii, Kerala State Electricity Boat-d, Vaidyuthi Bhavanarn, Pattom, T~17ir'uv3nanthapurarnnn695 004.
5 Ciiairni3n, Karnatalta Power Transr-nission Co~poralior~ l i d , Cauvery Bnawan, Bangalore -560 009
7 Chairman. APTRANSCO, \/idyut Soudha, Hyderatsad-500 049
8. Chiei Secreiary, Eiectr!city Depariment of Pondichern/, Pcndicherry-60500'I
9 C?s~r:~:an, Maharashtra State E!ectriciti, Transmtssionrn Cornpany Limited, C-19, E- Block, IVISEPCL., Prakashganga, Bandra Kurla Complex, Bandra (East), FAi~inbai - r n , . fir*
'tL1U U3 I.
10. Chairman. Madhya Pradesh Slaie Electricity Board. Shakit Bhawan, Vidyut Nagar, Rarnpur, Jabalpur - 482 008, hiladhya Pradesh
11. Chairman, Giljarat Electricity aoard, Sardar Patel Vidycli Bhawari, Race Course, 'd'adodzra - 390 O C 7 , Gujarat
: L Chrei Elec~rfcal Engineer, Govt. of Goa Electricity Deoartmerit 3'"har. Viclyi-~t Btiaws.?, Panall, Goa - 403 001
.lTi.Chairman, Chairman, Chhattisgarh State Power Transmission Compariy Limited, Daganla, Raipur, Chhattisgarh - 492 013
l 4 , Secretary (Powerj, Electricity Department, Adniir~islration of 11adra Nagar Haveli, U.T. Silvasa - 396 230
15.Secretary (Power), Electricity Department, Administration of Daman and Diu, U.T Daman - 396 270
'IG.Advisor, PAMD, Planning Commission,, Yojana Bhawan, New Delhi
17.Additional Secretary, MOP, Shram Shakti Bhawan, New Delhi
18. Member Secretary, Planning Commission , Yojana Bhawan, New Delhi
'19.Member Secl'etary, SRPC, Central Electricity Authority, No. 29 Race Course Cross Road, Bangalore-560 009
23.rvIe!nber Secretary, WRPC, MlDC Area, Marol, Andheri East, Mumbai- 400 094
21. Mem!~er (Power Systems), CEA, R.K.Puram, New Delhi -66
22.Secretary, CEA, Sewa Bhawan, R.K.Furani: New Delhi -66 - 03 copies
23.Joint Secretary, Ministry of Statistics & Programme Implementation, Sardar Patel Shawan, New Delhi.
24. Joint Secretary R Financial Advisor, MOP, Shram Shakti Bhawan, New Delhi
25. Joint Secretary (Transniission), MOP, Shran? SI-mkti Bhawan, New Delhi
r~' : <. ( . ~ d to he True COPY =! :;, . , , . ,
. , , . , ,.. , I . _ . . I
\ . j. . ..a ;
. - , ~. , ,;\ . : .. . .. .. . . .
, . . ,: : . \ : ' .. - .... .-. . . : , . . . . ; . , . . , .,'
26. Jolnt Secretary (Plan Finance Div.-ll), Ministry of Finance, Norlh Block, New Delhi
l 2 7 . Uircctor (-I-ransmrssion), MOP, Shram Shakt~ Ohawar?, New Delhi
1 28. C)irec,tor, Ministry of Finance (Plan firlance Div.), North Block. New Delhi ?$ 2 29. Depuly Secretary, Cabinet Secretarial, Kashtrapati Bhav~an, New Delhi
30. Under Secretary, Finance & Budyet Seclion, MOP, New Delhi
(See~na Gupta) General Manager (CP)
=rfrT;i ! ::,e,r,f~ed to be True Copy
*~l%~m;rjTiV,m-
! ANNEXURE - I A CTDP , , , ,CT CO-S? F-qT ATE
( B A S E COST)
TRANSMISSION SYSTEM ASSOCIATED WITH KRISHNAPATNAM UMPP - PART B (Cost i ~ p d a l c d to 4TH OLJARTER 2011 price level) --.- -
DESCRLPTlOk 1 No. .-.---,p --
, ~ r o r o d . _ _
A ?rr~liniir:av Siv~ey 6, 5011 inl~esi;galior! 8 Lard acciuisition io: SiS!n and @&R Conipensalioli
C Cost c i eompcnsation for Trans. Lines
i) Compensation !awards Crop & FTCC ~ i ) Cc!npe~ lsa t~on Inwards fores!
D Civil Works
i ) Ir~!rasrr!~ct~ire to; suSsldIicns
7,) 1.-lop, Res:dcnOal 'iuiiding:;
;I;) Cclonv (01 Trans. Lines and Skin
E C q ~ i p i n e r i t (Si13ply 8, Ercctior;) Cost
5 ) Tians.L~ncs
L) S.(ii)-Si.3.li~11~
l.-.- ~. ~ ~ - -. . . ~
l
F Sub Tota l A to E '1639.66-1
G Special Tools & Plan!s
H Incldeqla! expenditure dilnng con;lrvct~on (1EDC) 5 % o f [F - ~ ( i i ) ]
J Cevteges 8 Contingenc;ies Q 5% on Corxp~nSa!ory Afforestz!ion (considering 745,609 per Ha for 131 Ha
-p--
- G RAN D TO TAC'-------' No,e:
1 . De!X component is envisagad lobe covered uncle, Domestic
2. lnlerest rate has becn cor,sidcred @ 1C.5?10 for Ooineslic loan 8: Q 7% for THE 'A'OKLD BANK Loan
9. Ueb1:Egully relio Ihas been considered as 70:3U.
m C e r l ~ f l e d l o be True Copy
* m s r m m * m * For power Grid Corporation of India Ltd.
m / Company Secretary
d A+ I- TRANSMISSION SYSTEM ASSOCIATED WITH -1- -L
KRISHNAPATNAM UMPP = PART-B II
$ ?# cent& ~lectrici~*uthority -
System Planning & Project Appraisal Division Bhawan, R.. puram, New - l 10t%6. E P
I /
No. 5 1 / 4 / ~ # 6 ~ ~ - 2 0 ~ / 625-635 Date: July 17,2007
To. 1 .The Member Secretary, 2.The Director (Projects),
Southern Regional Power Committee, Power Grid Corp. of India Ltd. 29, Race Course Cross Road, "Saudamini", Plot No.& Sector-29, Bangalore 560 009. Gurgaoo 122 001, Haryana. FAX : 080-22259343 F M : 95124-2571932
. - 3.The Director (Transmission), 4.The Director (Tmnsmission), Transmission Corp. of Andhra Pradesh Ltd., h a t a k a State Power Transmission Corp.L,!d., Vidyut Soudha, Eyderabad - S O 082. Cauvery Bhawan, Bangalore 560 009. PAX : 0 4 0 4 ~ 1 3 7 FAX : 080 -22228367
S.% Member (Transmission), 6. Member (Distribution), Kerala State Electricity Board, Tamil Nadu electricity Board (TNEB),
i Vidyuthi Bhawanam, Pattom, P.B. No. 1028, 6"' Floor, Eastern Wing, 800 Anna Salai, Thinrvaaaathapnram - 695 004. Cbenoai - 600002. F M : 047 1-2444738 FAX : 044-2851862
7.The Director (Power), 8.The Superintending Engineer -1. Corporate Office, Block -I, First Floor, Electricity Department, Neyveli Lignite Corp. Ltd., Gingy Salai, Neyveli, Tmil Nadu - 607 801. Puduehe y - 605 001. FAX : 04142-252650 FAX : 0413-2334277/2331556
9. Ek-ioi (Piejacb), !G. Shri N. S. M. !.,m National Thermal Power Corp. Ltd. (NTPC), General Manager (Transmission),
. NTX Bhawan, Cone-7, h p e Complex, -NPCLL; -1 ~ ~ ~ l ~ ~ ~ , ~ i ~ d ~ i i i ~ b ~ a i Bhawin, Lodhi Road, Anushakti Nagar, Mew Delhi-110003. Mwbai - 400 094. ~~x-011-24360912 FAX : 022- 2~993~7on59912si1
1 I. The Director (Operation), Power Trading Corpn. of India Limited, p Floor, NBCC Tower,
1 .' 15 Bhikaji Cama Place, New Delhi 110066. FAX-011-41659504
- Minutes of the meeting Sub: 24" meeting of the Standing Committee on Power Syrten Pfanning of Southern Region
Sir,
24' meeting of the Standing Committee on Power System Planning of Southern Region was held on June 18,2007 at Baugalore. Minutes of the meeting are enclosed
9 ,
Your comments and observations, if any, may be sent to us at the earliest.
Eocl: Minutes - . -- C
. -
Scheme - B : Synchronous Inter-connection of SR and WR Transmission System: -
- Transmission Charges: Transmission charges for this scheme would be shared by SR and WR constituents on 5050 basis. Transmission scheme would be regional pool scheme of SR and WR Target Date: Target would be to match with the Krishnapatnam UMPP generation project.
Scheme - C : Evacuation System for Krishnapatnam UMPP Transmission System:
Krishr;apaL~am UM?? - Ne!!~re 4OO kV, Q ~ z d W C !ine 2) Krishnapatnam UMPP - Kumoo1400kV, Quad D/C Iine 3) Krishnapatnam UMPP - Gooty, 400 kV, Quad D/C line 4) Raichur - Sholapur 765kV S/C line-2 5) Sholapur - Pune 765kX\I S/C ;he
I 6) Kurnool - Raichur 765kV S/C line 71 765kV substations at Kurnool, Raichur, Sholapur and Pune, with
765/400kV 3000 MVA transformers at each of the substations. 8) Inter-linking of Raichur and Kurnool 765kV/400kV (PGCIL) S/S with
Southern Region grid through suitable inter-connection. Transmission Charges:
. - Transmission -charges for this scheme would be shared by all the beneficiaries of Krishnapatnam W P P in ratio of their shares in Krishnapatnarn UMPP. . Target Date: Target would be to match with the Krishnapatnam UMPP generation project.
Scheme - D : System strengthening in Western Region corresponding to power from Krishnapatnam UMPP
Transmission System: 1) Pune (WR) - Navi Mumbai (WR) 400kV D/C line Transmission Charges: Transmission charges for this scheme would be shared by WR. Target Date: Target would be to match with the Krishnapatnam UMPP generation project.
10.5 POWERGRID representative informed that for synchronous inter-connection of SR with WR through Raichur-Sholapur 765kV Iines, it was desirable that the Raichur - Sholapur 765kV S/C line-l under Scheme-B and Raichur- Sholapur 765kV S(C lip&-2 -iuider'~cheme-C should be commissioned simultaneously. For this, the Raichur-Sholapur 765kV S/C line-2, which was proposed a s part of Krishnapatnam transmission system should also be implemented matching with the line-l. the
Central Electricity Authority System Planning & Project Appraisal Division
Sewa Bhawan R.K Puram New Delhi - 110066
NO. 51/4/SP&PA-20111 1647-58 1
Minutes of the meeting is enclosed. It is also available at CEA's website ( www.cea.nic.in).
Yours faithfully,
-
29, Race Course Cross Road, Rangalore 560 009. FAX : 080-22259343
(Pardeep lindal) Director (SP&PA)
(Telephone: 0 1 l 261 98092, Fax No. 0 1 1 26 102045)
2.The Director (Projects), Power Grid Corp. of India Ltd.
"Saudarnini", Plot No.2, Sector-29, Curgaon 122 001, Haryana. FAX : 95124-2571932
4.The Director (Transmission), Kamataka State Power Transmission Corp.Ltd., Cauvery Bhawan, Bangalore 560 009. FAX : 080 -22228367
6. Member @istribriiion),
Cow to: (I) Sh. SK Soonee, CEO, POSOCO,
B-9, Qutub Institutiqnal Area, - ~ a t w a r i a ~ a r a i ; New DeIhi-1 10016
(2) Sh. Shashi Shekhar, Joint Secretary, Min. of New & Renewable Energy, CGO Complex, New Delhi -1 10003
Tarnil Nadu electricity Board (TNEB), 6" Floor, Eastern Wing, 800 Ama Salai, Chennai - 600002.
First Floor, Electricity Department, G i n 9 Salai, Puducherry - 605 001. FAX : 04 13-2334277/2331556
10. Director (Operations), WPCL, 12' Floor,Vkmrc Sarabhal Bhawan, Anushakti Nagar, -Mum baiz800 09-4.- FAX : 022- 25991258
National Thermal Power Corp. Ltd. (NTPC),
- Minutes of the meeting. Sir,
Sub: 33rd meeting of the Standing Committee on Power System Planning of Southern Region
The 33rd meeting of the Standing Committee on Power System Planning of Southern Region was held on 2 0 ' ~ October, 2011 (Thursday) at Conference Hall of Northern Region Power Committee, Katwaria Sarai, New Delhi.
- NTPC Bhawan, Core-7, Scope Complex,
- -. Lodhl R02d,_ - _. _ New Delhi-110003. FAX-021-24360912
requirement corrzsponding to a given time frame and likely load-generation scenario in that time frame. This planned system is then programmed for implementation under various schemes. A major part of the KUMPP transmission system was also planned for looking into requirement of the Southern grid though programmed to be implemented as part of KUMPP ATS. Now, if there .is delayluncertalnty of the ~-UlvfFTgmem&n -7 should identify the transmission system that would otherwise also be required for development of the Southem grid. -
DGM, PGCIL stated that due to likely delay of generation project, it has become necessary to review the ATS of KUMPP looking into the overall grid development, as the Part-B primarily consists of elements which establish synchronous interconnections between SR & WR through 765kV Raichur - Sholapur SIC lines. Here it may be pertinent to mention that the other 765kV Raichur - Sholapur S/c line has already been awarded through tariff based competitive bidding. The synchronous interconnection between SR & WR is of urgent nature as the existing interregional capacity is inadequate to cater to the interregional transfer requirement, as were observed during this summer when there was a large variation in the prices of electricity in SR & NEW Grid. Further, synchronization of SR with NEW grid shall be a major milestone in Indian Power system development thereby establishing nationwide synchronous grid. The synchronization of SR with WR grids have been planned through Raichur - Sholapur 765 kV 2xSlc lines. Therefore, it is necessary that the *r . 9 hnsnnapatnam UivEP Part-B tiiisiiii~sioii system wiiiprisiiig of folle~iiig elemeiiis %ay be de-linked from the commissioning of Krishnapatnarn UMPP generation project.
KUMPP Part-B
. . . ... ...!g ... . Establishment . .... of new-765/4~0. . . ~ ~ kV.. substations .at Raichur- &-~Sholapur with-2~1-500 MVA ICTs and 1x240 MVAR bus reactor each
(ii) Establishment of new 7651400 kV GIS substation at Pune with 2x1500 MVA lCTs and1 ~240-MVAR bus reactor
(iii) LILO- of existing Raichur - Gooty 400 kV Quad Dlc line at Raichur (New) substation
(iv) Raichur - Sholapur 765 kV SIC line with 240 MVAR switchable line reactors at each end
(v) Sholapur - Pune 765 kV SIC line with 240 MVAR switchable line reactors at each end
(vi) LILO of Aurangabad - Pune 400 kV Dlc at Pune (GIS)
(vii) LILO of Parli - Pune 400 kV Dlc at Pune (GIS).
. Members agreed for the proposal of de-linking of Part B from commissioning of Krishnapatnam UMPP generation project.
4.4 'The Part-C comprised of Krishnapatnam UMPP - Kumool 400kV Dlc line, Kurnool - Raichur 765kV S/c line and establishment of Kurnool 7651400 kV substation. This part
=. , mainly. oaten tQ the immediate evacuation of power fiom Krishnapatnam UMPP generation project. Hence the same may be deferred for the time being till position of generation projects commissioning gets clear. However, here it may be mentioned that Kurnool 7651400kV substation is necessary for interconnection of the Nellore Pooling Station -
765 KV GIS SUB-STATION, SHIKRAPUR, PUNE
WRITE UP ON ACQUISITION OF LAND
i S.NO. 1 Date Particulars Application for acquisition of land admeasuring 27.71 Hectares for establishment of the Sub-Station at Shikrapur, Pune, t o the Collector, Pune, under the Land Acquisition Act, 1894. (Ref.No. WRTS-I/Pune/TL765/F-109/11/3060 dated
POWERGRID to submit some more documents/records, vide Letter dated 14.02.2011.
02
POWERGRID complied with all the queries and submitted the requisite documents, vide letter Ref.No. WRTS-I/Pune/TL765/F-109/11/3308 dated ,
14.02.2011
Demand Note raised for Rs.10,000/- towards Office expenses by the nominated SLAO and the amount was de~os i ted on 06.07.2011.
14.01.2011) The Dy. Collector (LA), Co-ordination, Pune, has raised some queries and asked
04
Demand Note raised for Rs.95 lakhs towards 114'~ of the cost of the land as per Ready Beckoner and the amount of Rs.95 lakhs was deposited on 21.07.2011, vide cheque no.223573 dated 20.07.2011. Preliminary enqulry was conducted by the SLAO in association with POWERGRID representatives at site. During the enquiry, the villagers (mostly landowners) obstructed/resisted the officials for conducting the preliminary enquiry. On the advice of the SLAO-3, the land records of anaher land, adjacent to the proposed land, were submitted to the SLAO-3, vide letter ref. no. WRTS- I/Pune/TL765/F-109/11/844 dated 01.10.2011.
18.06.2011
1 09 1 05.10.2011 1 Committee members of POWERGRID were nominated for procurement of land )
14.03.2011. The Collector, Pune, nominated Dy.Collector (LA) SI.No.3 was nominated as Special Land Acquisition Officer (SLAO) for the acquisition of land, vide Order dated 18.06.2011.
11.10.2011, t o the Collector, Pune, enclosing therewith the copy of GR dated 04.08.2010, with a request t o acquire the land by making an Award with mutual consent.
10
The entire documents in relation to the newly identified land, was submitted to the Dy.Collector (LA), Co-ordination, Pune, vide letter Ref.No. WRTS- I/Pune/TL765/F-109/11/007 dated 03.11.2011. The Collector, Pune, by Order dated 21.11.2011, changed the SLAO-3 and
11.10.2011
nominated the SLAO-26 for acquisition of the land. DGM (ESMD), Nagpur, vide letter Ref.No.WRTS-I/Engg/1213/2011 dated 07.12.2011, requested the Collector, Pune, t o expedite the acquisition of land through negotiations in line with the ~rovisions of GR dated 04.08.2010.
through mutual consent vide note ref. no. DTS-4041/2011 dated: 5.10.12. POWERGRID wrote a letter Ref.No. WRTS-I/Pune/TL765/F-109/11/905 dated
Vide letter Ref.No. WRTS-I/Pune/TL765/F-109/11/0026 dated 08.12.2011, the names of the members of POWERGRID to be associated in the Committee headed by the District Collector, Pune, for purchase of the land directly from the landowners, was intimated to the SLAO-26. POWERGRID requested SLAO-26 t o convene the meeting for negotiations with the land owners, vide letter ref.No. WRTS-l/Pune/Land/06e dated 06.02.2012
1 16 1 14.02.2012 1 A meeting was held between POWERGRID (Law & Site representatives) and SLAO- I
Vide letter dated 21.02.2012 O~SLAO-26, a Committee comprising of Revenue Authorities and POWERGRID representatives was constituted by the Collector, P I I ~ P
t itp m- the State, POWERGRID and landowners.
Second tripartite meeting held and a rate of ~ s . s a k h s per Hectare was offered by the Collector, Pune, for which the land occupants requested for time. Representatives of Land owners intimated their consent for the rate od Rs.70 lakhs per Hectare offered by the Collector, Pune and submitted their written consent for the same on 09.05.12. Measurement of the land done by Taluka Land Records (TLR) Deptt, Shirur in ~ resence of re~resentatives of POWERGRID and SLAO-26. Vide letter dated: 29.10.12, SLAO-26 intimated the approval of the Commissioner, Pune for the rate of Rs. 70 lacs/hectare for procurement of the land. But the said ! a d being watan land under new rules, Nazraana amount has t o be deposited with State Administration t o which, POWERGRID agreed during the meeting on 27.03.12. POWERGRID was asked to coordinate with Tenancy Branch, Pune to get the exact Nazraana amount t o be deposited. --
WRITE UP ON NAZARANA
Upon receipt of the approval of the Commissioner, Pune, in respect of the Rate of the land, POWERGRID is required to co-ordinate with the Dy.Collector (Tenancy) for calculating the Nazarana as per the Rules:
On receipt of the Application from the office of the Collector, Pune, the Dy. Collector (Tenancy) office scrutinized the file completely and accordingly Nazraana amount has been calculated. A note for approval of the Commissioner was sent t o the office of the Commissioner for approval. On scrutiny of the case, the office of the Dy. Commissioner observed that individual applications of the land occupants together with affidavits and other relevant documents in respect of their lands, need to be submitted for approval.
S. No. 0 1
1 RHO. was apprised of the above developments and requested GM (Projects) t o I depute Law executive for discussions with the Commissioner and the Dy. Commissioner. Pune.
1 04 1 27.12.2012 ( Met with the Commissioner, Pune along with DGM (Law). Dy. Commissioner, (
Date 07.11.2012
Particulars Application for calculation of Nazaraana amount was submitted to the Collector, Pune fRef.No. WRTS-I/Pune/TL765/F-109/11/325 dated 06.11.12)
I I -
obtain Applications of the individual land occupants, affidavits and other relevant documents stating that they are ready to sell the land t o POWERGRID and there
Pune was also present during the discussions. During discussions, Commissioner, Pune insisted upon the submission of individual applications requesting the
05 1 Collector, Pune to allow them to sell the land to POWERGRID.
29.12.2012 / The Addl. Collector issued a formal letter dated 29.12.12 asking POWERGRID t o
I L
are no legal disputes or other encumbrances pertaining to their land, from each land occupant.
WRITE UP ON THE EFFORTS MADE FOR COLLECTING THE GUT-WISE APPLICATIONS AND OTHER DOCUMENTS FROM THE LAND OCCUPANTS
Particulars. 29.12.12 Met Tehsildar, Shirur with a request t o arrange the documents as per the letter
dated: 29.12.12 of Addl. Collector, Pune. Tehsildar advised us t o come on 31.12.12 for discussions in presence of Talati and other Revenue Officials.
02 31.12.12 M e t the Tehsildar, Shirur who has called Village Talati. Tehsildar advised the Talati t o extend necessary co-operation t o POWERGRID in obtaining the documents. However, the Talati intimated that it is the responsibility of POWERGRID to obtain 1 the documents sought by the Addl. Collector t o finalize the Nazaraana. Visited Village Shikrapur and met the villagers and obtained information regarding land occupants. Simultaneously, some villagers , staying at Mumbai and Pune city, visited Collector Office. We met them in the Collector Office and requested them t o submit the applications. The villagers assured us t o extend necessary co- operation in this regard. However, they insisted for a meeting with Collector, Pune to have a clear understanding of the matter. They are yet t o meet the Collector, Pune.
During the discussions with the viiiagers, it came t o itnow that about iG iaiid owners have since been died, 1 land owner is abroad and 1 land owner is missing i for the last 2 vears . Some land owners have settled at IVlumbai. 1 Some land owners of gut no. 629 & 631 visited our office. I t was intimated by them they will not compromise on the court cases at any cost.
In the afternoon, we met Dy. Commissioner, Pune and apprised him of the aforesaid problems and informed them that the Revenue Authorities at Shirur Tehsil Office are not co-operating. Dy. Commissioner, Pune advised us that this is the responsibility of POWERGRID t o obtain all the documents sought by the Addl. Collector and Revenue Authorities have no role t o play since i t is a case of Direct Purchase between POWERGRID and the Land Owners. Then Dy. Commissioner suggested us t o go for Land Acquisition, in which case the responsibility lies with the Revenue Authorities t o obtain necessary documents. He further advised us t o meet Commissioner, Pune and apprise him of the problems.
We met Commissioner, Pune who also advised us t o go for Land Acquisition. For the purpose, he advised us t o meet the Collector, Pune.
RHQ was also apprised of all the above developments. We tried t o meet the Collector, Pune. However, we were informed that Collector is out of station and he will be in the office on 07.01.2013.
GM (Projects) along with DGM (Law) reached Pune and met collector, Pune. Collector intimated that we can go ahead for land acquisition under urgency clause and district Administration will provide full support in early acquisition of the land. The application for land acquisition under urgency clause has been submitted in the Collector Office.
w & n y and processing of the file has been d 10.01.13 t o Collector, Pune for approval.
. .. - * * (m m JiT m) .- - ,\g POWER GRID CORPORATlOh! OF INDIA LTD.
- -. -~ L::~I~~. : I> .G
.... . ~~~ .. ~
(A (:,ovt. ul lnd~a Enterp~ .sc)
.p-) w m iftimhw: a~q*,cer& H1-312, 3 q a a:m.m,m.~i~~lifji t W, *.g. 2c*
m, p - 4 1 1 0 4 4 . gdl m *: C&L g. V-14 Q 15, WT,3fFT.%.@., iT&WJ,?@.
Pune SIS Construction Office: "Neptune Villan,ADC C-312,Near Akrudi BSNL Exchange, Sector No.26, Nigdi Pradhikaran, Pune-411044. Telefax: 020-27659909 TXFT /TEL:020-27658982, 020-27656614 E-mail: [email protected] Pune Site Office: Plot N0.A-14 &15, M.I.D.C.,Talegaon, Pune. - . - -- --
d%Ti C b m m-\/ WESTERN REGION TRANSMISSION SYSTEM-I
Ref: WRTS-1lPunelTL765lF3 0911 11. .:?c so Date. : 14.01.201 1
TO & & * B ~ / C ~ - S &vv,' The Collector Piiiie (Maharashtraj
Sub: - Acqirisition of Private Land for establishment of 765kVkV Sub-station of Power~rid at Villaqe-Shikrapur: Talirka-Shirur & District-Pune.
Dear Sir,
Power Gr~d Corporation of India L~mited, A public sector undertaking under ;vlinistry of Power and the Central Transmission Utility is transmitting about 45% of the power.genBrateca in this country in their transmiss~on network. POWERGRID is establishing 4001220 I<V substation near #Village IVavlakh Umbre, Taluka Maval Dist. Pune.
Pune is being one of the most important load center in Western Maharashtra, it has been decided to establish 3 su%station of having capacity 7651400 KV, in addition to the ongoing 4061220 KV station. I'irs proposed 765 KV substation will be constructed by POWERGRID matching with the comlnissioning of Krishnapattanam Ultra Mega Power ~ r o j e c i (KUMPP),to facilitate evacuation of power from KIJMPP to Maharashtra.
For establishment of 7651400 KV substation a separate private land at Village Shiltrapur,'Taluka Shirur, Dist. Pune has been identified admeasuring approxi.24.91 Hectares
L"/e ar? enclosing herewith the following documents for acquisition of 24.91 Hectares of Private Land at Village-Shikrapur, Taluka-Shirur & District-Pune. for establishment of a new 765kVl400kV Sub-station.
Registered Office: B-9, Qutub Institutional Area, Katwaria Saraj, New Delhi-110016
/ I \ A
(2) Budget Provision Certificate - Quadruplicate. (3) Demarcation Certificate - Quadruplicate. (4) Certificate for non involvement of forest land - Quadruplicate (5) Certificate for non involvement of any public praying place etc. - Quadruplicate (6) Statement showing the proposed Gut nos proposed for land acquisition for
7651400kV Substation - Quadruplicate (7) 7/12 statement of Gut nos to be acquired Village Shikrapur - Quadruplicate (8) Demarcated Village map of Village Shikrapur - Quadruplicate. (9) Brief write-up about Powergrid & proposed new scheme a! Pmn.e.
(10) Prior approval of the Government of India under Section 68 of the Electricity Act.- 2003.
( I l ) Power Map of Western Region.
It is requested to please take necessary action for acquisition of Private Land for PUBLIC PURPOSE, for establishment of new S u b - s t a f j ~ ~ by PO\wA.!EP\GP\!C! in Pune District.
'Thanking You
Encl: as above \
\ Yours Faithfully ,
(M.S:NaKhre) Chief Manager
Pune.
@a. m. r M. S. Na~nm
v gid5 / Chief Manaser a, '$ l POWSGRD P"
Date: 07-1 2-20 1 1
- The Collector, Pune Maharashtra
Snb: Reqiiireiizeizi of Laild of mecz apliox d$ Acres for esiaEc'ishmeni of a 765/400 KV GIS Substation at Village Shikrapur in Taluka Sizirur, Distt PIJHU - W---.
'Dear Sir,
Power Grid Corporation of India Limited, a public sector undertaking under Ministry of Power and the Central Transmission Utility, is transmitting about 51% of the Power, generated acrcss the country through its transmission network. POWERGRID is establishing 4001220 KV substation near Village Navlakh UmbresTaluka Mava1,District Pune, which has been commissioned very recently.
Pune being an important load centre in Western Maharashtra, it has been planned to establish one more substation of capacity 7651400 KV in addition to the ongoing 4001220 KV station. The proposed 765 KV substation will be constructed by POWERGRTD to match with the commissioning of Krishnapattailam Ultra Mega Power Project (KUMPP), to facilitate evacuation of Power to Maharashtra State.
Considering technical suitability and feasibility reports, it is proposed to establish a 765/400 KV GIS substation, at Village Shikrapur Taluka Shirur, Distt Pune. As the government land was not available, private land admeasuring approx. 40 Acres, which is mostly a barren non-cultivable, land has been identified in the Village Shikrapur, Taluka Shirur, Dist. Pune.
An application, in this regard, was submitted to your good of ice vide letter dtd. 1 1.10.1 1 for procurement of this land through tripartite negotiation basis comprising members from Distt. Collectorate, POWERGRID and land owners, for finalization of the rates in line with the MS State GR dated 04/08/2010. For further action in the matter, Special Land Acquisition Oficencf26 has been identified accordingly.
- . .. . in rnis regara, ~t IS sumnittea that establlsnment or tne suPsuaon IS on nlgn priority
and being monitored by Ministry of Power on MOU basis to match the evacuation of power from KUMPP. As such, it shall hc of high considerations ifan urgent priority is accorded for procurement of this land. It is mentioned that the contract activities for various work components arc also initiated for an early execution of the activities.
Your kind cooperatio~l and priority concerns are highly solicited for early procurement of this land
Thanking you,
Dy . General ~ a n & e r (~ngg . ) Western Region-I,
Regional Headquarter, Nagpur.
Copy for kind infonnation and early action in the matter pl.:
l . Shri Dilip Jagdale - Dy. Collector, Coordination, Pune. 2. Shri Mukesh Xakade, Dy. Collector/SLAO#26, Pune.
NOO: ED (WK-I), Nagpur. GM (Proj .-11), Nagpur.
IP-w ( m m m m ) POWER GRID COWBOMTION O F INDIA LTD.
(.A c w - i ~ ~ \ _
@(m) Mm, *i. 104, M*, @mm, gdr411 014.
Pune (Shikrapur) Conslruction Office, Flat No. 104, Ridhi Tower, Virnan Nagar, Pune 411014.
~ / T e l e p h o n e : 020-26631260, E-mail : [email protected]
m eh M - I /WESTERN REGION TRANSMISSION SYSTEM - I
Itel': ~ ~ ~ ~ ~ ~ l ~ S - l l l ' ~ 1 1 ~ ~ e l l ~ L 7 6 5 l l - ~ l 0911 l /.;' 2Sr Date: 06.1 1.20 12
S I I ~ ) : P r o c l l r e ~ i ~ e ~ ~ l 01'Lantl f'or cstablisllment of 7651400 KV GIS Substatioli a t Village C I . ; I , . - - ...... :.. T . . I . . I , - cl.: I \ : , .u 1) .... ,. . , : , I - n f i . . ~ . . . . ~ ~ ~ . k . . - Q+-+- ~ , . . , , . . . . . - , , ~ t p~ NA U I I I I \ I L I O ~ I I I I I I L I I L ~ I \ L I a 1 1 1 1 1 1 1 , U I J I I 1 U I I L , vruc I V I ~ I I ~ I n a l r t r n u r n i r . W W V ~ I n l l l r r . r n r w a x I T V .
1,TI-1 071201Ol R.SF.1461ST-2 tlatctl: 04.08.2010, with mutual consent.
POL\,CI 61 id Corporation of India l,~mitcd, a public sector undertaking ilndcr Ministry ol' I'ower and the Central l'ransmission Utility, is transmitting about 45% of the Power. p,enc~.aled rn 1111s counl~.y In t l ie i~ ~ransmission network. POWERGRID has established 4001220 I<V subslalion near Village Navlakh U~nbre,Talulta Maval,District Pune.
I'une being one of (lie most important load centes in Western Maharashtra, it has been dccided to establish one more subslation of capacity 7651400 KV in addition to the 4001220 I<V stalion. The proposed 765 ]<V substation will be constructed by POWERGRID matching ~ ~ i l l i h e ~om~ii iss ioning ot' I<~.islinapattanam Ultra Mega Power Pro,iect (KUMPP), to i;~ciIil~~te ttvaci~ation of' Powcr. from 1<1JtvIl'l> to Malial-asIi11.a.
We liavtt p~.oposcd lo cstabli~li a 7651400 ]<V GIS substation, at Village Shikrapur 'l'alultn Slii~,u~-. I3is;ll Pune Sor evacunrlon of P O M ~ ~ I . from I<UMPP to Pune, which is 50 klns l'rom llic ongolng ~l001221, l < \ / silbslal~on localed at MIDC, Talegaon.
For csrablislime~it ot' 7651400 I<V substation, a separate private land at Village SIiik~-api~~., 'falulia Slii~.u~-. Disl. Pune was identified admeasuring approx. 24.9 1 Hectares. An ;~l>l)lic;itio~i, in this regard. was submitted to Collectol-, Pune vide letter ref 110: WR'I'S- IIl'i111e/'~1..76511~109!1 113060 citd: 14.0 1 . 1 1 . ri-lic acqi~isition was to be carried out as per LA Acl 1894.
71-lle ~pl'oposal, for acquisitio1.1 of the land, was then sent to Dy. Collector (Coordination), Pune a~ id accol-clingly. SL,O Sr.no. 3 was nominated, for processing of thc case. Initial enquiry in this regard was condi~ctcd ,joil.irly a1 site on 15.09.1 1 . During the initial enq~~ i ry , it was 11olicc.d that some 01' [lie land is i~~idulated and having standing crops. As advised by SLO-3, (1
ex\cplol-ed Llic possibilily 01' locating 11ie substalion on sallie plot. snl!jec~ to ~ecli~iical si~itability oftlie land.
tairly Ieveled and barren land within
Accordingly. \VC have exanlined and shil'ted rhe location [owards the wester11 side of the s ame 1)lot in which is hi[-ly lcvcled and barren. 'l'he rcvised proposal for land acquisition was then suIxrm1eu 10 Siu. SI. .No.3 vicie our icttcl. ~ 'e l . No. WK'I'S-l/l'u1~e/1'1,~/65/FlUYI1 11844 dated 0 1.10.20 1 1 a n d to Collector- Pune dated: 1 1.10.1 1 . After which SLO Sr. No. 26 has been
appoi~lted, by Collector Pune vide thcir letter ref. no. @ETT?~RTB~~wP/~PR :?? /?? /?0?? , for processing oftlie case.
Considering [he facts that, s~~bstarion construction is a time bound project and delays in\!olved in thc c,onvcntional land acquisition process, it was decided to move ahead for the land acqiiisitiori th~.ougli tripartite ncgotialion approach with mutual consent. Further, i n line
with Cio\~ernmen[ of Maharas11t1.a Gli no. l.,?'l-I 07/20 101 V.%. 14613-2 dated. 04.08.201 0 (Copy enclosed as Anoexnrc-I), Collector Pune nominated a conlmittee for the purpose 1111der 111s Chai rmans l~ i~~. Mem hers of thc co~nnlittee are:
I . Dy. Col lec to~ (LA), Sr.110. 26, Pune 2 . Assistant Direclor (Town l'lan~iing), Pune 3 . A.K. I-landa, LIGM (Engg-CiviIIESM), POWERCRID, RHQ, Nagpur 4 . A . Chandramolian, DGM (F&A), POWERGRID, Pune 5 . 5 . K. Srivastzva, C":', (Law), PO??'E!?GP\!D, K H Q , Nagpi;;
l))!. Collector (LA, Sr.110. 26) carried out all tlie necessary procedures for identifying the piece o!. !and wl?erein, a!! search repel-ts and other documents related to !he said land were collected by rhem.
111 a meeting with Dy. Collector (LA, Sr.no. 26) alongwith CM, Pune and CM (Law), RHQ, Nagpur on 14.02 12, i t was t~nderstood that the land being considered comes under new terms and conditions and is "WatanLand". The cost of transferring the ownership rights to land occupants 01. tlie "Nazl.aanam shall be deposited to State Government and borne by seller or buycr.
I.'irst tripartite meeting was Iield on 05.03.12, chaired by Dy. Collector (LA, Sr. no. 26), ~\4ier-ein Astt. Dil-ector (Town Planni~~g), POWERGRID Conin~ittee members, I'OWERGRID ol'licials and land occupanls wcre present. Discussions regarding procurement of land through negotiations were held. (MOM Copy ellclosed as Annexure-IT)
Again, next tripartite meeting was held on 27.3.12, chaired by Collector Pune, wherein Dy. Collecror (LA, St., no. 26), Asst Director (Town Planning), POWERGRID Coni~nittee nie~nbers, POWERGRID officials and land occupants were present. A rate of Rs. 70 lacs per licctare was offered to the land occupants by Collector Purie. Also, the cost of transferring the ownership rights to land occupants or "Nazraana" shall be borne by POWERGRID and shall be deposited to State Government. Further, Collector, Pune advised to carry out the land nieasi~renien[ ininlediately by revenue authorities to assess the total area of the land. (MOM Copy enclosed as Annexure-111). 'l'he land owncrs of Village Shikrapur gave their consent in writing to SLO 26 on 9.5.12 regal.ding the rate of Rs. 70 lacs per hectare towards 1)rocure1Tient oSt1iei1. land. (Copy enclosed as Aunexure-IV)
Alier obtaining coliselit from tlie land owncl.s, regardi~lg rates for procu~,ing of the land, SLO ?h atli~ised us to carry out tlie mcasurc~iient along wilh T1.R oflice, Shiror. A fee of Rs. 4
37_.U00!- was dcposilod. as per the demand rlole raised by TLR office, and 1meas~11-ell-lent of llic said lancl was ci\rried 0111 011 2 1 .5. 12 and 22.5.12.
,.,.,,,..,... J > A @L 1 :. ... . , ,I V L L L I L U 15 - . ' V O U 1
rllcasul,e~liclll. i n rhc land to bc p~.oc~~l-ed are su~nrl.larized hercu~ldor:
Sr. i G l l t ~ o .
No. I
- p. ---
l Total Area of-the I Area to be procured (in-]
1 Gut -...-...-p--p-... (in Hectare) I Hectare) .................. i
Alier c o ~ n p l e ~ ~ o ~ l of the 11leasurelnent process, cornplcte set of file was recommended by C'ollcclor, I ' L I I ~ ~ to C o ~ n ~ n ~ s s ~ o n e ~ , Pune Ibr approval. The rate of 70 lacs per hectare has been approved by C C ~ O I ? ~ K I S S ~ O I ; ~ : , l3::ne a n d :I;c texes ii; this regard has becn issiied by Dy. Collect01 (LA, SI-. no. X), bide ref. 110: x.5 m 1 2 6 1 ~ sm/17/2011 dated: 29.10.12, towards p r o c u ~ ~ e ~ l ~ e ~ ~ t of'20.86 Hectare land at Village Shikrapus through tripartite negotiation \v1111 rnutaal consent for establisl~~llent of POWERGRID Substation. Complete set of file is aba~lable a1 SI,O 26 ol'fice, which Inay be sougl~t if required.
Sincc the land to be procured comes ~111del new terms and condition, we request you to issue ari order intimating exact a ~ l ~ o u n t o f ~ a z r a a n a to be submitted, i n this regard, as desircd by ~ ( ? I A I ' good oifict.: the gut wise derails for 9 guts, of land to be PI-ocured, along with other necessary docu~nents and I'er-faar ofall the 9 guts is being enclosed.
-This prqject is of iltrnost national importance and every development is closely monitored by Ministry of Power. Thcrefo~~e, WC request you to intimate Nazaraana a ~ n o ~ ~ n t so that registsation process can be completecl 011 timc and henceforth, procurement of the said land f ' o ~ establisllrnent of 7651400 K V GIS Substation of POWERGRID.
Your Cooperation and carly action in this inattel. is highly solicited.
l-banking you,
Yours faithfully , , - b. ( M S Naklise) DGM, Pune Mob. N'o. 94228 1 1696
Irlter Ojjce Memo
mi FROM: OGPl. Purie m 1 TO: G M (Projects), Nagpur
m / CC: 1. DGM (La\\;), Nagpi~r
2. S7'A to ED, WR-l, Nagpilr
m/ SU13: Regal-(ling llca~.ing of public grievances under Sec 5A of LA Act.
Hearing of pi~blic grievances under Section 5 A of LA Act 1894 of land acquisition for 765 KV GIS S/s ~ T I ~ L I ~ ~ . T I G T ~ ~ ~ 011 dated: 27.02.1 3 - at Talati Office, Shikrapur. Pune. Letter ~cga~dl l ig inti~iiarion ol' rhu same has bccn issued by Dy Collector (LA. S.no.26), Pune on dared: 08.2.13 arid handed over to t~ndcr.signed on dated: 12.2 13. (Copy enclosed).
-l'liis is for youl ki~ld illformation please.
Set tin93 /+CL 2 I Desktop I Kolan~
*&,~-3 i k . ? Z , @ n
I I V ' I mttWt11q q r l Y 0
(m * *l R . I % ~ / ? F / ~ w ~ R / ~ ' ~ / ? o ~ q
8 FEB 2013
I Oocu~nenis ond Set tirtgs I Ad,n,'nist/~olot: NCLS I Desktop I Kalanr
'f- 2) -qYhi- Q R (~y;1q
Inter Ofice Memo
h/ FROM: DGM, Pune (Shilcrapur) a l TO:. Chief Manager(PMS) - Shri Arun Kumar
~ I c c : 1. GM(Projects), Pune 2. STA to ED , WR-I, Nagpur
- Shri M M Mehendale
SUB.: ?c?ssession of !md .t vi!!age.-S_h_i!c_rapurj Dist-Pune.
It is to inform you that possession of the entire land of 20.86 ha area for establishment of 765/400kV GIS S/s at Village-Shikrapur , Dist-Pune was handed over to POWERGRID by SL026, Pune by making a Panchnama in this regard on 23.08.13 at 17.30 hrs.
However, formal letter of possession shall be issued by SL026 to POWERGRID in this regard on 26.08.13
(M S Nakhre)
l C \Dozl~rriei115 and Sell~ngsWdmin\My Documenls\~ower grid docx - W(.
<HS)
ture
1,449.51
6,929.07
573.90
.57 c' I
Summary o f Asset -I Anticipated DOCO 01-01-2015
PARTICULARS
LAND
BUILDING, CIVIL WORKS & COLONY
TRANSMISSION LINE
SUB-STATION
PLCC
S/S
44,561.83
1,086.07 2.44%
Particulars
Total cost (Plant and machinary cost
excluding IDC, IEDC, Land cost and cost
o f Civil Works for t he purpose of initial
ares included above
Estimated
Expenditure
f rom
01.08.2014 t o
31.12.2014
8.52
1,016.67
5,047.10
5,977.40
47.70
12,097.39
T/L
44,050.32
427.98 0.97%
Expenditure
Upto
31.03.2014
1,439.26
972.19
29,405.28
8,581.27
211.94
40,609.94
Estimated
Expenditure
f rom 01.04.2014
t o 31.07.2014
1.73
724.58
7,673.62
19,705.74
141.46
28,247.13
Estimated
Expenditure
f rom 01.01.20115
t o 31.03.2015
2,211.14
2,943.59
4,221.45
103.20
9,479.321
( RS./ LA
Estimated
Expenditure
f rom 01.04.2015
t o 31.03.2016
1,935.60
1,639.37 1
7,049.63
69.60
Estimated
Expenditure
f rom 01.04.2016
t o 31.03.2017
68.89
133.64
Total Expend
46,708.96
45,669.13
1,01,33C 10,694.20 202.53
Summary of Asset -I
Anticipated DOCO 01-01-2015
( RS./ LAKHS)
Expenditure Upto 31.03.2014 Expenditure from 01.04.2014 to 31.07.2014 Estimated ;Expenditure from 01.08.2014 to 31.12.2014 Estimated Expenditure from 01.01.2015 to 31.03.2015 Estimated Expenditure from 01.04.2015 to 31.03.2016 Estimated Expenditure from 01.04.2016 to 31.03.2017
PARTICULARS
IDC -1 TOTAL
Total 98,434.27 1.285.88 1 1,610.42 )
CERTiFlCATE OF CAPITAL COST
Transmission System associated w i th Krishnapatnam Project Name:
I I M P P - P / l R T R
Name o f Element:
Date of Commercial Operation:
1x5500 MVA, 765/400kV ICT 1 at Pune (GIS) S/s
Anticipated 01-01-2015
PARTICULARS '
CAPITAL
COST
Expenditure 01.04.2014 t o 31.07.2014
l Estimated Expenditure 01.08.2014 to 31.12.2014, I 1,500.00
(~s t ima ted Expenditure 01.01.2015 t o 31.03.2015 1 1,233.90
l I 1
l ~s t ima ted Expenditure 01.04.2015 to 31.03.2016 1 1J843.09 l 1
-,-- --
Initial Spares Included in Above - Transmission Line
- Sub-Station
( RS./ LAKHS) I l
IDC I IEDC I TOTAL
This is t o certify that the above summary kz; been prepared on t h e basis ci the informaiion drawn from the Audited
Statement o f Accounts of Power Grid Corporation of India Ltd., Western Region, Nagpur up t o 31.03.2014. The expenditure
from 01.04.2014 to 31.07.2014 have been verified f rom the books of accounr of the project. The balance expenditure is based
on the estimates. I
Place : NAGPUR Date : 01-09-2014 (M. TN M ~ R R ~ M )
AGM (F&A)
CERTIFICATE OF CAPITAL COST
Project Name: Transmission System associated with Krishnapatnam UlVlPP - PART B
Name of Element: 1x1500 MVA, 7651400kV IC? 1 a t Pune (G!S) S/s
Date of Commercial Operation: Anticipated 01-01-2015
PARTICULARS
Giri ii
BUILDING, CIVIL WORKS & COLONY
TP14N5Fr?!SS!OFJ LlME
SUB-STATION
PLCC
Expenditure
Upto
31.03.2014
7 7.55
1,659.11
1,736.76
Expenditure
01.04.2014
to
31.07.2014
159.03
4,618.99
4,778.02
Total Cost [Plant and Machinary cost
excluding IDC, IEDC, Land cost and cost
o f Civil works for the purpose of initial
Estimated
Expenditure
01.08.2014
'CO
31.12.2014
153.31
1,405.08
1,558.39
Estimated
Expenditure
01.01.2015
t o
31.03.2015
313.24
920.66
1,233.90
Estimated
Expenditure
01.04.2015
t o
31.03.2016
295.12
1,547.97
1,843.09
( RS./ LAKHS)
Total
Expenditure
998.35
10,151.81
m
1 Initial Spares included above l
69.09 1
This is t o certify that t he above summary has been prepared on the basis of the information drawn f rom the Audited
Statement of Accounts of Power Grid Corporation of India Ltd., Western Region, Nagpur up t o 31.03.2014. The expenditure
f rom 01.04.2014 t o 31.07.2014 have been verified from the books of account of the project. The balance expenditure is based
o n the estimates.
Place : NAGPUR Date : 01-09-2014
L (M. TAI MUKARRUM)
AGM (F&A)
CERTIFICATE OF CAPITAL COST
Transmission System associated wi th Krishnapatnam Project Name:
Name of Element: 1x1500 MVA, 765/400kV ICT 2 at Pune (GIS) S/s
Date of Commercial Operation: Anticipated 01-01-2015
IEstimated Expenditure 01.01.2015 to 31.03.2015 / 467.18 , I 1 I - 1 I 467.18 1
( RS./ LAKHS)
!Estimated Expenditure 01.04.2015 t o 3103201b
PARTICULARS
Expenditure Upto 31.03.2014
Initial Spares Included i n Above - Transmission Line - Sl?b-Sttian
This is t o certify that the above summary has been prepared on the basis or' the information drawn from the Audited
Statement o f Accounts of Power Grid Corporation of India Ltd., Western Region, Nagpur up t o 31.03.2014. The expenditure
from 01.04.2014 t o 31.07.2014 have been verified from the books nf account of the project. The balance expenditure is based
S on the estimates.
Expenditure 01.04.2014 t n 31.X7.2C!1/! , I L , J ~ J . ~ Z 7 n i n 3,001.92 1
Estimated Expenditure 01.08.2014 to 31.12.2014 1 1,075.00 I
CAPITAL
COST
1,121.21
1
-,
Place : NAGPUR ,l><-' >'L Date : 01-09-2014 (M. TAI M&ARRVM)
AGM (F&A)
I DC
18.44
IEDC
36.66
TOTAL
1,176.31
CERTIFICATE OF CAPITAL COST
Project Name: Transmission System associated with Krishnapatnam UMPP - PART B
~ w m e of tlement: 1x1500 MVA, 765/400kV ICT 2 at Pune (GIS) S/s
Date of Commercial Operation: Anticipated 01-01-2015
1 PARTICULARS
l
LAND
BUILDING, CIVIL WORKS & COLONY
TRANSMISSION LINE
SUB-STATION
PLCC
Expenditure
Upto
31.03.2014
Expenditure
01.04.2014
31.07.2014
Estimated
Expenditure
01.08.2014
t 0
31.12.2014
Estimated ( Estimated
Total
Expenditure
This is t o certify tha t the above summary has been prepared on the basis of the information drawn from the Audited
Statement o f Accounts o f Power Grid Corporation o f India Ltd., Western Region, Nagpur up to 31.03.2014. The expenditure
f rom 01.04.2014 t o 31.07.2014 have been verified f rom the books of account of the project. The balance expenditure is based
on the estimates.
Particulars
Total Cost (Plant and Machinary cos:
excluding ID€, IEDC, Land cost and cost
of Civil works for t he purpose of Initial
lnitial Spares included above
Place : NAGPUR Date : 01-09-2014 (M. TAJ MIMARRUM)
AGM (F&A)
T i l
Sub-Sta tion i I
5,953.61
CERTIFICATE OF CAPITAL COST
Transmission System associated with Krishnapatnam Project Name:
I IMPP - P d n T R
Name of Element:
Date of Commercial Operation:
1x240 MVAR, 765kV Bus Reactor at Pune (GIS) S/s
Anticipated 01-01-2015
Estimated Expenditure 01.08.2014 t o 31.12.2014 1 550.00 1 35.25 1 1 590.48
l I I
( RS./ LAKHS)
I Estimated Expenditure 01.01.2015 t o 31.03.2015 1 1,208.54 1 - 1 - l 1,208.54
I I 1 I
PARTICULARS
Expenditure Upto 31.03.2014
Expenditure 01.04.2014 t o 31.07.2014
I
l Estimated Expenditure 01.04.2015 to 31.03.2016 1 1 - 1 - 1 1,434.38 1 8,556.50 f 101.57 1 81.25 1 8,739.32
Initial Spares Included in Above -Transmission Line - Sub-Station
CAPITAL I I IDC COST
This is t o certify that the above sumi?iary has been prepsred or: the basis cf the iniormatior, drawn from the Audited
Statement o f Accounts of Power Grid Corporation o f India Ltd., Western Region, Nagpur up to 31.03.2014. The expenditure
from 01.04.2014 to 31.07.2014 have been verified from the books o f account of the project. The balance expenditure is based
on the estimates.
3,923.36 --. ?q A? l 4,000.09
IEDC
40.55 1,44022
Place : NAGPUR Date : 01-09-2014
TOTAL
1,505.83 25.06
./,' t, ~ ,; ! I l' (M. TN MU +RUM)
AGM (F&A)
CERTIFICATE OF CAPITAL COST
Project Name: Transmission System associated wi th Krishnapatnam UMPP - PART B
lvame or tlement: 1x240 MVAR, 765kV Bus Reactor at Pune [GIS) S/s
Date of Commercial Operation: Anticipated 01-01-2015
Expenditure
PARTICULARS
31.03.2014
BUILDING, CIVIL WORKS & COLONY 66.48
TRANSMISSION LINE I -
SUB-STATION i 1,439.35
PLCC i
Estimated Expenditure
Expenditure 01.04.2014
01.08.2014 t n
/ Total f ist (Plant and Machinary =it I I
I i I
Estimated
Expenditure
01.01.2015
t o
31.03.2015
198.70
1,009.84
1,208.54
I
( RS./ LAKHS)
Expenditure Total
01.04.2015 Expenditure
( Initial Spares included above
excluding IDC, IEDC, Land cost and c o n
of Civil works for the purpose of Initial
This is to certify that the above summary has been prepared on the basis of the information drawn f rom the Audited
Statement of Accounts o f Power Grid Corporation of India Ltd., Western Region, Nagpur up t o 31.03.2014. The expenditure
f rom 01.04.2014 t o 31.07.2014 have been verified f rom the booics of account of the project. The balance expenditure is based
o n the estimates.
- 1 7*967.78 1
Place : NAGPUR Date : 01-09-2014
'L)
(M. TPJ MUKARRUM) AGM (F&A)
U
CERTIFICATE OF CAPITAL COST
Transmission System associated w i th Krishnapatnam Project Name: I-n. - D
Name o f Element: Bays for 765kV S/C Solapur-Pune TL at Pune (GIS) S/s
Date of Commercial Operation: Anticipated 01-01-2015
( RS./ LAKHS)
TOTAL PARTICULARS
Expenditure Upto 31.03.2014
This is t o certify that the above summary has besn prepared on the basis of the information drawn from the Audited
Statement o f Accounts o f Power Grid Corporation of India Ltd., Western Region, Nagpur up t o 31.03.2014. The expenditure
f rom 01.04.2014 t o 31.07.2014 have been verified f rom the books of account of the proiect. The balance expenditure is bared I on the estimates.
Place : NAGPUR Date : 01-09-2014
AGM (F&A)
IEDC
17.55
CAPITAL
COST
547.42
Expenditure 01.042014 tn 31.07.2014 2,15?.4g I 22.73 L-I.aV 10 CC
Estimated Expenditure 01.08.2014 t o 31.12.2014 i 140.00 18.07 1 1.33 l Estimated Expenditure 01.01.2015 t o 31.03.2015 1 333.93 1 - 1 -
IDC
11.29
Estimated Expenditure 01.04.2015 t o 31.03.2016 640.43 / I 1 - 1 -
3,919.26 j 52.09 1 38.44
Initial Spares Included in Above -Transmission Line - S~-!h-St;atinc
CERTIFICATE OF CAPITAL COST
Project Name: Transmission System associated wi th Krishnapatnarn UMPP - PART B
Name of Element: Bays for 765kV S/C Solapur-Pune TL at Pune (GIS) S/s
Date of Commercial Operation: Anticipated 01-01-2015
PARTICULARS
Expenditure
Upto
31.03.2014
TRANSMISSION LINE 1
( RS./ LAKHS)
Expenditure
01.04.2014 Total
Expenditure 31.07.2014
S U B-STATION
I Particulars l I n I Sub-Station ,
617.75
lof Civil works for the purpose of Initial I I I
Total Cost (Plant and Machinary cost
excluding IDC, IEDC, Land cost and cost
/ Initial Spares included above
-
3,655.64
This is t o certify that the above summary has been prepared on the basis of the information drawn from the Audited
Statement o f Accounts of Power Grid Corporation of India Ltd., Western Region, Nagpur up to 31.03.2014. The expenditure
f rom 01.04.2014 t o 31.07.2014 have been verified f rom the books of account of the project. The balance expenditure is based
on the estimates.
Place : NAGPUR Date : 01-09-2014 (M. TAJ MUK'MUM)
A G M (F&A)
CERTIFICATE OF CAPITAL COST'
Transmission System associated w i th Krishnapatnam Project Name:
U M P P - PART B
Name of Element: 1x240 MVAR, 765kV Switchable Line Reactor fo r 765kV
s/C Solapur- Pune a t Punf (GIS) S/s
Date o f Commercial Operation: Anticipated 01-01-2015
1 1 4,042.28 1 38.93 1 27-56 1 4,108.71 1 Initial Spares included i n Above - Transmission tine
PARTICULARS
Expenditure Upto 31.03.2014
Expenditure 01.04.2014 t o 31.07.2014
Estimated Expenditure 01.08.2014 t o 31.12.2014
- Substat ion 66.74
This is t o certify that the above surnmsr+ has been prepated on the basis of the information drawn from the Audited
Statement of Accounts o f Power Grid Corporation of tndia Ltd., Western Region, Nagpur up t o 31.03.2014. The expenditure
from 01.04.2014 t o 31.07.2014 have been verified from the books of account of the project. The balance expenditure is based
o n the estimates.
Estimated Expenditure 01.01.2015 t o 31.03.2015 1 473.94 - 1 - 1 473.94
I I IEstirnated Expenditure 01.04.2015 t o 31.03.2015 1 594.71 /
- i - 1 594.77 /
CAPITAL
COST
1,270.77 I
i,237.80
465.00
Place : NAGPUR Date : 01-09-2014 (M.L;N M u h R u M j
AGM (F&A)
I DC
7.18 i
14.56
17.19
IEDC
11.41
11.67
4.42
TOTAL
I 1,289,_36
1,264.03
486.61
Project Name:
CERTIFICATE OF CAPITAL COST
Transmission System associated vdlth Srishnapatnam UMPP - PART B
1x240 MVAR, 765kV Switchable Line Reactor for 765kV SIC Solapur- Pune at Pune Name of Element:
(GIS) S/s
Date of Commercial Operation: Anticipated 01-01-2015
PARTICULARS
LAND
BUILDING, CIVIL WORKS & COLONY
TRANSMISSION LINE
SUB-S?.4T!QN
PLCC
Expenditure
Upto 31.03.2014
Expenditure
01.04.2014
to 31.07.20'14
Estimated
Expenditure
01.08.2014 to
31.12.2014
Estimated
Expenditure
01.01.2015 t o
31.03.2015
Estimated
Expenditure
01.04.2015
t o
31.03.2016
( RS./ LAKHS)
Total Expenditure
This is t o certify that the above summary has been prepared on the basis of t he information drawn from the Audited
Statement o f Accounts of Power Grid Corporation of India Ltd., Western Region, Nagpur up to 31.03.2014. The expenditure
f rom 01.04.2014 t o 31.07.2014 have been verified f rom the books of account of the project. The balance expenditure is based
o n the estimates.
Particulars
Total Cost (Plant and Machinary cost
excluding IDC, IEDC, Land cost and cost
o f Civil works for the purpose of Initial
Initial Spares included above
Place : NAGPUR Date : 01-09-2014 (M. TAJ M U ~ B ~ R U M )
AGM (F&A)
TL I
Sub-Stati~n I
66.74 l
CERTIFICATE OF CAPITAL COST
Transmission System associated wi th Krishnapatnam Project Name: ~ I M P P - P A R T R
Name of Element: Bays f o i LILO of 400kV D/C Pune-Parli TL along wi th
2x50 MVAR Line Reactors at Pune (GIS) S/s
Date of Commercial Operation: Anticipated
PARTICU lARS CAP!TAL 1 COST l
l Expenditure Upto 31.03.2014 / 2,817.74
I
Expenditure 01.04.2014 tn 31,@7,2014
Estimated Expenditure 01.08.2014 t o 31.12.2014
Estimated Expenditure 01.01.2015 to 31.03.2015
Estimated Expenditure 01.04.2015 t o 31.03.2016
EstTmated Expendituin 01.04.2016 t o 31.03.2917
1 12,333.84 !nitial Spares !nc!uded is Above - Transmissi~:: Line
IDC
( RS./ LAKHS)
TOTAL
96.02 2,959.85 ii
- Sub-Station 950.54
This i s t o certify that the above summary has beer? pmpamc! "i? t h e h s : s G: :he i t i f ~ i m ~ t i o i i drawn from the Auciited Statement of Accounts
of Power Grid Corporation of l ~ d i a Ltd., Westerri Region, Nagpur up to 31.03.2014. The expenditure from 01.04.2014 t o 31.07.2014 have
been verified from the books of account of the project. The balance expenditure is based on the estimates.
Place : NAGPUR Date : 01-09-2014 (h. TAJ MU'~RRUM)
AGM (F&A)
CERTIFICATE OF CAPITAL COST
Project Name: Transmission System associa:ed wi th Krishnapatnam UMFP - PART B
Name of Element: Bays for LILO of 400kV DIC Pune-Parli TL along with 2x50 MVAR Line Reactors at Pune (GIS) S/s
Date o f Commercial Operation: Anticipated 01-01-2015
PARTICULARS
Estimated
Expenditure
01.08.2014
t 0 31.12.2014
LAND 1 1.43925 l
1 1.73
BUILDING, CIVIL WORKS & COLONY 1 263.54 265.31
TRANSMISSION LINE l SUB-STATION 1 1,171.57 1 2,839.52
Estimated
Expenditure
01.01.2015
t o
31.03.2015
Expenditure
Upto
31.03.2014
PiCC I 85.48
2,959.85
Expenditure
01.04.2014
t o
31.07.2014
62.32
3,168.88
( RS./ LAKHS)
Estimated
Expenditure
01.04.2015 1 Total
Expenditure
Estimated
Expenditure
01.04.2016
t o t o
31.03.2016 31.03.2017
This is t o certify that the above summary has been prepared on the basis of the information drawn from the Audited Statement o f Accounts
o f Power Grid Corporation of India Ltd., Western Region, Nagpur up to 31.03.2014. The expenditure from 01.04.2014 t o 31.07.2014 have
been verified from the books of account of the project. The balance expenditure is based on the estimates.
Total Cost (Plant and Machinary cos:
Iexciuding IDC, i E D i , i and cost and cost I i
l 7,671.22
l of Civil works for the purpose of Initial 1
Place : NAGPUR Bate : 01-09-2014
Initial Spares included above
(M. TAJ MUKARRUM) AGM (F&A)
950.54
CERTIFICATE OF CAPITAL COST
Transmission System associated w i th Krishnapatnam Project Name:
U r n ? - V A K I B
Name of Element: Bays for LILO of 4OOkV D/C Pune-Aurangabad TL along
wi th 2x50 MVAR Line Reactors at Pune (GIS) S/s
Date of Commercial Operation: Anticipated 01-01-2015 ( RS./ LAKHS)
TOTAL
7 I his is to certify that the above siii i imaiy has been piepared on the basis cl( :he infc:maticn drawn f r cm the Audited
Statement o f Accounts o f Power G rid Corporation of lndra Ltd., Western Region, Nagpur up to 31.03.2014. The expenditure m
f rom 01.04.2014 t o 31.07.2014 have been verified from the books of account of the project. The balance expenditure is based
on the estimates.
lEDC
19.44
PARTICULARS
Expenditure Upto 31.03.2014
Place : NAGPUR
l i Expenditure 01.04.2014 t o 31.07.2014 1 2,023.87 22.29 i 19.20
Estimated Expenditure 01.08.2014 t o 31.12.2014 1 725.00 1 19.63 1 6.88 l
Estimated Expenditure 01.01.2015 to 31.03.2015 1 615.80 1 - I
Estimated ~ x ~ e n d i t u r e 01.04.2015 t o 31.03.2016 i 792.19 ! - I
4,893.43 , 53.46 ] 45.52
Initial Spares Included i n Above -Transmission Line - Su b-Station
Date : 01-09-2014
CAPiTAL
COST
(M. T N MUKARRUM] AGM (F&A)
IDC
736.57 1 11.54
Project Name:
CERTIFICATE OF CAPITAL COST
Transmission System associated with Krishnapatnam UMPP - PART B
Bays for LILO of 400kt! D/C ?nr?e-Asrangabad TL along -..~ith 2x50 MVAR Line Name of Element:
Reactors at Pune (GIS) S/s
Date of Commercial Operation: Anticipated 01-01-2015
PARTICULARS
LAND
BUILDING, CIVIL WORKS & COLONY
TRANSMISSION LINE
SUB-STATION
PLCC
Expenditure
Upto
31.03.2014
Estimated
Expenditure
01.01.2015
t o
31.03.2015
Expenditure
01.04.2014
to
Estimated I Estimated
Expenditure
01.08.2014
to 31.07.2014
31.12.2014
I I I I I P o c a r s L - Sub-Station l Total Cost (Plant and Machinary cost
excluding IDC, IEDC, Land cost and cost 4,187.53
of Civil works for the purpose of Initial
lnitiai S ares included above
Expenditure
01.04.2015
to
This is t o certify that the above summary has been prepared on the basis of the information drawn from the Audited
Statement of Accounts of Power Grid Corporation of India Ltd., Western Region, Nagpur up to 31.03.2014. The expenditure
from 01.04.2014 to 31.07.2014 have been verified from the books of account of the project. The balance expenditure is based
on the estimates.
Total
Expenditure
Place : NAGPUR Date : 01-09-2014 (M. TN ~ K ~ R R U M )
AGM (F&A)
Project Name:
Name of Element:
Anticipated DOCO
Transmission System associated with Krishnapatnam UMPP
- PART B
765kV S/C Solapur-Pune TL and LILO of 400kV D/C Pune-
Parli at Pune GIS SS under Transmission System associated
with Krishnapatnam UMPP - PART B.
Expenditure Upto 31.03.2013 I 5,757.51
1 CAPITAL 1
Expenditure From 01.04.2013 t o 31.03.2014 23,394.77
PARTICULARS
i Expenditure From 01.04.2014 t o 31.08.2~14 i -
'J4ys .yL i
COST
Estimated Expenditure From 01.09.2014 to 31.12.2014 1 5,112.47 1 I
I l
Estimated Expenditure From 01.01.2015 to 31.03.2015 I 3,338.72
l~s t imated Expenditure From 01.04.2015 to 31.03.2016 1 1,917.79 ( I l
This is t o certify that the above summary has been prepared on the basis of the information drawn from the Audited
Statement of Accounts of Power Grid Corporation of India Ltd., Western Region-l, Nagpur up to 30.06.2014,
Expenditure from 01.07.2014 to 31.08.2014 verified from the books of accounts. The Balance Expenditure is based on
estimates.
Total
Place : Nagpur Date : 15-09-2014
47,015.17
M.Taj M rrum AGM (F&A) WR-1, Nagpur
rFRTlFlCATF O F CAPITAL COST
Project Name: Transmission System associated wi th Krishnapatnarn UMPP - PART B
Name of Element: 765kV S/C Solapur-Pune TL and LILO of 400kV D/C Pune-Parli at Pune G15 SS under Transmission
System associated wi th Krishnapatnam UMPP - PART B.
Anticipated DOCO 01-01-2015
PARTICULARS
Expenditure
31.03.2013 t o
31.03.2014
I
TRANSMISSION LINE
SUB-STATION
I
cost excluding IDC, IEDC, Land cost 44,050.32 1,403.94
and cost of Civil works fo r the
Particulars
lpurpose of Initial Spares) I I I I
TL I Sub station
Expenditure
From
01.04.2014
t o
31.08.2014
Total Cost (Plant and ~ a c h i n a r y l
Estimated
Expenditure
From
Ui.09.2014 to
31.12.2014
Estimated
Expenditure
From
Oi.Oi.ZOi5 to
31.03.2015
( RS./ LAKHS) - Estimated I
Expenditure Total
From / Expenditure ili.04.20i5 to 1
This is t o certify that the above summary has been prepared on the basis of the information drawn from the Audited Statement of
Accounts of Power Grid Corporation of India Ltd., Western Region-l, Nagpur up t o 30.06.2014, Expenditure f r om 01.07.2014 t o
31.08.2014 verified f rom the books of accounts. The Balance Expenditure is based on estimates.
[ Initial Spares included above
Place : Nagpur Date : 15-09-2014
427.98 1
Project Name:
Name o f Element:
Anticipated DOCO
Transmission System associated wi th Krishnapatnam
UMPP - PART B
LILO of 400kV D/C Aurangabad-Pune TL at Pune GIS SS
under Transmission System associated wi th
Krishnapatnam UMPP - PART B.
PARTICULARS
Expenditure From 01.04.2014 t o 31.08.2014 I 874.42
CAPITAL
COST
Expenditure Upto 31.03.2013
Estimated Expenditure From 01.09.2014 to 31.03.2015 I 1,024.35
426.21
Estimated Expenditure From 01.04.2015 t o 31.03.2016 ( 311.92
( RS. / LAKHS) I I
Total
IDC / IEDC 1 TOTAL
4;59%08
This is t o certify that the above summary has been prepared on the basis of the information drawn from the
Audited Statement of Accounts of Power Grid Corporation of India Ltd., Western Region-l, Nagpur up t o
30.06.2014, Expenditure from 01.07.2014 t o 31.08.2014 verified f rom the books of accounts. The Balance
Expenditure is based on estimates.
Place : Nagpur Date : 18-09-2014
AGM (F&A) WR-1, Nagpur
Project Name: Transmission System associated with Krishnapatnam UMPP - PART B
Name of Element: LILO of 400kV D/C Aurangabad-Pune TL at Pune GIS SS under Transmission System
associated with Krishnapatnam UMPP - PART B.
Anticipated DOCO 01-04-2015
PARTICULARS
) Expenditure Expenditure
i r o i i i
01.04.2013 to
31.03.2014
LAND
nu!Ln!Nr;, c!vi~ ~ O P . K E a colnNv
TRANSMISSION LINE
Estimated Expenditure
Fr0ii-1
01.04.2014 to 01.09.2014 to
31.08.2014 31.13.2015
474.56
Estimated
Expenditure
From
01.04.2015 to
31.03.2016
SU B-STATION
c c
474.56
RS./ LAKHS)
T..+-rl l "La,
Expenditure
This is to certify that the above summary has been prepared on the basis of the information drawn from the Audited Statement
of Accounts of Power Grid Corporation of India Ltd., Western Region-l, Nagpur up to 30.06.2014, Expenditure from 01.07.2014
to 31.08.2014 verified from the books of accounts. The Balance Expenditure is based on estimates.
Particulars
Total Cost (Plant and Machinary cost
excluding IDC, IEDC, Land cost and
cost of Civil works for the purpose of
Initial Spares)
Initial Spares included above
Place : Nagpur Date : 18-09-2014
AGM (F&A)
TL
4,551.33
45.51
WR-1, Nagpur
Sub station
I
Form 1 1 Summaw Sheet
Name of the Transmission Licensee: Power Grid Corporation of India Limited
Name of the Reeion: WESTERN REGION
l ~ a m e of the Proiect: Transmission Svstem associatedwith Krishna~atnam UMPP-Part B
l ~ a t e of Commercial o~era t ion : 01-Jan-2015 (Ant.) I
Name of the Transmission Element or Communication System: 765 kV S/C Solapur-Pune T/L and LILO of 1100 kV D/C Pune-F'arli T/L at Pune GIS S/S with
bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bays
I RS. in Lacs
associated
Particulars
De~reciation-(Form No. 10A)
lop. and Maintenance-(Form No. 2) 280.931 1161.271 1199.641 1239.531 1280.64
Interest on Loan-(Form No. 9E)
Return on Equity-(Form No. 8)
Int. on Working Capital-(Form No. 11)
2014-15
1094.69
883.35
1301.03
91.00
(
2015-16
4872.05
3808.61
5816.68
397.85
2017-18 2018-19
5145.32 5145.32
Total 3651.001 16056.461 16682.581 16463.48 1 16217.99 I
=he Petitioner: Power Grid Corporation of India Limited
Details of Transmission Lines and Substations. Cornmuni~cation Svstem
Name of the Region: WESTERN REGION
Name of the Project: Transmission System associated with Krishnapatnam UMPP-Part B
Name of the Transmission element or Communication system: 765 kV S I C Solapur-Pune T/L and LILO of 400 kV D/C Pune-Parli
equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bays
Form-2
l ~ a t e of Commercial Operation: 01-Jan-2015(Anticipated)
Transmission Lines:
S1.N Name of Line Type of SIC or D/C
0. Line
AC/HVDC
I
7 1 765 kV SIC Solapur-Pune AC SC
2 LILO of Pune-Parli at Pune AC MC
3 LILO o f Pune-Parli at Pune AC DC
Substations:
A s'I.-u~~-'I. OOP S19 he0 'I.-(Z)aund-3Nfld S'I. 1 A s'I.-u~~-'I. OOP SI 9 he€i 'I.-('I.)aund-3Nfld PT
I I 1 A s'I.-uef-'I.I I 1 'I. I 1 I 00Pl ~ 1 9 1 he€i 'I.-(z)!lJed-3Nnd 1 €1 I
I I 1 A s'I.-u~~-'I. I I I 'I. l I 1 00Pl ~ 1 9 1 ~l-aund-3Nnd l 0'1. I
A
A
I I 1 A S'I.-U~~-'I.) I I 'I. I I I 00Pl ~ 1 9 1 l-peqe8ueJnV-3Nnd I L I
S'I.-U~~-'I.
s'I.-u~~-'I.
A
A
sheq pa$e!Dosse y $ ! ~ S/S (sI!~) aund ~ le JOID~~H sna AY S ~ L ' ~ A W OPZ pue (~19) aund z '8 1: 131 AY OOP/S~L 'WAW oos1:*z 's~uaud!nba y~ed-aund 3/a AY OOP 40 C)III pue 111 aund-~ndelos 31s AY s g ~ :wa$sAs u o ~ ~ e ~ ~ u n u r u r o ~ JO Juawala uo!ss!wsueJl ay140 aweN
g yed-ddwn weu$edeuys!~y y $ ! ~ pa$e!~osse wa~shs uo!ss!usueJl :pa[o~d ay3 40 aweN
N0193a NU31S3M :uo!za~ ay3 40 aweN
OOP
S9L
s'I.-u~~-'I.
s'I.-u~~-'I.
SI 9
SI 9
OOP
OOP
'I.-('I.)!lJed-3Nnd he€i ON 'I.-Jndel0~-3Nnd
SI 9
SI 9
Z'I.
'I.1
Ill-aund-3Nnd
ll-peqe8ueJnV-3Nnd
6 8
- Form 3
Normative parameters considered for tariff computations Name of the Petitioner :: Power Grid Corporation of India Limited
Name of the Project :: Transmission System associated with Krishnapatnam UMPP-Part B
Name of the Transmission Element or Communication System :: 765 kV SIC Solapur-Pune T/L and LILO of 400 kV D/C Pune-Parli T/L at Pune GIS S/S with associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS)
and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bays
Date o f Commercial Operation: 01-Jan-2015 (Q*. \
D = v + i ~ m a l ~ v c
Base Rate of Return of Equity
Tax Rate
2017-18
Effective tax rate Grossed uw Rate of ROE
l ~ o r m a t i v e O&M er KM I Rs. Lakh I I I I I I I
2018-19 I, Urn .Ic.UIOI a I Unit 12013-14 ,
Existing
%
%
Target availability - AC System
% I %
I I 1 17.48%1 19.61%1 19.61%
2014-15
15.50% 11.33%
I I 19.61%1 19.61%1 19.61%
ITarrret availabilitv - HVDC Svstem 1 % 1 1 96%1 96%1 96%1 96% 1 96% 1 %
Double Circuit (Bundle conductor with four s u b-conductors)
,Double Circuit (Sin~!e Conductor!
98%1 98%1 98%1 98% 1 98%
I
2015-16
15.50% 20.96%
Rs. Lakh
M ulticircuit with two or three conductors Single Circuit (Bundled conductor with four
2016-17
Double Circuit (Two and Three Conductor) M ulticircuit with four or more conductors
s u b-conductors)
Single Circuit (Single Conductor)
Normative O&M per bay
15.50% 20.96%
1.174
Rs. Lakh
Rs. Lakh
Single Circuit (Six conductor) Sinale Circuit (Twin and Three conductor)
Rs. Lakh , 0.336, 0.303 Rs. Lakh Rs. Lakh
Rs. Lakh
15.50% 20.96%
1.062
1.24
Rs. Lakh Rs. Lakh
132KV Sub-station and below 220KV Sub-station
1 - I I I I I
765KV Sub-station I Rs. Lakh I 91.641 84.421 87.221 90.121 93.111 96.2
0.313
0.783
0.671
0.224
4 0 0 KV ~ ~ G u b s t a t i o n
400KV Sub-station
15.50% 20.96%
1.097
1.282
0.671
0.447
Rs. Lakh Rs. Lakh
15.50% 20.96%
0.324, 0.334
0.707
1.863
0.606
0.202
Rs. Lakh Rs. Lakh
Balia-Bhiwadi HVDC Bipole Scheme
HVDC Back-to Back Stations
1.133
0.346
1.324
0.707
0.404
32.73
45.82
R i hand-Dadri HVDC Bipole Scheme Talcher-Kolar HVDC B i ~ o l e Scheme
0.731.
1.925
0.627
0.209
65.46
Rs. Lakh
Rs. Lakh
Spares for WC as % of O&M
', / ccb;,.. - - '
4, , <p:\ (Petitioner)
1.171
1.368
0.731.
0.418
30.15
42.21
Rs. Lakh Rs. Lakh
Receivables in Months for WC Bank Rate as on 1 s t April. 2014
1.21
0.755
1.989
1.413
0.647
0.216
51.54
60.3
1326.25
553
%
0.755
0.432
31.15
43.61
1811
2122
Months
%
0.78
2.055
0.669
0.223
53.25
62.3
1537
578
15
0.806
2.123
0.691
0.23
0.78
0.446
32.18
45.06
1511
1173
2
13.2
0.806
0.461
55.02
64.37
1666
627
15
33.25
46.55
1637
1271
2
13.5
34.36
48.1
56.84
66.51
1805
679
15
58.73
68.71
1774
1378
2
13.5
1955
736
15
2119
797
1922
1493
2
13.5
2082
1617
15 15
2
13.5
2
-13.5
F
Statement of Caoital Cost
l ~ a m e of the
Name of the Region: WESTERN REGION
Name of the Project: Transmission System associated wi th Krishnapatnam UMPP-Part B Name of the Transmission Element: 765 kV SIC Solapur-Pune T/L and LILO o f 400 kV D/C Pune-Parli T/L at Pune GIS S/S wi th associated bays a1
equipments, 2*1500 MVA, 765/400 kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/!; wi th associated bays
Date of Commercial Operation: 01-Jan-2015(Ant.)
1 1 I I Rs Particulars
A. a) Opening Gross Block Amount as per books
I b) Amount of capital liabilities in A(a) above c) Amount of IDC,FC,FERV and Hedging cost included in A(a) above
d l Amount of IEDC lexcludina IDC.FC.FERV and Hedaina cost) included in Ala) above
b) Amount of capital liabilities in B(a) above
c) Amount of IDC.FC.FERV and Hedaina cost included in Bla) above
d) mount of IEDC (excluding IDC,FC,FERV and Hedging cost) included in ~ ( a j above
C. a) Closing Gross Block Amount as per Books
b) Amount of capital liabilities in C(a) above c) Amount of IDC,FC,FERV and Hedging cost included in C(a) above
d l Amount of IEDC lexcludina IDC.FC.FERV and Hedaina cost) included in Clal above
d (Pet
i
n Lacs
118-19
.330.6
!85.88
i10.34
- PART-I11 FORM-4C
Abstract of Capital Cost Estimates and Schedule of Commissioninq for the New projects
Name of theTransmission W e e : POWFR G R T D D
Name of Region: WESTERN REGION
1 Name of the Project : Transmission System associated with Krishnapatnam UMPP - Part B 1 I I l
( 7 6 5 k ~ S/C Solapur-Pune TL and LILO of 400kV D/C Pune-Parli at Pune 1 Name of Element: GIS SS with associated bays and equipments, 2x1500 MVA, 7651400kV
ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor at Pune (GIS) . . 1 S/S with associated bais. Capital Cost Estimates
/ ~ o a r d of Director/ Agency approving the Capital cost
Capital Cost excludinq IDC, IEDC & FF
1 estimates:
In..&- ..--....,.-,-c P - - : L - , - - - L - - L : - - - L - - . "OLC 3: OJJC)I U V ~ I the L ~ J J I L ~ I LUX C ~ L I I I 10~t.b.
Price level of approved estimates
Foreign Exchange rate considered for the Capital cost
Foreign Component, if any (In Million US $ or the relevant Currency)
Domestic Component (Rs. Lakhs)
Board of Directors 267th meeting
I 8th Feb 2012
Present Day Cost
As of End of 4th Qtr. Of the year 2011
I
Completed Cost AS On scheduled Of the
transmission system/transmission element1 Communication Svstem
Capital cost excluding IDC, FC, FERV & Hedging
Fore~gn Component, ~f any (In Mill~on US $ or the relevant Currencvl
I I
Rate of taxes & duties considered
Capital cost Including IDC, IEDC, FC, FERV & Hedging Cost
I Domestic Component (Rs Lakh)
Total IDC, FC, FERV &Hedging Cost (Rs Lakh)
Ccst (Rs. Lakhs] I 1 104638.04 124519.27
5014.24
I I
5966.95
Foreign Component, i f any (In Million US $ or the relevant Currencv)
Domestic Component (Rs. Lakhs.)
Capital cost Including IDC, IEDC& FC (Rs Lakh)
COD of transmission system l/ transmission element em 7
COD of transmission system l/ transmission element 3/ Communication System 3
1
Schedule of commissioning
(Scheduled DOCO elementwise)
COD of transmission system 1 /transmission element l/Communication System 1
COD of last transmission system /transmission element / Communication System
109652.28
l I 1 I Note: 1. Copy of approval letter by the Board duly certified by the Company secretary should be enclosed 2. Details of Capital Cost are to be furnished as per FORM-5 or 5A as applicable 3. Details of IDC & Financing Charges are to be furnished as per FORM-12(B).
130486.21
1-Jan-15 CQ W ) 7-Oct-14
Element wise Break-up of Project Cost for Transmission System PART-Ill
Name of the Petitioner; PowerGrid Corporation of India Ltd. Form5 Name of Reg~on : Western Region-l Name of the Project .Transmission System associated w i th Krishnapatnam UMPP - Part B Name of the Element: 765kV SIC Solapur-Pune T L and LILO of 400kV DIC Pune-P 765kV Bus Reactor a t Pune (GIS) SIS wi th associated bays.
Anticpated DOCO: 01.01.2015 SI.No. Particulars As per Original Estimate As on COD L~ab~li t~es / Va
Provision
Quant~ty Rate Est~rnated Rate
Estimated Amount
Quantltv Amount
l 2 3 A TRANSMISSION LINE
1.0 Prel~minary works pp - - - p 1 1 Des~gn & Englneerlng
p-p p P p p -p
0 00 p p- - p- p p - p - -
Prellmlnary lnvestlgatlon Rlght of way forest 1 2 clearance PTCC . general c~vil works 1 (Ls) 2188 44 218844 1 (LS) 2956 75 2821 46 13529 -768 31
cnmpensatlon etc
1.3 Total P r e l ~ m ~ n a w works 2188.44 2 0 Transmiss~on L~nes mater~al
I 2 l Towers Steel (MT) 23223 4 0 7 1 1640159 214680 0 7 3 1404756 - p p p P- -P p p p- - - pp - - - p -
-p - -
2 2 Conductor (Km) 3922 46 3 52 13796 03 3481 00 3 94 1263640
2 3 Earlh Wire (Km) 563 8 0 56 312 99 336 02 0 53 153 96
2 4 Insulators (Nos) 352417 0 01 2105 25 366371 00 0 01 2476 33
22080 nos has been cons~dered same
2 5 Hardware Fltllngs 1 (LS) 1393 07 1393 07 1 (LS) 1829 50 1580 90 2 6 Conductor & Earthw~re accessories 1 fLs) 627 93 627 93 1 fLS) 600 72 51909 2 7 Spares 0 00
Erect~on Str~nglng & CIVII works including 1 (LS) 9463 22 9463 22 1 (LS) 7334 16 6185 55 foundat~on
2 9 Total Transm~ssion Lines material 44100.07 3 0 Taxes and Dut~es 3 1 Custom Duty
3 2 Other Taxes & Dut~es
0 00
46288.51
pp
0 00
- --
SI.No. Particulars As per Original Estimate As on COD Liabilities / Variation Reasons for Variation Admitted Cost
Provision
Quantity Rate Quantity Rate Amount
Estimated Amount
1 2 3 4 8 4.2 Land -- - -. - 1354.64 1250.00 --_ 0.00 -1 04.64 As per-actual 4.3 Site preparation 820.00 1.30 300.99 517.71 Site levelling is included in the S/s civil work
Total Preliminary works 8. land 2070.00 1355.94 300.99 413.08
.- .-----.--.-p- -~ pp--p-- -..-p-.-..- ... ~
50.- G ! ! ! ! ! ! --._-.---.---.-.-----p -----p- ~-- . p . . . --pp
5.1 Control Room B Office Building including HV -p-- --
439.00 439.00 l (LS) 741 . l 6 250.59 490.57 -302.16 As per actual exc!cution and site condition _ . - _ - . 7 _ - ~ __. .. . -_ ~- - - -- -. . .- . - -
5.2 Township B Colony 1 (LS) 701.00 701.00 1 (LS) 66.84 22.60 634. Only scope of transit camp has been kept.Scope of
5.4 Foundation for structures . . - . - 1(LSl l802.99 5.5 ~ i s c . civil works 1 (LS) 450.00 450.00 1 (LS) 476.96 161.26
Total C iv i l Works 2662.99 2590.87
1 (LS) 26510.53 20399.33 6111.21
Transformers 7.00 1044.56 5536.62 1775.31 ~~~ ...~ ~ . .. . . . . . -. ..- . .
compensating Equipment( Reactor, SVCs 489.80 11 491.02 3320.89 2080.32
-. - ~-~
Control . Relay B Protection Panel 1 (LS) 581.85 262.84
431 1 17 Due to decrease In award rate as compared to FR 1 1 In award rate as compared to FR
In award rate as compared to FR - -
-496.61 (Due to increase In award rate as compared to FR. I . - - -- -. . . --- . - - - - - - - - _
6 5 P ~ C C - 1 (LS) 4 5 0 6 6 1 (LS) 564 14 361 34 ~ u e t o increase ~yaward rate a ~ ~ o m p a r e d to FR 6 6 HVDC package 0 00 O!'! -
6 7 Bus ~ a r s / conductors/lnsulators 1 (LS) 435 12 414 81 award rate as compared toFR -
6 8 outdoor llght~ng 1 (LS) 124 00 131 94 award rate as compared& FR -
6 9 ~ m e r g e n c ~ DG set 1 (LS) 46 41 65 45 award rate as compared to FR -
6 10 ~ r o u n d ~ i ~ system 0 00 6 11 Structure for Sw~tch yard 1 (LS) 193 54 573 90 award rate as compared to FR
Due to Increase In award rate as compared to FR Prov~s~on of CSDs (Rs 460 71 Lakhs) for CGL make CBs
6.12 Auxiliary System 1 1 (Ls ) 605071 60607/ 1 (LS)I 2819 571 2040,191 779381 -2213 50 connectors, at '6 SAS in L 'R-' BIB augmentatio~, Of foundation 'lamp bolts. l l I I I I I I I I I I I I I IProcuremnet of 33kV cable for power line crossings
I
ITotal Substa t ion Equipments 46339.1 I 1071.49j
" ~, ,:; m ,, ! 8.
< ', ,!3,u Taxes and Duties r , \ ,; -...---.,,'A-$// Total (Communication System) ..\,/'l i. Construction and pre-commissioning
7.0 8 0 8 1 -
Spares (~ncl In eqpt cost) Taxes and Dutles Custom Duty p-
- - - - . - -
SI.No.
1 10.2 10.3
11.0 11.1 11.2 .~ -
Particulars As per Original Estimate As on COD Liabilities / Variation Reasons for Vari, Provision
Estimated Estimated Quantity Rate Quantity Rate Amount Amount
2 Tools and Plants construction Insurance
Total Const ruc t ion a n d p re 0.00 commiss ion ing expenses Overheads .--.--p p
Establishment Audit & Accounts
11.3
12.0
13.0 13.1
Contingency 0.00
Total Overheads 7277.42
Cos t of P lant 8 Machinery 104638.04
Capital Cost including Plant & Machinery Interest During Construction (IDC) - -pp
13.2 13.3 13.4
14,0
Financing Charges (FC) ---p----p-----
Foreign Exchange Rate Variation (FERV) -p- p -
Hedging Cost
Capital c o s t inc lud ing IDC, FC, FERV 109652.28 B Hedging Cos t
I
Break-up o f Construction / Supplv/ Sewice packages
Name of the Petitioner: Power Grid Corporation of lndia Ltd.
Name of the Region : Western Region-l
N a m e o f t h e P ro jec t :T ransmiss ion S y s t e m assoc ia ted w i t h K r i shnapa tnam U M P P - P a r t B N a m e o f t h e Element : 765kV SIC So lapu r -Pune T L a n d L I L O o f 400kV DIC Pune-Par l i a t P u n e GIS SS w i t h assoc ia ted b a y s a n d equ ipmen ts , 2r P u n e (GIS) SIS w i t h assoc ia ted bays. Communication system
\
SL
1
1
3
.
.. . 5
Erection, Testing 8 Commissioning of India 8 ABB 1337/1/G4/NOA-1114343 Transformer ICE 6 88,007,392 441.22 With
escalation 7x500 MVA, l-phase Transfom~er at AB. Sweden Erection
26.06.12 26.06.12 31.12.14
DOCO: 01.01.2015
4.71
Date of Start Oate Of
of work completio Awarded value INR n of Work
7 8
......~.~p~--...
30.05.2012 30.06.14 297762 SEK-
NameINo. of Connrucfion/supply/se~~ice package
2
1287.79
p - -. . . . . .
1012.64
-- . - . ..
50.63
9452.44
3946.70
- -.---p
6380.59
1310.62
--...p-pp.
5033.86
. . . p -- - p
4.52
p----
circui;Breakerfo;Sd;p"rs,s
Scope of works1 (in line with h a d of cost break-ups as
applicable)
3
. . -
450.46
-.---p--- ~
7
Shunt reactor at Pune GIS SIS (P260 RT02) - Off shore Supply
- - .. _--p---.....-__-__-.--_p.
4 nos 420kV 3 Ph Bus Reactor at Pune GIS S/S - Supply
---p-.-.---..
1338/1/G4/NOA-114466
. ~ ~
...... ~ ~ ~ . .
Whether awarded through ICBIDCBI DepaRmentallyI
Deposit Work, etc.
4
New 7651400 kV substation at ~holapur (P260 5502) -Supply
. .
26.06.2012 26.06.2012 31.12.14 Shilpa 1258/1/G4/NOA-114346
765kV Tower supply ICE 11 636,760,461, 5903.41 379.41 With
escalation
--
ICE 11 215,539,84;! 1284.59 13.16 With
escalation
. . . - . - - . -- --...-.---------p- ~ --.---- ~
Lumino CC-CS1147-WRIICD- 02.07.2012 02.07.2012 31.12.14
.._./-- Industries 1262/1/G4/NOA/4362 AC5R Bersimis USD= 4 9,695,000
With
Conductor supply ICB
8612850 escalation 4680.45 248.46
~ - ~ - ~ --p--.---p--.-..---- -- --p-----.. ..-..-p-p---..-.---.-..-.------.,.-..------- . -....-.p- ~ -----p- ~ . .
~ . . ~
-
. -~
~ ~ ~ ~ t ~ ~ ~ f f ~ h ~ ~ ~
97.77
12.87
104.95
8
p- p
9
10
No of bids received
5
-ABB
ICE
4 nos. 420kV 3 Ph Bus Reactor at Pune GIS S/S - Erection
-- 765kV Solapur-Pune TL (Part-l) - Supply
.~ -p~-~ -------p---
765kV Solapur-Pune TL (Part-l) - Erection
.
l
Date of award
l i
6
...
~ - ---
~ . . . . - -.. . ~ . - - ~~ -
BHEL
. - . ~ ---.
-~ ~ . . - - - ~ ~
CCZSl147-WRlISS- 1334111 G5lNOA-114316
- - . .
DC8
....
DC0
30.05.2012
~ - - ~ ~ - p - ~ . . New 7651400 kV substation at Pune
-
(GIS) -Off shore Supply
~
GCBIGIFB
ICB
j6skv S /s . . - -~
Equipment supply (Off shore)
... . CC-CS1147-WRIIRT- 1413/3/GB/NOA-114768
3
7
Supply of 765kVCB 19.06.2012 Siemens
SURPb- - -
400kV Shunt Reactor Supply
~~ -----p--.-------
BHEL
-.-----p---.-p--pppp.-..--.~p-------..
JV of lsoiux and Karamtara
19.06.2012 30.06.14 CCES/256-WRlICB- 1507131 GlO/NOA/ 4331
5
. -
4
~ - -- ~-
11.05.12 31.12.14 USD=
31309432 15044.57 4311.53 338.24 19694.34
11.,05;1.2 HYOSUNG /
USD= With 2010000 escalation
981.27 299.50 7.02
CC-CSl147-WRIIRT- 1413/3/GB/NOA-1114769
.. CC-CSl147-WRITTW- 1257/1/G4/NOA-114344
~~
12
-~--~p~-~
12
.--.----p
LBT
..~-.--~p-_._-.
06.09.13 31.12.14
31.12.14
650.74
43.24
- -
400kVShunt Reactor Erection
~
2e,os12. .- ~
765 KV Auto Transformer : Supply. of ABB. CC-CSII47-WRI/lR- i65/400kv 26.06.12 31.12.14
. . - 26.06.12
-
765 KV Auto Transformer : Supply, .
Erection. Testlng 8 Commissioning of 7x500 MVA, l-phase Transformer at
. . . . . 06.09.13
~
180.63
39.50
-
4
....-p-- ~
26.06.2012
- ~-
ICE
...p-p-p--.--.---pp ~
76skV Tower supply
~
JV of lsolux and Karamtara
1335/3/G5/NOA-114300
CC:CSMh7-WRi"R-. .
1337/1/G4/NOA-114342
p- ~ - ~ - - - . .
JV of ABB, lndia 8 ABB AB. Sweden --~-.- . . .
~
ICB
--p-----
- 31.12.14
0609.13
26.06.2012
CC-CSl147-WRITTW- 1257/11G4/NOA-1114345
Equipment supply (Off shore) . . - - -
765'400kV
Transformer Supply ~- -p . ...
124,783,OOCl
.-~-------p--~--.--~pp--.--p--
11,542,300
06.09.13
765kVTower Erection
.
.----~.
31.12.14
26.06.2012
-.-.-.p
GCBIGIFB
- . p -
ICE
...------p - - ~ - ~ ..
With escalation
With escalation
31.12.14 26.06.2012
-~
4
...----pp ~ -~.
633,976,006
926,093,565
. . . .
6
.
848.59
50.00
507,591,380
-pp---p-
P . . . 26.06.12
..~. ~ ~
P,- ..~.
escalation With ..-.-.----.p ~
With escalation
-~~.-.------~----.-.----..--.-~--~-p-p-.--.----~-..-p.-p.
160.91
-.
0.48
8621.06
With escalation
~ p--.-.-----
~-
5295.86
3863.97
p
-~~-.
208.60
-. - -- -.
3.14
.
0.16
82.52
-~- p--
5586.98
p--p.- - .. ..
- E d m
m m m o m u m m 3 m I m
W m u m m h m - l 2 1 z z l g l g ' *
r( - l ~ 1
PART-111 FORM 581
DETAILS OF ELEMENTWISE COST
Name of the Petitioner : POWER GRID CORPORATION OF INDIA LTD. Name of Region: WESTERN REGION-I Name of the Project : Transmission System associated with Krishnapatnam UMPP - Palt B Transmission lines
Name of line
Name of the Transmission Element or Communication Element: 765 kV SIC Solapur-Pune T/L and LILO of 400 kV D/C Pune- Parli T/L at Pune GIS S/S with associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bays
Revised cost
Cost (Rs. Lacs)
2
Completed Cost (Rs. Lacs)
(Rs. Lakh)
Name of the Transmission Element or Communication Element: LILO of 400 kV D/C Aurangabad - Pune T/L at Pune GIS. Ant. Total
Covered in the present petition
Yes
Yes
Petitioner
I Financial Package u p t o COD (Block Year- 2014-2019)
I Name o f t h e Transmission Licensee: Power Grid C o r ~ o r a t i o n o f India Limited
Name o f t he Region: WESTERN REGION
Name o f t h e Project: Transmission System associated w i t h Krishnapatnam UMPP-Part B
Name o f t h e Transmission Element o r Communicat ion Element: 765 kV SIC Solapur-Pune T/L and LILO
o f 400 kV D/C Pune-Parli T/L a t Pune GIS S/S w i t h associated bays and equipments, 2*1500 MVA,
7651400 kV ICT 1 & 2 a t Pune (GIS) and 240 MVAR, 765 kV Bus Reactor a t Pune (GIS) S/S w i t h
associated bays Date o f commercial Operation: 01-Jan-2015 (4%. >
Rs. I n Lakhs
Particulars Financial Package as Financial Package as As Admi t ted b y COD
I Approved 1 o n COD l / 31.03.2014 Currency and Currency and
Currency and Amount Amoun t Amount
Loans
Loans-Domestic IN R 76756.6 ILIR 30760.89
Loans-Foreign IN R 25907.24 T - * _ I I liNS - ~ r - ~ r r r g h n n r r r r n 4 l lrln
l lULdl LUdllb 1 ICJ13CJ.CJ111\1K 1 3CJCJCJO.131 IIQK I
. ,
Foreign
Domestic INR 32895.68 ILIR 24286.33
Notional
Total Eauitv I I INR
1 I I I 1 32895.681 INR 1 2 4 2 8 6 . 3 3 1 1 ~ ~
I
Debt Eauitv Ratio 70:30:00
Total Cost IN R 109652.28 INR 80954.46 lhlR
Add Cap for 2014-2015 9479.38
Add Car, for 2015-2016 10694.2
Add Cap for 2016-2017 202.53
Add Cap for 2014-2015 Actual Normative
Debt 6635.57
Equity 2843.81
Total 9479.38
Add Cap for 2015-2016 Actual Normative
Debt 7485.94
Equity 3208.26
Total 10694.2
Add Cap for 2016-2017 Actual Normative
Debt 141.77
Equity 60.76
Total 202.53
Total Capital cost with Addcap 101330.57
,y L,..-,. F /.;: { ;.S;: % :s - \ q . \ ( ~e t i t i one r ]
- &L-
statement of ~dd i t i ona l Capitalisation after C= Name of the Petitioner: Power Grid Corporation of India Limited -- Name of the Region: WESTERN REGION 0
F a m e of the Project: Transmission Svstem associated with Krishna~atnam UMPP-Part B I I
Name of the Transmission Element or Communication system: 765 kV S/C Solapuc-Pune T/L and LILO of 400 kV D/C
associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 76!i kV Bus
Date of Commercial Operation: 01-Jan-2015 ( 4%kc \
SI. No.
1 2
3
Year
4
2014-2015
2014-2015
2014-2015
BUILDING
TR LINE
Work I Equipment proposed to be added after COD uto cut off
datelbeyond cut off date
2014-201 5 2014-201 5
SUB STATION
PLCC
Total
Total I 202.531 I I I I
BUILDING
TR LINE
SUB STATION
1935.6
1639.37
BUILDING
SUB STATION
Amount capitalised and proposed to be
capitalised
PLCC
Total
Balance, & Retent~on Payments
Balance & Retentron Payments 14. (1)
7049.63 69.6
10694 2
Regulation under which .Justification
covered
221 1.14
2943.59
4221 45
Balance & Retention Paymer~ts
Balance & Retention Paymer~ts
68.89
133.64
Balance & Retention Payments
Balance & Retention Paymer~ts
~a lance & Retention Payments
103.2
9479.38
~a lance & Retention Paymer~ts
~a lance & Retent~on Paymer~ts
Balance' & Retention Payments
f
Financing of Additional Ca~italisation
I ~ a m e of the Petitioner: Power Grid Corporation of India Limited
Name of the Region: WESTERN REGION
Name of the Proiect: Transmission Svstem associated with Krishna~atnam u L ~ P P - P ~ ~ ~ B
Name of the Transmission Element or Communication System: 765 kV S/C solhpur-~une T/L and LILO of 400 IcV D/C Pune-Parli T/L at Pune GIS !
associated bays and equipments, 2*1500 MVA, 765/400 kV ICT 1 & 2 at Pune (GUS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with as
bays
Date of Commercial Oueration: 01-Jan-2015 ~ Q W ) Amounl
Financial Year ActualIProiected 7 Admitted l ~ m o u n t Capitalised in Work/Equipment 12014-15 12015-16 12016-17 12017-18 12018-19 1 I I I I
I I I I
1 Loan 6635.57 7485.94 141.77
Total 9479.38 10694.2 202.531 01 0 1 1 I I A -5
'S with
ociated
Calculation of Return on Equity Name of the Transmission Licensee: Power Grid Cor~oration of India Limited
-
Name of the Region: WESTERN REGION Name of the Proiect: Transmission Svstem associated with Krishna~atnam UMPP-Part B
Form 81
Name of the Transmission Element or Communication System: 765 kV S/C Solapur-Pune T/L and LILO of 400 kV D/C Pune-Parli T/L at Pune GIS S/S with associated bays and equipments, 2*1500
MVA, 7651400 kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S
with associated bays
Date of Commercial operation: 01-Jan-2015
I Rs. in Lacs
Particulars O ~ e n i n ~ Eauitv Notional Equity on Add Cap
Total Equity Average Equity
In,, a,* ..,, ,, em..:*.. rlu l a L a n c L u 1 1 1 UII c q u ~ r y I 4-n- n- l r o - r r o l 4 l r 4 r - u -.l r 4 r - u -.I I 13UI.U3I 3010.001 0141.331 0133.1 1 0133.1
I I I I I
2014-15
24286.33
Rate of Return on Equity (%) Return on Equity
Calculation of Grossed up Rate of ROE I Rate of ROE I 15.51 15.d 15.51 15.5 i 15.5 1
2843.81
27130.14
25708.24
2015-16
27130.14
20.243
5204.12
3208.26
30338.4
28734.27
Time Line Incentive Communication Dis-incentive
2016-17
30338.4
20.243
5816.68
Effective P p-P Rate - of ROE MAT Rate
60.76
30399.16
30368.78
0.5
0
Grossed up Rate of ROE
2017-18
30399.16
20.243
6147.55
16
20.96 20.243 1 20.2431 20.243 1 20.243 1 20.243
2018-19
30399.16
0
30399.16
30399.16
0.5
0
0
30399.16
30399.16
20.243
6153.7
- 1 6 20.96
20.243
6153.7
0.5
0
16
20.96
0.5
0
0.5
0
1 6 20.96
16
20.96
Details of additional ROE
Name of the Petitioner:
Name of the Region:
Name of the Project:
Name of the Transmission Element or
Communication system
Completion Time as per Investment approval
, p G G 7 Start Date
765kV S/C Solapur-Pune TL and 0 LILO of 400kV D/C Pune-Parli at , Pune GIS SS with associated bays
and equipments, 2x1500 MVA, 765/400kV ICT 1 &2 at Pune (GIS) and 240 W A R , 765kV Bus Reactot and 765kV, 240 MVAr Switchable Line Reactor at Pune (GIS) S/S with associated bays
+T:rangabad- K,, , - q e TL at Pune GIS SS with 09.02.2012
,,'. A . , an&:ated bays and 400kV, 50
1 '
i ', ,!
Scheduled COD (Date)
08.10.2014
08.10.2014
POWER GRID CORPORATIClN OF INDIA WESTERN F!EGION 1 "Krishnapatnam UMPP- Part: B"
Actual Completi~on time Qual' ying time sche ule(as per regu ation) (in
onths) i Start Date 1 AC~U;I~Z~D l Months
(Petitioner)
Calculation of Weighted Average Rate of lnterest on Actual Loans Name of the Transmission Licensee: Power Grid Coruoration of India Limited
-
Name of the Region: WESTERN REGION
Name of the Proiect: Transmission Svstem associated with Krishnauatnam UMPP-Part B
Form ~ c I
Name of the Transmission Element or Communication System: 765 kV S/C Solapur-Pune T/L and LILO of 400 kV D/C
Pune-Parli T/L at Pune GIS S/S with associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune
(GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bavs
I ate of Commercial Operation: 01-Jan-2015 I
Particulars l BRD V-Loanl-61.03
Gross Opening Loan
2014-15
Cumulative Repayments of Loans upto Previous Year
Net Loans Ouenina
Net Closing Loan 1 23928.2 1 23038.721 22139.49 1 21230.521 20316.67 A..----- RI-& l a--
IMVSI arc IVSL LUQII ! 24148.741 23483.461 22589.11 1 2?685.0?! 20773.6,
24369.28
Add: Drawl(s) during the year Less: Reuavmentisi of ioan durina the vear
2015-16
0
24369.28
24369.28
0
441.08
Rate of Interest on Loan
Interest on Loan
2016-17
441.08
23928.2
BOND - XI-II-Loan2-
Gross Oueninn Loan
24369.28
0
889.48
1.61
388.79
I
2017-18
1330.56
23038.72
1978
Add: Drawl(s) during the year
Less: Reuavmentls) of Loan during the vear
Rs. in Lacs
2018-19
24369.28
0
899.23
1.61
378.08
Cumulative Re~ayments of Loans upto Previous Year
Ne t Loans Ouenina
Ne t Closing Loan
Average Net Loan
24369.28
2229.79
22139.49
1978
0
0
Rate of Interest on Loan
Interest on Loan
3138.76
21230.52
0
308.97
1.61
363.68
0
1978
1978
1978
Gross Opening Loan
Cumulative Repayments of Loans upto Previous Year
Ne t Loans Opening
Add: Drawl(s) during the year
Less: Repayment(s) of Loan during the year
0
913.85
1978
0
0
8.8
174.06
Ne t Closing Loan
Average Net Loan
BOND - XI-IV-Loan4-
1.61
349.13
0
1978
1978
1978
1450
0
1450
0
0
Rate of Interest on Loan
I nterest on Loan
1.61
334.46
1978
0
0
8.8
174.06
1450
1450
1978
0
1978
1978
1978
1450
0
1450
0
0
7.93
114.99
Gross Opening Loan
Cumulative Repayments of Loans upto Previous Year
N e t Loans Opening
Add: Drawl(s) during the year
0
0
8.8
174.06
1450
1450
9 1978
0
0
1978
1978
1450
0
1450
0
0
7.93
114.99
Less: Repayment(s) of Loan during the year
1212.18
0
1212.18
0
0
1978
1978
1978
8.8
174.06
1450
1450
8.8
174.06
1450
0
1450
0
120.83
7.93
114.99
1212.18
0
1212.18
0
1450
120.83
1329.17
0
120.83
1329.17
1389.59
1208.34
1268.76
7.93
110.19
1212.18
0
1212.18
7.93
100.61
1212.18
0
1212.18
0- 0
1212.18
0
1212.18
0
Form 9C Calculation of Weighted Average Rate of lnterest on Actual Loans
Name of the Transmission Licensee: Power Grid Corporation of India Limited Name of the Region: WESTERN REGION Name of the Project: Transmission System associated with Krishnapatnam UMPP-Part B Name of the Transmission Element or Communication System: 765 kV S I C Solapur-Pune T/L and LILO of 400 kV D/C Pune-Parli T/L at Pune GIS S/S with associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune
(GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bavs
( ~ a t e of Commercial operation: 01-Jan-2015
I I l l I I Rs. in ~acsl
I Particulars I Net Closing Loan 1 1212.181 1212.181 1212.181 1212.181 808.121
l~verage Net Loan I Rate of Interest on Loan I 8.71 8.71 8.71 8.71 8.71
I lnterest on Loan
P
I PROPOSED LOAN 2014-15 (3.30%)-Loans-
Gross Opening Loan
.Cumulative Renavmentr nf leans !pto Prevlcus Year 27658.66 ( 27658.66 1 27658.66 1 27658.66 1 27658.66
0 1 a! V nl I o l 6 I Net Loans Opening Add: Drawlls) during the vear
I Less: Repaymentisj of ioan during the year Net Closing Loan
27658.66
0
Average Net Loan Rate of Interest on Loan Interest on Loan
Add: Drawl(s) during the year 0 0 0 Less: Repavment(s) of Loan during the vear 441.08 889.48 899.23
0 1 0 1 0 1 0 27658.661 27658.661 27658.661 27658.66
Gross Opening Loan I 56668.12 56668.12 56668.12 56668.12
Net Closing Loan 56227.04 55337.561 54438.33 Average Net Loan 56447.58 55782.3 1 54887.95
27658.66
0 ' 0
27658.66
27658.66
9.3 2572.26
Cumulative Repayments of Loans upto Previous Year Net Loans Opening
Rate of Interest on Loan 5.94 6 6.07
Interest on Loan 3355.56 3344.85 3330.45
(Petitioner) I
27658.66
0
27658.66
9.3 2572.26
0
56668.12
27658.66 0
27658.66
9,3 2572.26
441.08
56227.04
27658.66
0
27658.66 9.3
2572.26
1330.56
55337.56
27658.66
9 3 2572.26
2229.79
54438.33
3259.59
53408.53
NATIONAL STOCK EXCHANGE OF INDIA L IM ITED
Stock of the nation
Ref.: NSE/LIST/199045-S March 25,20 13
The Manager (Finance) Power Grid Corporation of India Limited Saudamini, Plot No.2, Sector - 29, Gu:ga~n(I-Ixyana) - ! 22 00 1.
Kind Attn. : Mr. K.C. Pant
Dear Sir,
Sub: Listing of Secured, Redeemable, Non-Convertible: Non Cumulative, Redeemable, Taxable Bonds (Series-XLII) issued by Power Grid
Corporation of India Limited
This has reference to your listing application for the listing of secured redeemable, non- convertible, non cumulative, redeemable, taxable Bonds (Series-XLII).
In this connection, we are pleased to inform you that the securities as specified in the application are duly listed on t h m ~ s e ~ r n e n t witheffect from March 25,2013 and all members have been suitably informed as per details given below:
A Trade Statistics report will be provided to you on a monthly basis in the first week of the following month, if the security was traded during the previous month. This report will contain price volume details for each day traded.
Yours faithfully, For National Stock Exchange of India Limited
u:\k,\ &c~~;.
Sr. No
l
Vishal Patelia
Security Description
Power Grid Corp 8.80% 2023 (S-XLII)
Sec Type
PT
Security
PGC23
Issue
8.80%
Issue Size (Rs. in lakhs) 199000
Maturity Date
13-Mar-2023
- N A T I O N A L STOCK EXCHANGlE O F I N D I A L I M I T E D
Stock o f the notion
Ref.: NSE/LIST/206336-V June 06,2013
The D y. General Manager. (Finance), Power Grid Corporation of India Limited "Saudamini", Plot No.2, Sector - 29, Gurgaon - 122 00 l .
Kind Attn. : Mr. Sandeep Kumar Jain
Dear Sir,
S U ~ : Listkg nf Eccured, Redeer?lab!e, NCR-Convertib!~, Ne:: Cumu!ati-;-;c, Redeemable, Taxable Bonds (Series - *XL111 issued by Power Grid
Corporation of India Limited
This has reference to your listing application for the listing of Secured Redeemable, Non - Convertible, Non - Cumula~ive, Redeemable, Taxable Bonds (Series - XLIII).
In this connection, we-arepleased to irIform you that the securities a s specified in-the application are duly listed on the WDM segment with effect from June 06, 2013 and all members have been suilably informed as per delails given in the Amexure.
A Trade Statistics report will be provided to you on a monthly basis in the first week of the following month, if the security was traded during the previous month. This report will contain price volume details for each day traded.
Yours truly, For National Stock Exchange of India Limited
Sarnir ~ a g e v Manager
[F- .;'P ,,-- -..
{S,. p- >,~*b;.\ (" , \ . . 1;. . - , -: . ! ..: LI ..- . i . . : - . I
. . . : ! \ " .\. ,i \ ---,..' ..;. ' L>$<<?, L:., >
--l
Excharlge Plaza. Bandra Kurla ( :o inp lex . 8andra !El, Mumba~ - iOC051, India. Tel: t 9 1 2 2 26598235136, 26598346 Fax: t91 22 26598237i38, ?6598347!46 E-mail : cml is lb i l sc w i n Web sir?: wv~w.nseindia.com
Continuation Sheet
Ref.: NSE/LIST/206246-6 June 05,2013
Annexure
i Security Description No 1 1 Sr. 61 Security
l l I/ 1 Power 7.93% 201 Grid 7 (s-xLIIIj Carp 1 I l - . I
7.93% 20 15 (S-XLIII)
7.93% 2019 (S-XLIII)
7.93% 2020 (S-XLTTI) PT ?GC20 7.93% 26050 20-May-2020
Power Grid C o ~ p PCCZ! ,7.93% 26050 20-May-2021
I Power Grid Coq) 6. 1 7.93% 2022 (S-XLIIT) PGC22 7.93% 26050 20-May-2022
N A T I O N A L STOCK E X C H A N G E OF INDIA LIMITED ~ i )
Stock of [ h e oat lon
Ref.: NSE/LIST/2 1 1749-W July 30,2013
The Dy. General Manager (Finance), Power ( ir id Corporation of India Limited "Saudamini". I'lot No.2, Sector - 29, Gurgaon - 122 00 l .
Kind Attn. : Mr. Sandeep Kumar ,Jain
Dear Sir,
Sub: Listing of Secured, Redeemable, Non-Convertible, Non-Cumulative, Taxable Bonds (Series - XLIV) issued by Power Grid Corporation of
India Limited
This has rcfcrcncc to your listing spplication for the listing n f Sectired Redeemable. Non - Convertible, Non - Clumulative, Taxable Bonds (Series - > L I a
In this connection, we are pleased to inform you that the securities as specified in the application are duly listed on the WDM segment with effect from July 30, 2013 and all members hairs "veii suitabtji inforxed as per detai!s given below:
- - - - -
A Trade Statistics report will be provided to you on a monthly basis in the first week of the following month, if the security was traded during the previous month. This report will contain price volume details for each day traded.
Security Description
Power Grid Corp 8.70% 201 8 (S-XLIV)
Power Grid Corp
Yours truly, For National Stock Exchange of lndia ~irnited
'..-
&Samir Rajdev Manager -
\ >:.. .. ,
Sec r r ~ P
PT
Exchange Plaza, tia~ldrd Kurla Complex, Bandra (t). Mumba~ 40U051, Indla. lel. +YI 22 Lb598L35136, Lo5Ytl34b tax: +YI 21 Lb5YtlL3lf3M. Lb598341148
E-!nail : [email protected] Web site: www.nreindia.com
8.70% 2023 (S-XLIV) PGC23
I'ower Grid Corp 8.70% 2028 (S-XL,IV
PGC'28
Security
PGC18
8.70%
8.70%
Issue
8.70%
132200
132200
15-Jul-2023
15-Ju1-2028
Issue Size (b. in la khs)
132200 J
Maturity Date
15-Jul-2018
NATIONAL STOCK EXCHANGE OF I N D I A L I M I T E D
Ref.: NSEILISTI 250623-5 T12d + Septemberl5,2014
The Chief Manager (Finance), Power Grid Corporation of India Limited C b 1 h - 1 5 "Saudamini", Plot No.2, Sector - 29, Gurgaon - 122 00 1.
ICir?d Attr?. : Mr. K C Par?t
Dear Sir,
Sub: Listing of Seciired, Redeemable, Non-Convertible, Non-Ciimulative, Taxable Bonds (Series -XLVI) issued by Power Grid Corporation of India Limited
This has reference to your listing of Secured, Redeemable, Non-Convertible, Non-Cumulative, Taxable Bonds (Series -XLVI) issued by Power Grid Corporation of India Limited.
In this connection, we are pleased to inform you that the securities as specified in the application are duly listed on the WDM segment with effect from September 15, 2014 and all members have been suitably informed as per details given below:
If you require any further clarifications, we shall be glad to oblige.
Yours truly, For National Stock Exchange of India Limited
Sr. No
1
2
3
Kamlesh Pate1 Manager
Issue Size (Rs. in lakhs)
145400
145400
145400
Exchange Plaza, Bandra Kurla Complex, Bandra (E), Mun~bai 400051, India. Tel: +91 22 2 6 5 8 P 2 8 5 d f i n P L ~ 3 1 ~ i ~ & ~ : i91 22 26598237f38 E-mail : [email protected] Web site: wwvr.nseindia.com
Maturity Date
04-Sep-2019
04-Sep-2024
04-Sep-2029
Security Description
Power Grid 9'30% 2019 (S-XLV1) STRPP-A
Power Grid 9'30% 2024 (S-XLV1) STRPP-B
Power Grid Corp 9.30% 2029 (S-XLVI) STRPP-C
Signsr : Patsl Karnlssh Date: Mon. Sep 15, 2014 19:57:01 IST
@ N S E Location: NSE
Sec Type
PT
PT
Security
PGCl9B
pGC24A
PGC29
Issue
9.30%
9.30%
9.30%
- Form 9D
Calculation of Weighted Average Rate of lnterest on Loans-Foreign Currencv Name of the Transmission Licensee: Power Grid Corporation of India Limited
Name of the Region: WESTERN REGION Name of the Project: Transmission System associated with Krishnapatnam UMPP-Part B
Name of the Transmission Element or Communication System: 765 kV SIC Solapur-Pune T/L and LILO of 400 kV D/C Pune-Parli T/L at Pune GIS S/S wi th associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 81 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S wi th associated bays
Date of Commercial Operation: 01-Jan-2015 I FC in Lacs
Particulars 2014-15 2015-16 2016-17 2017-18 2018-19 IBRD V-Ex.Rate-61.03-Loan1
l ~ r o s s Opening Loan 1 399.31 399.31 399.31 399.31 399.3
l~umula t i ve Re~avments of Loans u ~ t o Previous Year 0 1 7.23 1 21.8 I 36.541 51.43 Net Loans Opening 399.3 392.07 377.5 362.76 347.87
Add: Drawl(s) during the year 0 0 0 0 (3
Less: Repayment(s) of Loan during the year 7.23 14.57 14.73 14.89 14.97 Net Closing Loan 392.07 377.5 362.76 347.87 332.9 Average Net Loan ~ l n r r n
L 340.38 a ~ 3 . o ~ 384.79 370.13 "' 33
Rate of Interest on Loan 1.61 1.63. 1.63. 1.61 1.61
Interest on Loan 6.37 6.2 5.96 5.72 5.48
--3L&TL= (Petitioner'
Form
Calculation of Intered~ on Normative Loan
Name of the Transmission Licensee: Power Grid Corvoration of India ~ i m i t e d
l ~ a m e of the Region: WESTERN REGION l
Name of the Project: Transmission System associated with ~ r i shna~a tnam UMPP-Part B
Name of the Transmission Element or Communication System: 765 ~ V S / C Solapur-Pune T/'L and LILO of 400 kV D/C Pune-Parli T/L at Pun
GIS S/S with associated bays and equipments, 2*1500 MVA, 7651400 kV BCT 1 & 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pu
(GIS) S/S with associated bays -- Date of Commercial Ooeration: 01-Jan-2015
Particulars bd 2013-14 2014-15
Gross Normative Loan Oveninn 10 t- 56668.12
Cumulative Repayments of Normative Loans upto Previous Year
Net Normative Loans Ooenine
k r e a t e l ~ e c r e a s e due t o ACE durinn the "ear
I~ess: Repayment(s) of Normative Loan during the year 01 1094.69
l ~ e t Closina Normative Loan I ID( 62209
l~verane Net Normative Loan I 01 59438.56
Rate of Interest on Loan
lnterest on Normative Loan
Pro rata lnterest on Normative Loan 0 1 8851.35 7-
Form 10
Calculation of Depreciation Rate Name of the Transmission Licensee: Power Grid Corporation of India Limited
Name of the Region: WESTERN REGION
Name of the Project: Transmission System associated w i th Krishnapatnam UMPP-Part B
~ a m e of the Transmission Element o r Communication System: 765 kV SIC Solapur-Pune T/L and LILO o f 400 kV D/C I Pune-Parli T/L a t Pune GIS S/S w i th associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 a t Pune (GIS) and 240 MVAR, 765 kV Bus Reactor a t Pune (GIS) S/S w i th associated bays
Date of Commercial Operation: 01-Jan-2015 [4Z/Le- )
Particulars SI. No.
2
3
Grossblock at the
beginning
o f the year
Average Gross Block
BUILDING TR LINE
5.281 1920.61'
6.33 1 28.66 4 SUB STAI-IOIV j 34264.411 4221.451 38485.861 36375.14
6
A J J P - - HUU ~ d p
during the year
5 l PLCC
1
Dep. Rate
P ---- L#--,- UIUSS u l u L n
at the end of the year
2713.44 42126
401.11 103.2 1 504.3 1 452.7 LEASEHOLD LAND
Total
2
3
Rs. in Lacs
Amount
2015-2016 FREEHOLD LAND
4
5
2211.14
2943.59
0 80954.46
BUILDING TR LINE
Total 1 90433.84 Weinhted Average Rate o f De~reciat ion
Weighted Average Rate of Depreciation
L a ~ s e d life
1449.51
SUB STATIOIV PLCC
Lapsed life 2016-2017
4924.58
45069.59
5.11 1
0 9479.38
4924.58
45069.59
10694.2
2
1 2
0
38485.86 504.3
3 4
3819.01
43597.8
0 90433.84
1935.6 1639.37
101128.04
FREEHOLD LAND BUILDING
5
6
1449.51
7049.63 69.6
TR LINE SUB STATION
Total 1 101128.04 Weighted Average Rate of Depreciation
3.34 5.28
0
85694.15
6860.18
46708.96
95780.94
1449.51
6860.18
PLCC LEASEHOLD LAND
127.55
2301.96
1449.51
45535.49 573.9
4872.05
5.09
46708.96 45535.49
202.53
3.34
5892.38 45889.28
0 68.89
573.9 0
0 4378.78
0
42010.68
539.1
0 133.64
101330.57
0 3.34 5.28
1449.51 6929.07
0 0
196.81 2422.95
5.28
6.33
46708.96
45669.13
101229.31
2218.16
34.13
1449.51 6894.63
573.9 0
5140.64 5.08
46708.96
45602.31
0
3.34
573.9 0
0 230.28
5.28 5.28
2466.23 2407.8
6.33 3.34
36.33 0
-
l
Name of the Transmission Element or Communication System: 765 kV S IC Solap~ir-Pune T/L and LILO of 400 kV D/C
Pune-Parli T/L at Pune GIS S/S with associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS)
and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bays
Date of Commercial Operation: 01-Jan-2015
Form 10 Calculation of De~reciation Rate
-
Name of the Transmission Licensee: Power Grid Corporation of India Limited
Name of the Region: WESTERN REGION
P
SI. No.
Name of the Project: Transmission System associated with Krishnapatnam UMPP-Part B
Particulars Amount
SUB STATIOI?! 1 45669.131 G ( 45669.13 1 45669.13 1 5.28 PLCC 573.9 1 0 1 573.91 573.91 6.33
TR LINE 46708.96 0 46708.96 46708.96 5.28
Gross block
at the
beginning
of the year
LEASEHOLD LAND 0 1 0 l 0 1 0 ( 3.34 Total i 101330.571 0 1 101330.571 101330.571
Weighted Average Rate o f Depreciation
Lamed life
Adci Cap
during the
year
-
2018-2019
FREEHOLD LAND 1449.51 0 1449.5 3. 1449.51 0 BUILDING 6929.07 0 6929.07 6929.07 3.34 TR LINE 46708.96 0 46708.96 46708.96 5.28
Gross biock
at the end
of the year
SUB STATION 45669.13 0 45669.13 45669.13 5.28 PLCC 573.9 0 573.9 573.9 6.33 LEASEHOLD LAND 0 0 0 0 3.34 Total 101330.57 0 101330.57 101330.57
Average
Gross Block
Weighted Average Rate o f Depreciation
Lamed life
Dep. Rate
Statement o f Depreciation Name o f the Transmission Licensee: Power Grid Cordoration of India Limited
N a m e of the Region: WESTERN REGION
Name of the Proiect: Transmission Svstem associated w i th Kr ishna~atnam UNIPP-Part B
Name of the Transmission Element or Communication System: 765 kV S/C Solapur-Pune T/L and LILO of 400 kV D/C Pune-Parli T/L at Pune GIS S/S wi th associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S w i th associated bays
Date o f Commercial Operation: 01-Jan-2015
Particulars
Opening Capital Cost A d d C a ~ Cost
2017-18
Closing Capital Cost
Average Capital Cost
Depreciable Value 1 75820.19 1 84898.29 1 89801.821 89892.95 1 89892.95
Rs. in Lacs
2018-19 2014-15
80954.46
9479.38
Freehold Land (AV. Cost) 1 1449.51 I
l Rate of De~rec ia t ion I 5.11
90433.84
85694.16
Remaining Depreciable Value 1 75820.19 1 83803.61 83835.08 1 78785.57 1 73640.25
IDepreciation during the vear 1 1094.691 4872.051 5140.641 5145.321 5145.32
2015-16
90433.84
10694.2
1449.51
5.09
Isaianee useiui i i ie of the asset {at the beginning o i year) l ~ l a p s e d life o f the asset (at the beginning o f the vear)
2016-17
101128
95780.95
30 / 29 / 28 / 27 / 26
0 1 l I 2 1 3 1 4
(Petitioner)
101128
202.53
1449.511 1449.51
5.081 5.08
Depreciation upto previous year Cumulative depreciation (incl. o f AAD)
101330.6
101229.3
1449.51
5.08
101330.6
0
0
1094.69
101330.6
0
101330.6
101330.6
101330.6
101330.6
1094.69
5966.74
5966.74
11107.38
11107.38
16252.7
16252.7
21398.02
I Calculation of Interest on Workin~r Capital
l ~ a m e of the Transmission Licensee: Power Grid Corporation of India Limited --p
Name of the Region: WESTERN REGION
Name of the Proiect: Transmission Svstem associated with Krishna~atnam UMPP-Part B
Name of the Transmission Element: 765 kV S I C Solapur-Pune T/L and LILO of 400 kV D/C Pune-Parli T/L at Pune GIS S/S with associated bays and equipm
7651400 kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bays Date of Commercial Operation: 01-Jan-2015 (Ant.)
h. and Maintenance I 93.641 96.771 99.971 103.291
Particulars
l ~ o t a l workinn capital I 2696.201 2947.041 3060.35 1 3033.131
2014-15
Maintenance Spares
Receivables
2017-18
168.56
2434.00
Rate of Interest
Interest on working ca~i ta l
Form 11 +
174.191 179.951 185.93
2676.08 2780.43 2743.91
Pro rata Interest on working capital
nts, 2*1500 MVA,
13.50
363.99
91.001 397.851 43.3.151 409.471
Rs. in Lacs 4
13.501 -- 4;:l:;!1 13.50 397.85 409.47
PART-I11 FORM- 12A
Incidental Expenditure - during Construction
Name of the Petitioner: Name of the Region:
POWER GRID CORPORATION OF INDIA LTD.
WESTERN REGION-I
Name of the Project: Transmission System associated w i th Krishnapatnam UMPP - P A R ' B
Name of the Transmission Element or Communication System
1) 765kV SIC Solapur-Pune TL and LlLO of 400E:V D/C Pune-Parli a t Pune GIS SS w i th associated bays and equipments, 2x1500 MVA, 765/400kV ICT 1 8 . 2 a t Pune (GIS) and 240 MVAR, 765kV Bus Reactor a t Pur~e (GIS) S/S w i th associated bays.
2) LlLO of 400kV D/C Aurangabad - Pune at Pune (GIS) l Date of Commercial Operation 1) 01.01.2015 (Ant ic ipated) l
1) 01.04.2015 (Ant ic ipated)
PART-I11 FORM- 12A
Incidental Expenditure during Construction
Name of the Petitioner: Name of the Region:
POWER GRID CORPORATION OF IlNDlA LTD.
WESTERN REGION-I
Name of the Project: Transmission System associated with Krishnapatnam UMPP - PAR-
Name of the Transmission Element or 1) 765kV S/C Solapur-Pune TL and L11.0 of 4001<V D/C Pune-Parli at Pune GIS SS with
associated bays and equipments, 2x:LSOO MVfr, 765/400kV ICT 1 8 ~ 2 at Pune (GIS) and Communication System 240 MVAR, 765kV Bus Reactor at Pulie (GIS) S,/S with associated bays.
2) LILO of 4OOkV D/C Aurangabadl - Pune at Pune (GIS)
Date of Commercial Operation 1) 01.01.2015 (Anticipated)
1) 01.04.2015 (Anticipated)
lmount in Rs. I
106.86
Note: IEDC should be duly reconciled with the corresponding figures of
Auditor's Certificate.
Form No. 1281
Draw Down Schedule for Calculation of IDC & Financing Charges
Name of the Transmission Licensee: Power Grid Cor~oration of India Limited
Name of the Region: WESTERN REGION
Name of the Proiect: Transmission Svstem associated with Krishna~atnam UMPP-Part B
Name of the Transmission Element or Communication System: 765 kV S I C Solapur-Pune T/L and LILO of 400 kV D/C
Pune-Parli T/L at Pune GIS S/S with associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS)
and 240 MVAR, 765 kV Bus Reactor at Pune (GIS) S/S with associated bays
Rs. In Lakhs
Drawn Down Schedule for Calculation of IDC & Financing Charges
Draw Down Schedule for Calculation of IDC & Financing Charges Name of the Transmission Licensee: Power Grid Corporation of India Limited
-
Name of the Region: WESTERN REGION Name of the Project: Transmission Svstem associated with Krishnapatnam UMPP-Part B
Form No. 1 2 ~ 1
Name of the Transmission Element or Communication System: 765 kV S I C Solapur-Pune T/L and LILO of 400 kV D/C Pune-Parli T/L at Pune GIS S/S with associated bays and equipments, 2*1500 MVA, 7651400 kV ICT 1 & 2 at Pune (GIS)
and 240 MVAR, 765 kV Bus Reactor at Pune (GlSl S/S with associated bavs
Rs. In Lakhs
Drawn Down Schedule for Calculation of IDC & Financing Charges
SI.No. Drawn
Down
Particulars I DC
Financing Charges
Equity
Foreign Equity Drawn
Indian Equity Drawn
Total Equity Drawn
Quarter 1
27130.14
27130.14
Quantum in FC
Quarter 2
Quantum in FC
Quarter n (COD) Ex. Rate on
Drawn Down
Date Quantum in FC
Amount in
Indian Rupee
Ex. Rate on
Drawn Down
Date
Ex. Rate on
Drawn Down
Date
Amount in
Indian Rupee
Amount in
Indian Rupee
1285.88
PART-I11 FORM- 13
Breakup of Initial Spares
Name of the Petitioner: Name of Region: Name of the Project : Name of the Transmission Element :
Anticipated DOCO:
POWER GRID CORPORATION OF INDIA WESTERN REGION 1 Transmission System associated with Krishnapatnani UMPP - Part B 765kV SIC Solapur-Pune TL and LILO o f 400kV D/C Pune-Parli a t Pune GIS SS with
associated bays and equiprnents, 2x1500 MVA, 7651400kV ICT 1 &2 a t Pune (GI!;) and 240 MVAR, 765kV Bus Reactor a t Pune (GIS) S/S with associated bays.
(Amount in Rs. Lakh)
I Y 0
Particulars
Transmission Line
Transmission Substation (Green Field/ Brown
Series Compensation devices HVDC Station Gas Insulated Substation
Communication System
Plant & Machinery Cost (excluding IDC
and IEDC) upto DOCO
39467.36 32596.32
s to be furnished as per Regulation 13.
figures of initial spares included in each transmission system may be provided
(Petitioner)
387.99
IDC
673.30 667.27
5.60
IEDC
1031.44 443.20
4.17
Year wise additional Capital expenditure up to cut off date
Total Cost
44050.32 44001.04
From 01.01.15 to 31.03.15
2943.59 4221.45
103.19 560.79
2015-16
1639.37 7049.63
69.60
Initial spares claimed
2016-17
0.00 133.64
0.00
Amount
427.98 1086.37
0.00
%
0.97 2.44
0.00 -
Name of the Petitioner:
Name of the Region:
Name of the Project:
Name of the Transmission Element or Communication System
PART-I11
FORM- 14
Other Income as on COD
POWER GRID CORPORATION OF INDIA LTD.
WESTERN REGION-I
Transmission System associated with Krishnapatnarn UMlPP - PART B
1) 765kV S I C Solapur-Pune TL and LILO of 400kV D/C Pune-Parli at Pune GIS SS with
associated bays and equipmc?nts, 2x1500 MVA, 765/400kV ICT 1 &2 at Pune (GIS) and
240 MVAR, 765kV Bus Reactor at Punt! (GIS) S/S with assclciated bays.
2) LILO of 400kV D/C Aurangabad - Puine at Pune (GIS)
(Amount in Rs. Lakh)
(Petitioner)
Summary Sheet S I
Name of the Transmission Licensee: Power Grid Corporation of India Limited -- Name of the Region: WESTERN REGION -P
Form 1 1
I ~ a m e of the Proiect: Transmission System associated with Krishnapatnam UMPP-Part B I I Name of the Transmission Element or Communication System: LILO of 400 kV D/C Aurangabad - Pur~e T/L at Pune 61s. Date of Commercial ooeration : 01-Aor-2015IAnticioatedl
Interest on Loan-(Form No. 9E) 1 0 1 150.8!5I 146.291 135.991 1 125.39
Particulars
Deoreciation-[Form No. lOAl
OP. and Maintenance-(Form No. 2) I 0 1 31.521 32.551 33.631 I 34.74
2014-15
0
Return on Equity-(Form No. 8)
Int. on Workine Caoital-(Form No. 111
2015-161 p- 2:;;;;; 1 2017-18
243.52 251.76
0
0
Total
2018-19
251.76
0 1 714.291 728.531 719.131 709.46 --
271.331
2;;:;;l 280.51 17.07 17.24
I
280.51
17.06
l ~ a m e of the Petitioner: Power Grid Corporation of India Limited 7 I Details of Transmission Lines and Substations, Communication Svstem
Name of the Region: WESTERN REGION
Name of the Proiect: Transmission Svstem associated with Krishnauatnam UMPP-Part B -p
Form-2
I ~ a m e of the Transmission element or Communication system: LILO of 400 kV D/C Aurangabad - Pun~e T/L at Pune GIS. Ant. - 1 1 l ~ a t e of Commercial Operation: 01-Apr-2015 (-G*) Transmission Lines:
Name of Line Type of
Line
AC/HVDC
SIC or D/C No. of Sub
Conductor
1
2
Voltage
level KV
Line ( ~ i n e
LILO of 400kV D/C Aurangabad-Pune
LILO of 400kV D/C Auran~abad-Pune
Date of
Commercial
operation Covered in the
AC
AC
petition
Substations: I SI. No. Name of Sub-station Type of Voltage
Substation level KV
Total
No. of I No. of Bays
Transformers / Reacotrsl SVC
etc.
765 KV 400 KV
Date of
Commercial Covered in the d resent I operation
Yes/No No.
66'201 66'201 66'201 anoqe (e)3 U! papn13u! ($so3 8u!8pa~ pue ~tl3d'3d'3a18u!pn13xa) 3a31jo ~ u n o u t f (P
S0'99 50'99 S0'99 SO"99 anoqe (e)3 U! papnpu! $so3 %u!8pa~ pue /\tl3d13d'3a1jo aunoutf (3
anoqe (e)g U! papnpu! $so3 8~!8paH pue ~ ~ 3 d ' 3 d ' 3 a l jo $unoutf (3
anoqe (e)g U! sa!$!l!qe!l leyde3 jo aunoutf (q
21'89Ltl
66'201 66'101 66'201 anoqe (e)tf U! papnpu! (as03 8~!8paH pue ~t134'3d'3a1 Bu!pnl~xa) 3a31~0 ~ u n o u t f (P
S0'99 50'99 S0'99 SO"99 anoqe (e)tf U! papnpu! $so3 Bu!Bpa~ pue /\tl3d13d'3(31j0 $unoutf (3 anoqe (e)tf U! sa!p!l!qe!l le$!de3 jo $unouy (q
syooq ad se aunoutf y3olg s s o ~ g 8u!uado (e .tf
s~eln3!yed
21'89Lb
I- ( s10~-~dtf-10 :uo!$e~ado le !3~auuo3 40 a$ea
"3utf ' s ~ g aund $e 111 aund - peqe8ue~ntf 3/a AY 0 0 ~ jo 0111 :$uaual3 uo!ss!usueJl a q $ ~ o aueN
tfb U J O LC
21'89Lb -tt anoqe (e)3 U! sa!p!l!qe!l le$!de3 jo $unowtf (q
2TU89Lb syoog ad se aunoutf y3olg sso~g 8u!sol3 (e
PART-I11 - FORM-4C
-
Abstract of Capital Cost Estimates and Schedule of Commissioninq for the New proiects
Name o f theTransmission Licensee : POWER GRID CORPORATION OF INDIA
Name o f Region: WESTERN REGION
1 ~ a m e o f Element:
Name of the Project :
1 LILO of 400kV D/C Aurangabad-Pune TL at Pune GIS SS
Transmission System associated with Krishnapatnam UMPP - Part B
I I Capital Cost Estimates
I
Date of approval of the Capital cost estimates:
Price level of approved estimates
I l Capital cost excludinq IDC, IEDC & FC
I I
8 th Feb 201 2
Foreign Exchange rate considered for the Capital cost estimates
I I
Foreign Component, if any (In Million US $ or the relevant Currencv)
Present Day Cost
As of End of 4th Qtr. Of the year
3 , I / comestic Component $5. Laths) I
I I I I I
Compieted Cost AS On scheduled Of the
transmission svstem/transmission Lull
elementl Communication Svstem
I D C . . FC. FFRV & m n + t I
Foreign Component, if any (In Million US $ or the relevant Currency)
Capital cost excluding IDC, FC, FERV 81 Hedging Cost (Rs. Lakhs)
Foreign Component, if any (In Million US $ or the relevant Currency)
Domestic Component (Rs. Lakhs.)
4618.35
Domestic Component (Rs Lakh)
Total IDC, FC, FERV & Hedging Cost (Rs Lakh)
Rate of taxes & duties considered
lcapital cost Including IDC, IEDC& FC (Rs Lakh) I l l
5495.84
Schedule o f ~ o m m i s s i o n i n ~ I I
,(Scheduled DOCO elementwise)
Capital cost Including IDC, IEDC, FC, FERV 81 Hedging Cost
221.31
COD of transmission system 1 /transmission element1 : I 1
263.36
7 COD of transmission system l/ transmission element 31 Communication System 3
l/Cornmunication System 1
COD of transmission system l/ transmission element
COD of last transmission system /transmission element / Communication System
Note: 1. Copy of approval letter by the Board duly certified by the Company secretary should be enclosed 2. Details of Capital Cost are to be furnished as per FORM-5 or 5A as applicable 3. Details of IDC & Financing Charges are to be furnished as per FORM-12(B).
(Petitioner)
l - - 1 (94- ) 7-Oct-14
Element wise Break-up of Project Cost for Transmission System
Name of the Petitioner; PowerGrid Corporation of India Ltd. Name of Region: Western Region-l Name of the Project :Transmission System associated with Krishnapatnam UMPP -Part B Name of the Element: LILO of 400kV DIC Aurangabad-Pune TL at Pune GIS SS Anticpated DOCO: 01.04.2025 SI.No. Particulars As per Original Estimate As on COD Liabilities / Variation Reasons for V:
Provi!;ion
Quantity Rate Estimated
Rate Estimated
Quantity Amount
1 2 3 4 5 6=3-4.5 A TRANSMISSION LINE
1.0 Preliminary works . ~ ~ -p---pp- - ...p -~ -.-...-p---
1 .l Design & Engineering p .-- . . - p -p pp--.-. ~p ~~p ---. p
Preliminary investigation,Right of way, forest 1.2 clearance. PTCC . general civil works, 1 (LS) 47.03 47.03 l (LS) 250.00 200.00
compensation etc.
1.3 Total Preliminary works 47.03 200.00 50.00 -202.97 2.0 Transmission Lines material
2.1 Towers Steel (MT) 2051.6 0.71 1451.20 2343.52 0.49 1112.29 33.39 305.52 Due to deleton of scope of D/C towers. --p----. -p--p- -p . .p ~- .. p------ . ~
2.2 Conductor ( K 2 -- P - . . . 432 .54-_ . 2 2 0 p p l252.33 ~p- ~
47.2 2.3 ~~a r th ! ! ! i r e~m) . . ~ ~_ 0 . 5 7 26.71L ~ ~ -
2.4 Insulators (Nos) . . , . . - . ... 20930 P.00 9750 -~
2.5 ~ ~ Hardware Fittings .. .. . -p 1 (LS) 8!?79 K 7 9 -~
2.6 Conductor & Earthwire accessories 1 (LS) 69.57 69.57 1 (LS) 144.41 134.82 9.60 -74.85 Minor variation --p--- -~ - ~ - -- -~-~----- . . ~~~ . ~
2.7 Spares . . . - .. .. - - 0.00 ~~ - ~ - ~ . . .
2.8 Erection. Stringing & Civil works including foundation 1 (LS)
1245.68 1245.68 1 (LS) 1027.07 9'16.92 1 1 0.15 218.61 Due to deleton I
2.9 Total Transmission Lines material 4229.78 4087.15 261.92 -1 19.29 3.0 Taxes and Duties 3.1 Custom Duty
3.2 Other Taxes & Duties I
Total Taxes B Duties 0.00
Total -Transmission lines 4276.81 4287.15 311.92 -322.26
~SI.NO. I Particulars 1 As per Original Estimate 1 As on , SLNo. Particulars As per Original Estimate As on COD Ad
Provision
Quantity Rate Estimated Estimated Amount
Quantity Rate
1 2 3 5.4 Foundation for structures -. -- 5.5 Misc. civil works 0.00 0.00
Tota l C iv i l Works 0.00 0.00 0.00 0.00 -p-....
1 2 3 5.4 Foundation for structures
5.5 Misc. civil works 0.00 0.00 Tota l C iv i l Works 0.00 0.00 0.00 0.00
-p-....
i t ted Cost -I
6.4 Control . Relay & Protection Panel 0.00 0.00 0.00 0.00 . ~ . . -~ . . ~ ~ ~ . .-.--p ~ ~ ~- -. .-.. ... -..~ ...
6.5 ~ PLCC ~ ~ .. .... .~---------...-.----p-- - - 0.00 0.00 L ! . . . - - - . . . - - - . . . . O : E - _ .. .. - - . . - - . .--P --
6.6 HVDC package 0.00 . . . _. ooc : . .O,E ~ ... .. ... . --- -~
6.7 Bus Bars1 conductors/insulators 0.00 0.00 -----P-- ~ - ~. . . . .-.-!?G - . ... . -
6.8 outdoor lighting 0.00 - . - . . . - - - - . . . . !c?_- _ - 0,o - - ooo - - ._--p-- ~ .. --p-- -. .-
3 - Emergency-DG s e t . . O,O(!. .. . . !?C!! - 0 0 0 .. O.OO.-- - -- ~- .- ~~ . ~ ~~ - - ~- - ~p
p~ --- p-- ~~ ---- 0.00 0.00 6.10 Grounding System . - . - . - - - . . . 100 - - - - - . . . - - - -0.00~ --.--..---p- . . -- .~
---p ~ - --P- ~
0.00 6..11 Structure for Switchyard - -~ . -. - -- . . ~ - ~ ~ - - -- - - . . ~ 0.00 ~ - - ~ 0.00 ~ 0 . E ~ - .. ~ .. . .
6.12 ~ u x i l i a ~ system 0.00 0.00 0.00 0.00 Total Substa t ion Equipments 0.00 0.00 0.00 0.00
\ 7.0 Spares (incl.in eqpt. cost) I 8.0 Taxes and Duties 0.00 0.00 0.00
h 8.1 Custom Duty - ~- - ~. - - 0.0.0 ~~- ~-~ - ~~ ~- ... 0.00. ~- - - ~ ~ 0.00 - - .'?O0 --P- -~ ~ - .- .... . - -- ~- ~ ~~ ~ ~ ~ - - ~ - .
-2, 8.2 Other Taxes & Duties
\ 8.3 Total Taxes 8 Duties
Tota l (Sub-station) 9.0 Communication System g.! Preliminary W o r k ~~
9.2 Cofluntcation system equipment's- ~ - - . 9.3 Taxes and Duties
Total (Communication System) 10,0 Construction and pre-commissioning
expenses 10.1 Site supe~ision & site admn.etc. ~
10.2 Tools and Piants 10.3 construction Insurance
Tota l Const ruc t ion a n d pre
commiss ion ing expenses
11.0 Overheads . - - -p-p- -
~~~ ~-
-
-
~
- -
p~..
\ >>;;L
. -- ~-
~
~
~
~~1
-----..-.---p
-. . - - -. - -
---A
\.,; 4
\-'1--1f2
_~%JJ:~.(:apital 155.26.-
---_P
Cost including Plant 8 Machine
0.00 0.00 0.00
~ -
-
~.~
0.00 0.00 0.00
0.00
--p- ~-~p--~-
341.54 0.00
0.00 341.54
4618.35
O:o!-p - .
ivn.4434j Interest During Construction (IDC) 73 .- l 7 6 ~~-~ 0.00 Financing Charges (FC)
---P- . - E 0 _---.p-._ !L!!?
-
~~
-~~
. . _
---.p.
- -
~~ ~
..~---~-~~p~
0.00 0.00 0.00
.. . . .
~ - - .
- . .. . . .
~. 0.00 . .. . Q : O !
0.00
0.00
----p ~--~-p-
102.99 ~
0.00 0.00
102.99
4390.14
0.00 0.00 0.00
-- ~-
~ ~~-
0.00 0.00 0.00
0.00
.... . ..... --
_.. 0.00 ..-...~.--'?LO
0.00 0.00
31 1.92
_ 0.00 0.00 0.00
. ~ - -
~~ -~~
~ .
0.00 0.00. 0.00
0.00
-_--_ 23855 0 00 0.00
238.55
-83.71
-~ -~ ~ - ~
~ ---~- - ~- ~ ~ - ~ - .
~. ~ ~ ~ - - ~
. ~ - ~ - - ~ - ~
~- ~ ~ -- - ~- -~
~ - ~-~~ -~ - --
-..-.----p-~ - - ~
- - - - - - - - - - . - - - - p - ~ - -----.-p-
- p---.-----
~
-
-
- ~
~p
~-
-
SI.No. Particulars As per Original Estimate As on COD Adriitted Cost Provi!;ion
Quantity Rate Quantity Rate Estimated Estimated Amount
1 2 3 B 13.3 Foreign Exchange Rate Variation (FERV) O.OO -. -. -- -
13.4 Hedging Cost 0.00 0.00
,4,0 Capital cost including IDC, FC, FERV R Hotininn Cnst
4839.66 4456.20
(Petitioner)
Break-up o f Construction I Supply I Service packages
Name o f the Petitioner: Power Grid Corporation o f India Ltd.
Name of the Region : Western Region-l Name o f the Project :Western Region System Strengthening Scheme- V Name o f the Element: LlLO o f 400kV DIC Aurangabad-Pune TL at Pune GIS SS Communication system
Form -5A
Anticipated DOCO: 01.04.2015
Scope of works1 (in Whether awarded line with head of through ICB/DCB/ No of bids Date of Date of Start
SL Name/No. of Construction/supply/service package cost break-ups as Departmentally/ received award of work
completio Awarded value n of Work
applicable) Deposit Work, etc.
1 2 3 4
. . ~ ---- ~~ .~ . - ~ ~ ~ - - -- - ~ . .. ~~ - . .. .. . ~ -~ ~~ - . ~ -~ . 1 Crop, tree compensation. Railway ESTIMATED
blocking charges
. . - - - ~~- - ~ ~- - -. .~ -~ -~ ---- . ~. .. jv of. NC.ex
---- ~ - -
2 LILO of 400kv DIC ~ ~ n e - ~ ~ b a d T C - - ~ c c - c s n 4 7 - w ~ i r r G v - --
supply Shilpa 125811lG4lNOA-114346 400kVTower supply ICB 11
. . L.,LOcf 40FkkvDIC P;ne-xgba.*.TL - - of-iC-CB - C-C-CS11-47-wRR1.~I -
-- -
supply Shilpa 1258/1/G4lNOA-1114347 ICB 11 400kv Tower erection
4 Conductor Pkg( CD05) Kataria CC-CS1147-WR1lCD- 02.07 2012 02.07.2012 31.12.14
conductor supply
5 Insulator Pkg IS04 29.06.2012 29.06.2012 31.12.14 126511lG4lNOA-l14358 €i NOA-I114359 Insulator supply ICB 4
(Petitioner)
- Form-6
Financial Package upto COD (Block Year- 2014-2019) Name of the Transmission Licensee: Power Grid Corporation o f India Limited
Name of the Region: WESTERN REGION Name of the Project: Transmission System associated w i th Krishnapatnam UMPP-Part B
Name of the Transmission Element o r Communication Element: LILO of 400 kV D/C Aurangabad - Pune T/L a t Pune GIS. Ant.
Date of commercial Operation: 01-Apr-2015 (R),&'\ /
Rs. I n Lakhs Particulars
Loans
Loans-Domestic
Loans-Foreign Total Loans
Equity
Foreign
Domestic
Financial Package as Approved Currency and
Amount
INR
INR
IN R
As Admitted by COD
/ 31.03.2014 Currency and
Amount
INR
3387.77
3387.77
1451.9
Financial Package as on COD
Currency and Amount
INR INR
INR
INR
1288.44 1830.9
3119.34
1336.86
Statement of Additional Capitalisatioln after COD
Name of the Petitioner: Power Grid Corporation of India Limited
l ~ a m e of the Region: WESTERN REGION I I of the Project: Transmission System associated with Krishnapatnam UMPP-Part B
of the Transmission Element or Communication svstem: LILO of 400 kV DIC Auranrrabad - Pur~e T/L at Pune GIS,, Ant.
1 ate of Commercial Operation: 01-Apr-2015 C 4 MF)) I
SI. No.
1
Year
2015-2016 2015-2016
Work I Equipment proposed to be added after COD uto cut off
datelbeyond cut off date
TR LINE Total
Amount capitalised and proposed to be
capitalised
31 1.92 31 1.92
Justification
Balance & Retention
Regulation u~nder which cove~red
Admitted Cost
I l l I I I 10 10 10 IPE.PTZ 10 I ueoi l e ~ o l )
-$uv 319 aund $e 111 aund .. peqeSueJnv 3/a ~y OOP 40 0111 :ura$sA~ uo!$e3!unururo3 JO $uaural3 uo!ss!ursueJl ay$ 40 aureyy (1 Ued-ddmn ureu$edeuys!~)( y$!M pa$e!3OSSe ura$sAs UO!SS!USUeJl :pa[oJd ay140 aUtlN
-
-
Form 8
Calculation of Return on Equity Name of the Transmission Licensee: Power Grid Corporation of India Limited Name of the Region: WESTERN REGION
Name of the Project: Transmission System associated with Krishnapatnam LIMPP-Part B
Name of the Transmission Element or Communication System: LILO of 400 kV D/C Aurangabad - Pune T/L at Pune GIS. Ant.
Date of Commercial operation: 01-Apr-2015 (Q*') Rs. in Lacs
2018-19
1430.44
0
1430.44
1430.44
19.61
280.51
280.51
15.5
0
0
15.5
20.96
19.61
Particulars
Opening Equity Notional Equity on Add Cap Total Equity
Average Equity Rate of Return on Equity (%)
Return on Equity Pro rata Return on Equity
C=l!r,u!aticr! cf Greccec! Rate cf RAE Rate of ROE
Time Line Incentive Communication Dis-incentive Effective Rate of ROE
MAT Rate Grossed up Rate of ROE
-7 (Petitioner)
2014-15
0
0
0
0
0
0
0
0
0
0
0
0
0
2015-16
1336.86
93.58
1430.44
1383.65
19.61
271.33
271.33
15.5
0
0
15.5
20.96
19.61
2016-17
1430.44
0
1430.44
1430.44
19.61
280.51
280.51
15.5
0
0
15.5
20.96
19.61
2017-18
1430.44
0
1430.44
1430.44
19.61
280.51
280.51
15.5
0
0
15.5
20.96
19.61
-
-
I GIS. Ant. 1
Form 9C Calculation of Weighted Average Rate of lnterest on Actual Loans
--
Name of the Transmission Licensee: Power Grid Corporation of India Limited Name of the Region: WESTERN REGION
Name of the Project: Transmission System associated with Krishnapatnam UMPP-Part B
Name of the Transmission Element or Communication System: LILO of 400 kV D/C Aurangabad - Pune T/L at Pune 1
Date of Commercial Operation: 01-Apr-2015 L U ' q ) /
Particulars
IBRD V-Loanl-61.03
Gross Opening Loan
Cumulative Repavments of Loans upto Previous Year
I 2014-15
Net Loans Opening
Add: Drawl(s) during the vear
I Rs. in Lacs
0
0
Less: Repayment(s) of Loan during the year Net Closina Loan
2015-16
0
0
Average Net Loan Rate nf !nterert nr! Lo?;~! . - -
1830.9
33.14
0
0
01 1764.35 1 1697.15 1 1629.231 1560.75
O! 1.v11 1.611 1.Si1 4 c4 l A . V A !
4 c4
Interest on Loan
2016-17
1797.761 1730.93
0 1 0
' PROPOSED LOAN 2014-15 (9.30%)-Loan2-
Gross O~ening Loan
1830.9
99.97
66.83
1730.93
0
01 1288.44 1 1288.44 1 1288.441 1288.44
I Cumulative Repayments of Loans upto Previous Year 1 0 l 0 / Net Loans Opening 01 1288.44
2017-18
1663.37
0
Add: Drawl(s) during the year
Less: Re~avmentfs) of Loan during the vear
2018-19
1830.9
167.53
1595.08
0
67.56
1663.37
28.41
0
1288.44
Net Closing Loan
Average Net Loan
Summary
1830.9
235.82
0 1 0 1288.441 1288.44
0
0
Rate of Interest on Loan
Interest on Loan
68.29
1595.08
27.32
0
0
68.66
1526.42
0
0
0
0
Gross Opening Loan 0
Cumulative Re~avments of Loans u ~ t o Previous Year 0
26.23
1288.44
1288.44
5 Add: Drawlls) during the vear
25.13
0
0
9.3
119.82
3119.34
33.14
Less: Repayment(s) of Loan during the year
Net Closina Loan
I Interest on ~ o a n 01 148.231 147.151 146.061 144.95
1288.44
1288.44
0
Average Net Loan
Rate of Interest on Loan
(Petitioner)
0
0
9.3 1 9.3
119.821 119.82
3119.34
99.97
0
0
0
0
1288.44
1288.44
9.3 1 119.821
0
0
0
1288.44
1288.44
167.53
66.83
3019.37
3119.34-
235.82
0
3052.79
4.86
67.56
2951.81.
0
2985.59
4.93
0 1 68.29
2883.52
68.661
2814.861
2917.67
5.01
2849.19
5.09
'auv '~19 aund ae 111 aund - peqeslue~nv 3 /a AY 00.b 40 0111 :uaasAs uo!ae3!unuuo3 JO auaual3 uo!ss!usueJl aqa 40 a u e N g yed-ddwn ueu~edeuqs!~)( q a ! ~ paae!~osse waasA~ uo!ss!usueJl : p a l o ~ d aqa 40 a u e N
I:LTsz I:L'TSZ I:L'TSZ izs'Ebz 1: 1 JeaA aqa Buynp ueo1 a n ! a e w ~ o ~ 40 (s)auawAeday :ssa1
bE'8TZ ~eaA aqa Bu!~np 3 3 ~ oa anp asea~saa/aaea~sul
b9'06SZ b'Zb8Z 9l'b60E bE'6TTE 0 Bu!uado sue01 a n ! a e w ~ o ~ a a ~
I 'auv -SIS aund ae I/.L aund - peqesue~nv 3/a AY o o b ~ o 0111 :waasAs uo!aes!unwwo~ JO auawalg uo!ss!wsueJl aqajo a w e ~ l
Calculation of Depreciation Rate l ~
Name of the Transmission Licensee: Power Grid Corporation of India Limited
-
Name of the Region: WESTERN REGION
Name of the Project: Transmission Svstem associated with Krishnapatnam UMPP-Part B
Form 10
Name of the Transmission Element or Communication System: I-ILO of 400 kV D/C Aurangabad - Pune T/L at Pune GIS. Ant. a ate of Commercial Operation: 01-Apr-2015 104 1
SI. No.
1
2
3
4
5
L
Particulars
lweighted Average Rate o f Depreciation ( I L a ~ s e d life
FREEHOLD LAND BUILDING
I . . - TR I INF
SUB STATION P LCC
I I I I 5.28 1
2015-2016 I
Gross block at
the
beginning of the year
1
2
0
0
4456.2
0
0
0
0
FREEHOLD LAND BUILDING
3
4
5
6
1
2
Add Cap during the
year
4768.12
0
0
0
4768.12
TR LINE
SUB STATION P LCC LEASEHOLD LAND
Total Weighted Average Rate o f Depreciation Lapsed life
3
4
5
0
0
311.92
0
0
0
0
FREEHOLD LAND BUILDING
6
Gross block at
the end of
the year
0
0
0
0
0
TR LINE SUB STATION
P LCC
1
0
0
4768.12
0
0
0
0
0
0
LEASEHOLD LAND Total
Weighted Average Rate o f Depreciation Lapsed life
Average Gross B!eck
4768.12
0
0
0
4768.12
4768.12
0
0
2018-2019
FREEHOLD LAND
0
0
4612.16
0
0
0
0
0
0
0
4768.12
Dep. Rate
4768.12
0
0
0
4768.12
0
0
0
0
Rs. in Lacs
Amount
0
3.34
5,28
5.28
6.33
0
3.34
0
0
0
0
0
0
243:52
0
0
0
0
5.28
5.28
6.33
3.34
4768.12
0
0
0
251.76
0
0
0
251.76
5.28
2
0
0
0
4768.12
4768.12
0
0
0
0
3.34
0
4768.12
/I?- . -
0
0
0
5.28
5.28
6.33
251.76
0
0
3.34
/m-., - --;-pki\
0
251.76
5.28
3
Name o f the Transmission Licensee: Power Grid Corporation o f India Limited
Name o f the Region: WESTERN REGION
-
Name o f the Project: Transmission System associated w i th Krishnapatnam UMPP-Part B
Name o f the Transmission Element o r Communication System: LILO of 400 kV D/C Aurangabad - Pune T/L a t Pune GIS.
Form 10
Calculation o f Depreciation Rate
Date of Commercial Operation: 01-Apr-2015 [' 9 hAy ' \I I Rs. in Lacs
I Gross I Average
Gross
Gross
block a t
the end of
the year
block a t
the
beginning SI. No. Dep. Rate
Add Cap
during the .,,.-m
Particulars Amount
y c a l I o f t h e I I vear I
BUILDING 1 0 1 0
TR LINE SUB STATION
Total 1 4768.121 0
Weighted Average Rate o f Depreciation I I
I I
PLCC l 0 1 0
Lapsed life
4768.12 0
LEASEHOLD LAND
The Calculation of Total Life o f Asset
0
0
0 1 0
SI. No.
1
2
3
Name o f the Assets
- 1
4
5
(Petitioner)
FREEHOLD LAND
BUILDING
TR LINE
6
Gross Block
-2
SUB STATION
PLCC
o 0
4456.2
LEASEHOLD LAND
Total
-ife As per CERC Norm!
-3
0
0
Weighted Life
(4)=C01.2 X C01.3
o 25
35
0
4456.2
o 0
155967
25
25
0
0
25 0
155967
Form 10A
Statement o f De~rec ia t ion Name of the Transmission Licensee: Power Grid Corporation o f India Limited
Name of the Region: WESTERN REGION l ~ a m e of the Project: Transmission System associated w i th Krishnapatnam UMPP-Part B I Name of the Transmission Element o r Communication System: LILO o f 400 kV D/C Aurangabad - Pune T/L a t Pune GIS. I Ant.
Date o f Commercial Operation: 01-Apr-2015 (@G' ) I Rs. in Lacs
l Particulars 1 2014-15 1 2015-16 1 2016-17 1 2017-18 1 2018-19 1 Opening Capital Cost
AddCap Cost
Closing Capital Cost -- . - - -. - - . . - 1 1- 0 4768.12 l Average C a ~ i t a l Cost 01 4612.16
0
0
Freehold Land (AV. Cost)
Rate o f De~rec ia t ion
4768.12
4768.12
De preciable Value Balance useful life of the asset (at t he beainnina o f vearl
4456.2
311.92
p- 4768.121 4768.121
4768.121 4768.121
0
0
I E ! ~ ~ ~ ~ , ~ !Ife =f the asset [at the beginning =f the yea:) I 0 1 0 ( 1) ? ( d 2 1
0
0
Remaining De~rec iab le Value m I I I I I
4768.12
0
0
5.28
01 4150.94 1 4047.791 3796.03 1 3544.27
Depreciation during the vear Depreciation upto previous year Cumulative depreciation [incl. o f AADI
4150.94
3 5
01 243.521 251.761 251.761 251.76
0 1 0 1 243.521 495.281 747.041
0 1 243.521 495.281 747.041 998.8 1
4768.12
0
0
5.28
4768.12
0
4291.31
34
0
5.28
4291.311 4291.31
33 1 3 2
0
5.28
I
Form 111 Calculation of lnterest on Working Capitail
Name of the Transmission Licensee: Power Grid Cor~ora t ion of India Limited
l ~ a m e b f the Region: WESTERN REGION P P 1 1 Name o f the Project: Transmission System associated w i th Krishnapatnam UMPP-Part B
Name o f the Transmission Element: LILO o f 400 kV D/C Auran~abad - Pune T/L a t Pune GIS. Ant.
Date of Commercial Operation: 01-Apr-2015 /1 wLd. '1 / I 7 I
l Receivables
RS. in Lacs
Op. and Maintenance
Maintenance S ~ a r e s
l ~ o t a l workine c a ~ i t a l 1 01 126.41 1 129.01 1 127.701 I 126.35) -
h a t e of lnterest
0
0 2.63 4.73
\ --. P
2.80 ---+ 5.04
Interest on working capital
Pro rata Interest on working capital
- -=%m
2.90
5.21
0
0
^C (Petitioner)
17.07
17.07
17.24
17.24 17.06
17.06
Name of the Region: WESTERN REGION
Name of the Project: Transmission System associated with Krishnapatnam UMPP-Part B
-
--
l ~ a m e of the Transmission Element or Comm. Svstem: LILO of 400 kV D/C Auranaabad - Pune T/L at Pune GIS. 1
Form No. 128
Draw Down Schedule for Calculation of IDC & Financing Charges
Name of the Transmission Licensee: Power Grid Corporation of India Limited
Rs. In ~akhsl
Drawn Down Schedule for Calculation of IDC & Financing Charges
SI. I
PART-111 FORM- 13
Breakup of Initial Spares
Name of the Petitioner: POWER GRID CORPORATION OF INDIA Name of Region: WESTERN REGION 1 Name of the Project : Transmission System associated with Krishnapatnam UMPP - Part E! Name of the Transmission Element : LILO of 400kV D/C Aurangabad - Pune at Pune (GIS)
Anticipated DOCO: 01.04.2015
(Amount in Rs. Lakh)
l Particulars IEDC 1 Year wise additional ~ m ~ o t a l Cost I Initial spans Cost (excluding IDC
and IEDC) upto 1 DOCO
1 to 3;z~;itu~ up to cut :;date From 01.04.15 2016-17 '2017-18
1 clairid 1 Amount
1 Transmission Line ! 4239.41 66.05 102.99 \Transmission Substation I I I I I I I I 1 I (Green Field/Brown Field) PLCC Series Compensation
Gas Insulated Substation
Note: 1. Details to be furnished as per Regulation l3
2. Corresponding figures of initial spares included in each transmission system may be provided sepa:rat
INDEX
Name of the Company
CHECK LIST PART-111
Power Grid Corporation of India Ltd.
Asset-I:765kV SIC Solapur-Pune TL and LILO of 400kV DIC Pune-Parli at Pune GIS SS with associated bays
Name of the and equipments, 2x1500 MVA, 7651400kV ICT 1 &2 at Pune (GIS) and 240 MVAR, 765kV Bus Reactor and 765kV. 740 MVAr Switchable L ~ n e Reactor at Pune (GIS) SIS with associated bays Asset-11: LILO of 400kV DIC
project : Aurangabad-Pune TL at Pune GIS SS with associated bays and 400kV, 50 MVAr Line Reactor under "Krishnapatnam UMPP- Part B " in Western Region
Abstract of capital cost estimates and schedule of commissioning for ~"'M-~C It he new projecVElement
Checklist of Forms and other information1 documents for tariff filing for Transmission System for 2014-19 Block Form No. FORM- l FORM-2
1 SI. No.
FORM-3
FORM- 4 assetslelements under project
FORM-4A Statement of capital cost Yes FORM-4R Statement of capital works in progress N A
Tariff Filing Formats (Transmission and Communication System) Summary Sheet Details of TL,SS & Communication System
1
2
3
Tick Yes Yes
certificate of incorporation, Certificate for Commencment of1 InformationlDocument
'+
S
Tick
Business, Memorandum of Association. & Articles of Association ( For New Stat~on setup by a company making tariff application for the first time to CERC)
Regionwise and Corporate audited Balance Sheet and Profit & Loss Accounts with all the Schedules & annexures for the new Transmission System & for the relevant years.
Copies of relevant loan Agreements Copies of the approval of Compctcnt Authority for the Capital Cost
N A
Consolidated Balancesheet of 'POWERGRID & Regional Balance Sheet of SR for FY 20 14-1 5 shall be submitted shortly N A Investment Approval attached alongwith
and Financial package. Copies of the Equ~ty participation agreements and necessary approval for the foreign equity.
Petition Equity contribution by GO1 (57.9%) and others(42.1%)
7
8
9 Any other relevant information (Please specify) N A
List of supporting documents to be submitted: a. Detailed Prqject report b. CPM analysis c. PERT Chart and Bar Chart d.Justification for cost and time Overrun Transmission Licensee shall submit copy of Cost Audit Report along with cost accounting records, cost details, statements, schedules etc. for the transmission system as submitted to the Govt. of India for first two years i.e. 201 4- 15 and 2015-1 6 at the time of mid-term true-up in
N A
NA 20 16-1 7 and for balance period of tariff per~od 20 14- 19 at the time of final true-up in 2019-20. In case of ~nitial tariff filing the latest \